R EADINESS C OORDINATOR N ETWORK February 26, 2015.

14
READINESS COORDINATOR NETWORK February 26, 2015

Transcript of R EADINESS C OORDINATOR N ETWORK February 26, 2015.

Page 1: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

READINESS COORDINATOR NETWORK

February 26, 2015

Page 2: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

AGENDA

Status of MIS / EBT Implementation

Rutland Pilot Update

Gathering food prices

Preview: participant notification materials

2/26/2015 2

Page 3: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

STATUS OF IMPLEMENTATIONCERES AND EWIC Round 1 User Acceptance Testing completed.

149 issues identified by testers 62 cancelled – User questions resolved

33 closed – resolved, retested, passed

42 resolved– will be retested in UAT round #2 (R2 will start March 2)

12 assigned – 10 submitted to the Mountain Plains User Group (issues with base code of transferred systems); 2 are being worked on by WIC Central staff

Rutland DO continuing pilot planning.

Notification materials for participants and grocers being developed.

Applications coming in from big chains and Rutland area grocers applying for authorization as WIC retail vendors. Remainder of state to apply in March.

Xerox and WIC Central team working on eWIC readiness for chains and independent retailers

2/26/2015 3

Rowell, Nancy
Please use 149 "issues" instead of defects. We actually had relatively few defects.
Page 4: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

RUTLAND PILOT UPDATE

2/26/2015 4

Planning for second nutrition contacts WIC events Community partner events

Preparing a WIC “carnival” and learning events to introduce eWIC to participants

Superuser “Demo” of Ceres Test – mock appointment with certification and benefit issuance.

Page 5: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

Vermont WIC must establish “Not to Exceed Pricing” for the items on our Approved Products List Required by feds as cost containment measure NTE price is set by retailer “Peer Group” (size of

store, chain vs independent) eWIC system set up to pay no more than NTE

price for each food item eWIC system collects prices charged and makes

adjustments to NTE over time We need to set the starting NTE prices

based on current prices

GATHERING FOOD PRICES

2/26/2015 5

Page 6: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

Chain prices virtually the same statewide; prices gathered as part of WIC Authorization

Need prices for Small Chains, Large Independents, and Small Independents throughout the state

Created a Price Survey to gather this information

Organized by food categories We will use prices to calculate a fair starting

Not to Exceed price for each peer group for use in Pilot and Rollout

GATHERING FOOD PRICES

2/26/2015 6

Page 7: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

DOs will receive final store assignments, price survey spreadsheet, and instructions by end of this week

Can be done by any DO WIC staff members (one or several persons)

Complete and return by the end of March

GATHERING FOOD PRICES

2/26/2015 7

Page 8: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

Price Survey on Eggs:

Approved Products List (APL) for Eggs:

GATHERING FOOD PRICES EXAMPLES

2/26/2015 8

On the shelf, find the lowest priced and highest priced eggs that meet these requirements,

and put the prices here.

Page 9: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

Price Survey for Peanut Butter

APL for Peanut Butter

GATHERING FOOD PRICES EXAMPLES

2/26/2015

On the shelf, find the lowest priced and highest priced PB that meets these requirements.Enter prices here

Page 10: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

PARTICIPANT MATERIALS

2/26/2015 10

FLYER

Page 11: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

PARTICIPANT MATERIALS

2/26/2015 11

Card

Page 12: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

Please check the current list of authorized grocers in your region

GROCER AUTHORIZATION

2/26/2015 12

• Tell us if we should be reaching out to any not listed

• Can be in VT, NY, MA or NH border regions

• Email suggestions to [email protected]

Page 13: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

Subscribe to our Grocer Blog: http://vermontwicebt.com

FOLLOW THE GROCER NEWS

2/26/2015 13

Page 14: R EADINESS C OORDINATOR N ETWORK February 26, 2015.

NEXT RCN MEETING: MARCH 26 12:30 PM-1:30 PM

Release of VT Ceres-eWIC Readiness Toolkit Rutland Pilot Planning Report

If you will miss the meeting, please review the meeting materials and contact us with any questions and suggestions http://healthvermont.gov/wic/ReadinessCoordinatorNetwork.aspx Lynne Bortree [email protected] Jeanne Keller [email protected]

2/26/2015 14