R EADINESS C OORDINATOR N ETWORK January 22, 2015.
-
Upload
julie-carter -
Category
Documents
-
view
218 -
download
0
Transcript of R EADINESS C OORDINATOR N ETWORK January 22, 2015.
READINESS COORDINATOR NETWORK
January 22, 2015
AGENDA
Status of MIS / EBT Implementation
WIC Approved Products List and Minimum Inventory
Participant notification materials
1/22/2015 2
STATUS OF IMPLEMENTATIONCERES AND EWIC
User Acceptance Testing is underway.
Trained UA Testers are running scripts, checking for “defects” in both Ceres and eWIC systems.
Defects are researched, assigned, fixed. Testing again in Feb of all fixes.
Rutland DO continuing pilot planning.
Notification materials for participants and grocers being developed.
Big chains and Rutland area grocers now applying for authorization as WIC retail vendors
1/22/2015 3
What retail vendors must stock year-around to be authorized for WIC
Specifies the categories and quantities of WIC foods that must be stocked at all times
Goal: to make sure WIC shopper has adequate choices
Categories:
MINIMUM INVENTORY STANDARD
1/22/2015 4
How to read the MI Standard
What’s “WIC approved?”
=> Consult the Approved Products List
MINIMUM INVENTORY STANDARD
1/22/2015 5
CHEESE
6 lbs, min 2 varieties 8 oz and/or 16 oz blocks/bricks
Any WIC approved Total 6 pounds
EGGS
3 dozen Any WIC approved Total 3 dozen
BEANS, PEAS,
LENTILS
4 X 2 varieties 15-16 oz cans WIC approved canned Total 8 cans OR 4 bags
OR 2 X 2 varieties 1 pound bags WIC approved dried
PEANUT
BUTTER
3 16-18 ounce jars Any WIC approved Total 3 jars
CATEGORY QUANTITY SIZE/CONTAINER TYPE COMMENTS
The specific food items approved for eWIC purchase & for Minimum Inventory
The APL is loaded in Ceres and the Xerox system by UPC code – grocery store scanners read the UPC code and compare to what’s in their UPC/APL database.
APPROVED PRODUCTS LIST (APL)
1/22/2015 6
Messages: Choices, Convenience, Flexibility, Connections Attend a Learning Fair
“The New WIC Card – Coming Soon to Vermont WIC” Posters Flyers Postcard (large format)
Newsletter article (Spring Rutland, Fall rest of state) Newsletter insert (DO specific)
PARTICIPANT MATERIALS
1/22/2015 7
NEXT RCN MEETING: FEBRUARY 26 12:30 PM-1:30 PM
Details of the Vermont eWIC/Ceres Readiness Toolkit First monthly Rutland Pilot Planning Report
If you will miss the meeting, please review the meeting materials and contact us with any questions and suggestions http://healthvermont.gov/wic/ReadinessCoordinatorNetwork.aspx Lynne Bortree [email protected] Jeanne Keller [email protected]
1/22/2015 8