The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 (849) 03615612, Fax: (848) 832 - 8393 [email protected], [email protected], www.aimcontrol.service.to 1 N o .: 3242/MR.0/2008AIM Date: August 25, 2008 CONDITION SURVEY REPORT No. : 3242/MR.0/2008AIM APPLICANT : BROUNS MARITIME LTD NAME OF VESSEL : M/V “XINHE” SCOPE OF INSPECTION : PRE-PURCHASE CONDITION SURVEY PLACE OF INSPECTION : GO DAU B PORT – DONG NAI PROVINCE, VIETNAM

description

Agriculture - Industry - Marine Control Inspection Group (AIM Control) Worldwide is an independent inspection group acting globally and providing a complete range of inspection, quality goods control and consulting service to trade and industry as well as governmental buying organizations. ACTIVITIES: Ø Inspection & Survey/Surveyors Ø Quality Goods Control Services Ø Laboratory Testing Services Ø Engineering Control & Inspection Services Ø Buying Agent & Sourcing Services Ø Third Party Inspection, Expediting Services Ø Loss Adjuster Services Ø Appraisal & Valuation Services Ø Diving & Underwater Works Ø Certification Services Scope of Inspection & Survey consist of (but not limited): · Cargo Tank Inspection · Draft Survey/Inspection · Deadweight Survey/Inspections · Deadweight calculation · Survey/Inspection & Issues of Ullage & Weight · Cargo Contamination Investigations · Measurement of LPG, LNG, Crude, Oil, VAM, BA, Methanol, PPG-3010,. . at ship’s & shore’s tanks/ tanker · Loading / Discharge Pumping Inspection/Survey · Tank Calibration Calculation & Issues · Approval & Issues of Quality & Weight Certificates · Bunker Survey/Inspection Services · Crude oil vessels Survey/Inspection · New Ship Building Supervision · Consumer Goods Survey/Inspection · Hull & Machinery damages Inspection/Survey · Supervision, Survey of repairs · Investigation & Analysis of causes & circumstances of incidents & accidents · Pre-Purchase Vessel Condition Survey/Inspection · On-hire, Off-hire & condition Survey/Inspection · P&I Survey/Inspection · Dry-docking Survey/Inspection · Superintendents · Ship Register Survey/Inspection · Marine consultants · Projects of new shipbuilding/ ship designs · Free gas Inspection. · Testing of products & materials lab analysis aim to identify brand name, component · Survey / Inspection of damage and / or loss to be stuffed cargo · Loading stuffed to/unstuffed off & intact seal condition Survey/Inspection · Survey/Inspection to damage and/or loss to lash barges lighters causing by collision · Survey/Inspection & approval of towage & stowage, lashing · Seaworthiness condition Survey/Inspection · On-hire, Off-hire & condition of container Survey/Inspections · Investigation of causes pollution · Investigation of causes damage reasons · Reports to damage extent / preventing and overcoming to handling consequence of pollution · Study to transport feasibility · Superintendence to handling & stowage · Prevention insp. of damage and/or loss on goods · Pre-loading cargo Survey/Inspection · Planning & stowage Survey/Inspections · Bulk cargo weight Survey/Inspection · Inspection & supervision of weight, packing of bulk cargo · Quantity tally · Damage & loss prevention inspection/survey to goods · Tanks, holds inspection · Inspection of weight, quantity, condition, quality, dimension, packing, marking & export / import cargo / tally & Supervision on loading/discharge · Liquid, dry cargo contamination · Disputes concerned to cargo outturn · Disputes to charter party performance · Mechanical equipment structu

Transcript of Pre-Purchase Condition Survey Report on M.V XINHE

Page 1: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

1

No.: 3242/MR.0/2008AIM Date: August 25, 2008

CONDITION SURVEY REPORT

No. : 3242/MR.0/2008AIM

APPLICANT : BROUNS MARITIME LTD

NAME OF VESSEL : M/V “XINHE”

SCOPE OF INSPECTION : PRE-PURCHASE CONDITION SURVEY

PLACE OF INSPECTION : GO DAU B PORT – DONG NAI PROVINCE, VIETNAM

Page 2: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

2

THIS IS TO CERTIFY that in accordance with the instructions received from Messrs BROUNS MARITIME LTD. on the 24 & 25 August , 2008 the undersigned surveyor of the company ”AIM Control ”, Independent Marine & Cargo Surveyors, carried out a pre-purchase survey of the m/v “XINHE ”.

I. GENERAL INFORMATION

1. Date and Place of Survey 24 & 25 August 2008

Go Dau B Port, Dong Nai Province – Vietnam

2. Survey Company AIM Control

3. Surveyor’s Name Dr Capt Nguyen Te Nhan

4.

Reference Number 3242/MR.0/2008AIM

5. Condition of the survey.

In the course of the inspection the vessel was port side alongside at Berth No. B3 of the port of Go Dau B. The discharging of the clay & feldspar cargo in bulk were in progress in order to arrange an accuracy of the fore draft: 6.80 & aft draft: 7.80M

Page 3: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

3

II. REPORT OF CONDITION SURVEY

А. GENERAL DATA

1 Name of vessel M/V “ XINHE”

2. Previous names M/V “TIAN YANG”

3. Port of registry / Flag PANAMA

4. IMO-no. 8991279

5. Call signal 3ECS6

6. Owners Hongkong Tianhe Shipping Co., Ltd

7. Managing owners Fuzhou Hailing Shipping Co., Ltd.

8. Technical superintendence by ZHOU YOYUN

9. Year and place of build 1983 / Dalian - China

10. Builder Werlf Nobiskbug GMBH - Germany

11. Type of ship General Cargo Ship

12. Classification society IBS. CMO General Cargo issued by Isthmus Bureau of Shipping

13. Lo.a. x Bo.a. x D x d summer, m 125.20 x 17.20 x 10.10 x 7.5 m

14. Dimensions Principals

Main measurements 115.03 (L) X 17.20 (B) x 10.10 (D)

15. GRT / NRT 4,976.00 MT / 3,510.00 MT

16. Deadweight, t 7,412.93 MT

Page 4: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

4

Certificates Date of issue Date of expiry

International Load Line Certificate

27 April 2006 01 November 2010

Safety Equipment Certificate

16 March 2006 01 November 2010

Safety Construction Certificate

16 March 2006 01 November 2010

Safety Radiotelegraphy Certificate

02 January 2008 25 October 2008

International Oil Pollution Prevention Certificate

16 March 2006 01 November 2010

Certificate of Classification

24 March 2006 30 September 2010

Certificate of Registry

29 June 2006 Permanent

International Convention for the Safety of Life at Sea, 1974 16 March 2006 10 January 2011

International Tonnage Certificate (1969)

issued by Isthmus Bureau of Shipping

31 March 2006 Permanent

International Ship Security Certificate 18 May 2006 11 January 2011

17.

Document of Compliance 07 February 2006 24 November 2010

1 = Technical condition and maintenance good

2 = Technical condition and maintenance satisfactory (explanation required)

3 = Technical condition and maintenance with deficiencies (explanation required)

Page 5: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

5

REPORT OF CONDITION SURVEY

B. SURVEY REPORT

Item No. SURVEYED OBJECT, TYPE, REMARKS / EXPLANATIONS, ESTIMATION

1. Hull incl. Plating, Decks, Bulkheads, Framing, Bulwark, etc.

The hull (see remark above) below waterline : The shell platting above water line was old painted. And over a number of old rests paint coatings and was found to be partly rust stained. STBD/side. • 1,800 x 2,000 mm of hull shell plating which was placed over the waterline from Fr. 15 to Fr. 20 was

waved in different deflection inward to 02 mm max. • 1,500 x 2,000 mm of hull shell plating which was placed over the waterline in the way of Fr. 117 to Fr.

120 was slight rust. General speaking, the STBD side of hull shell plating was slight fitting with many spots due to corrosion with cover old painted. But in sound condition

P/side. • 50 x 90 mm of bow shell plating placed over the waterline was waved in different deflection inward to

03 mm max. • 800 x 3,500 mm of hull which was placed over the waterline in the way of Fr. 133 to Fr. 140 (at hold No.

1) was slight dent in different degree with max. deflection inward to 02mm. • 500 x 4,500 mm of bulwark in the way of Fr. 60 to Fr. 75 (at hold No. 3) was slight dent in different

degree with max. deflection inward to 30mm. • 80 x 2,000 mm of hull in the way of Fr. 25 to Fr. 30 (at gangway) was slight fitting with many spots in

different degree with max. deflection inward to 05 mm. • 800 x 1,000 mm of bulwark in the way of Fr. 30 to Fr. 31 (after the gangway) was slight dent in

different degree with max. deflection inward to 20mm. • 50 x 1,000 mm of hull in the way of Fr. 07 to Fr. 12 (at aft part) was slight fitting with many spots in

different degree with max. deflection inward to 03 mm. General speaking, the Port side of hull shell plating was slight fitting with many spots due to corrosion with cover old painted but in sound condition. • 2,000 x 3,000 mm of forecast shell plating were waved different degree with max. deflection up to

02mm. • Weather deck shell plating was fitting spots due to corrosion but covered by old painting. • Main deck shell plating was fitting spots due to corrosion but covered by old painting. • Poop deck shell plating was fitting spots due to corrosion but covered by old painting. • Main deck was found rust with pitting and covered with old painted but looked structurally sound. • Framing as far as it could be inspected was found in slight rust in sound condition. • Bulwark of forecastle has a number of insignificant indentations but looks as structurally sound.

1 2 3 Estimation of technical condition

X

Page 6: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

6

2. Superstructure incl. Plating, Decks, Bulkheads, Framing, Bulwark, Ladders, Reeling ect.

Superstructure decks are found to be rusted & old painted but structurally in sound condition. Bulkheads found to be rusted & old painted in bad conditions. Steel works of sides of the cabins are badly rusty in old painting condition. Old electric cables remain on ceiling of poop decks are in sound condition Reelings of hatch winch are slightly bent in different directions, partly rust stained. but look as structurally sound. It was good maintained

1 2 3 Estimation of technical condition

X 3. Openings in Hull, Superstructure and their Closing Appliances, device incl. Hatchways of

cargo holds/tanks, Tightening arrangements and Securing arrangements, Closing gears, Hatch coamings, Cargo ports, Companion hatches, Skylights and Ventilating trunks, Scuttles, Outside and Inside doors, Sliding doors, Swan necks, Cowls etc.

HOLD CONDITION: Hold No.1: (Capacity : 2,069 M3, Fr. 117 to Fr. 146) Ventilator system: Mechanical ventilation, out of operating condition. Hatch covers : + Type: McGregor, opened and closed by cable & wincher. + Type of hold: single with tweendeck without leaves of tweendeck. + 06 leaves (03 of fore, 03 of aft), The platting of the hatches are partly rusted with pitting, covered by old paint (especially in the way of welding seams and the joining of leaves). All the surface of the hatch is to be rusted and old painted. Rubber packing of the hatch covers is pliable with central depression up to 3mm. Information re ultrasonic or hose test is not provided. Basing on our opinion the hatch cover is not water tight. The signs of using tape are found on the face of the hatch at fore & aft and anywhere hatch. The hatch is to be covered 03 layers of tarpaulin Chains of hatch cover were found in heavy rust Shipside, bulkhead, ceiling & tank top were badly rusted. It is not covered by paint Vertical access ladders, platform (fore & aft) were badly rusted. It is not covered by paint. Inner side plating got badly rusted Bilge of compartments & Ballast manhole covers were not inspected due to cargo into hold. General speaking, the plating of Hatch covers & hold No.1 were badly rusted and corroded without cover paint in bad condition & and unwatertight

Page 7: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

7

Hold No.2: (Capacity : 4,397 M3, Fr. 75 to Fr. 117) Ventilator system: Mechanical ventilation, out of operating condition. Hatch covers: + Type: McGregor, opened and closed by cable & wincher. + Type of hold: single with tweendeck without leaves of tweendeck. + 06 leaves (04 of fore, 04 of aft), The platting of the hatches are partly rusted with pitting, covered by old paint (especially in the way of welding seams and the joining of leaves). All the surface of the hatch is to be rusted and old painted. Rubber packing of the hatch covers is pliable with central depression up to 2mm. Information re ultrasonic or hose test is not provided. Basing on our opinion the hatch cover is not watertight. The signs of using tape are found on the face of the hatch at fore & aft and anywhere hatch. The hatch is to be covered 03 layers of tarpaulin Chains of hatch cover were found in heavy rust Shipside, bulkhead, ceiling & tank top were badly rusted. It is not covered by paint Vertical access ladders, platform (fore & aft) were badly rusted. It is not covered by paint. Inner side plating got badly rusted Bilge of compartments & Ballast manhole covers were not inspected due to cargo into hold. General speaking, the plating of Hatch covers & hold No.1 were badly rusted and corroded without cover paint in bad condition and unwatertight. Hold No.3: (Capacity : 4,094 M3, Fr. 34 to Fr. 75) Ventilator system: Mechanical ventilation, out of operating condition. Hatch covers: + Type: McGregor, opened and closed by cable & wincher. + Type of hold: single with tweendeck without leaves of tweendeck. + 06 leaves (04 of fore, 04 of aft), The platting of the hatches are partly rusted with pitting, covered by old paint (especially in the way of welding seams and the joining of leaves). All the surface of the hatch is to be rusted and old painted. Rubber packing of the hatch covers is pliable with central depression up to 3mm. Information re ultrasonic or hose test is not provided. Basing on our opinion the hatch cover is not watertight. The signs of using tape are found on the face of the hatch at fore & aft and anywhere hatch. The hatch is to be covered 03 layers of tarpaulin Chains of hatch cover were found in heavy rust Shipside, bulkhead, ceiling & tank top were badly rusted. It is not covered by paint Vertical access ladders, platform (fore & aft) were badly rusted. It is not covered by paint. Inner side plating got badly rusted Bilge of compartments & Ballast manhole covers were not inspected due to cargo into hold. General speaking, the plating of Hatch covers & hold No.1 were badly rusted and corroded without cover paint in bad condition and unwatertight.

1 2 3 Estimation of technical condition

X

Page 8: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

8

4.

Rudder and steering gear (qty, type, serial No., supplier)

Ordinary Rudder: one We request Master & C/E supply the dry dock and appropriate certificate were issued by the representative of class but they advised that it was lost due to a long time. Results of clearing measurements: rudder stock bearing maximum allowable Unknown mm actually measured Unknown mm rudder bearing maximum allowable Unknown mm actually measured Unknown mm

1 2 3 Estimation of technical condition

5. Anchor arrangement

Anchor Windlass – 01 Electro-Hydraulic, (SASSIN 3SM10 – 250/330) Windlass Hydraulic Pump (one, AEG) 02 Hall’s anchors? by Unknown kgs (due to it’s document was lost) Chain cables ∅ 50mm, length Unknown m. Anchor chain cable were inspected to find it was worn. The oil pump of windlass is placed in forecastle compartment. The above compartment is not provided with any heating facilities. In the course of the inspection the chain lockers were opened and inspected. Longitudinal bulkhead between the chain lockers was fond to be partly rusted through and badly thinned.

1 2 3 Estimation of technical condition

X

Page 9: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

9

6. Mooring arrangement

01 Aft Mooring Electro-Hydraulic Winch, type: Vertical, made by: Unkonwn (it’s document & marking were lost)

Winches Hydraulic Pump: 01, Type, made by Unkonwn (it’s document & marking were lost)

Aft: 04 bitts, 04 hose holes, 04 roller open chocks 01 Fore Mooring Electro-Hydraulic Winch, type: Horizontal, made by: Unkonwn (it’s document & marking were lost)

Winches Hydraulic Pump: 01, Type, made by Unkonwn (it’s document & marking were lost)

Fore: 04 bitts, 03 hose holes, 08 roller open chocks Mooring ropes: synthetics 08 Pcs x200 m, circle 80 mm, it is were badly worn All mooring equipment is found to be in bad order

1 2 3 Estimation of technical condition

X

7. Signal means Navigation Lights in compliance with COLREG 1972:

Fore masthed – 02 pcs Mean masthead –02 Pcs Port side – 02 pcs Stbd.side – 02 pcs Stern – 02 pcs Towing – 02 pcs Anchoring (fore) – 02 pcs Anchoring (aft) – 02 pcs Not Under Command – 02 sets 16 complete set of the spare bulbs is provided. Signalling panel and it alarm was tested and found in apparent good condition. Other signalling apparatus: 02 Black balls 01 Black Rhomb 01 Black Cylinder Signalling lamp with spare bulb.

1 2 3 Estimation of technical condition

X

Page 10: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

10

8. Life-saving appliances 01 enclosed motor boat of STBD side per 26 persons capacity, with Engine power, required fuel for

running. Engines were started and reversed in the course of the inspection. It is normal condition 01 boat of Port side per 26 persons capacity, without Engine power. It is normal condition The p/side l/boat was lowered to water. In the course of the operations no deficiencies found. All limit switches were found in operating order. L/boats ratio, drinking water, pyrotechnics and equipment were complete. 04 Inflatable Life Raft, made by Jangsu, China, for 15 persons, next service dated 10/2008 30 Life-saving jackets - last shore based inspection 2001 10 Life buoys - last shore based inspection 2001 06 Bridge pyrotechnics up to 10.2005

Line throwing appliances up to 10.2005 01 EPIRB up to 2011 SARTs – 2 pieces up to 04/2011 4 sets of Thermal Protective Aids 03 Two way VHF Radio All the appliances were checked and found in sound condition.

1 2 3 Estimation of technical condition

X

Page 11: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

11

9. Fire fighting equipment

Total quantity of Fire hoses is 13 pieces. Diameter of fire main is 80 mm (Nav. Deck 02 pcs, Crew Deck 02 pcs, Boat deck 02 pcs, Main deck 04 pcs, Tween deck 02 pcs & Bottom deck 01 pcs ) 06 Emergency escape breathing device 01 Fire alarm panel 01 Emergency telephone station 01 Emergency fire pump 01 Fireman’s outfit 01 CO2 Horn (AC/DC) 12 Fire Hydrant 02 CO2 Release station 01 Fixed fire extinguishing 15 Foam fire extinguishing 08 CO2 extinguisher 5kg All the equipment was tested and found in sound condition.

1 2 3 Estimation of technical condition

X

10. Cargo handling gears/ securing appliances

N/A

1 2 3 Estimation of technical condition

Page 12: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

12

11. Accommodation and service compartments

The vessel is provided with 23 cabins for crew and 02 deck offices. Accommodation and service compartments were found to be cleanliness clear of ship’s stores.

All compartments have lighting adequate with fixtures and wiring in good order. Heating of compartments was in good order.

Galley, freezing and provision rooms were found to be duly maintained and free of infestation.

The equipment of freezing and provision rooms is in good order and household refrigerators and 01 freezer are installed instead of original freezing equipment.

Muster Lists were found to be adequately and prominently displayed escape and access routes clearly marked by IMO signs.

A general condition of the accommodation is satisfactory, her wear and tear conform her age.

1 2 3 Estimation of technical condition

X

12. Radio equipment

VHF stations “Sailor” type: Sam Yung Enc, S.Korea & Kenwood , 02 sets MF/ HF DSC Controller-receiver: “Scanti”, type: Sam Yung Enc, S.Korea, 01 set. (M. 2005) NAVTEX: Type JRC, 01 set Weather fax: Type Fruno, 01 set INMARSAT – C : Type Fruno Electric Co., (M. Nov. 2002) GPS – Type Fruno Electric Co Portable VHF station: Type Navico, UK, - 03 sets/ (battery expired on 11, 2009) All the equipment was tested and found in sound condition.

1 2 3 Estimation of technical condition

X

Page 13: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

13

13. Navigational equipment

Radars: “type Fruno, RDP 119, 112, model. Fr 1510 mark 3 – in operational condition Gyro Compass and repeaters Auto pilot: ““type Anschutz – Kiel, Germany – in operational condition Echo sounder: ““type Skiper ED 162 – in operational condition Magnetic compass: “type Anschutz – Kiel, Germany (date of last adjustment dated 25/02/2008) GPS: Type Koken, Japan & Garmin, China, 02 sets – in operational condition All the equipment was tested and found in sound order. The vessel was found to be provided with all required nautical publication and charts for present voyage for Nav. Ocean China, Thailand, Vietnam & Indonesia. (some publication to be updated). Old Notices to Mariners are found missing, therefore chart correction cannot be available.

1 2 3 Estimation of technical condition

X

14. Main engine incl. service systems and appliances

item MAIN ENGINE year and place of build 1982, Germany qty One type MAK 8MN 551 K made MAK Number of cylinders 08 power, kw 2940 Speed, RPM 10 knots, 375 PRM supplier MAK running hours after repaired

Unknown, repair dated 24/04/2004

fit

item GEAR BOX year and place of build 1971 qty One type RENK AUS 90S, 4,000 PS made Zahnraderfabrik Aktiengesellschaft serial No 640309 supplier RENK AG

fit

item MAIN EGINE TURBOCHARGER qty 02 type VTR 230

made U.K

fit

Page 14: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

14

serial No Unknown supplier Brown Boveri BBC item FUEL OIL SYSTEM

fit ME F.O. booster pump-02 units

Made-Schwerolzubringer, type-2.4m3 fit

F.O. transfer pump- 01 unit

Made- Schiffs Klassikatien, Germany

type-AJ 160 LK4

Serial No- 1650409

fit

F.O. purifier - 01 unit

made-Westfalia Separator AG

type-SAOG 3016

serial No-1644092

fit

pipes and valves system

fit

fuel oil and gas oil tanks Fuel oil Tank No. Tanks capacity/m3

No.01 (P,S) Tanks 98.503 x 2 No.02 (P,S) Tanks 87.004 x 2 No.03 (P,S) Tanks 97.224 x 2 No.04 (P,S) Tanks 28.884 x 2

fit

Diesel oil Tank No. Tanks capacity/m3

No.02 (C) Tanks 95.235 Day Tank 15.716 Setl. tank 17.386

fit

Fuel viscosity- MDO M.E day consumption 6 Tons Fuel viscosity- MDO A.E. in port up to 500 kg Item LUBRICATING & DO OIL SYSTEM ME L.O. Pump-01Unit made-Unknown

type-AO 180 M4

serial No 37311 - 16

fit

L.O. purifier-01Unit type-KYDL203CD-23

serial No A20705818

supplier-Csscnanjing Luzhou Machine co., China

fit

D.O. purifier -01 unit made-Westfalia

type-ON2016

serial No1644168

fit

pipes and valves system fit

Page 15: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

15

item COOLING WATER SYSTEM M.E. F.W. cooler-01 unit made-Alfa Laval

type-Unkonwn

serial No Unknown

supplier-Bergedorfer Eisenwerke GMBH

fit

M.E. F.W. cooling pump-02 units Grease Leaked

type-AJ160 LK4

serial No 1650001-1A

supplier-Schiffs Klassifikation

fit

pipes and valves system fit item COMPRESSED AIR SYSTEM starting air compressors–-03 units

made-TANABE, Japan.

type-Vertical Two Stage Water

serial No. 741084

supplier-Tanabe Pneumatic Machinery

Bore: 1524

HP: 133.3

Stroke: 127

Speed: 870 RPM

Pressure: 25kg/cm2

Model: 4165A

Capacity: FA 80 M3 /h

fit

air receiver purpose M.E. start –-02 Units

number -02

capacity- Unknown m3

Year -1982

Serial-225R55026

supplier- Kloclner Humboldf Deutz AG Koln

fit

pipes and valves system fit Surveys of the air receivers

Date of carrying out of Date of the next internal

survey hydraulic

test external

examination internal survey

hydraulic test

external examination

(1) Unknown Unknown Unknown Unknown Unknown Unknown

1 2 3 Estimation of technical condition

X

Page 16: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

16

15. Auxiliary engine incl. Service systems and appliances item DIESEL GENERATOR No.1 & NO.3 Quantity 02 type 1FA3286 power, kw 400V, 355KA, A510, 50Hz, 1,000 RPM made SIEMENS supplier SIEMENS Number of cylinders 08 x 2 running hours after repaired

Unknown

fit

item DIESEL GENERATOR No.2 Quantity 01 type 1FA3286 power, kw 400V, 167KA, 50Hz, 1,000 RPM make SIEMENS serial No. 036608 supplier SIEMENS Number of cylinders 06 running hours after repaired

Unknown

fit

item EMERGENSY DIESEL GENERATOR number 01 type Unknown power, kw Unknown make Lister Fetter

serial No. 4302037TS2A008

fit

1 2 3 Estimation of technical condition

X

16. Main, auxiliary and exhaust gas boilers

ITEM OIL FIRED BOILER type Unknown made Unknown, due to it is lost marking

Unfit item DISTILLATE OIL BURNER type Unknown

make Unknown due to it is lost marking

Fit

1 2 3 Estimation of technical condition

X

Page 17: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

17

17 Ship´s systems

17/1 Fresh & Ballast system

Tank No. Tanks capacity/m3

AFT 256.326 No.1 F.O.T (P, S) 93.826 X 2 No.2 B.W.T (P, S) 131.742 X 2 No.3 B.W.T (P, S) 95.712 X 2

fit Ballast pump item BALLAST PUMP type IJ180 M4 made Schiffs Klassifikation serial No. 2060807 capacity Unknown pipes and valves system

fit

1 2 3

Estimation of technical condition X

18/2 Fresh water system

Number tanks/ Tank No. Tanks capacity/m3

F.W.T (P, S) 47.384 X2 No.1 F.W.T 48.035 No.2 F.W.T 47.013

B.W.T (F.W.T) 62.704

fit

1 2 3 Estimation of technical condition

X

Bilge system item OILY WATER SEPERATOR number 01

fit item SLUDGE PUMP number 01 item FIRE PUMP

18.3

number 01

fit

1 2 3 Estimation of technical condition

X

Page 18: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

18

Propellers, Tail shafts, Shaft bearings, Shaft seals Propeller Type Unknown, the certification is lost number 01 number of blades 04 pcs diameter 4,300mm grade of blade material Stainless hub material Stainless date of survey Unknown

fit

Tail shaft The tail shaft time of operation: from previous repairs …………… hours, from manufacture ………………. hours, propeller shaft was taken out : Unknown flaw detection of tail shaft cones was performed dated: Unknown

tail shaft cones (bow) fit flanges shaft (stern) fit keyway, thread, bolted and sleeve couplings fit

Shaft seals

Stern tube seal at oil lubrication (test)– gravitation of oil tank dated: Unknown fit Stern tube bearing (material) fit

Stern tube clearances at oil lubrication additionally specify slump size of propeller shaft

actual: bow Unknown mm. actual: stern Unknown fit

18

allowable : bow Unknown mm allowable: stern Unknown fit 1 2 3

Estimation of technical condition X

19. Outboard fittings Condition

Bottom and side fittings (tested)- PH 0.3 mpa

fit

1 2 3 Estimation of technical condition X

Page 19: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

19

LIST OF DEFECTS/RECOMMENDATIONS

Defects

Recommendations

Date of rectification

1

The hull platting above the waterline is not duly maintained and painted

To be scratched, rusted and painted & & pitting

2

Main deck was found rust with pitting and covered with old painted

To be duly cleaned and painted

3 St/side forecastle platting is as bolster are found rusty and one

of them rusted trough. To be repaired

4 Steel works of sides cuttles of the cabins are badly rusty

To be maintained, repaired and painted

5

The plating of shipside, bulkhead, tween deck, ceiling holds

To be duly cleaned and painted

6

The Main Deck scuppers are made as ordinary holes in sides waterways.

The special plugs to be prepared (MARPOL requirements)

Page 20: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

20

7

The platting of the hatches was partly rusty with pitting (especially in the way of welding seams).

The hatches are to be maintained and painted.

8 Cargo hold ventilation is out of order To be restored

9 Watertight door of the Poop deck are to be battened down hardly

To be repaired

10 The holes in knees of port side hatch coaming To be repaired (RMRS) During intermediate

repairs

11 Inner surface of the hold coamings To be maintained and painted

12

The chain of hatch covers of holds was fond to be partly rusted through and badly thinned.

To be repaired During intermediate repairs

13 Missing Notices to Mariners To be ordered and received ASAP

14 Log Book, engine log book, navigation log book are restricted in China Language

The log books to be provided & written down with English Language

ASAP

Page 21: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

21

15

Running hours of Main Engine are unknown. The equipment for Main Engine indication is not available onboard. The lost of certifications & reports of repair, last dry dock

The equipment required to be provided. Crankshaft deflection is to be measured each 1,250 r/hours. To be ordered and received

16 Engine Room Fan Exhauster is out of order To be repaired

18 26.08.2008 - M/E was repaired by C/E & engine part

This report is not a guarantee of condition, and the findings contained herein are based upon generally accepted methods of testing and observation. Stated findings are the opinion of the undersigned surveyor based upon observations noted at the time of the survey. Unless specifically indicated, no destructive testing of the hull, deck or structure was performed, and no machinery was disassembled or bench tested. By nature of their design and construction, the inner structure of hulls and decks can be concealed and obscured from view, and no exact determination of their condition may be determined. Statements of condition and discussion of construction details are based upon the experience of the surveyor and readily available observation and testing methods, and rely upon the best judgment of the surveyor using the information readily gleaned from the testing methods employed. Hidden internal structural damage or potential for future damage is generally detected using the above testing methods, but many indications of internal flaws are inexact and open to interpretation. Wherever possible, conservative judgment has been used in reporting these findings. However, the possibility exists that hidden damage, including latent defects, may not have been located. Further, the treatment of the vessel and its equipment following the time of the survey cannot be estimated, and certain conditions may worsen minor damage, or create new areas of concern, within a short period of time. These circumstances are beyond the control of the surveyor, and no estimation of such usage is covered by this document, nor is any responsibility accepted for such unforeseen and inestimable situations. REMARKS:

The above survey has been conducted to the best of our ability without prejudice to any parties concerned. FOR AGRICULTURE - INDUSTRY - MARINE INSPECTION CORP.

Dr Capt Nguyen Te Nhan / General Director

Page 22: Pre-Purchase Condition Survey Report on M.V XINHE

The Viet-Nhan Agriculture - Industry - Marine Control Inspection Group 45, Str. 03, Ward 04, District 03, Ho Chi Minh City, Vietnam Tel. (848) 832 - 7204 – (849) 03615612, Fax: (848) 832 - 8393

[email protected], [email protected], www.aimcontrol.service.to

22