letteR to shAReholdeRs31 October 2010
Dear Ministers,
We are pleased to submit the TransGrid Annual Report 2010 to Parliament. The Annual Report includes the income statement for the year ending 30 June 2010 and the balance sheet as at that date certified by the Auditor-General of New South Wales (NSW).
The Annual Report was prepared in accordance with the requirements of Section 24A of the State Owned Corporations Act 1989 and the Annual Reports (Statutory Bodies) Act 1984 and reporting regulations issued by NSW Treasury.
Mr Bruce Foy Mr Peter McIntyre Chairman Managing Director
About this RepoRtThis annual report was prepared by TransGrid’s Corporate Communications Manager and designed by an external graphic design firm. The total external costs in producing this report were $53,783.
Our annual reports are available on www.transgrid.com.au.
A printed version of the annual report can be requested by phone on 02 9620 0875.
We welcome your feedback on this report:
>> By email at [email protected]>> By post, PO Box 87, Horsley Park NSW 2175,>> By phone, 02 9620 0875
coveR imAgeDavid Adams and Michael Knox, Trainee Engineering Officers, at Sydney West Substation.
TransGridannualreporT2010>contents 1
2 transGridataGlance
6 ournetwork
8 howwefitinthemarket
9 ourdirection
10 reviewbychairmanandmanaGinGdirector
12 ourboard
14 ourexecutiveleaders
16 ourresults
34 ourmarket
38 ourPeoPle
46 oPerationalexcellence
54 ourcommunity
60 healthandsafety
66 ourenvironmentalcommitment
70 ourcaPitalworksProGram
76 corPorateGovernance
88 financials
124index
126Glossary
forabetterfuture
enerGytoday,enerGytomorrow...
aboveByron Mills, Projects Coordinator, Wagga Wagga.
TransGridannualreporT2010>section 3
transGridataglanceWeownandmanageoneofthelargesthighvoltagetransmissionnetworksinaustralia.
beingthebestwecanbe
enerGytoday,enerGytomorrow...
leftJohn McCall, Projects Manager/Northern, Peter McIntyre, Managing Director, and Lionel Smyth, General Manager/Network, at the Tomago Substation site.
4 transGridataGlance>TransGridannualreporT2010
whoarewe? Weownandmanageoneofthelargesthighvoltageelectricitytransmissionnetworksinaustralia,connectinggenerators,distributorsandmajorendusersinnsWandtheaCT.
ournetworkincludesover12,600kilometresoftransmissionlineandlinkstoQueenslandandVictoria,facilitatinginterstateenergytrading.
ourpeoplearecrucialtoourperformance.TheyplayakeyroleinensuringwemeetourobjectivesandprovideareliablepowersupplytonsWandtheaCT.
transGridataglance
BrINGS eLeCTrICITy To More ThaN
3millionhouSehoLDS aND BuSINeSSeS aCroSS NSW, The aCT aND oTher STaTeS
More ThaN
1,000eMPLoyeeS
TraNSMISSIoN LINeS oPeraTING aT
132kv,220kv330kvand500kv
DeLIverING a fIve-year CaPITaL WorkS ProGraM vaLueD aT
2.6billion
36,483TraNSMISSIoN LINe STruCTureS
91SuBSTaTIoNS aND SWITChING STaTIoNS
TransGridannualreporT2010>transGridataGlance 5
358DISTrIBuTor aND DIreCT CuSToMer CoNNeCTIoN PoINTS
63GeNeraTor CoNNeCTIoN PoINTS
6INTerCoNNeCTIoNS To TraNSMISSIoN NeTWorkS IN vICTorIa aND QueeNSLaND
13CuSToMerS DIreCTLy CoNNeCTeD To our NeTWork
TraNSPorTeD arouND
75,100GIGaWaTT hourS( GWh) of eNerGy DurING The year
“Wehavealong,proudhistoryinthenationalelectricityMarket(neM).Forover60years,wehavebeendeliveringaworld-classelectricitytransmissionservice.ourhistoryputsusingreatsteadforthefuturesothatwecanmeetourupcomingchallenges.”
chairman,brucefoy
abovehannah Dunn, Media and Government Manager at Macarthur Substation.
6 ournetwork>TransGridannualreporT2010
ournetwork
OPERATING SYSTEM VOLTAGES 500kV Transmission Lines
330kV Transmission Lines
220kV Transmission Lines
132kV Transmission Lines
66kV Transmission Lines
330kV Underground Cable
Customer Exchange Point
Interstate Exchange Point
500kV Substations
330kV Substations
220kV Substations
132kV Substations
INSET
Tomago
Eraring
Vales Point
Munmorah
Tuggerah
Sydney East
RegentvilleSydney West
Sydney South
NewcastleWaratah
West
Liverpool
Kemps Creek
Vineyard
Sydney North
Dapto
Ingleburn
Wallerawang
Yass Avon
Bayswater
Liddell
Beaconsfield West
Haymarket
INSET
TumutBurrinjuck
YassMarulan
Yanco
Griffith
Buronga
Broken Hill
FinleyDeniliquin
Darlington Point
AlburyHume
Cooma
Munyang
Snowy Adit
Queanbeyan
Canberra
Murrumburrah
Cowra
Kangaroo Valley
Panorama
Molong
Orange
Beryl
Parkes
Forbes
Wellington Bayswater Liddell
Dapto
Muswellbrook
Tamworth 330
Armidale
DumaresqLismore
Tamworth 132
Gunnedah
Narrabri
Moree
Inverell Glen Innes
Tenterfield
Koolkhan
CoffsHarbour
Nambucca
Kempsey
Port Macquarie
Taree
Balranald
Coleambally
Murray
Upper Tumut
Lower Tumut
ANMJindera
Guthega
Mt Piper132
Wallerawang
Mt Piper330
Avon
Wagga132
Wagga330
Redcliffs
Dederang
Wodonga
Bulli CreekMudgeeraba
Uranquinty
Gadara
Raleigh
Capital Wind Farm
during2009/10weinvested$428.7millioninournetwork.ThisincludedcompletionoftheWestern500kVproject,whichiscrucialtomaintainingreliableelectricitytransmissionservicetothesydney/newcastle/Wollongongregion.
nswelectricitytransmissionnetwork
TransGridannualreporT2010>ournetwork 7
OPERATING SYSTEM VOLTAGES
500kV Transmission Lines
330kV Transmission Lines
220kV Transmission Lines
132kV Transmission Lines
66kV Transmission Lines
330kV Underground Cable
Customer Exchange Point
Interstate Exchange Point
500kV Substations
330kV Substations
220kV Substations
132kV Substations
OPERATING SYSTEM VOLTAGES 500kV Transmission Lines
330kV Transmission Lines
220kV Transmission Lines
132kV Transmission Lines
66kV Transmission Lines
330kV Underground Cable
Customer Exchange Point
Interstate Exchange Point
500kV Substations
330kV Substations
220kV Substations
132kV Substations
INSET
Tomago
Eraring
Vales PointMunmorah
Tuggerah
Sydney East
RegentvilleSydney West
Sydney South
WaratahWest
LiverpoolKemps Creek
Vineyard
Sydney North
Dapto
Ingleburn
Wallerawang
Yass Avon
Bayswater
Liddell
Beaconsfield West
Haymarket
Newcastle
aboveDon Mckay, Network Control Manager at the State System operations Control Centre.
8 howwefitinthemarket>TransGridannualreporT2010
howwefitinthemarket
WehaveanimportantpositioninthenationalelectricityMarketandworkcloselywithourstakeholderssowecanprovidethebestpossibleelectricitytransmissionservice.
australianenerGymarketcommission(aemc)a statutory commission responsible for developing NeM and market development rules.
australianenerGymarketoPerator(aemo)operates the NeM and manages power system security.
australianenerGyreGulator(aer)administers the National electricity rules (Ner) and makes regulated revenue determinations for monopoly energy companies like TransGrid.
GeneratorsMake electricity at power plants. Most power plants use coal, gas, water or wind –Eraring Energy, Macquarie Generation, Delta Electricity, Snowy Hydro, Origin Energy, and Renewable Power Ventures.
transmissionelectricity goes through TransGrid’s high voltage transmission lines that stretch across all of NSW.
distributionelectricity travels through distribution lines, where smaller pole-top transformers reduce the voltage for use in homes – Energy Australia, Integral Energy, Country Energy, ActewAGL.
endusersThe electricity travels through wires inside the walls to the switches for use in homes and businesses.
TransGridannualreporT2010>ourdirection 9
ourdirection
WeusetheBalancedscorecardtocommunicateourstrategies.Wemeasurefourmajordriversforthebusiness–financial,customersandstakeholders,internalprocesses,learningandgrowth.
eachyearwestepbackandreflectonourdirectiontomakesureitmeanssomethingtoourbusinessandourpeople.Beforewemapourstrategies,weundertakescenarioplanningtoidentifywhatcouldhappeninthefutureenvironmentsothatwecanmakegooddecisionsnow.Thisforwardplanningisakeybuildingblocktoourstrategies.
ourobjectives>> Tobeasuccessful business,and,tothisend:– tooperateatleastasefficiently
asanycomparablebusinesses.
– maximisethenetworthoftheState’s investmentinit.
– exhibitasenseofsocial responsibilitybyhavingregardtotheinterestsofthecommunityinwhichitoperates.
>> protecttheenvironmentbyconductingitsoperationsincompliancewiththeprinciplesofecologicallysustainabledevelopmentcontainedinsection6(2)oftheProtection of the Environment Administration Act, 1991
>> exhibitasenseofresponsibilitytowardsregional developmentanddecentralisationinthewayinwhichitoperates
>> operateefficient, safe and reliable facilitiesforthetransmissionofelectricityandotherformsofenergy
>> promote effective accesstothosetransmissionfacilities.
whatwevalueourvisionToberecognisedasaworld-classelectricitytransmissioncompany.
ourmissionToprovidesafe,reliableandefficienttransmissionservicesandtobecommerciallysuccessful.
ourvaluesourvaluesdriveourdecisionsandtheyaffecthowweconductourbusiness.Withoutcommitmenttoourvalues,wecannotachieveourvisionandmission.
Honesty and integrity–tobetruthfulandconsistentinourdealings.
Trust and respect–torecogniseandhaveconfidenceintheabilityofourcolleagues,valuetheircontributionsandopinionsandacceptthedifferences,aswellasthesimilaritiesofpeople.
Open communication–toshareinformationinanopenandtransparentmanner.
Professionalism–toundertakeourtasksdiligently,andtoaddressthedifficultaswellastheordinaryissuesthatweface.
Fairness and equity–toundertakeourdutieswithoutfearorfavour,andmakedecisionswithimpartialityandsensitivity.
Consideration–totreatpeoplewithunderstandingandconsidertheirviewpointswhenmakingdecisions.
Wearealeadingelectricitytransmissionserviceprovider.Wearecommittedtoourpeople,theirsafety,ourcommunityandcommercialsuccess.
eachyearwestepbackandreflectonourdirectiontomakesureitmeanssomethingtoourbusinessandourpeople.
TransGrid Corporate Plan 2010/2011
10 chairman’sandmanaGinGdirector’sreview>TransGridannualreporT2010
reviewbychairmanandmanagingdirector
Tobethebestwecanbe,weneedleaderswhomotivateandempower.Thisisthefocusofourleadershipstrategywhichisallaboutgivingourleaderstheskillstheyneedtodrivechange.
The2009/10yearhasbeenaverysuccessfulyear.Wehavedeliveredourbest-everresultinayearinwhichwehavealsohadthechallengeofdeliveringourbiggestevercapitalworksprogram.
2009/10wasthefirstyearofthe2009to2014revenuecapdecisionbytheaer,whicheffectivelyincludesmorethan95percentofouttotalforecastrevenueoverthattime.Thisdecisionalsoincludesincentivesforimprovingefficiency.
Wereceivedrevenueof$695millionandachievedarecordoperatingprofitof$225.3.althoughthisrepresentsamodestincreasefromlastyear,itreflectsastrategyofsteadysustainableefficiencyimprovementsyearonyear.allmeasuresofefficientandeffectiveservicedeliverytoourcustomerswerepositiveandefficiencyimprovementsdeliveredpositivecommercialoutcomes.Weareconcentratingonimprovingourresultseachandeveryyear.Thismeanshavingallpartsofourbusinessasproductiveaspossible.
ourtopgoaloverthelastyearhasbeentobringourcapitalworksprogramtothepeopleofnsW.Weachievedaremarkableincreaseinourabilitytodeliveralarge-scalebuildingprogrambyworkingsmarterandgettingthebestoutofourresources.Theprogramhassteadilygrownwiththeneedtoreplaceassetsbuiltinthe1960sand1970scoupledwiththeneedtomeettheincreasingdemandforelectricity.
Weinvested$428.7millioninourcapitalprogramduringtheyear.ThisincludedcompletionoftheWestern500kVproject,whichiscrucialtomaintainingreliabletransmissionservicestothesydney/newcastle/Wollongongregion,representingaroundonethirdoftheneM.WealsofinishednewsubstationsatWagganorthandQueanbeyanandstartedworkonanewsubstationatTomago.WecompletedtheWollartoWellington330kVline,whichrepresentedanorganisationaleffortofmanyemployeesovermorethansevenyears.
Weachievedapositiveoutcomeundertheaerplanavailabilityandreliabilityincentiveschemes.Thisreflectsgoodmanagementofplannedoutagesandreliableplantperformance.asat30June2010,weareontrackforanevenbetterresultundertheseincentiveschemesforthe2010calendaryear.
Weunderstandtheimportanceofengagingwithourstakeholdersinatargetedway.Buildingoftransmissionlinesconstitutesanincreasingproportionofourfutureinvestmentprogram,andtheseprogramsimpactonlocalcommunitiesinbothpositiveandnegativeways.itisthereforevitalforeachoneofourbuildingprogramstohaveauniqueandpersonalconsultationprocess.
Tobethebestwecanbe,weneedleaderswhomotivateandempower.Thisisthefocusofourleadershipstrategywhichisallaboutgivingourleaderstheskillstheyneedtodrivechange.overthenextyearwewillstartrollingoutthenewleadershipprogramacrossthebusiness.
Wearepleasedtopresentour2010annualreporttoyou.
The2009/10yearhasbeenaverysuccessfulyear.Wehavedeliveredourbest-everresults.
Thisreportisnotjustaboutlookingback.itisalsoaboutlookingattheroadaheadandwherewewanttogo.
TransGridannualreporT2010>chairman’sandmanaGinGdirector’sreview 11
althoughwerecordedasafetylostTimeinjuryFrequencyrate(lTiFr)of2duringtheyear,itwasanimprovementfrom3.5in2008/09.oursafetymottoof‘stopandconsider’isveryimportanttousandweworkedcloselywithouremployeestoreduceworkplaceinjuries.Thebigchallengeforuswillbetobetterintegratesafetyintoeverydaybusinessdecisionsandensurethatcontractorsafetyisliftedtomatchthatofourpermanentworkforce.
overthelastyear,wekickedoffourwellbeingprogramtohelppromoteahealthyandhappylifeforouremployees.ouremployeesspendmoreoftheirwakinghoursatwork,whichiswhywewanttomakeitaprimeplaceforpromotinghealthyhabits.
insupportofastrongfutureandmajorinvestmentprogram,ourworkforcehasgrownoverthelastyear.Wewelcomedsevennewapprenticesand24newgraduatesduringtheyear.Wenowhave48apprenticesand56newgraduatesintotal.ourapprenticeandgraduateprogramsbuildtheskillsweneedforthefuture.Wewelcomeallnewemployeestoourorganisation.
althoughwehavehadasuccessfulyear,wearefacingmorechallengesthaneverbefore.Wehaveacapitalworksprogramof$2.6billion–thelargestinourhistory.Weneedtosetourselvesupsothatwecandeliveronthiscommitmentefficiently,andinamannersensitivetoaffectedcommunities.
ourwinsarereflectiveoftheeffortsofourpeopleandweintendtosupporttheseeffortsintothefuture.Weinvolveemployeesindecisionsandletthemknowtheimpacttheyhaveonourfuture.Theyhaveachievedinanenvironmentthatcontinuestochange.onbehalfoftheboardandexecutiveteam,wethankthemfortheirhardworkandcommitment.
WethankKevinMurray,formerManagingdirector,whoretiredfromTransGridon26april2010.ThroughKevin’sleadership,wecontinuedtoimproveontheefficiencyofourbusiness,deliverour2004to2009capitalworksprogramandmaintainhighlevelsofsafetyandreliability.
ourleadershipteamhasfocusedonimprovementandhavebeensuccessfulinexecutingourorganisation’svision.Wethankthemfortheircommitment.
lookingaheadtothenextfiveyears,weareconfidentwehaveeverythinginplacetodeliveronourobjectives.Thisincludeshavingtherightpeopleandtherightexpertise.
Weinviteyoutotaketimetoreadourreporttobetterunderstandourstrategy,theprogresswearemaking,howwearegoingaboutitandwhattheroadaheadlookslike.
Byworkingsmarterandmeetingourchallengesheadon,wehaveachievedgreatcommercialresults.However,wearefacingmoreexternalpressuresthaneverbeforeandweneedtotakearenewedlookatefficiency.Welookforwardtobuildingonoursuccessesin2010/11.
aboveChairman, Bruce foy, and Managing Director, Peter McIntyre.
12 ourboard>TransGridannualreporT2010
ourboard
mrbrucefoy
(bcomm,ll.b,faicd)
Director and ChairmanMrBruceFoywasappointedasTransGrid’sChairmanon30June2009andhasbeenaTransGriddirectorsince15december2005.
Brucehasheldvariouspositionswithinthebankingindustry,mostrecentlyasManagingdirectorCountryHeadoftheinGBankn.V,apositionhehelduntil2005.Currently,BruceisadirectoroftheFinancialplanningassociationofaustralialtd;adirector/TrusteeoftheFirststatesuperannuationTrusteeCorporationandadirectorofThedoctorsHealthFundltdandsouthernuraniumltd.
BrucewasadmittedasabarristerofthesupremeCourtofnsWin1989.HeholdsaBacheloroflawsandaBachelorofCommerce,fromtheuniversityofQueensland.BruceisalsoaFellowoftheaustralianinstituteofCompanydirectors.
HebringstotheTransGridBoardextensiveexperienceincorporateandfinancialmanagement.
mrPetermcintyre
(bsc,be(hons),mba(technologymanagement),fieaust,faicd)
Executive Director and Managing DirectorMrpeterMcintyrewasappointedtotheTransGridBoardon27april2010.
asManagingdirectorofTransGrid,petermanagesthedevelopment,operationandmaintenanceofthensWelectricitytransmissionnetwork.
peterhasover25yearsexperienceintheelectricitytransmissionindustry,withparticularexpertiseinpolicydevelopment,assetmanagementandregulatorystrategy.
priortohisappointmentasManagingdirector,peterheldthreeexecutivepositionswithinTransGrid:GeneralManager/systemoperations,GeneralManager/networkperformanceanddevelopmentandGeneralManager/networkdevelopmentandregulatoryaffairs.
peterisalsodeputyChairmanoftheaustralianpowerinstitute,adirectoroftheenergynetworkassociation,aFellowoftheinstitutionofengineersaustraliaandaFellowtheaustralianinstituteofCompanydirectors.
msmatinaPaPathanasiou
(bcomm,ll.b,maicd)
DirectorMsMatinapapathanasiouwasappointedtotheTransGridBoardon13december2004.
Matinahasover20yearsfundsmanagementandinvestmentbankingexperience.shehasspecialisedintheinfrastructuresectorwithsignificantexperienceintheenergysector.MatinaisemployedbyQiCasapartneroftheGlobalinfrastructureinvestmentteam,whichshejointlyestablishedin2006,andwhichnowmanagesover$2.6billionofinvestmentsinglobalunlistedinfrastructureinutilitiesandtransportassets.
priortojoiningQiC,MatinawasemployedbytheaMpCapitalinvestors,BankersTrustandMacquarieBankintheirbusinessfocussingoninfrastructure.shestartedhercareerwitharthurandersenasataxadviser.
MatinaholdsaBachelorofCommerce(majoringinaccounting,Financeandsystems)andaBacheloroflawsfromtheuniversityofnsW.in1985,shewasadmittedasasolicitorofthesupremeCourtofnsW.
MatinaiscurrentlyadirectorofBrisbaneairportandWestlink(M7Tollroad).sheisontheBoardandinvestmentCommitteeoftheinfrastructureindiaHoldingsFundandisontheinvestmentCommitteeofTheQiCGlobalinfrastructurebusiness.
TransGridannualreporT2010>ourboard 13
mrnevillebetts
DirectorMrnevilleBettswasappointedtotheTransGridBoardon30June1998.
nevilleiscurrentlytheassistantsecretaryoftheelectricalTradesunionofaustraliansWbranch.nevillehasbeenaunionofficialsince1984.HeisalsoamemberofthedivisionalCouncilpowerindustryCommittee,TreasureroftheaCTutilitiesandlightManufacturerindustryTrainingadvisoryBoard(iTaB)andamemberofthenationalTrainingadvisoryGroup(nTaG)fortheelectricalTransmissionanddistributionindustry.HeisVicepresidentofunionsaCTandamemberoftheaCTlaborCouncilexecutive,andformermemberoftheaCTGovernmentindustrialrelationsadvisoryCommittee.nevilleisalsoamemberoftheaustralianinstituteofCompanydirectors.
neville’sin-depthunderstandingoftheelectricityindustry,anditsassociatedindustrialrelations,trainingandunionactivities,isaninvaluableresourceoftheBoard.
thehon.JohnPriceam,
(JP,imareng,ieng,ofieaust.,maicd)
DirectorTheHon.JohnpriceaMwasappointedtotheTransGridBoardon5February2008.
priortohisappointment,Johnbeganhiscareeratthestatedockyardleavingin1982asassistantGeneralManagerandengineeringManagertotakeupaconsultingrole.in1984,hewaselectedtothensWlegislativeassembly,firstlyastheMemberforWaratah,andin1999,astheMemberforMaitland,retiringin2007asdeputyspeaker.
John’spreviousdirectorshipsincludenewcastleFMptyltdand2HdBroadcastersptyltd.HeservedasChairmanofboththesecompaniesfrom1997to1999.JohnisaformerChairofHunteruni-ClinicsptyltdandisacurrentmemberoftheCounciloftheuniversityofnewcastle.
Johnbringstotheboardawealthofknowledgefromhislengthycareerinpolitics,alongwithastrongcommercialandadministrativebackground.
mrmichaelnuGent
(fcPa,faicd)
DirectorMrMichaelnugentwasappointedtotheTransGridBoardon1august2008.
MichaelisalsocurrentlyadirectorofliveCorpwhichprovidesservicestotheliveanimalexportsector.
Michaelwasformerlyanon-executivedirectoroferaringenergy,railaccessCorporationandsnowyMountainsengineeringCorporation.MichaelwaspreviouslytheChiefexecutiveandanexecutivedirectorofGoodmanFielderlimited(1990-1994),theManagingdirectorofeldersagribusinessandanexecutivedirectorofitsparentcompanyFostersBrewingGrouplimited(1983-1990).
Michaelalsoheldanumberofgeneralmanagement,marketingandfinancialpositionsinthefood,transportandvehicleindustriesrespectivelywithHenryJonesiXllimited,Brambles,ansettandtheBritishleylandMotorCorporation(1965to1982).earlyinhiscareer,MichaelworkedforpeatMarwick,nowKpMG,(1961to1965)andsubsequentlycompletedhisprofessionalaccountingtrainingin1968andiscurrentlyanFCpa.
MichaelbringstotheTransGridBoardabroadrangeofskillsandexperienceinmanagement,strategy,governance,marketingandfinance.Healsohasexperienceininfrastructureandtheexecutionoflargecapitalprojectsacrossabroadrangeofindustries.
msclaremannion(acis,b.ed)
Board SecretaryMsClareMannionwasappointedasBoardsecretaryinseptember2008.
ClarehasnineyearsexperienceatTransGrid.ClareholdsaBachelorofeducationandhasrecentlycompletedaGraduatediplomainappliedCorporateGovernancefromCharteredsecretariesaustralia.
14 ourexecutiveleaders>TransGridannualreporT2010
ourexecutiveleaders
mrchrisfitZGerald
General Manager/ Capital Program DeliveryChrisisresponsiblefor:
>> executingourmajorcapitalworksprogram
>> supportingtheongoingperformanceofourhighvoltagetransmissionassets
>> providingdesignsandadviceforminorprojects,replacementprojectsandotherassetmanagementactivities
>> applyingexpertisetonon-regulatedprojects.
mrmichaelGatt
General Manager/CorporateMichaelisresponsiblefor:
>> representingTransGridasacorporateentity
>> stakeholderandcommunityliaison>> internalandexternalcommunicationstrategies
>> propertyportfoliomanagement>> mediaandgovernmentinteractions>> corporatestrategyanddevelopment>> corporatesocialresponsibility>> legalservices.
mrtonymeehan
Chief Financial OfficerTonyisresponsiblefor:
>> ourcommercialandcorporatefinancialinterests
>> financialstrategiesandpolicies>> debtportfolio,bankingandinsurancearrangements
>> corporateaccountingandmanagementaccounting
>> taxation>> businesssystems>> procurement.
Managing DireCTOrPeter McIntryre
general Manager neTwOrk
Lionel Smyth
general Manager neTwOrk DevelOPMenT
anD regulaTOry aFFairSvacant
exeCuTive Manager SySTeM OPeraTiOnS
Neil Smith
general Manager CaPiTal PrOgraM
DeliveryChris fitzGerald
general Manager COrPOraTeMichael Gatt
CHieF FinanCial OFFiCer
Tony Meehan
general Manager buSineSS ServiCeS
Paul Phillips
TransGridannualreporT2010>ourexecutiveleaders 15
mrPaulPhilliPs
General Manager/Business Servicespaulisresponsiblefor:
>> environmentalcomplianceandservices>> healthandsafety>> humanresources>> informationtechnologyservicesandbusinesscommunicationservices
>> regionalprocurement,fleetmanagement,logistics
>> qualityandbusinessimprovementservices>> executiveservices.
mrneilsmith
Executive Manager/ System Operationsneilisresponsiblefor:
>> thereliableoperationofthensWelectricitytransmissionnetwork
>> operatingpolicy,strategiesandinstructionsfornetworkoperation
>> monitoringandcontrolfacilities>> operatingthesystemfromthecontrolcentres
>> liaisonwithaeMoanddistributors.
mrlionelsmyth
General Manager/Networklionelisresponsiblefor:
>> assetmanagementpoliciesandstrategies>> managingandmaintainingourhighvoltagetransmissionsystemassets
>> propertyandeasementmaintenance>> fieldmanagementandcommissioningofcapitalprojects.
“Changeisnowstandardbusinesspracticeforus.ourleadershipteamhasbeeninstrumentalindrivingefficienciesacrossourbusinesstoensurewearethebestwecanbe.Weareatapointwherewecanlookaheadandbeconfidentaboutthefuture.”
chairman,brucefoy
TransGridannualreporT2010>section 17
havingoutcomesinmind
enerGytoday,enerGytomorrow...
ourresults> Benchmarked
world-wideasatopelectricitytransmissionserviceperformer
> achievednetworkreliabilityexceeding99.999%
> increasedoperatingprofitby$46.3million
> Welcomed74newemployeestotheorganisation
left
Steve Paddison, Communications Technician Specialist, Newcastle regional Centre.
18 ourresults>TransGridannualreporT2010
whatwedidwell
INTroDuCeD a
wellbeingProGraM To heLP eMPLoyeeS Make heaLThy LIfeSTyLe ChoICeS
WeLCoMeD
74neweMPLoyeeS To The orGaNISaTIoN
CoMPLeTeD The
western500kvProJeCT, our LarGeST-ever CoMPLeTeD ProJeCT
aChIeveD NeTWork reLIaBILITy exCeeDING
99.999%
LauNCheD a NeW exTerNaL
website
IMProveD our
safetyresults
IMPLeMeNTING our BIGGeST-ever INveSTMeNT ProGraM, a
$2.6billionCaPITaL WorkS ProGraM over The 2009 To 2014 PerIoD
aCTIveLy WorkeD WITh LoCaL
communitiesThrouGh our SPoNSorShIP ProGraM
BeNChMarkeD WorLD-WIDe aS a ToP eLeCTrICITy TraNSMISSIoN
serviceperformer
“Throughtheexpertiseofourpeopleandsmartinvestmentinournetworkwecontinuedtodeliverstrongresultsallround.oursolidperformanceputsusinagoodpositionforthefuture”.
Petermcintyre,manaGinGdirector
exCeeDeD aNNuaL oPeraTING ProfIT TarGeT By
$46.3million
TransGridannualreporT2010>ourresults 19
wherewecanimProve
restructureour CoMPaNy To SuPPorT furTher SuSTaINaBLe IMProveMeNTS IN effICIeNCy
harNeSS The
fullpotentialof our PeoPLe IN MeeTING our BuSINeSS oBJeCTIveS
CoNTINue To
reduceavoIDaBLe WorkPLaCe INJurIeS
aCTIveLy
contributeTo The DeveLoPMeNT of NeM PoLICIeS aND ruLeS
exPeDITe aND ProMoTe NeW
connectionsTo The NeTWork
Make BuSINeSS DeCISIoNS WITh aN effeCTIve
commercialmindset
CoNTINue To TeST ourSeLveS aGaINST
externalbenchmarks
BeTTer uTILISe
innovationaND NeW TeChNoLoGIeS
Seek The vIeWS of our STaff,
addresstheissuesaND aCT oN TheM
revIeW our
environmentalSTraTeGy To BeTTer refLeCT key ChaNGeS IN The exTerNaL eNvIroNMeNT
“Whilstourachievementsover2009/10showstrengthsinmanyareas,weareawareofthechallengesahead.Weneedtothinkandactcommerciallysothatwecanworkinnewanddifferentwaystodriveefficiencies.Weknowwhereweneedtoimproveandwilltakeourpeopleonthejourneytobetteringourresultseachyear.”
brucefoy,chairman
20 ourresults>TransGridannualreporT2010
$695.0 $42.2m(6.5%)increase
financessnaPshot
$362.4$41.9m(13.7%)increaseexceededannualtarGetby$51.4m
$225.3$7.9m(3.6%)increaseexceededannualtarGetby$46.3m
$135.1$14.9m(12.4%)increaseexceededannualtarGetby$30.1m
earninGsbeforeinterestandtax($m)
revenue($m)
Profitbeforetax($m)
dividend($m)
TransGridannualreporT2010>ourresults 21
69.5 71.5
105.9
120.2
135.1
20102009200820072006
118.1
141.6
190.6
217.4225.3
20102009200820072006
216.3240.8
290.5
320.5
362.4
20102009200820072006
478.5
506.7
573.0
652.8
695.0
20102009200820072006
Byintroducingefficiencyimprovementsacrossallfacetsofthebusiness,wehavedeliveredstrongcommercialresults.
22 ourresults>TransGridannualreporT2010
0.3%decreaseexceededannualtarGetby0.3%
0.5%decreaseexceededannualtarGetby0.5%
0.4timesdecrease
1.6%decrease
7.5returnonequity**(%)
6.5returnonassets*(%)
2.6interestcover(times)
48.4GearinGratio(%)
TransGridannualreporT2010>ourresults 23
47.3 46.1 46.750.0 48.4
20102009200820072006
2.22.4
2.9 3.0
2.6
20102009200820072006
5.45.8
7.7 8.07.5
20102009200820072006
5.8
6.3
7.16.8
6.5
20102009200820072006
* return on assets measures the efficiency with which TransGrid uses its assets to produce profits. It is calculated taking into consideration net borrowing costs.
** return on equity measures TransGrid’s efficiency in earning profits on behalf of its shareholders. It is calculated taking into account post-tax profit.
Weareconcentratingonimprovingourresultseachandeveryyear.Thismeanshavingallpartsofourbusinessasproductiveaspossible.
24 ourresults>TransGridannualreporT2010
PeoPlesnaPshot
aNNuaL TurNover raTe
4.96%
averaGe aGe
42.4years
averaGe yearS ServICe
17.3years
workforceProfile
staffnumbersstaffbycateGory2008to2010
cateGorydescriPtion 2010 2009 2008
administrativeofficer 151 150 151
apprentice 48 63 57
engineeringofficer 291 269 254
lineWorker 32 33 38
operator 22 22 24
professionalofficer 252 227 212
powerWorker 40 44 49
seniorContractofficer 91 90 91
networkTeamleader 18 17 19
Tradesperson 72 76 73
Total 1,017 991 968
* Staff Numbers do not include four Managing Director’s scholarship holders.
TransGridannualreporT2010>ourresults 25
staffnumbersstaffbyGender30June2010
staffnumberscomParisonofstaffbycateGoryasat30June2010
totalstaff
no.P/tstaff
equiv.f/tofP/t
equiv.f/tstaff
administrativeofficer 151 20 12.46 143.46
apprentice 48 0 0 48
engineeringofficer 291 2 1.72 290.72
lineWorker 32 0 0 32
operator 22 0 0 22
powerWorker 40 0 0 40
professionalofficer 252 5 3.36 250.36
seniorContractofficer 91 0 0 91
networkTeamleader 18 0 0 18
Tradesperson 72 0 0 72
Total 1,017 27 17.54 1,007.54
* Staff numbers do not include four Managing Director’s scholarship holders
descriPtion30June
200930June
2010
Female 146 155
Male 845 862
Total 991 1,017
seniorcontractstaffbyGender30June2010
descriPtion30June
200930June
2010
Female 8 9
Male 82 82
Total 90 91
above
Leonie McCallum, human resources Project Co-ordinator at Metropolitan regional Centre.
26 ourresults>TransGridannualreporT2010
safetysnaPshot
annualltifrdecreasedby1.52
emPloyeesafetylosttimeinJuryfrequencyrate(ltifr)
10.9contractorsafetylosttimeinJuryfrequencyrate(ltifr)
$191.2m(30.8%)decrease$428.7
caPitalinvestment($m)
reGulatorytest numberofProJectsthatcomPletedthereGulatory
test2009/10
numberofProJectsPlannedtoGothrouGhreGulatory
testdurinG2010/11
newsmallnetworkassets 2 2
newlargenetworkassets 2 2
ourbuildinGProGram
lostTimeinjuryFrequencyrate
TotalnumberoflostTimeaccidentsfortheYearx1,000,000
averagenumberoffull-timeequivalentemployeesx2,000hours
=
TransGridannualreporT2010>ourresults 27
3.5
1.6
3.7 3.7
2.0
20102009200820072006
619.9
218.2
158.6
355.0
428.7
20102009200820072006
caPitalworkscomPleted2009/10
2009/10
Transmissionlines 3
substations 7
Transformeradditionandreplacementprojects 8
Total 18
ourtopgoaloverthelastyearhasbeentobringourcapitalprogramtothepeopleofnsW.Weachievedaremarkableincreaseinourabilitytodeliveralarge-scalebuildingprogram.
28 ourresults>TransGridannualreporT2010
availabilitydecreasedby0.2%98.2%
availability*
assetbaseincreasedby$768.2m$5,939.1
assetbase($m)
systemminuteslostincreasedby0.86systemminutes1.28
reliability(systemminuteslost)**
networksnaPshot
TransGridannualreporT2010>ourresults 29
98.4
99.499.5
98.5
98.2
20102009200820072006
5,170.9
3,929.03,749.94,220.6
5,939.1
20102009200820072006
0.42
1.19
0.68
0.37
1.28
20102009200820072006
* our availability has been impacted by outages, which were necessary for us to implement our capital works program.
Cumulative Circuit availability as a percentage based on TransGrid owned transmission lines rated at 132kv and above for planned, forced and emergency outages.
** our reliability for 2009/10 is lower than in previous years due to the failure of a current transformer at Bayswater switchyard in July 2009.
MaINTeNaNCe exPeNDITure (2009/10)
$65.4million
30 ourresults>TransGridannualreporT2010
13
1010 10
13
20102009200820072006
13customers
communityinformationsessions
stakeholderssnaPshot
numberofcommunityinformationsessionsheld 2009/10
dumaresqtolismore330kVtransmissionlineproject 8
Tomagotostroud132kVtransmissionlineproject 3
Westernsydneysupplyproject 2
Manildratoparkes132kVtransmissionlineproject 2
Total 15
environmentsnaPshot
environmentalincidentnotificationstatistics
2009/10 2008/09
low 17 16
Medium 5 7
High 2 3
Total 24 26
tyPeofissue numberofissues
oilspill 7
Fire 6
Contractorissues 6
erosionandsedimentissue 3
Contamination 2
TransGridannualreporT2010>ourresults 31
media
sPonsorshiPs
2009/10
numberofmediainquiriesreceivedandactioned
175
numberofmediareleasesissued 36
2009/10
numberofsponsorshipssupported 16
Totalexpenditureonsponsorships $336,571
“ourproventechnicalcapabilitiescoupledwithourgoodinsightwilldriveustofurthersuccess.Westriveforexcellenceandexceedourtargetseachandeveryyear.akeyfocusoverthenextyearwillbetostrengthenourreportingacrossallareasofourbusiness.”
Petermcintyre,manaGinGdirector
during2009/10,wereported24environmentalincidentsinourincidentnotificationsystem(ins).Twooftheseincidentswereofasignificancelevelthatrequirednotificationtoaregulator.Wepromptlyaddressedallissues.during2009/10therewerenoprosecutionsbroughtagainstusunderanyenvironmentalstatutes.
TransGridannualreporT2010>section 33
ourmarketeffectivestakeholderengagementisessentialtothewaywedobusinessintheneM.Wearecommittedtobuildingtrustingrelationshipswithourstakeholders.
left
Peter Glenn, Projects Support engineer at Macarthur Substation.
34 ourmarket>TransGridannualreporT2010
ourmarket
facinGnewchallenGesinthenemWecontinuetoseeanevolvingnationalenergyMarket(neM).Manydifferentgroupsdrivethischange,includingneMparticipants,interestgroups,participantbodiesandgovernments.
ClimatechangeandtheformationoftheaustralianenergyMarketoperator(aeMo),whichhasaleadingnationalplanningrole,allimpactourroleintheneM.astheneMchanges,sodoesourroleandthenationalelectricityrulesweliveby.Thisiswhywewillworkhardtoensureourpositionsontransmissionissuesareeffectivelyrepresentedandthebestlong-termoutcomefortransmissioncustomersisachieved.
WewillcontinuetobeacrosswhatishappeningintheneMandparticipateinthedevelopmentofnewrulesandpolicyreviewsinitiatedbytheMinisterialCouncilonenergytoensurethemostefficientandeffectiveroleforourbusiness.
enGaGinGnemstakeholderseffectivestakeholderengagementisessentialtothewaywedobusinessintheneM.Webuildtrustingrelationshipswithourstakeholderstoprovidethemwiththebestpossibleelectricityservice.
Weuseamulti-stakeholderengagementprocess,whichrecognisesthedifferentrolesthatthegovernment,marketandcommunityplayinthedeliveryofourworks.
duringtheyear,ourstakeholderengagementstrategyincluded:
>> implementingdemandmanagementinitiativeswithothercompanies
>> providinginputintoneMpoliciesandassociatedregulatoryprocess
>> co-ordinationmeetingswithmarketparticipantsincludingthegenerators,distributorsandaeMo
>> liaisingdirectlywithaffectedlandowners,governmentdepartmentsandcouncilsonourcapitalprojects
>> developingnewnetworkconnectionswithgenerationandloadproponents.
electricitydemandontheriseThechallengeswearefacingintheneMarecoupledwiththeneedtomeettheincreasingdemandforpower.
Wepublishourannualplanningreport(apr)eachJune.TheaprplaysavitalroleinthemarketasitprovidesadvanceinformationtomarketparticipantsandinterestedpartiesonnsWenergydemandprojections,thenatureofemergingconstraintsinthensWelectricitynetwork,andproposednetworkdevelopmentsoverthenextfiveyears.The2010aprforecaststhatpeakelectricitydemandinnsWwillincreaseby2.3percentannuallyonaverageforthenexttenyears.
Therearevariousreasonsforthisincreaseindemand.someoftheseinclude:
>> ournetworkservessomeofaustralia’sfastestgrowingcommunities.populationinnsWisforecasttogrowbysixpercentby2013/14
>> peopleareusingmoreelectricitythanpreviouslywith81percentofhouseholdsnowhavingairconditioners
>> theincreaseduseofcomputers,laptopsandplasmatelevisionshasincreasedexpectationsforareliablepowersupply.
astheneMchanges,sodoesourroleandthenationalelectricityrulesweliveby.Wewillworkhardtoensureourpositionsontransmissionissuesareeffectivelyrepresentedandthebestlong-termoutcomeforourcustomersisachieved.
TransGridannualreporT2010>ourmarket 35
Summer Peak Demand (2001/02 to 2018/19)
Winter Peak Demand (2001/02 to 2018/19)
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
50% POE Projection (MW)
90% POE Projection (MW)
Actual20
18/1
9
2017
/18
2016
/17
2015
/16
2014
/15
2013
/14
2012
/13
2011
/12
2010
/11
2009
/10
2008
/09
2007
/08
2006
/07
2005
/06
2004
/05
2003
/04
2002
/03
2001
/02
10% POE Projection (MW)
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
50% POE Projection (MW)
90% POE Projection (MW)
Actual20
18/1
9
2017
/18
2016
/17
2015
/16
2014
/15
2013
/14
2012
/13
2011
/12
2010
/11
2009
/10
2008
/09
2007
/08
2006
/07
2005
/06
2004
/05
2003
/04
2002
/03
2001
/02
10% POE Projection (MW)
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
2018
/19
2017
/18
2016
/17
2015
/16
2014
/15
2013
/14
2012
/13
2011
/12
2010
/11
2009
/10
2008
/09
2007
/08
2006
/07
2005
/06
2004
/05
2003
/04
2002
/03
2001
/02
aboveL-r – Ian Davidson, Manager/Central region, Lionel Smyth, General Manager/Network, and Tim Barnes, Projects Manager/Central at orange regional Centre.
36 ourmarket>TransGridannualreporT2010
demandmanaGementinitiativesoverthelastyear,wehavestrengthenedourtieswithdistributorsintheareaofdemandManagement(dM).
WehavesignedaMemorandaofunderstanding(Mou)withallnsWandaCTdistributorstopromoteinitiativesinthedMareaincluding,demandsideresponse,embeddedgenerationandenergyefficiencyinitiativeswhichhavethepotentialtolowerpeakdemand.TheMouisbackedupwithastrongeducationcampaign.
WearealsoworkingindependentlywithtertiaryinstitutionsoninnovationdMresearchprojects.Theseagreementscoverawiderangeofprojects,including:
>> energyanddemandauditsofdifferentcustomers
>> reviewofresidentialloadcontrol
>> energysurveystargetedatcustomereducation
>> airconditioningcycling–controlofresidentialandsmallMediumenterprise(sMe)installations
>> baseloadprofile–signaltocustomerstoreducedemandbelowtheirbaselineonpeakdays
>> changeoflightswithenergyefficientlampsonbusinesssites
>> jointresearchprojectondMwithrMiTMelbourne,andenergyaustralia
>> co-fundingofaproject(lowriseHighenergy)bytheWarrenCentreforexcellenceoftheuniversityofsydney.
overthenextfiveyears,wewillrolloutthefollowingdMprojectswithdistributors:
>> anetworksupportprojectaspartofthedevelopmentofelectricitysupplytotheFarnorthCoastofnsW
>> anetworksupportprojectaspartofthedevelopmentoftheelectricitysupplytothesydneyCentralBusinessdistrict(CBd)andinnermetropolitanarea
>> aprojectwiththestate’sdistributorsaspartoftheimplementationofinnovativedemandsideresponsesolutionstorequestsforproposalsfornon-networkalternatives
>> provisionofreactivepowersupportfrompowerstationsforthemainsystemnetwork
>> implementationofasystemprotectionschemetoimprovethepowertransfercapabilitybetweensnowyandYass/Canberra.
ourpreparationsforthe2009to2014revenuedeterminationrepresentedanorganisationaleffortofmanyofouremployees.Goingthroughthisprocessgaveustheopportunitytoseehowwecanimproveourbusiness.
uPcloselearninGfromtherevenuereseteveryfiveyearstheaerdeterminesourrevenue.
ourpreparationsforthe2009to2014revenuedeterminationrepresentedanorganisationaleffortofmanyofouremployees.Goingthroughthisprocessgaveustheopportunitytoseehowwecanimproveourbusiness.
asaresult,aninternalreviewhasbeenundertakentodeterminewhatwecouldhavedonebetterbasedonfeedbackfromtheaer.WesetuparevenueresetimprovementCommitteewhosecharterwastoidentifytheimprovementsneededtoputusingoodsteadforthenextrevenuedetermination.
Welearnedmanylessonsfromthisexercise,including,theneedformoretransparentandobjectivedata,andscopetotakeamoreholisticviewtothewaywemanageourcapitalworks.Thereisalsoscopetobemoreresponsivetotheperformanceincentivesbuiltintorevenuecapdecisions.
Wehavestartedputtingtheabovelearningsintopractice.inparticular,wehave:
>> strengthenedgovernanceinhowweplanourcapitalprojects
>> changedourprocessestoenablebetterregulatoryreportingprocesses
>> improvedourinternalreporting>> reviewedourself-insuranceadministrationandcapitalburdenrates
>> launchednewsoftware,whichallowsustobetterestimatethefuturecostsofourbuildingprogram.
overthenextyear,wewillcontinuetoembedtheselessonsacrossourbusiness.inparticular,wewill:
>> developamodeltoassistinapplyingthecapitalexpenditureincentiveschemeinamorecommerciallyeffectivemanner
>> improveourunderstandingoftheinteractionbetweenkeycapitalprojectsandtransmissionserviceoutcomes
>> developaprocessformanagingchangestoourcapitalworksprogramcausedbychangesinrequirementssincethemostrecentrevenuecapdecision
>> reviewourcostallocationprocessesandredevelopouroperatingexpendituremodel
>> implementchangestoourfinancialandprojectsystemstoimproveprocessefficiency.
Thisexercisewillbecomestandardbusinesspracticeforusoverthenextyear.
TransGridannualreporT2010>ourmarket 37
nationalmarketreviewsWeregularlytakepartinneMreviews.
ThemainneMregulatoryreviewsandconsultationsimpactingusduringtheyearincludedthefollowing:
>> TheaerregulatoryinvestmentTestforTransmission(riT-T).TheriT-T,whichreplacestheexistingregulatorytestfortransmissionassets,startedon1august2010.itprovidesasingleframeworkforregulatorytestsonalltransmissioninvestmentsandremovestheformerdistinctionbetweenreliability-drivenprojectsandthosemotivatedbythedeliveryofmarketbenefits.
>> duringMay2010,theaeMCreceivedadirectionfromtheMinisterialCouncilonenergytostartareviewofTransmissionFrameworks.Thereviewfocusesontheprovisionofelectricitytransmissionservicesinthelightofclimatechangepolicies;transmissioninvestment,networkcharging,managementofnetworkcongestionandaccessandconnection.Thisreviewisscheduledtobecompletedbynovember2011.
>> WeweresuccessfulinourMeritsreviewappealtotheaustralianCompetitionTribunalwithregardstoourfinalrevenuedecisionofapril2009.
>> inconjunctionwithGridaustralia,welodgedarulechangeproposalonconfidentialityprovisionsapplyingtonewconnectionapplications.ThenewrequirementsbenefitTransGridthroughmoreefficientprocessingofnetworkapplications.
otherkeyreviewscurrentlyunderwayincludetheaeMC’songoingreviewofTotalFactorproductivityandaeMo’srulechangeproposalsarisingfromitsnetworkControlandancillaryservicesreview.
overthenextyear,wewillcontinuetobeakeyplayerinprovidinginputintoneMregulation.
aerPerformanceincentiveschemeon1July2009,webecamethefirsttransmissionnetworkserviceproviderintheneMtoparticipateinanewcomponentoftheaer’sperformanceincentivescheme.Thenewcomponentmeasurestheimpactoftransmissionoutagesonthemarketpriceandgivesanincentivefortransmissionproviders,likeourselves,toreducethisimpact.
Wehavebeenproactiveinourresponsetothisschemeandhaveputinplacesomeadjustmentstokeypractices.Thefirstresult,reportedon31december2009,wasanachievementof39percentoftheavailableincentive.Thisisanexcellentresultagainstachallengingtarget.
“wholeofindustry”nememerGencyaPProachWeworkcloselywithneMparticipantstohelpusbettermanagethenetwork.
Weholdannualtrainingsessionswithoursystemoperators,operatorsfromotherelectricitycompanies,ourmajorcustomers,aeMoandothermarketparticipantsinnsWandaCT.
Thegoalofthetrainingistosetupouroperatorstodealwithacriticalsystemincidentsothatpowercanbebackonassoonaspossible.Fortunately,suchincidentsareveryrare,however,whentheydooccurweneedtorespondintherightway.
incidentscoveredintrainingrangefromminorincidentsallthewaytotheultimatecriticalincident–the“blackstart”,wherethewholenetworkhasshutdown.Wehavedevelopedacomputersimulationmodelforthispurpose.
overthenextyear,wewillbroadenthescopeofthetraininganddofurthergoodworkwithotherneMparticipantsinthisessentialarea.
lookinGatimaGeandrePutationourimageandreputationreflectshowgoodabusinessweare.Thisiswhywearetakingacloselookatit.
during2008/09,wedidanimageandreputationaudittoseewhatourstakeholdersthinkofus.Theauditshowsthatourstakeholdersexpectmoreofusthantheydidtenyearsago.Tothisend,wehavewovenimageandreputationconsiderationsintoourbusinessstrategies.
apriorityforushasbeentobettertalktostakeholdersinthebuildingofnewlines.Wehavestakeholdermanagementplansforeachofourmajorcapitalprojects.Thesearetargetedatmeetingcommunityexpectationsforwiderconsultationandbettercommunicationthroughouttheentirelifecycleofaproject.
Theimageandreputationaudithasgivenusasolidbasistocarefullylookathowwedealwithourstakeholders.overthenextyear,wewillcontinuetoworkcloselywithourstakeholderstoensuretheirneedsaremet.
ourwins–2009/10>> Implemented strategies to put us in good stead for the next revenue reset determination.
>> Signed an Mou with all NSW and aCT distributors to promote DM initiatives.
>> achieved a positive outcome in the aer performance incentive scheme.
>> Contributed to important national market reviews.>> Looked at our image and reputation.
theroadahead–2010/11>> undertake a customer connection survey to identify opportunities for improvement.
>> Implement new processes and models for the connection of renewable and low carbon generation sources to our network.
>> actively collaborate with our stakeholders to make sure our role in the NeM is valued by the market.
>> Widen our demand management projects around NSW.>> Take steps to strengthen and promote our image and reputation.
TransGridannualreporT2010>section 39
ourpeopleWeareasuccessfulbusinessbecausewehavetherightpeople.Theyhaveachievedinanenvironmentthatcontinuestochange.Wethankthemfortheirhardworkandcommitment.
left
Wayne Chambers, Manager/ellipse and Business reporting, Louise Birkmann, Senior analyst, and Scienta Lau, Insurance officer, at Sydney head office.
40 ourPeoPle>TransGridannualreporT2010
theriGhtworkforceWefaceanumberofchallengesoverthecomingyearsinbuildingtherightworkforceforthefuture.
Wehavealargenumberofemployeesagedover50andwepredictahighnumberofretirementsoverthenextfivetotenyears.Theretirementoftheseemployeeswillaffectourknowledgeandskillsaswellasleadershipcapability.
Wearepleasedthatouroverallseparationrateforreasonsotherthanretirementislow,aroundtwotothreepercent.However,weknowthatweneedtochallengeouremployeeswithrewardingworkanddevelopthemwithacareerpathinmindsothatwecanretainthem.
strategiessuchasleadershipdevelopmentandincreaseddevelopment-levelintakeshavehelpedtoaddressourageingworkforceissueandwewillcontinuewiththemoverthe2010/11period.
Theresourcingofalargecapitalworksprogramandtheneedtomanageagrowingnumberofentry-levelemployeespresentschallengesforhowweplanourworkforce.Wearecurrentlyreviewingourworkforceplanningstrategy,whichwillincludethetrialofanonlineforecastingandplanningtool.overthenextyear,thefocuswillbetotakeamoreholisticviewtoworkforceplanning.
Wearealsolookingatintroducinganalumniprogramforretiredemployees,youngeremployeeswhohaveresignedandwhomwewouldliketoenticebackaswellasotherkeygroups.Thisprogramwillbeprogressivelyintroducedoverthe2010/11period.
leadershiPthatdrivesourvisionTheleadersoftodayandtomorrownolongerjustdirectbutfacilitate,motivateandcoach.inthisperformance-drivenworld,ourleadersneedtohaveinitiativeandfosteraculturethatrecognisesandrewardssuccess.
Wehelpstaffdeveloptheirleadershipskillsbyofferingarangeofprogramsspanningfromfrontlinemanagementstudiestomoretargetedleadershipdevelopmentprogramsforhigh-potentialcandidates.
over30employeeshavetakenpartintargetedleadershipdevelopmentprogramsduringtheyear.TheseprogramsareoverseenbyourleadershipCouncil,whichincludesexecutivemembersandotherseniormanagers.inearly2010,wewidenedthescopeofourleadershipprogramssothatwehaveabroadermixofhighpotentialcandidatesforfutureprograms.overthenextyear,wewillreviewourleadershipcompetenciestobetteralignwithourvisionandstrategies.nominationsforthesenewprogramswillstartinthefirsthalfof2010/11.
akeycomponentofourleadershipstrategyisthediplomainManagementprogram.duringseptember2009,13participantsstartedthischallengingjourney.Theprogramgivescandidatestheskillstheyneedtomanagepeopleandresources.participantsenjoyarangeofbenefits,someofwhichincludegaininganationallyrecognisedqualificationandbeinginabetterpositiontogointomanagementrolesinthefuture.
leanneKeene,informationCommunicationsTechnologysystemsManager,says,“The best thing about the program is that it covers both management theory and practice. The course includes a
series of 8 face-to-face days which are complemented by assessment tasks. The course has provided me with an insight into the skills required in managing a team which is composed of different personality types who in turn approach their role in different ways. This understanding of people as well as the practical skills gained from the course modules has empowered me to shape the work environment so that all members of my team can make an effective contribution and we can achieve our goals.”
securinGfuturetechnicalexcellencethrouGhaPPrenticesWehavecontinuedourstrongfocusonapprenticeships.
ourapprenticeshipprogramprovidesgroundingforourapprenticestodevelopabroadrangeoftechnicalskillssotheycanbecomeleadersintheirfield.ourapprenticesarepartofaprogramtoaddresstheskillshortagesintheelectricityindustry.
Wehaveatotalof48apprentices,allatdifferentstagesintheircompetency-basedtraining,whichnormallytakesfouryears.Yearafteryear,thepopularityofourapprenticeshipprogramcontinuestogrowandattractarecordnumberofapplicationsfromhighcalibrecandidates.The2009/10yearwasnoexception.
Theapprenticeshipprogramgivesapprenticesbothonandoffthejobtrainingtohelpthembecomequalifiedsystemselectricians.Theygettoworkonmanydifferentprojectsinthetransmissionlinesandsubstationsgroups.andworkwiththebesttrainerswhoareworldexpertsintheirfield.
MostofourapprenticesaresuccessfulinobtainingpermanentpositionswithinTransGrid.
ourpeople “Wedevelopandmotivateourpeoplewithaneyeforthefuture.Weneedaworkforcethathasinitiativeandwilladapttochangetodeliverthebestpossibleservicetoourcustomers.Wearecommittedtodevelopingourfutureleaders,andprovidingthemwithchallengingcareerpaths.Wevalueourpeopleandempowerthemtobethebesttheycanbe.”
Petermcintyre,manaGinGdirector
TransGridannualreporT2010>ourPeoPle 41
manaGinGdirector’sscholarshiPProGramThroughtheManagingdirector’sscholarshipprogram,wegiveouremployeestheopportunitytobethebesttheycanbe.
ourManagingdirectorawardsthescholarshipannuallytoaTransGridapprenticewhohasexcelledathisorherstudiesandshownleadershipatwork.Thescholarshipisagreatwayforourapprenticestoreachnewheightsintheircareers.
duringtheyear,theManagingdirectorawardedourfifthManagingdirector’sscholarshiptoMelaniedunnill,previouslyaCommunicationsapprenticeatYass.MelanieisnowstudyingaBachelorofengineering(electrical)attheuniversityofsydneyandwilldoworkexperiencewithus.
ThescholarshiphasallowedMelanietoreapthebenefitsofherhardworkandcommitment.
WithMelanie’sjourneyonthescholarshipprogramjustbeginning,Jeremyroberts’hasjustfinished.Jeremywasawardedthefirstscholarshipin2005andinlate2009completedhisBachelorofengineeringattheuniversityofWollongong.
ofhisexperience,Jeremysays,“I have started on TransGrid’s graduate development program with my first placement in the design group at Newcastle. I am enjoying the technical design work this rotation has exposed me to and I look forward to continuing my learning on the program. It is very satisfying to see a project through from start to finish.”
ourgraduateprogramisallaboutbuildingskillsanddevelopingfutureleaders.Wecurrentlyemploy60graduates,whichincludesanintakeof24for2009/10.
in2010,wekickedoffourYoungprofessionalsprogram,whichinvolvesastructuredthree-yeardevelopmentplanthatsupportsgraduatesinattainingtheirCpengorCpa.TheYoungprofessionalsprogramdevelopsourgraduatesinarangeofareassuchasleadership,safetyandstakeholdermanagement.itgivesthemtheskillstheyneedtofulfiltheircareeraspirationsandensuretheyarecontinuallychallenged.
ourgraduatesrotatethroughdifferentareasoftheorganisationsotheygettoknowthebusinessinsideout.Theprogramalso
includesworkplaceseminarsforyoungprofessionals.overthelastyear,wehaveheld13seminars.
ourtailoredprogramensuresthateachgraduatereceivesmentoringandfeedbackneededtomeettheircareergoals.
Connieliangjoinedusasanelectricalengineeringgraduate.onhertimewithus,Conniesays,“When I first started with TransGrid, I was faced with a steep learning curve. My supervisor and work colleagues are really helpful and supportive, guiding me to put into practice the skills I acquired at university. The graduate development program also holds monthly seminars which gives graduates an insight into other specialised work areas. I believe these are the things that make TransGrid and its development program first rate”.
uPcloseGraduatesonaProGramforsuccess
abovetoPL-r – Samantha Christie, Darren Wu, khorshid Jahan, and Shahpar ahmed, electrical engineering graduates at the Metropolitan regional Centre.
aboveMelanie Dunnill and former Managing Director, kevin Murray, at the Scholarship awards Ceremony.
aboveConnie Liang, electrical engineering Graduate.
42 ourPeoPle>TransGridannualreporT2010
newaPProachtoPerformancemanaGementagoodperformancemanagementsystemdrivesahighperformingculture.Thisiswhy,overthelastyear,wehavestartedimplementinganonlineperformancemanagementtool.
Thenewsystemwilldelivermanybenefitstoourbusinessincludingmoretargetedperformanceassessments,onlinehelptools,streamlinedreportingandeasieraccesstoperformancemanagement.
during2009/10,weranapilotofthenewsystemwithYassemployeestopromotebetterparticipationinperformancereview.Thepilotwassupportedwithtrainingonmanagingemployeeperformance.
Thefeedbackfromthepilotgrouphasbeenverypositive.participantsfoundthenewsystemverysimpletouseastheycanquicklylogonandseehowtheirreviewisprogressing.inaddition,Managerscaneasilyschedulereviewsfortheirstaffandtheratingscriteriaiswideenoughtocoveroffalllevelsofperformance.
overthenextyear,wewillrollouttheprogramacrossthebusinessandcommunicateitsbenefitstoouremployees.
emPloyeeenGaGementTheextenttowhichouremployeesfeelengagedoftendictateshowlongtheywillstaywithus.
Wehavemanylong-termemployeesaswellasmanynewemployees.Theseemployeesplayakeyroleinhelpingusdeliveronourobjectives.
overthenextyear,wewilldeliveranemployeesurvey.Thesurveywillbeanimportantwayforouremployeestotelluswhatwearedoingwellandwhereweneedtoimprove.
Wewillactontheresultsandfocusonthoseareasthatthemajorityofemployeesbelieveneedimprovement.Wewillalsoidentifyourstrengthsandcontinuetobuildonthem.initiativesfromthesurveywillbeactionedin2011andbeyond.
oPencommunicationWeliveourvalueofopencommunicationbysharinginformationwithourpeople.
ourinternalcommunicationsmakesurethatouremployeescanbetteridentifywithwherewearegoingasabusiness.
uPclosehowtodeveloPaworldexPert
during2009,wekickedoffaresearchprojectwithMacquarieuniversitytitled“How do people become experts?”Theresearchisaboutunderstandingthedifferentwaysthatexpertshandleinformation.
Wehavereapedlargebenefitsfromthisresearch,particularlyinthetrainingofsystemoperators.ithelpsustoscreenpeopleatanearlierstagetoestablishtheirunderlyingsuitabilityforthejobanddeveloptargetedtrainingtohelpnewstaffrecognisethesecues.Thiswillhelpthemtobecomeexpertsmuchsoonerthanmightotherwisehavebeenthecase.
Wefollowedthreelinesofinvestigationindoingthisresearch:
>> observingoperatorsbyusingeye-trackingtechnologyandwatchingthespecificareasthatoperatorsfocuson.
>> Carryingoutspatialrecognitionexercisestodeterminewhetherthereisunderlyinginnateskillsthatexpertspossess.
>> onlinescenariotesting,whichflashesupanabnormalscreenforashorttime,requiringtheparticipanttoexplainwhatwashappeningandwhatneedstobedone.
neilsmith,executiveManager/systemoperations,says:“This training is an industry first and we are setting the benchmark for best practice in emergency response. We are the leaders in this area. Over the next year, we will broaden the research to include other NEM participants. The World Expert training will be part of a recruitment campaign targeted at bringing new staff into the control room at an earlier stage, allowing them to work alongside the experienced operators.”
TransGridannualreporT2010>ourPeoPle 43
Wecommunicatewithouremployeesinmanydifferentways.progressupdatesandinitiativesarecommunicatedviabriefingsessions,emailbroadcastsandamonthlyelectronicnewsletter.Thesecommunicationchannelsareavaluablewayofengagingouremployeesandgettingtheirfeedbackonwhatisimportanttothem.
overthenextyearwewillintroduceanewintranet,whichwilladdanewdynamictothewaywecommunicatewithouremployees.Wewillalsolookatnewwaystobetteraligninternalcommunicationswithoverallorganisationalstrategy.
CorporateCommunicationsManager,natalienacinovicsays:“We want our people to identify with our business strategy and feel like they are making a difference. We will continue to be more proactive in our internal communications by telling simple and consistent messages to nurture a workplace that works towards the same goals.”
emPloyeebenefitsthatworkWewantouremployeestoenjoytheirtimeatTransGrid.Thisiswhyweofferthemmanybenefits.
Wehelpemployeesgetagoodwork-lifebalancebyofferinganine-dayfortnight,35-hourweek,flexibleworkarrangements,maternity/paternityleaveandvacationcaresubsidies.
ouremployeescanbepartofourregionalsportsandsocialclubs,whichgivesthemthechancetomeetfellowemployeessociallyandhavefun.Theclubsoffermanyticketstodiscountedsportingevents,theatreshowsandconcerts.
Weprovidecompetitivesalariesforemployeeswithagenerous13percentemployer’ssuperannuationcontribution.employeescanalsoenterintosalarysacrificearrangementsforthepurchaseofmotorvehiclesandforthepaymentoftheirelectricitybills.
TheTransGridemployeesWelfareFundcontinuestobepopular.Throughasmallweeklycontribution,employeescanreceivesupportforthemselvesandtheirfamiliesintimesofhardshipandcanaccessarangeofwelfareandrecreationalfacilities.
GoodworkPlacerelationsWecontinuedtohaveaharmoniousworkplacerelationsenvironmentduring2009/10withmostissuesdealtwithataworkplacelevel.
WealsomovedintotheFederalworkplaceindustrialrelationsjurisdiction,followingthensWGovernment’sreferralofitsstateindustrialrelationspowerstotheCommonwealth.Thishasnotaffectedusgreatly,withonlyminorchangestopoliciesandproceduresrequiredtocomplywiththenewlegislation.
Weliveourvalueofopencommunicationbysharinginformationwithourpeople.ourinternalcommunicationsmakesurethatouremployeescanbetteridentifywithwherewearegoingasabusiness.
aboveleftGavin Thomas, Capital expenditure analyst, and angela Chau, Graduate accountant at Sydney’s head office.
aboveDavid adams and Michael knox, Trainee engineering officers, at Sydney West Substation.
44 ourPeoPle>TransGridannualreporT2010
movinGforwardwithdiversityourdiverseworkforcehasbeensteadilygrowingoverrecentyears,withthenumberoffemaleshavingrisenfrom146to155overthelastyear.
ourworkforcediversitystrategyisaboutimprovingcareeropportunitiesforpeoplewhoareunder-representedinourworkforce.
during2008/09,wedevelopedaneeoManagementplan2010to2013,whichincludesspecificprogramsforeeoGroups.
equalemPloymentoPPortunity(eeo)disclosures
Trends in the representation of EEO Groups1
eeoGrouP PercentaGe(%)oftotalstaff
benchmark3ortarGet
2010 2009 2008
Women 50% 15 15 14
aboriginalpeopleandTorresstraitislanders
2.6% 0.8 0.8 0.9
peoplewhosefirstlanguagewasnotenglish
19% 20 20 19
peoplewithadisability 12% 6 6 5
peoplewithadisabilityrequiringwork-relatedadjustment
7% 0.5 0.5 0.5
Trends in the distribution of EEO Groups2
eeoGrouP PercentaGe(%)oftotalstaff
benchmark3ortarGet
2010 2009 2008
Women 100 94 92 93
aboriginalpeopleandTorresstraitislanders
100 n/a n/a n/a
peoplewhosefirstlanguagewasnotenglish
100 106 104 104
peoplewithadisability 100 102 105 103
peoplewithadisabilityrequiringwork-relatedadjustment
100 n/a n/a n/a
notes
1 excludescasualstaff.2 adistributionindexof100indicatesthatthecentreofthedistribution
oftheeeogroupacrosssalarylevelsisequivalenttothatoftheotherstaff.3 TheaboveeeoBenchmarksaredeterminedbythensWGovernment,
departmentofpremierandCabinet,equalemploymentopportunity.
aboveleft
rachana amin, Professional engineer, and Ingrid Thompson, Graduate accountant.
aboveriGhtShahpar ahmed, electrical engineering Graduate.
TransGridannualreporT2010>ourPeoPle 45
multiculturalPoliciesandservicesProGram(mPsP)WearecommittedtothemulticulturalismprinciplesoutlinedinthePrinciples of Multiculturalism Act 2000(nsW).
oureeoManagementplan2010to2013considersculturalandreligiousdiversityacrossbroadareas.TheseareintegratedwithinourMpsp.
Thekeyresultsoftheplaninclude:>> Planning:integratingmulticulturalpolicygoalsintoouroverallbusinessplanning.
>> Consultation and feedback:policydevelopmentandservicedeliverydrivenbyconsultationandfeedback,complaintsandparticipationonadvisoryboardsandsignificantcommittees.
>> leadership:ourManagingdirectorandseniorleadersactivelypromotingtheplanandimplementingmulticulturalismwithinthewidercommunity.
>> Human resources:improvingourskillsbyemployingandtrainingpeoplewithlinguisticandculturalexpertise.
>> access and equity:puttinginplaceprogramsthatreducethebarriersforpeoplefromcultural,linguisticandreligiouslydiversebackgrounds.
>> Communication:usingarangeofcommunicationchannelstoeducatepeoplefromculturallyandlinguisticallydiversebackgroundsaboutourservices.
>> Social and economic development: puttingprogramsandservicesinplacetodeveloptheskillsofaculturallydiversepopulationforthesocialandeconomicbenefitofthensW.
aboriGinalandtorresstraitislanderemPloymentactionPlanWesupportaboriginalandTorresstraitislanderpeopleindevelopingtheirfullpotential.ouraboriginalandTorresstraitislanderactionplanaimstoimproveindigenousemployment.
ThegoaloftheplanistoincreasethenumberofaboriginalandTorresstraitislanderpeopleapplyingforTransGridjobs,retaininganddevelopingtheirskillsandprovidingthemwithcareerpaths.
femalesbyclassification2009/10 malesbyclassification2009/10
Senior Contract O�cer
Professional O�cer
Engineering O�cer
Apprentice
Administration O�cer
Tradesperson
Team Leader/Network
Senior Contract Ocer
Professional Ocer
Power Worker
Operator
Misc
Line Worker
Engineering Ocer
Apprentice
Administration Ocer
administrationofficer 89
apprentice 3
engineeringofficer 7
professionalofficer 47
seniorcontractofficer 9
Total 155
administrationofficer 62
apprentice 45
engineeringofficer 283
lineworker 32
Miscellaneous 5
operator 22
powerworker 40
professionalofficer 205
seniorcontractofficer 82
Teamleader/network 18
Tradesperson 72
Total 862
46 ourPeoPle>TransGridannualreporT2010
disabilityactionPlanourdisabilityactionplanisconsistentwiththensWGovernment’sdisabilitypolicyFramework,theNSW Disability Services Act 1993andtheNSW Anti-Discrimination Act 1977.
Theplanaimstoremovebarrierstoservicesforpeoplewithadisability,givinginformationinarangeofformats,makingourbuildingsandfacilitiesphysicallyaccessible,helpingpeoplewithadisabilityparticipateinpublicconsultationsandincreasingtheiremployment.
women@transGridactionPlanTheWomen@TransGridprogramstartedin2008/09toattractwomentoengineering,technicalandmanagementrolesandhelppromoteagreaterwork-lifebalance.
Committeemembershelpwithactivitiessuchasworkingparties,researchandpromotionalactivities.Theyalsotalkwithfellowfemaleemployeesaboutcurrentissues.
duringtheyear,theWomen@TransGridactionplanwaslaunched.Theeventwaswellsupportedbywomenfromseveralofourlocationsaswellasmembersoftheexecutiveandmanagersandteamleaders.
Matinapapathanasiou,adirectorontheTransGridBoard,gavethekeynotepresentation,discussinghereducation,
careerachievementsandtheexperiencesshehashadinvariousorganisationsandroles.Matinaprovidedgoodinsightintowhatshehasfoundhelpfulalongthewayandthepresentationwasbothinterestingandinspiring.
sincethelaunchoftheactionplan,theWomen@TransGridprogramhasputinplacearangeofinitiatives.someoftheseincludethepromotionoftheactionplanandprofilesofsuccessfulwomenviaourvariousinternalcommunicationchannels.
Theprogramhasalsopromotedarangeofexternalseminarsandtalksonareassuchasleadershipanddevelopment.over25womenhaveattendedtheseevents,withmanyofthembringingnewideasbacktotheworkplace.in2010/11,wewilllaunchasurveyregardingdevelopmentbarriersforwomen.
WewouldliketothankeveryonefortheircontinuedsupportoftheWomen@TransGridinitiatives.
eeoachievements2009/10>> developedtheeeoManagementplan2010to2013.
>> re-issuedourpoliciesonanti-discrimination,harassment,bullyingandequalemploymentopportunityandappropriateuseofTransGrid’semail,internetandcomputerresources.Thesepoliciescanbeaccessedfromourintranet.
>> deliveredawarenesssessionstoseniorleaders,apprentices,traineeengineeringofficersandgraduatesontheCodeofConductandanti-discrimination,harassment,bullyingandeeopolicies.
>> encouragedindigenousandfemaleapplicationsforthe2010apprenticeintake.
>> sponsoredtheindigenousaustralianengineeringsummerschool2010.
>> launchedtheWomen@TransGridactionplan.
>> appointedaprovidertodeveloptailoredworkplacebehaviourtrainingforallemployees.
>> providedinductionprogramstoallnewemployeestointroducethemtoourpolicies.
>> sponsoredthedon’tdisMyabilitycampaign.
>> providedaquietroomforstafffromreligiouslydiversebackgroundstouse.
>> promotedoureeoachievementsandinitiativesthroughourvariousinternalcommunicationchannels.
>> ConsultedwithstaffindevelopinganageingworkforceplanandstrategiesfortheWomen@TransGridactionplan.
ontheeveningof21september2009,astormseverelydamagedour220kVlinewhichsuppliespowertoBrokenHill.Fiveofourtowersweredamagedbythestrongwinds.
Formorethanaweek27TransGridemployees,sevenCountryenergyemployeesandsixcontractedplantoperatorsworkedtirelessly,finalisingrepairworkonthetransmissionlines.Thisincredibleeffortresultedinaround2.5kilometresoftransmissionlinebeingre-builtby29septemberinharshweatherconditions.
Thelogisticsinvolvedinresourcingtherecoveryeffortwerequitechallengingwithstaff,plantandmaterialbeingsourcedfromanumberofourregionsacrossnsW.ThepressuretoreturnthetowertoservicewasmademoreurgentbythefactthatthesoleemergencysupplytoBrokenHillwasbeingprovidedbyCountryenergy.Thisvulnerability,combinedwiththehighcostoffuel,madeitevenmoreimportanttomakesuretherestorationwasexpedited.
Thechallengeswefacedwereexacerbatedbywindscausingthewirestobecomeentangledinthetowersteelworkandsurroundingtrees.safetywasalwaysourhighestpriority.our“stopandConsider”mindsetwascalledtoaction.duetoconductorsbeingentangledintreesandthefallentowers,wehadtomovethemverycarefullyontheirnewstructures.
Thechallengewasnotonlytoensurethatweworkedsafely,buttoseeifwecouldbuildthelinebetter.Wealsohadtobeconfidentthenewstructuresweredesignedandbuiltinsuchawaythattheywouldsustainanyfutureextremeweatherconditions.Weachievedthisbycomingupwithaninnovativesolutionsowecouldrebuildthelinewithminimumimpactoncustomers.
Thebiggestfactorinachievingthefastreturntoservicewastheeffortwespentinplanningtherightsolution.oursitesupervisorhadextensiveexperience
uPcloseextremeweathersouthofbrokenhill
TransGridannualreporT2010>ourPeoPle 47
eeoPlannedachievements2010/11>> ContinuetosupporttheWomen@TransGridprogramandimplementitsinitiatives.
>> encourageindigenousandfemaleapplicationsforthe2010apprenticeandgraduaterecruitmentdrives.
>> delivertailoredworkplacebehaviourtrainingforallemployeeswithafocusoneeo,andpreventingharassment,discriminationandbullying.
>> improvethequalityofoureeostatisticaldata.
>> promoteoureeoprogramstoemployeesandprospectiveemployeestodevelopandattractpeoplefromeeogroups.
>> implementandcommunicateourrevisedgrievancemanagementprocess.
>> Continuetosupportthedon’tdisMyabilitycampaign.
>> increaseinteractionwithuniversities,schools,industryandprofessionalcommunitygroupstoimprovetherepresentationofeeogroupsandgainnewinsightintofutureprograms.
>> Giveourseniormanagersbetterinformationonhowweareperformingagainstoureeotargets.
ourwins–2009/10>> reviewed our workforce planning strategy.>> renewed our leadership strategy for high-potential employees.
>> Piloted an online performance review system.>> Strengthened our internal communication strategies. >> Made good progress in implementing eeo strategies.
theroadahead–2010/11>> roll out the online performance review system across the business.
>> align recruitment strategies to the skills the business needs to be successful.
>> Launch a new employee orientation program.>> Introduce programs to improve the retention and re-employment of high potential employees.
>> undertake an employee engagement survey and identify improvement initiatives.
>> roll-out a leadership program for high-potential employees.
inleadinglargeteams.inaddition,weappointedastaffmemberwhohadthesoledutyofensuringthatallplantandmaterialwasavailableintheshortesttimepossible.Weaddresseddesignissueswiththeon-sitepresenceofaseniorlinedesigner.
GeneralManager/network,Mrlionelsmythsays,“This event reaffirms the fact that NSW can rely on our expertise and determination to get the job done. So many people were involved in this enormous feat. We had so many challenges, including the extreme weather and the complex line design, let alone the demand of getting the line up in record time. We met all of these challenges by working closely together towards a shared outcome for the people of NSW. The job was managed flawlessly with a well thought out plan which was communicated and executed in a very safe way”.
leftrestoration of the Broken hill transmission line.
aboveChris Bennett, Professional engineer, and Maggie Chan, Business Services Manager.
TransGridannualreporT2010>section 49
alwayslearninganddoing
enerGytoday,enerGytomorrow...operationalexcellenceWehavearenewedfocusonenhancingourcommercialmindset.Wearewatchingourbusinessprocessestoseehowwecanworksmarteranddothingsmoreefficiently.
left
L-r – Lewis ryan, Professional engineer, and Joseph Diver, Graduate electrical engineer at Metropolitan regional Centre.
50 oPerationalexcellence>TransGridannualreporT2010
betteroPerationalefficiencyinthepreviousregulatoryperiod,weworkedhardtomanageourcosts.Wedidthisbyputtinginplacegoodbusinessstrategy,beingproactivewithbenchmarkingandimprovingthewaywedothings.
Wehavearenewedfocusonenhancingourcommercialmindset.Wehavestarteddevelopingaframeworkthatcarefullylooksatallrevenueandcostdriversimpactingourprofits.Wearealsowatchingourbusinessprocessestoseehowwecanworksmarteranddothingsmoreefficiently.
althoughourunregulatedbuildingprogramisasmallpartofourregulatedbuildingprogram,weseeitasanimportantpathwaytogrowingourprofits.overthenextyear,wewilldevelopabusinessmodelfornegotiatedandunregulatedwork.Thiswillhelpdeliverthebestcommercialoutcomesforunregulatedwork.
alowcostserviceProvidereveryfiveyearstheaerdecidesourrevenueforregulatedservicessowecanmaintainournetwork.
electricitytransmissioncostsgenerallyformaround10percentofmostnsWhousehold’selectricitybills.The2010/11transmissionpricesforloadcustomersanddistributorshaveincreasedoverallbymorethantheexpectedConsumerpriceindexmovements.
ourpricehasmainlyrisenbecauseofthesharpfallintheneMrevenuestreamsthatareusedtooffsettransmissionprices.
WeunderstandthatourcostsareultimatelymetbythepeopleofnsW,anddespitethisincrease,wecontinuetobeoneofthelowest-costtransmissionserviceprovidersworldwide.
GoodmaintenancedrivesworldclassreliabilityThehighreliabilityofournetworkisacombinationoftherightplanningandtherightmaintenancestrategies.
ournetworkManagementplansetsoutthemaintenanceneedsforourequipmentandhelpsustocontinuallyimproveournetwork.Wecarefullyplanournetworkmaintenanceandconsiderthedifferentlifespansofvarioustypesofequipmentandtheirservicingneeds.
Weusearisk-basedapproachindevelopingourassetmanagementstrategies.Thesestrategiesarecheckedbyspecialistworkinggroupsandconsidermanyfactorssuchascost,expectedreliabilityandassetcapability.
overthelastyear,wehaverevisedourtransmissionlinemaintenancerequirementsfordetailedaerialinspections.Toachieveadetailedevaluationoftheconditionofalllinecomponentsandfittings,analternativemethodusingdigitalimagerytechniqueswhilstthehelicoptersafelyoperatesatitspreferredflyingheightandspeed,wassuccessfullytrialledduringtheyear.
atthesametimelightdetectionandranging(lidar)technologiesarebeingemployedtocaptureanaccuratevegetationprofileandidentifytreesthatrequiremaintenance.Thesetechniquesarenowplannedtobeextendedtotheentirenetworkforthecomingyeartoprovideuswiththefirstfulldigitalimagesofalltransmissionlineassetsandeasements.
operationalexcellence
ThelatestinternationalTransmissionoperationsandMaintenancestudy(iToMs)hasdemonstratedthatweareoneofthebestperformingtransmissioncompaniesintheaustraliaandnewZealandregion.
aboveriGhtL-r – amie White and kieran Caffery, electrical apprentices, russell ubrihien, Grid officer, and Col Campbell, electrical fitter, at Wagga Wagga’s apprentice workshop.
TransGridannualreporT2010>oPerationalexcellence 51
during2009/10,wespent$65.4milliononmaintenanceandexceededourmaintenancetargetof95percentforeachofthelast15years.Thisresult,coupledwiththeexpertiseofourpeople,isakeyfactorinourongoinghighlevelofreliability.
atoPPerformerininternationalbenchmarkWehavehadahighlevelofnetworkreliabilityovermanyyears.
during2009,atotalof27companiestookpartintheinternationalTransmissionoperationsandMaintenancestudy(iToMs),whichcomparesperformancewithinthetransmissionindustryworldwide.
inthelatestresults,wehavebeenidentifiedasaleadingperformerworldwideonbothserviceandcostmeasures.Wearenotonlywellaheadoftheworldwideaveragebutalsowellaheadoftheasia-pacificaverage,demonstratingthatweareoneofthebestperformingtransmissioncompaniesintheaustraliaandnewZealandregion.
Wecontinuetoreapthebenefitsoftakingpartinthisglobalbenchmarkingstudy.itnotonlyreaffirmsourbestpractice,assetmanagementtechniquesbutalsohelpsusstayabreastofleadingtrendssothatwecanfurtherstrengthenouroverallmaintenanceperformance.
takinGstePstomanaGechanGeTheonethingthateveryorganisationiscertainofisthatchangeisaconstantintoday’sworld.Well-implementedchangemeanssuccess.
Changeforacompanylikeourshasmanydifferentfacetstoit.duringtheyear,wedevelopedaformalchangemanagementsystemsothatwecanbetterpositionourselvestodriveimprovementsacrossthebusiness.
Thefocusfornextyearwillbetocommunicateandeducateourpeopleonhowtouseit.Weknowthatchangeassociatedwithcontinuousimprovementisvitalinusbeingsuccessful.
overthenextyear,wewillusethechangesystemtoimplementsomeimportantcontinuousimprovementprojects.someoftheseincludeknowledgemanagement;incorporatingrevenueresetlearningsinthebusiness;strategicprocurementandperformancemonitoring.
PushinGthetechnoloGyenveloPeWehavedrivenourinformationtechnologiestonewheightsoverthelastyear.Goodinformationtechnologysupportsgoodbusinessprocesses.
during2009/10,weimplementedthefollowinginformationtechnologyimprovements:
>> executedamulti-sourcingstrategy,whichtransitionedsomeapplicationsupportandfullcorporatedatanetworkservicestoexistingandnewemployees,allofwhichwascompletedwithoutdisruptiontothebusiness.
>> replacedourenterpriseservers,whichhostourmajorapplications,toimproveperformanceandreliability.
>> launchedanewexternalwebsitedesignedwithuserneedsinmind.
>> introducedvideoconferencingatourmajorsitestoenablebetterstaffcollaborationandpromotebusinessefficienciesthroughreductionintraveltime.
>> performedastrategiccheckofourenterpriseresourceplanningsolutions.
>> Completedservervirtualisationtosaveoperatingandadministrationcosts.Thisprojectincludedthedeliveryofcriticalbusinessprojectssuchasoffice2007andanemployeeself-serviceupgrade.
overthenextyear,wewilldriveourinformationtechnologiesfurther.Wewillimplementourenterpriseresourceplanningstrategy;upgradeouroutageplanningmanagementsystemandgrowtheunregulatedtelecommunicationsbusinesstoincreaseprofits.
“Thechallengeforusoverthenextfewyearswillbetorefineandenhanceourassetmanagementstrategytocaterfortheexpected24percentincreaseinourassets.Wewilldothisbylookingatinnovativewaystogetthebestoutofourassetbase.”
lionelsmyth,GeneralmanaGer/network
52 oPerationalexcellence>TransGridannualreporT2010
anewvirtualcontrolroomThestatesystemoperationsControlCentreinWesternsydneyhasreceivedafacelift,makingitthemostmoderncontrolroominaustralia.
Therefurbishmenthasbroughtmanybenefitstothebusiness.someoftheseincludebetteroperatorsituationalawarenessandasuperioroverviewofthetransmissionnetwork.systemoperatorshaveaccesstothebesttools,networkinformationonhandsoonerandoperatortraininginrealtime.
Thesmart,fit-for-purposecontrolroomhasreducedourcostsbyallowingcompleteflexibilityofoperationfromanygeographiclocation.
Weareproudtosaythatthetransitionfromthetemporarycontrolroomransmoothly,withnopowersupplyinterruptionstoourcustomers.
moreeffectivesecuritycontrolduringtheyear,westartedupgradingtoanewaccesscardmanagementsystemsothatwecanbettercontrolandmonitoraccesstooursites.
Thenewsystemincorporatesthelatesttechnologyandwillincludeasecuritypanelupgradeateachsite.
Themainbenefitofthenewsystemisthatitwillgiveusasinglesystemtoreacttoalarms.Theupgradewilldriveefficienciesbycuttingdowntheadministrativeworkloadofmanagingsiteaccess.
Theprojectisnearlyfinishedwiththeinstallationofhighsecurityfences,detectionsystems,closedcircuittelevisionandaccesscontrolsystems.
deliverinGanefficientsuPPlychainWedeliveranefficientsupplychain,whichpromotescompetitionandgetsthebestvalueformoney.Thishelpsustodeliverourcapitalworksprograminthebestwaypossible.
Weseekcompetitivequotesandadvertisetenderspubliclyonourexternalwebsiteandinthepress.ourprocurementframeworkencouragesbusinessestocompeteintheopenmarketbysubmittingeitherexpressionsofinterestortenders.
duringtheyear,werevisedourprocurementgovernanceframework.Theserevisionshaveimprovedthecosteffectivenessofprocuredgoodsaswellasthetimeframesinwhichtheyaredelivered.Weheldawarenesssessionsformanagerstomakesuretheyunderstandthenewframeworkandtheirresponsibilities.
“ThestatesystemoperationsControlCentrerefurbishmenthasbroughtmanybenefitstothebusinessincludingasuperioroverviewofthetransmissionnetwork,networkinformationonhandsoonerandoperatortraininginrealtime”.
neilsmith,executivemanaGer/systemoPerations
duringoctober2009,wegavethepublicabrandnewexternalwebsitewww.transgrid.com.au.
Thenewwebsitewasbuiltfromthegroundupandincludesmanynewfeaturessuchasanewlookandfeel,betterfunctionality,improvedsearchfacilities,moredynamicgraphicsandtheintroductionofemployeevideoprofiles.Thenewlookwebsitepresentsourinformationinawaythatmakesitmucheasiertofindwhatyouarelookingfor.
ourwebsiteusersarequitediverse,rangingfromjobseekerstothebroadercommunityandmarketparticipants.Weranin-depthfocusgroupswithmanyofourstakeholderstotapintotheirexpectationsasusers.Thefeedbackfromthefocusgroupshashelpedshapethe
waywepresentinformationonthewebsite.Thechallengewastomakesurethatthewebsitewasaone-stopshopforourstakeholders.Weneededtoincreasetheinteractivity.Wedidthisbyhavingafacilityforthepublictosubscribetoupdatesonprojects,mediaandcareers.sincegoinglive,wehavehadover200membersofthepublicsubscribetowebsiteupdates.
Weareconfidentthatthenewwebsitewilldeliverresults,enhanceourbrandandmeetthedifferent,yetuniqueneedsofourstakeholders.
overthenextyear,wewilllookatourwebsiteanddrivefurtherimprovementsinthewaywecommunicateinformationtoourusers.
uPcloseamodernwebsite
TransGridannualreporT2010>oPerationalexcellence 53
newintranetisonitswayWewillgolivewithanewintranet,theWire,in2011.TheWirewillhavealookthatreflectsourpositioningasamodernandperformance-drivenorganisation–andmoreimportantfunctionality.
preparationskickedoffinJanuary2010with50ofouremployeestakingpartinfocusgroupsessions.Thefocusgroupswereagreatwayforustofindoutwhatouremployeeswantofanintranet.TheirinputhasgonealongwayindefiningwhattheWirewillbeabout.
TheWirewillbebuiltwiththelatestintechnologyandwilldeliverall-roundbenefitstoouremployees.someoftheseincludereal-timenewsupdates;teamandprojectsitestopromotecollaborativeworkpractices;aknowledgebaseforemployeestocontributetoasharedpoolofinformationandastronggovernanceframework.
TheWirewillbetheprimaryinternalcommunicationsplatformforemployeesandwillplayakeyroleinengagingemployeefeedbackonourstrategiesandinitiatives.
“ihavebeenwithTransGridforafewmonthsandthenewexternalwebsitehasreallyhelpedmefindouteverythingineedtolearnaboutthecompany.TheemployeevideoprofilesarefantasticandgavemeagreatunderstandingofwhaticanexpectwhileworkingatTransGrid.Withonlyafewclicks,icansubscribetoupdatesonourcapitalworksprogramwhichhelpsmeinmyroleasCommunityliaisonofficer.”
kristyhead,communityliaisonofficer
ourwins–2009/10>> Implemented a new external website.>> Scoped the development of a new intranet. >> Identified as a leading performer in the IToMS benchmark.>> Delivered information technology improvements to the business.
>> Developed a new business model to address the regulatory and financial aspects of the business for medium and long-term forecasting of organisational performance.
>> Commenced the rollout of a new access card management system.
theroadahead–2010/11>> Develop an approach on knowledge management for both internal and external knowledge.
>> Strategically review our procurement function.>> Improve performance reporting through the development of organisational key performance indicators and a business reporting platform.
>> Launch a new employee intranet.>> apply our change management system across the business.
aboveL-r – Brett hasenkam and robert Smith, Communication Technicians, orange regional Centre.
TransGridannualreporT2010>section 55
beingintouch
enerGytoday,enerGytomorrow...
ourcommunityWeappreciateourcommunitiesandvaluetheircontributions.Weengagewiththemandbuildvaluablepartnerships.
leftL-r – Matthew Lee, and Joseph Diver, Graduate electrical engineers with Tim Barnes, Project Manager/Central, kristy head, Community Liaison officer, albert Maldonado, Network Projects engineer at Metropolitan regional Centre.
56 ourcommunity>TransGridannualreporT2010
GivinGbacktoourcommunitiesWeappreciateourcommunitiesandvaluetheircontributions.Weengagewiththemandbuildvaluablepartnerships.
Wehaveaproudtrackrecordofinteractingwiththecommunityduringourcapitalworksprocess.WiththeresponsibilitytomaintainasafeandsecureelectricitysupplythroughoutnsW,wearecommittedtolisteningtothecommunity.
oursponsorshipframeworksupportsstrategicpartnershipswithorganisationsintheareasofindustry,education,communityandenvironment.
duringtheyear,werenewedourpartnershipwithGreeningaustralia,ourlargestsponsorship.TheGreenGridpartnershipcontributestotheenvironmentalwellbeingofnsW.
WehavealsocontributedtouniversitiestohelpdeveloppowerindustryexpertiseandsupportedsomekeyeventsthathaveastrongpresencewithinnsW.Thisgoesalongwaytohelpingusstrengthenourtieswiththecommunity.
oursponsorshipshavebeenasuccessbecauseouremployeeschampionthemyearinandyearout.Wethankthemfortheircommitmenttotheseworthwhilecauses.
ourcommunity “ourworkwiththecommunityhasincreased.Weunderstandthatourbuildingprogrammaysometimesimpactoncommunities,sowetrytobalancethetechnicalneedsofanupgradetothenetworkwiththeneedsofcommunities.Weworkwithourcommunitieseverystepoftheway.”
michaelGatt,GeneralmanaGer/corPorate
Wevaluethefutureofthepowerindustryandhavecontinuedtobeagoverningmemberoftheaustralianpowerinstitute(api).
Theapi’sgoalistoboostthequalityofpowerengineeringgraduates,whoseekasuccessfulcareerinourindustry.Throughthismembership,wesupportthedevelopmentofpowerengineeringprogramstoattractthebestengineeringgraduates.
eachyearwetakepartintheapiengineeringsummerschoolprogram.Theprogramincludestwoweekspackedfullofpresentationsbyindustryexperts,fieldtripsandnetworkingevents.Thesummerschoolgivesouryoungengineersthechancetointeractwithotherdelegateswhichhasproveninvaluableincreatinggoodnetworks.
sophiedowling,plantengineer,attendedthesummerschoolthisyearandsaysofherexperience:“One of the most rewarding features of the program were the discussions with the technical presenters from the industry. This gave me the opportunity to ask lots of questions. The informal discussions are where the best learning took place. Another feature of the program is the syndicate work. This required me to work in a small group to research a topic under the guidance of an industry expert and present the results to all delegates at the end of the program. API allowed me to broaden my knowledge and look at what I do at TransGrid from different perspectives.”
uPcloseinvestinGinfuturePowerenGineerinGcaPability
aboveriGhtL-r – Lionel Smyth, General Manager/Network, John McCall, Projects Manager/Northern, Peter McIntyre, Managing Director, and Warwick Schroder, Civil Projects engineer at Tomago Substation.
aboveSophie Dowling, Plant engineer.
TransGridannualreporT2010>ourcommunity 57
nameoforGanisation amount*Granted
natureandPurPoseofsPonsorshiP
australiannationalFielddays(anFd)
1,035 TookpartintheanFdasanexhibitorprovidingcareersinformation,capitalprojectinformationandenvironmentalinformation.
stateWater 5,500 sponsoredthecentenarycelebrationsmarking100yearssincethebuildingofBurrinjuckdam.
electricenergysocietyofaustralia(eesa)
16,500 Goldsponsoroftheeesastateconference.ComplimentaryregistrationswereprovidedtotheYoungprofessionalsprogramnetworktoallowgraduateemployeestoattend.
departmentofageing,disabilityandHomeCare
5,500 sponsoredthedon’tdisMyabilityCampaign.Twoambassadorsspoketoouremployees.
engineeringaidaustralia 3,000 sponsoredtheindigenousaustralianengineeringsummerschoolheldattheuniversityofnsW.
TheWarrenCentre 22,000 sponsoredtheenergyefficiencyprojectlowenergyHighriseprojectstage2(leHr2).
TheWarrenCentreforadvancedengineeringisanindependent,industry-linkedinstitutecommittedtofosteringexcellenceandinnovationinadvancedengineeringthroughoutaustralia.
ThissponsorshipwasfundedfromtheinnovationdMallowanceasapprovedbytheaer.
engineersaustralia–sydneydivision
2,500 sponsoredtheengineersaustralia–sydneydivision–excellenceawardsevent.Theeventrecognisesthecommitmentengineersmaketothewellbeingofthecommunityandtheinnovativeworkbeingperformedeverydaybypeopleintheengineeringprofession.
Taralgapublicschool/upperlachlanBushpoets
600 VisitedTaralgapublicschooltotalktothechildrenaboutelectricityandsafetyaroundourassets.
universityofnsW(unsW)–schoolofelectricalengineering
25,000 Theaustralianpowerinstitute(api)wasapproachedbytheschoolofelectricalengineering,universityofnsW,tosupportaschoollecturingposition.TheapiandTransGridareproviding$25,000eachtowardsthesalaryofaselectedlecturerwiththeremainderpaidbytheunsW.
TaFensW–Westernsydneyinstitute
1,100 sponsoredthestudentexcellenceawards2010attheWesternsydneyinstituteofTaFensW.
Greeningaustralia 220,000 renewedpartnershipwithGreeningaustraliaforafurtherthreeyears.Thetotalcostis$660,000($220,000peryear).
earthwatchinstituteaustralia 27,720 renewedpartnershipwiththeearthwatchinstituteaustralia.ThiscostincludedourmembershipwiththeearthwatchCorporatesustainabilityGroupandfourplacesforemployeestotakepartintheenvironmentalFellowshipawardprogram.
MovemberFoundation 2,000 donationoftwoTransGridteamstoparticipateinMovember.$1000perteamwasgranted.
CanberrainstituteofTechnology 300 donationtoFyshwickTradeskillsCentreprizenight2010.
nsWFireBrigades–Trainingdivision(CentralCoast)
1,200 one-offdonationtothensWFireBrigadestrainingdivision(CentralCoast)charitygolfdaywithallfundsraisedsupportingtheBurnsequipmentFund.
CancerCouncilofaustralia 2,616 Wematchedemployees’donationsforaustralia’sBiggestMorningTea.
* all amounts are GST inclusive.
58 ourcommunity>TransGridannualreporT2010
communityconsultationonourProJectseachoneofourprojectsrequiresauniqueapproachtocommunityconsultationthatconsidersthedifferenttypesofcommunitiesweworkin.itisimportantforourconsultationactivitiestostartearly,andbeclearandconsistentthroughoutthelifeoftheproject.
Wedeliverourcommunityconsultationsinlinewithwell-plannedcommunicationstrategies.Theaimistomakesurethedevelopmentofaprojectinvolvesallstakeholdersandconsiderstheirintereststhroughoutallstagesoftheproject.effectivecommunicationandconsultationwiththecommunityiscriticaltosuccessfullyachievingtheprojectobjectives.
overthelastyear,wehaveheldatotalof15communityinformationsessionsforfourofourprojects.
BestpracticecommunityrelationshasbeenattheforefrontoftheWesternsydneysupplyproject.This$569millionprojectinvolvesanupgradeoftheexistingabovegroundtransmissionlinebetweenthesydneyWestsubstationateasternCreekandGreystanes;buildingoftwonewsubstationsatGreystanes(Holroydsubstation)andpottsHill(rookwoodroadsubstation);andthebuildingofnewundergroundelectricitycablesbetweenthetwonewsubstations.
Wehaveactivelyengagedourcommunityandkeystakeholdersintheearlystagesofthisproject.Wehave:
>> soughtexpressionsofinterestfromthemarkettoseeifthereareanypossiblenon-networksolutions
>> establishedacommunityinformationlineandprojectemailaddressforpublicenquiries
>> heldinformationsessionstoadviselandownersundertheexistingabovegroundtransmissionlineabouttheupgradeandtoansweranyquestionstheymayhave
>> deliveredquarterlycommunityupdatestoaround2,600ownersandoccupiersoflandalongtheprojectcorridor
>> postedregularinformationincludingcommunityupdates,factsheetsandenvironmentalassessmentsonourexternalwebsite
>> providedafacilityforthecommunitytosubscribetoregularprojectupdatesviaourexternalwebsite.
australiannationalfielddaysduringoctober2009,weparticipatedintheaustraliannationalFielddays,athree-dayagriculturalshow,heldinBorenore,nearorange.
Theshowattractedthousandsofcommunitymembersfromaroundthestateandwasagoodopportunityforustotalkwithlandownersonimportantprojects,safetyaroundpowerlines,environmentalinitiativesandpotentialemployees.
ourexhibitprovidedgeneralinformationaboutTransGridandourlocalprojectsintheCentralWest.Communitymembersinquiredaboutarangeofprojectsincludingtheorangenorthredevelopmentproject,ManildratoparkestransmissionlineandtheWestern500kVproject.
Thethemefortheeventwas“changingagricultureinachangingenvironment”.Toreinforcethistheme,wepromotedourGreenGridpartnershipandgavearangeofeasementinformationtothecommunity.
ourstaffdidacommendablejobontheday.Theyprovidedfirst-handknowledgeinrespondingtoanyissuesandquestionsraisedbythecommunity.
teachinGourschoolsaboutelectricityTofurtherbuildgoodcommunitylinks,wehavebeenworkingwithlocalschoolsinareasaroundourcapitalprojects.
duringnovember2009,wevisitedTaralgapublicschoolandpresentedtoitsstudents.Thepresentationgavestudentsinterestingfactsaboutelectricityandimportantsafetymessagesforbothhomeandschool.WealsotookthestudentstovisitournewBannabysubstation.
ourgoodworkwiththeTaralgacommunitystartedtwoyearsagowiththebuildingofBannabysubstation.WewereactiveintheupperlachlanshireCouncilduringtheconstructionofthe500/330kVBannabysubstation,whichwaspartofouroverallWestern500kVproject.ThebuildingofBannabysubstationinvolvedsubstantialroadworks,whichwereundertakenbytheupperlachlanshireCouncil.Wethankboththecommunityandthecouncilfortheirassistancewhiletheroadworkswereunderwayandduringtheoverallbuildingofthesubstation.
chamPioninGemPloyees’toPfourcharitiesduringoctober2009,welaunchedacharityfundraisingprogramwhichsupportsfourkeycharitieseachyearonanorganisationwidebasis.
WeengagedouremployeesinthisinitiativerightfromthestartbyaskingthemtoprovidefeedbackonwhatcharitiestheywouldliketoseeTransGridsupport.Manyvoteswerereceivedanditwasrewardingtoseetheinterestfromemployees.
ourschoolssponsorshipprogramissomethingweareveryproudof.itisasmallwayinwhichwecanhelpourlocalcommunities.overthenextyear,wewillformaliseourschoolssponsorshipcampaignbyvisitingfurtherschoolsandlaunchingaTransGridkidswebsitepage.Welookforwardtoworkingwithmoreschoolsoverthenextyear.
TransGridannualreporT2010>ourcommunity 59
during2010/11wearesupportingthefollowingcharities:
>> australia’sBiggestMorningTea>> JeansforGenesday>> Movember>> pinkribbonday.
during2010,wehaveorganisedeventssuchasmorningteastoshowoursupportoftheabovecharities.Thecommitmentfromouremployeesintheseinitiativeshasbeensecondtononeandwelookforwardtoholdingsimilareventsinthefuture.
ouremployeeshaveenjoyedparticipatinginthesecharityevents.itisagreatwayforallemployeestogettogetherandsupportaworthwhilecause.
PromotionWemakeawidevarietyofinformationavailabletoourcustomers,stakeholders,employeesandsuppliers.
Weproducedthefollowingpublicationsduringthereportingperiod:
>> annualreport>> nsWannualplanningreport>> Corporateplan>> statementofCorporateintent>> Varietyofbrochures,advertisements,factsheets,communityupdatesandprojectnewslettersinformingstakeholdersaboutourcapitalprojects
>> reviewofenvironmentalFactorsforourvariouscapitalprojects.
electronicservicedeliveryWeusemanydifferentcommunicationtoolstoengagethepublic,customers,stakeholders,employeesandsuppliersaboutwhatwedo.
Weprovideouremployeeswithfacilitiestosecurelyaccesselectroniccorporateapplications,suchastheintranetandtheiremailaccountthroughtheinternet.Thenewintranet,scheduledtogolivein2011,willfurtherstrengthenthistwo-waycommunication.
Wehavegonelivewithanewexternalwebsite,whichbettermeetstheincreasingneedsforinformationbythepublic.Thepubliccannowsubscribetoregularupdatesonourcapitalprojects,mediareleasesandregulatorydocuments.Thenewwebsitealsofacilitatessimpleaccesstooure-tenderingande-recruitmentsites.
ourwins–2009/10>> Contributed $336,571 to sponsorships over the last year.>> Continued our good work with the aPI.>> renewed our GreenGrid sponsorship for a further three years.
>> formalised our charity fundraising program.
theroadahead–2010/11>> Launch an employee-giving program.>> formalise our schools sponsorship program.>> Create stronger links between our sponsorships and our capital projects.
>> rollout a social media policy to take our work with the community to the next level.
aboveMichael Gatt, General Manager/Corporate (far right), talking with community members at the australian National field Day agricultural exhibition in orange.
TransGridannualreporT2010>section 61
thinkingstopandconsider
enerGytoday,enerGytomorrow...
healthandsafetysafetyisournumberonepriority.ourhealthandsafetyapproachiswovenintobusinessdecisions,processesandeverydayactivities.
leftanthony o’Mara, electrical apprentice, yass regional Centre.
62 healthandsafety>TransGridannualreporT2010
PuttinGhealthandsafetyfirstsafetyisournumberonepriority.Thatiswhyourhealthandsafetyapproachiswovenintobusinessdecisions,processesandeverydayactivities.
ourstrategiesareaimedatcontinuallyimprovingourhealthandsafetyperformanceandmaintainingamajorfocusonriskmanagement.
ourgoaliszeroinjuries.Webelieveallaccidentsarepreventableonandoffthejob.
Thelosttimeinjuryfrequencyrate(numberoflosttimeinjuriespermillionman-hoursworked)for2009/10wastwo,whichwasasignificantimprovementfrom3.5in2008/09.
Thehealthandsafetystrategiesforthenext12monthsaredesignedtoraiseawarenessandhaveapositiveimpactinreducingourinjurylevels.
oursafetyPerformance
2009/10 2008/09 2007/08 2006/07 2005/06
lostTimeinjuryFrequencyrate 2.0 3.5 3.7 1.6 3.7
TotallostTimeincidents 4 7 7 3 7
Totaldayslost 79 54 83 6 228
averagelostTimerate 19.75 7.71 11.86 2 32.57
healthandsafety
“Keepingouremployees,contractorsandthepublicsafeisessentialtothewaywedobusiness.safetyisournumberonepriority.WeliveourstopandConsidermottodayinanddayout.ourgoaliszeroinjuries.
ourhealthandsafetystrategiesforthenext12monthsaretargetedatreducinginjuriesacrosstheentireorganisation.”
kenmccall,healthandsafetymanaGer
TransGridannualreporT2010>healthandsafety 63
causeofaccidentsfrom30June2009to30June2010(%)
Sports
Miscellaneous
Innapropriate Technique
Surface/Ground Conditions
House Keeping
Inappropriate use of PPE
Hazard not Identi�ed
Procedure not Followed
Lack of Concentration
lackofConcentration17%
procedurenotfollowed10%
Hazardnotidentified20%
inappropriateuseofppe3%
Housekeeping3%
sports3%
Miscellaneous7%
inappropriatetechnique21%
surface/groundconditions16%
althoughwerecordedasafetylTiof2duringtheyear,itwasanimprovementfrom3.5in2008/09.Weworkedcloselywithouremployeestoreduceworkplaceinjuries.Thebigchallengeforuswillbetobetterintegratesafetyintoeverydaybusinessdecisionsandensurethatcontractorsafetyisliftedtomatchthatofourpermanentworkforce.
abovevijendra Prasad at Macarthur Substation.
leftamie White, electrical apprentice, Wagga Wagga regional Centre.
64 healthandsafety>TransGridannualreporT2010
Healthandsafetyauditinghasrisenduringthelastyear.Theprocessesforaccreditingcontractors’healthandsafetysystemsandmonitoringperformancearealsobeingreviewedtoprovidemoretransparentinformationintenderselectionforprojects,networkmaintenanceactivitiesandmanagingcontractors’safetyperformance.
duringJune2010,weheldtwoworkshopswithourexecutiveleadershipteamtoidentifystrategiesfor2010/11.Thekeyimprovementareasforthecomingyearincludehealthandsafetybehaviours,electricalsafety,contractorsafety,wellbeingandhealth,travellingsafelyandfatigue.
oneoftheareasidentifiedintheseworkshopswastoimprovethehealthandsafetybehavioursofourpeople.Thesafetycultureofourpeoplecanhaveadirecteffectonoursafetyperformance.Toassist
uswithbetterunderstandingoursafetyculture,theexecutiveoccupationalHealthandsafetyCommitteeendorsedaprogramtoconduct13shortsafetyfocusgroupsessionsacrossthecompanyduringJuneandJuly2010.Thesefocusgroupstakeasnapshotofourunderlyingsafetyculture.Basedontheoutcomes,targetedinitiativesandactionscanbedevelopedwhichshouldimproveoursafetyperformance.
oranGetakeshomethesafetydayshieldWehavealongandproudsafetydayhistory.
our52ndannualsafetyday,heldon10september2009,waslargerthaneverwith21teamsfromacrossourbusinesscompetinginfirstaid,emergencyresponse,firefightingandriskassessment.
Thedaywasagreatsuccesswitharecordnumberof200participants.itfinishedwithapresentationdinnerwheretheeffortsofparticipantswererecognisedbyourChairman,MrBruceFoy.
safetydayisallaboutputtinginpracticeourlivingmottoofstopandConsider,whichinvolvesputtingsafetyfirstsothatwerealiseourgoalofzeroinjuries.
Wecongratulatetheorangeteamwhotookhomethesafetydayshield,provingthemselvesthebestall-rounders.
overthenextyear,wewillbroadenthescopeofoursafetydaytoincorporatekeyaspectsofourWellbeingprogram.
“icongratulateMarkandGrantfortheirsignificantcontributiontoonthejobsafetythroughtheirpositiveattitude.Theircommitmenttoputtingsafetyfirsthasbeensecondtononeandreaffirmsourlong-standing,positivesafetyculture.”
brucefoy,chairman
Wevalueanenvironmentthathelpsouremployeesbalanceworkandfamilyresponsibilitieswhilestayinghealthy.Thisgoesalongwaytocreatingacontentedandloyalworkforce.
duringMarch2010,wekickedoffourWellbeingprogram.Themaingoaloftheprogramistopromoteahealthy,happyandproductivelifebymakingpersonalchoicesthatcontributetoahealthyandbalancedlifestyle.ouremployeesspendmostoftheirwakinghoursatwork,whichiswhywewanttomakeitaprimevenueforpromotinghealthyhabits.
ThefirstinitiativeofourWellbeingprogramoccurredinapril2010withonsitefluvaccinationsofferedtoallemployees.Thevaccinationswereverypopularacrossallofoursiteswithnearly40percentofemployeestakingupthevaccination.
ourWellbeingprogrambringswithitarangeofprinciplestosupportemployees’social,emotional,physicalandfinancialwellbeing.someoftheseincludehealthassessments,returntoworkprograms,ergonomics,employeeassistanceprogram,financialinformation,eldercareandchildcareresourcesandhealthawarenesssessions.
HealthandsafetyManager,KenMcCallstates:“Our Wellbeing program caters for the rapidly changing work/life balance needs of our employees. Increasingly, we are seeing the link between employee wellbeing and their ability to perform their role. Healthy, engaged and valued workers will reap great personal benefits while TransGrid will see proportionally, a real productivity gain.”
uPclosekeePinGouremPloyeeshealthy
TransGridannualreporT2010>healthandsafety 65
chairman’ssafetyawardwinnerTheannualChairman’ssafetyawardrecognisesanindividualorteamwhohavemadeasignificantcontributiontosafetyanddevelopedorappliedsafetysolutionsinaninnovativeway.
Thisyear’sawardwaspresentedtoMarkZahraandGrantleves,fromthesubstationsgroup,fortheinnovativeworkmethodstheyappliedinoverhaulingHaymarketGasinsulatedTransformers.MarkandGrant’ssafetyinitiativeisallaboutlookingoutsideofthesquareforsolutions.MarkandGrantappliedthisprincipletotheHaymarkettransformermaintenancework.
TheHaymarketgasinsulatedtransformerswereduefortheirfour-yearoverhaul.MarkandGranttookituponthemselvestoinvestigatealternateworkmethodstothoserecommendedbythemanufacturer.
TheoutcomeatHaymarketwasasignificantlysaferjobwitharobustrepeatableworksystemandtoolsthataresuitableforuseonthethreetransformersandreactorseveryfouryears.
futurehealthandsafetystrateGiessomeoftheimprovementareasthatwewillfocusonoverthenextyearinclude:
>> promotingawarenessofthedangersofelectricity,forbothnewemployeesandexistingemployees,toreducethepotentialforelectricalrelatedincidents
>> improvingtheprocessforaccreditingcontractors,tenderingrequirements,inspectingandauditingcontractorsworkandreportingofcontractorperformance
>> continuingtodevelopandimplementtheWellbeingprogram
>> developinginitiativestoreducetraveltimewhilepromotinggreaterunderstandingandawarenessoftherisks
>> promotingawarenessoffatigue-relatedrisks.
ourwins–2009/10>> reduced our LTIfr from 3.5 to 2.>> Launched our Wellbeing program, including on-site flu vaccinations.
>> held safety improvement workshops with our senior leaders.
theroadahead–2010/11>> Better equip our contractors to meet our health and safety expectations in line with increased construction activity.
>> further embed our Wellbeing program across the organisation.
>> Broaden the scope of our safety day to include wellbeing.>> help our employees and the public better appreciate the dangers of electricity.
aboveMark Snowdon, Projects foreman/Team Leader, Lionel Smyth, General Manager/Network, Isabel Shanahan, Grid engineering officer, and Michael Gatt, General Manager/Corporate, at Wallerawang Substation.
TransGridannualreporT2010>section 67
beinggreen
enerGytoday,enerGytomorrow...
ourenvironmentalcommitmentWevaluethefutureofourassetsandwillcontinuetoprotectthembytakingawholeofbusinessapproachtotheenvironment.
leftColin Mayer, Senior Project Manager, at Macarthur Substation.
68 ourenvironmentalcommitment>TransGridannualreporT2010
ourenvironmentalcommitment
“Wearecommittedtoprotectingourenvironment.ourenvironmentalstrategiesareaimedatpreventingenvironmentalincidentsandshiftingourenvironmentalculturetoonethatintegratesenvironmentalmanagementintoeverydaybusinessactivities.”
stuartJohnston,corPorateenvironmentmanaGer
WehavecontinuedtoimproveourenvironmentalManagementsystem(eMs).duringoctober2009,oureMswasrecertifiedagainsttheiso14001standard.
duringtheyear,wemadethefollowingchangestooureMs:
>> Wedevelopedtheenvironmentalrulesprocedurewhichestablishesenvironmentalassessmentresponsibilitiesforthedifferentstagesofacapitalproject.Theprocedureaddressesanumberoffindingsfromauditsandincidentinvestigations.proceduresforthepreparationofConstructionenvironmentalManagementplans(CeMp)andenvironmentalimpactassessment(eia)havealsobeenprepared.
>> WeimplementedtheGreenhouseGasreportingdataCollectionproceduretohelpusmeettheNational Greenhouse and Energy Reporting Actrequirements.
>> Weupdatedourwastemanagementprocedure.
liveGreenourliveGreenprogramisallaboutincreasingemployees’awarenessofenvironmentalimpactsandencouragingthemtoembraceenvironmentallyfriendlyoptions.Theprogramhasbeenanexcellentopportunityforeveryonetoworkasateamtoachievepositivechange.
duringtheyear,wehavepromotedlivegreentipstoouremployeesthroughvariousinternalcommunicationchannels.Wepromotetipsacrossfourthemes:recycling,energyuseandsavings,waterandhometips.
Thechallengeforusoverthenextyearwillbetoestablishclearstrategiesformeasuringthesuccessoftheprogram.
resPondinGtoclimatechanGeThecommunityexpectsenergycompaniestoaddressclimatechange.
Theknowledgeofclimatechangehassignificantlyimprovedoverrecentyears.Thelastfewyearshavebeenaperiodoflearningforusandwehavefocusedonlookingathowclimatechangecouldimpactourloadforecastsandperformanceunderarangeofscenarios.Wearealsomonitoringcommunity,
politicalandregulatorydevelopmentsinthisareaandactivelyrespondingtoreportspublishedbyindustrybodies.
overthelastyear,wehavetakenthefollowingstepsinrespondingtoclimatechange:
>> completionofaGreenhouseandenergyreportingguidetohelpstaffusetheCommonwealthsoftwarepackageforreportinggreenhousegasemissions
>> submissionofthenationalGreenhouseandenergyreporting(nGer)reporttotheCommonwealthGovernment
>> developmentofaTransportenvironmentalstrategy,whichsetstargetsfortheenvironmentalperformanceofourfleetandhowweselectthem
>> preparationofaClimateChangeandCarbonManagementstrategy
>> continuedtomaintainanawarenessofcommunity,politicalandregulatorydevelopmentsrelatingtoclimatechange.
Wevaluethefutureofourassetsandwillcontinuetoprotectthembytakingawholeofbusinessapproachanddevelopingassetstrategieslinkedtotheimpactsofclimatechangeoverthenextyear.
Thestandoutwinnerofthe2009Chairman’senvironmentalawardwastheMacarthursubstationprojectteam.TheprojectteamwasledbyVijendraprasad,peterGlennandHeatherWaglandandisrecognisedfortheinnovativeenvironmentalapproachestaken.
externalstakeholders,includingtheMountannanBotanicGardenandCampbelltownCityCouncilallhadsignificantexpectationsfromtheproject.Theirsatisfactionwiththeoutcomeisameasureofthesuccessoftheproject.
alandscapingplanutilisingnativevegetation,ascreeningmound,lowreflectionconductorsandenhancementof
keyareasoftheendangeredCumberlandplainwoodlandcommunitymeantthatstakeholder’shighexpectationsofminimalenvironmentalimpactweresatisfied.
TheMacarthursubstationprojecthasdemonstratedthatbyengagingwiththecommunity,wecanworkwithcontractorstodeliverasubstationthatmeetstheobjectivesofsustainabledevelopment.
Macarthursubstationhasdefinitelysetanewenvironmentalbenchmarkforfuturesubstations.
allnominationsreceivedcontinuetodemonstratetheongoingcommitmentthatourstaffhavetoimprovingourenvironmentalperformance.
uPclosechairman’senvironmentalawardwinner
aboveMacarthur Substation.
TransGridannualreporT2010>ourenvironmentalcommitment 69
GreenGridoverviewGreenGridisaremarkable12-yearpartnershipbetweenTransGridandGreeningaustralia.
GreenGridisresponsibleforrestorationworksonanareaofapproximately2,000footballfields.Theprojecthasengaged350landholdersintheMurrumbidgeeandlachlancatchmentsofnsW.planting,directseedingandfencinghasbeencarriedoutonover1,000hectaresofclearedfarmlandwithsupportfrom1,800volunteersrepresentinglandcare,schools,TransGridandGreeningaustralia.
ThehighlightsofGreenGridduring2009/10included:
>> GreenGridanditsassociatedprogramBoorowariverrecovery(partofthenationalriverrecoveryprogram)werebothselectedasnationalfinalistsintwocategoriesforthenationalBanksiaawardsfor2009.
>> TheBoorowariverrecoveryprogramwasafinalistinthe2010unitednationsassociationofaustralia(unaa)Worldenvironmentdayawards.
>> TheBoorowariverrecoveryprogramwasafinalistinthe2010nationallandcareawards.
>> 31newsiteswereaddedtotheGreenGridprogramtakingittoover350sites.
>> 25newlandholdersand260newvolunteersjoinedtheprogram.
>> 15successfulcommunityeventswereundertakenacrossnsW.
>> environmentalrestorationandrehabilitationworkswereimplementedonapproximately60hectaresofclearedfarmland.
TheprioritiesoftheGreenGridpartnershipoverthenextfewyearsinclude:
>> managingclimatechangebyimplementingcarbonand/orecologicalmitigationopportunities
>> extendingtheGreenGridpartnershipfurtherintoourcentralandnorthernregions
>> addressingbiodiversity,waterqualityandsustainabilityissuesthroughtargetedon-groundaction.
ThefuturedirectionsofGreenGridwillbuilduponpastachievementswithabroaderfocustooffsetourcarbonfootprint.
wastereductionandPurchasinGPolicyWehaveanongoingcommitmenttoincorporatingthensWGovernment’sWastereductionandpurchasingpolicy(Wrapp)intowhatwedowiththeenvironment.
since1999,wehavesupportedtheWrappframeworkbymaximisingresourceefficiencyandreducingwastegenerationthroughavoidance,reduction,reuseandrecycling.
ourWrappplanincludesthefollowingwastereductioninitiativesfortheofficeenvironment:
>> reductioninpaperuse>> increasedrecycling>> educationinitiativesthroughourliveGreenprogramtoinformstaffaboutenvironmentalissuesincludingresourceconsumption.
inouroperationalenvironment,ourWrappplanincludeswastereductionandrecyclinginitiativesformaintenanceandconstructionactivities,includingvegetationmaterialsandconstruction,demolitionandexcavatedmaterials.
in2009,weissuedourWrappreporttothedepartmentofenvironment,ClimateChangeandWater(deCCW).
earthwatchThroughourpartnershipwiththeearthwatchinstitutewearegivingouremployeesthechancetobetterunderstandlocalenvironmentalissuesandbroadentheirpersonaldevelopment.
Theearthwatchinstituteisanindependent,non-profitorganisationthatsupportsscientificresearchbyplacingvolunteersinthefieldtoworkwithscientists.
during2009/10,thefollowingemployeesparticipatedinearthwatchfieldresearchprojects:
>> GordonKeen–FreshwaterTurtlesoftheKimberlyThisstudyishelpingtodefinethepopulationstructure,densityandfeedingbehaviouroftwofreshwaterturtlespecies.
>> sophiedowling–projectMantraThisprojectstudiestheworld’slargestraytohelpprotectthespeciesagainstrisingthreatstoitslong-termhealth.
>> darrenspoor–ClimateChangeintherainforestThisprojectmeasuresthedistributionofanimals,birdsandreptilesinthedaintreerainforestinQueenslandtoassesstheimpactsofclimatechange.
onhisexperiencewithearthwatch,darrensays,“Despite the late nights and early mornings, it was all good fun and a real honour to be a part of this research program. There was always interesting work to be done. I feel very fortunate to have travelled to areas that would be completely inaccessible as a tourist. I thank TransGrid’s leaders for this fantastic opportunity”.
duringJuly2009,weextendedourpartnershipwithearthwatchtoincludethescientistforadayprogram.Thisprogramisagreatwayforouremployeestogetoutintothefieldandassistinmuchneededconservationresearch.during2009/10,wehadtenemployeesparticipateinthisprogram.
ourwins–2009/10>> achieved recertification of our eMS against the ISo 14001 standard.
>> Completed a Greenhouse Gas emissions Inventory Study (carbon footprint).
>> Completed our WraPP reporting requirements. >> Developed a Transport environmental Strategy. >> Completed our NGer reporting requirements under the National Greenhouse Energy Reporting Act 2007.
>> renewed our GreenGrid partnership for a further three years.
theroadahead–2010/11>> Develop a sustainability road map. >> Scope a plan for being carbon neutral by 2015.>> Look into how the performance of our assets can be impacted by climate change.
>> Provide training to project managers and the wider business on key environmental risks in project delivery.
>> Develop a code of conduct for environmental management in TransGrid.
TransGridannualreporT2010>section 71
ourcapitalworksprogramWearecommittedtodeliveringourcapitalworksprogramonasustainablebasis.Thegoalisnotjusttodelivertheprojectsbuttodelivertheminthemostefficientmanner.
enerGytoday,enerGytomorrow...
left
Peter McIntyre, Managing Director, Mark Connolly, Project engineer/yass and Lionel Smyth, General Manager/Network at orange substation.
72 ourcaPitalworksProGram>TransGridannualreporT2010
deliverinGasustainablecaPitalProGramWearecommittedtodeliveringourcapitalprogramonasustainablebasis.
Todeliveronourcapitalprogram,weneedtohavetherightskillsandexpertise.Wehavedevelopedspecificresourcetargetswhichhavebeenmetwithastrongintakeoftraineesandgraduatesoverthelastfouryears.Thetraininganddevelopmentopportunitiesprovidedtoourtraineesandgraduateshasputtheminagoodpositiontomoveintomoreexperiencedroles.
inadditiontodevelopingtheskillsandexpertiseofourpeople,wehavedevelopedprojectdeliverymodelstohelpusdeliverourcapitalworksprogrammoreefficiently.ourdesignandconstructmodelforsubstationprojectsbenefitsuswithmoreprojectsbeingdeliveredontimeandtobudget.Currently,sixcontractorshavebeenpre-qualifiedtobidfortheseprojects.Weexpectthatallmajornewsubstationprojectsinthe2009to2014periodwillbedeliveredusingthismodel.
anearlycontractorengagement(relationship)model,beingusedforthetelecommunicationupgradeworks,hasproventobeagrowingsuccess.sixprojects,withatotalvalueofover$50million,havebeenorarebeingdeliveredbythismodel.Thelessonslearnedfromtheearlierworkshaveledtobetterdeliverytimesandlowercostsinlaterworks.
duringtheyear,weimplementedaprojectmanagementtool,artemis,tohelpdelivertheupcomingcapitalprogram.Wehavewidenedtheuseofartemisthroughouttheorganisationtoprovideaviewofthewholecapitalworksprogramsothatlonger-termforecastsareavailable.asthetoolhasdeveloped,variouspartsofthebusinesshaveseenthebenefitsinforecastingtheirworkloadsandidentifyingwherekeybusinessinformationwillbecomeavailablefromprojects.
wollartowellinGton330kvtransmissionline
Powering supply to half a million homes in Central West NSWduringearly2010,wecompletedanew117kilometre,330kVtransmissionlinebetweenWollarandWellington.Thenewlinerepresentsa$90millioninvestmenttoensurehighstandardsofreliabilitytotheCentralWestnsWcommunity.
WestartedbuildingthelineinFebruary2008.ThelinelinksWellingtonsubstationtoour500kVnetwork,viaanew500/330kVsubstationatWollar.
environmentalconsiderationswerekey.Thestudyareaforthelinewaschosenonthebasisthatitmetenvironmental,socialandeconomiccriteria.aftermuchcommunityconsultation,wechoseapreferredcorridorandstartedanenvironmentalimpactassessment(eia).
TheprojectgaveusthechancetobuildonourongoingpartnershipwithGreeningaustraliaandthecommunity–viatheMolongGrassWoodlandCommunityrestorationproject.TheMolongprojectinvolvedcommunitygroups,Greeningaustraliaandouremployeesenhancing25hectaresofBox-GumGrassyWoodlandandrevegetating50hectaresofadjacentclearedfarminglandinMolongtoestablishwildlifecorridorsinthelocallandscape.
WestartedbuildingthenewWollar500/330kVsubstationinoctober2008bybuildingacreekcrossingnearthesubstationsitetomaintainexistingwaterflows.
WehadtwotransformersdeliveredtoWollarsubstationinseptember2009.eachtransformerweighedaround125tonnesandwasover85metresinlength.WeenergisedWollarsubstationinJanuary2010andtheWollartoWellingtontransmissionlineinMarch2010.
Thesuccessfulcompletionoftheprojectisatestamenttotheeffortofmanyemployeesandcontractorsoveraperiodofmorethansevenyears,frominitialplanningthroughtofinalconstruction.
tomaGotostroud132kvtransmissionline
Strengthening supply to one of the fastest growing areas in NSWTomeetthegrowingenergyneedsinthestroud,TarroandBulahdelahcommunities,wearebuildinganew$50milliontransmissionlinefromTomagotostroud.
Weexpectpeakelectricitydemandinthelower-midnorthCoastareaofnsWtorisebyasmuchas35percentoverthenexttenyears.
ThenewprojectinvolvesthebuildingofsixkilometresofnewtransmissionlinebetweenTomagoandTarro,andthereplacementof64kilometresofanexistingwoodpolepowerlinebetweenTarroandstroudroadwithaconcretepoleline.
Weareintheenvironmentalplanningstages,withareviewofenvironmentalFactors(reF)havingstartedinFebruary2010,duetobefinishedbydecember2010.Wehavecompletedalargemajorityofthefieldstudiesandnosignificantimpactshavebeenfoundatthisstage.
ourcapitalworksprogram
Wecurrentlyhavemorethan60majorcapitalprojectsunderwaycoveringmostofourprojectsinthe2009to2014regulatoryperiod.Wehavebeensuccessfulindeliveringourcapitalworksprogrambecauseoftheskillsofouremployeesandcontractors.Weareconfidentthatthisskillandknowledgebasewillprovidealong-termbenefittous.
TransGridannualreporT2010>ourcaPitalworksProGram 73
caPitalworksProGram–snaPshot
substationscomPleted transmissionlinescomPleted transformeradditionandrePlacementProJects
Macarthursubstation
WaggaWagganorthsubstation
Queanbeyansubstation
Wollarsubstation
Bannabysubstation(aspartofWestern500kVdevelopment)
Bayswater500kVswitchyard(aspartofWestern500kVdevelopment)
Mtpiper500kVswitchyard(aspartofWestern500kVdevelopment)
WollartoWellingtontransmissionline
YassWaggaWaggatransmissionlinerebuild
somelineconversionsontheCoffsHarbourtoKempseytransmissionline
CoffsHarbour
Cowra
Finley
Koolkhan
sydneysouth
WaggaWagga
shuntreactorsatWellingtonandsydneysouthsubstations
Wehaveworkedwiththecommunityrightfromthestart.Therearearound121propertyownerspotentiallyaffectedalongtheline.ourpeoplemetthelandownersintheearlystagestointroducethemtotheproject.Throughoutourdealingswiththelocalcouncilandlandownersfromsurroundingareas,ourresponsefromindividualshasbeenlargelyapositiveone.Werecognisethevalueinseekingfeedbackfromthecommunityduringeverystageofthecapitalprojectdeliveryprocesstomakesureitsviewsarecarefullytakenintoconsideration.
Weexpecttheprojecttomakerealcontributionstothelocalcommunitybycreating40newfull-timejobsinthearea.
Westartbuildingthenewlineinoctober2011.Completionisexpectedinnovember2012.
waGGawaGGanorth132kvsubstation
Delivering supply to 14,000 customers in Wagga Wagga duringseptember2009,wecompletedbuildinganew$22millionWaggaWagganorth132kVsubstation.
WestartedbuildingthesubstationinMay2008,aftermorethanfiveyearsofdetailedplanningwithCountryenergy.
risingelectricitydemandinWaggaWaggaanditssurroundingareasmeantthatourexistingWaggaWaggasubstationwasreachingcapacity.ThenewWaggaWagganorthsubstationwillsupplytenofCountryenergy’sruralzonesubstations,providingpowertoaround14,000homesandbusinessesintheWaggaWaggaarea.
TheBomenBusinessparksite,locatedadjacenttotheexistingindustrialareainByrnesroad,gaveusthechancetobuildcloselytotheexistingtransmissionnetworkinfrastructure,optimisingthepowerflowingintotheWaggaWaggaregion.
ThenewsubstationhasproventobeanimportantpartofourcapitalworksprogramandwillgoalongwaytosupportingfuturedevelopmentinnsW’slargestinlandcity.
queanbeyan132kvsubstationredeveloPment
More power to 50,000 homes and businessesduringMay2010,wecompletedamajorredevelopmentofQueanbeyan’s132kVsubstation.
The$28.5millioninvestmentwillimprovepowersupplytoover50,000homesandbusinessesintheQueanbeyan,Canberra,easternaCTandBraidwoodcommunities.
ThefirstQueanbeyansubstation,builtin1957,hasprovidedreliablepowertotheQueanbeyanandsurroundingcommunitiesforover50years.However,therebuildofQueanbeyan’s132kVsubstationwasimportantincateringfortherapidlygrowingregion.
Westartedworksindecember2008bydemolishingtheoriginalsubstationandreplacingitwithanup-to-date,modernsubstationonanadjacentsite.
aboveCompleted Wollar to Wellington 330kv Transmission Line.
74 ourcaPitalworksProGram>TransGridannualreporT2010
Wefacedmanychallengesinseeingthisprojecttofruition.Weneededtoplancarefullyandregularlyreviewouractionplanstomakesureissueswereaddressedpromptly.WeworkedcloselywithCountryenergyinaproactivewaytoovercomethetechnicalchallengesoftheproject.
Theprojectwasoneofanumberofsystemupgradeswedidintheareatomaintainasecureelectricitysupplyintheregionforyearstocome.
Testingandpre-commissioningofthesubstationwascarriedoutduringmid-2010.Thesubstationisexpectedtobefullyenergisedandinoperationbytheendof2010.
oranGenorthredeveloPment
Better power supply to Orangeinmid-2009,westartedamajorupgradetotheorangenortharea.orangesubstationprovideselectricitytomorethan40,000peopleandplaysakeyroleindeliveringsafepowertotheorangearea.
Theorangenorthredevelopmentprojectwillhappenoveraperiodoffouryearsandinvolvesbuildinganewswitchingstationonleedsparade,rearrangingthetransmissionlinestoconnecttheswitchingstationtotheexistingnetworkandupgradingtheexistingorangesubstationonWilliamstreet.
Theorangenorthsubstationisnowover50yearsoldandthesubstationsiteistoosmalltocaterforallthenecessaryupgrades.anewswitchingstationwillbebuiltaspartofalargerprojectfortheregion’spowersupply.
stakeholderconsultationhasbeenveryimportanttousduringthisproject.WeinvitedthecommunitytohavetheirsayontheprojectwiththepublicreleaseofthereF.Wealsopublishedcommunityupdates,feedbackformsandeasementguidesonourpublicwebsite.
Theswitchingstationandtransmissionlineworksareduetobefinishedbylate2011andthesubstationupgradebymid-2013.
uPcloseenerGisinGthewestern500kvTomeetrisingelectricitydemandinthesydney,newcastleandWollongongareas,wehaverecentlyfinishedtheWestern500kVproject,atavalueof$320million.itisourlargestever-completedproject.
Theprojectincludesnolessthansixmajorcomponents,including:
>> BuildingofBayswater,Mtpiper,BannabyandWollar500/330kVsubstations.
>> upgradingof330kVequipmentatWallerawang330kVswitchingstation.
>> replacementofthecircuitbreakersandprotectionschemechangesatBayswaterandliddellsubstations.
Theprojectkickedoffindecember2005andtookalmostfiveyearstocomplete.
Wewereactivewiththecommunityrightfromthestart,withdevelopmentapprovalsandenvironmentalapprovalsinvolvingtheupperlachlanshirecouncilintheGoulburn/Crookwellareaofthestate,thelithgowCitycouncil,theMid-WesterncouncilandMuswellbrookcouncilintheHunterValley.significantcommunityconsultationwascarriedoutatBannaby.
Theprojectincludedthesupplyofsevenbanksofthreesinglephasetransformers,atotalof21units.eachbankof500/330/33kVtransformershasacapacityof1500MVa.during2008/09,18oftheseunitswereshippedfromJapantotheportofnewcastleandthenbyheavyhaulageroadtransporterstoBayswater,MtpiperandBannaby.Thelastthreeunits,forWollar,weredeliveredinthesecondhalfof2009.
siteworksstartedatBayswaterinaugust2007andfinishedon8January2009.Thereplacementofthecircuitbreakers,
protectionschemechangesatBayswaterandliddellandtheupratingoftheWallerawang330kVswitchingstationwerecompletedinMarch2009.
Mtpipersubstationfollowedwithcompletionon27March2009.inconjunctionwiththecompletionofMtpiper,thefirst500kVlinebetweenBayswaterandMtpiperwasputinservice.ThismarkedtheachievementofthefirstofanumberofsignificantmilestonesfortheWestern500kVproject,asthelinecarriedloadat500kVforthefirsttime.
ThesecondsignificantmilestonefortheprojectwasachievedinearlyJune2009whenMacquarieGenerationcompletedthereplacementofno.3generatortransformerswith500kVunits.MacquarieGeneration’sunitstartedgenerationintothe500kVsystemon3June2009.
ThesecondtransformeratMtpiperwascommissionedandputintoserviceinJune2009.Theestablishmentofthe
aboveCompleted Bannaby 500/330kv Substation.
TransGridannualreporT2010>ourcaPitalworksProGram 75
beaconsfieldwestsubstationuPGrade
$144m investment to secure inner Sydney power supplyduringapril2010,westartedanupgradeonourBeaconsfieldWestsubstation.
Thesubstationwasfirstcommissionedin1979asthefirst330kVsubstationintheinnersydneyareaandisavitalpartofournetwork.BeaconsfieldWestisoneofourtwobigsubstationsintheinnersydneyCBdandinnermetropolitanareaanditsupgradeisimportanttomaintainreliabilitytoourinnersydneycommunities.Theseworkswillincreasethecapacityofthesubstationby50percent,whichwillsupplyaroundhalfamillionaveragehomes.
Theprojectinvolvesupgradinghighvoltageequipmentinthesubstation,constructingnewbuildingsandinstallingathirdstate-of-the-arttransformeratthesite.
innovationhasbeenakeyconsiderationonthisproject.Forinstance,weputinplacesignificantfireprotectionmeasurestoprotectthebuildings,appliedaninnovativedesigntotheoilcontainmentsystemandusedleadingconstructionmethodologies.
on17March2009,weformallyawardeduGlinfrastructureacontracttodesignandconstructthesubstation.Theceremonywasagreatwayforustorecognisetheskillsandcapabilitiesofourcontractorsinhelpingtodeliveronourmulti-billiondollarcapitalworksprogram.
Weareexpectingtocompletethesubstationinnovember2012.
westernsydneysuPPly
A key milestone in our journeyWehaveembarkedonourlargestprojectever–theWesternsydneysupply.TheWesternsydneysupplyisa$569millioninvestmenttosecuresydney’spowersupplyforthefuture.
sydney’spopulationisexpectedtoincreaseby1.1millioninthenext25years.Thismeansweneedtopoweranadditional640,000homesandover6.8millionsquaremetresofcommercialspace.Thatisanaveragepopulationincreaseof40,000peopleeveryyearforthenext25years.
TocaterforthisgrowthwewillbeupgradingtheexistingtransmissionlinebetweeneasternCreekandHolroyd,buildingtwonewsubstationsatHolroydandpottsHillandjoiningthesesubstationswithnew18kilometreundergroundcables.ThecablewillfollowthesydneyWaterpipelinebetweenGuildfordandregentsparkandtheliverpooltoparramattaBusT-Way.
Wevalueindustryinputandattheendof2009,weaskedindustrytoproposealternativestobuildingthenewinfrastructuresuchasdemandmanagementsolutions.althoughtheseproposalshavethepotentialtodelaytheneedtobuildtheinfrastructure,noviablealternativeswerepresented.
environmentalconsultantswereengagedtodofieldstudiesandprepareareFforeachpartoftheproject.Thesestudieswillhelpusdetermineandmanageanypotentialenvironmentalimpactsthisprojectmayhave.
WewillstartbuildingthetransmissionlineandHolroydandrookwoodroadsubstationsinmid-2011.Buildingoftheundergroundcablewillstartfrommidtolate2011.
ourwins–2009/10>> Delivered more than $428.7 million worth of capital projects across NSW.
>> Successfully finished the Western 500kv project, one of our largest and most important projects.
>> Boosted our graduate, apprentice and engineering trainee numbers to build our internal project delivery capability.
theroadahead–2010/11>> Implement a capital program prioritisation framework to deliver our capital works more efficiently.
>> Implement a risk methodology for our major capital works.>> Consolidate and refine our approach to community and stakeholder engagement for our transmission line projects.
secondlinebetweenBayswaterandMtpiperat500kVandtheestablishmentoftheMtpipertoWallerawang330kVlinewerecompletedinaugust2009.
WollarsubstationwasplacedinserviceduringJanuary2010andBannabysubstationwasinserviceduringMarch2010.
Whatremainstobedonein2010/11isthecompletionoftheassociatedlinerearrangementsatBannabyandMtpipersubstations.Thisworkwillhappeninaugust2010.
Weworkedwiththelocalpeopleeverystepofthewayandthankthemfortheircontributionstotheproject.TheprojectwasnosimplefeatandinvolvedhundredsofTransGrid,unitedGroup,contractorandsubcontractorstaff,allofwhoaretobecommendedfortheirachievementstodate.
“FortheWesternsydneysupplyproject,wehavebeenengagingthecommunityrightfromthebeginninginmanydifferentways.someofthesehaveincludedgivingthecommunitytheopportunitytosubscribetoourprojectsviaourwebsite;establishingacommunityinformationlineandprojectemailaddressforpublicenquiries;,holdingtargetedinformationsessionsforlandowners;recordingallcommunityconsultationswithnewconsultationmanagementsoftwareanddeliveringquarterlycommunityupdatestoaround2,600landowners.”
michaelGatt,GeneralmanaGer/corPorate
TransGridannualreporT2010>section 77
beingresponsibleandaccountable
enerGytoday,enerGytomorrow...
corporategovernanceourBoardandmanagementsupportanenvironmentthatencouragesaccountabilityamongstallemployeestodeliveraserviceinthebestinterestsofshareholders,thecommunityandourstakeholders.
leftalbert elsouri, engineering officer/Technician, at Metropolitan region.
78 corPorateGovernance>TransGridannualreporT2010
ourcharterWewereestablishedasastate-ownedcorporationon14december1998,intermsoftheEnergy Services Corporations Act 1995.
section6Coftheactgivesus,asanenergytransmissionoperator,twoprincipalfunctions,whichare:
1. toestablish,maintainandoperatefacilitiesforthetransmissionofelectricityandotherformsofenergy.
2. toprovideservicesforthetransmissionofelectricityandotherformsofenergyinaccordancewiththerelevantregulatoryregime.
Thesectionalsoempowersustoutiliseanddevelopourelectricitytransmissionfacilitiestocarryouttelecommunicationsservices.
TheprincipallegislationweoperateunderistheEnergy Services Corporations Act 1995,theElectricity Supply Act 1995andtheState Owned Corporations Act 1998.
ourshareholdersourBoardandexecutivebelievethatgoodgovernanceisthekeytoahigh-performingandsustainableorganisation.
ourBoardisaccountabletothevotingshareholdersforourperformance.Therearetwovotingshareholdersatanyonetime,eachholdingthesamenumberofsharesandthesamerights.TheshareholdersholdtheirsharesonbehalfofthensWGovernment.
asat30June2010,ourshareholderswere:
>> TheHon.MichaeldalyMp,MinisterforFinance.
>> TheHon.ericroozendaalMlC,Treasurer.
ourministerFrom1July2009till13september2009,weformedpartoftheportfoliooftheHon.ianMacdonaldMp.
From14september2009till20May2010,weformedpartoftheportfoliooftheHon.Johnrobertson,MlC.
From21May2010to30June2010,weformedpartoftheportfoliooftheHon.paullynchMp,Ministerforaboriginalaffairs,MinisterforindustrialrelationsMinisterforCommerce,MinisterforenergyandMinisterforpublicsectorreform.
boardofdirectorsourprincipalobjectivesandfunctionsandthestructureandcompositionofourBoardarelaidoutintheEnergy Services Corporations Act 1995 No. 95;theState Owned Corporations Act 1989 No. 134andourconstitution.
ourBoardoperatesinaccordancewiththeprinciplessetoutintheBoardCharter.ThischarterdetailstheBoard’sstructureandresponsibilitiesandisreviewedonanannualbasis.TheBoardalsohasaCodeofConducttowhichalldirectorsmustadhereandwhichisreviewedonanannualbasis.
corporategovernance
TheBoardisresponsibleforprovidingeffectiveguidanceanddirection,independenceindecisionmaking,aneffectivesystemofcorporategovernanceandexecutivedevelopmentandsuccessionplanning.
aboveriGhtomar hassanein and Jahangir Safari, electrical engineering Graduates.
TransGridannualreporT2010>corPorateGovernance 79
boardstructureTheEnergy Services Corporations Act 1995 providesthatourBoardconsistof:
a. TheManagingdirector.
b. onedirectorappointedbythevotingshareholdersontherecommendationofaselectioncommitteecomprising:i. twopersonsnominatedbythe
portfoliominister;ii. twopersonsnominatedbythelabor
CouncilofnsW,eachbeingapersonselectedbythecommitteefromapanelofthreepersonsnominatedbythelaborCouncil;and
c. atleasttwo,andnotmorethanfiveotherdirectors,appointedbythevotingshareholdersattheirdiscretion.
Theperiodofappointmentofnon-executivedirectorsisatthediscretionofthevotingshareholders.
boardresPonsibilitiesTheresponsibilitiesofourBoardareoutlinedintheBoardCharter.Themainresponsibilitiesinclude:
>> providingstrategicguidanceanddirectiontothecorporation,includingcontributingtothedevelopmentofandapprovingthecorporatestrategy.
>> reviewingandapprovingbusinessplans,theannualbudgetandfinancialplans,includingcapitalexpenditureinitiatives.
>> overseeingandmonitoring:– organisationalperformanceand
achievementofstrategicgoalsandobjectives
– compliancewiththeCorporation’sCodeofethicsandConduct
– progressonmajorcapitalexpenditureandothersignificantcorporateprojects
>> Monitoringfinancialperformance>> ensuringthataneffectivesystemofcorporategovernanceexists
>> ensuringeffectivemanagementprocessesincludingexecutivedevelopmentandsuccessionplanning.
chairmanandmanaGinGdirectorTheBoardCharteroutlinestheroleoftheChairmanandManagingdirector.
TheChairmanistoprovideleadershipandpromotethecohesivenessandeffectivenessoftheBoard.
KeyrolestobeperformedbytheChairmaninclude:
>> assistingtheBoardtodevelopgoodrelationshipswiththeshareholdingministersandportfoliominister,withtheManagingdirectorandwithotherkeystakeholdersandinterestedparties.
>> assistingindividualdirectors,andtheBoardasawhole,tounderstandtheirrole,responsibilitiesandaccountabilities.
>> HelpingdirectorsunderstandtheirrisksandliabilitiesasindividualmembersandasaBoard.
>> ensuringacomprehensiveagendaispresentedateachBoardmeeting.
section20l(2)oftheState Owned Corporations Act 1989andarticle16.7(a)ofourconstitutionprovidethattheManagingdirectorisresponsibleforourday-to-daymanagementofoperationsinaccordancewiththegeneralpoliciesandspecificdirectionsoftheBoard.
boardinductionandtraininGupontheirappointmenttotheBoard,ourdirectorsundergoaninductionprogramtohelpthemunderstandtheBoard’sexpectationsandrequirements.BriefingswiththeChairman,theManagingdirectorandtheBoardsecretaryarearranged.
anumberofkeydocumentsarealsoprovidedduringthistime,including:
>> letterofappointment>> adeedofindemnity>> alistoffellowdirectorsandthechairandcontactdetails
>> acopyofthebusiness’sconstitution>> acopyoftheBoard’sCodeofConduct>> copiesofthechartersfortheBoardandBoardCommittees
>> acopyofthemostrecentstatementofCorporateintent(sCi)andannualreport
>> theBoardandCommitteemeetingschedule
>> organisationcharts>> acopyofthepreviousmonth’smeetingpapersandminutes.
newlyappointeddirectorsalsoreceiveongoingeducationviaquarterlyinformationsessions.Weheldthreeinformationsessionsduring2009/10.duringtheyear,informationsessionswereheldonbushfirepreparedness,transmissionpricing,debtmanagementanddirectorduties.
termsofofficeandremunerationinaccordancewithschedule8,Clause5oftheState Owned Corporations Act 1989,adirectormaybeappointedtoholdofficeforaperiodnotexceedingfiveyears.
Theremunerationofeachnon-executivedirectorispaidoutofourfunds,andisdeterminedbytheshareholders.Thetotalincomereceived,orduereceivable,byallourdirectorsislistedinthenotestotheFinancialstatements.
TheManagingdirectorisnotentitledtoanyadditionalremunerationforbeinganexecutivedirector.
80 corPorateGovernance>TransGridannualreporT2010
commitmentTwelveBoardmeetingsandoneadditionalBoardandexecutivecorporateplanningsessionwereheldduringtheyear.
ofthetwelveBoardmeetings:
>> onemeetingwasheldinaugustatMacarthurduringtheMacarthursubstationopening
>> asecondmeetingwasheldinseptemberatWaggaWaggaduringoursafetyday
>> athirdmeetingwasheldindecemberatournewcastleregiontomeetwithemployeesandpresenttheChairman’ssafetyandenvironmentalawards
>> allotherBoardmeetingswereheldatoursydneyoffice.
conflictofinterestTheBoardCodeofConductsaysthatadirectormustdiscloseintereststotheBoard(whichincludespositionsandpecuniaryinterests)incorporations,partnershipsorotherbusinessesthatmayberelevanttotheactivitiesoftheBoardoranassociatedcommittee.Wemaintainaregisterofsuchinterests.
Thefollowingconflictsofinterestweredeclared:
>> attheBoardmeetingheldonTuesday30July2009,MrJohnpricedeclaredaconflictofinterestwiththeagendaitem‘TamworthtoGunnedah66kVtransmissionlinedismantling’.
>> attheBoardmeetingheldonTuesday24november2009,MrJohnpricedeclaredaconflictofinterestwiththeagendaitemonthe‘Gleninnestoinverelltransmissionlineproject’.
>> attheBoardmeetingheldonTuesday20april2010,MrJohnpricedeclaredaconflictofinterestwiththeagendaitemonthe‘KempseytoportMacquarietransmissionlineproject’.
>> attheBoardmeetingheldonTuesday18May2010,MrJohnpricedeclaredaconflictofinterestwiththeagendaitemonthe‘armidaletoCoffsHarbourtransmissionlineupratingproject’.
>> attheBoardmeetingheldonTuesday22June2010,MrJohnpricedeclaredaconflictofinterestwiththeagendaitemonthe‘KempseytoportMacquarietransmissionlinesafetyincident’.
Therehavebeennootherconflictsofinterestdeclaredduringtheyear.
indePendentProfessionaladvicedirectorsandBoardcommitteeshavetheright,inconnectionwiththeirdutiesandresponsibilities,toseekindependentprofessionaladviceatourexpense.
disclosureobliGationsWehaveaframeworktomakesurewemeetourdisclosurereportingobligationstoshareholdingministers.
ourBoardaimstoensurethatourshareholdingministersareinformedofallmajordevelopmentsaffectingourstateofaffairs.Thisisprimarilyfacilitatedthrougharangeofdisclosureandreportingtoolsincludingmeetings,progressreports,ourannualreport,regulatorydocumentsandourwebsite.
aboveL-r – Peter McIntyre, Managing Director, and robert Trimble, Substations engineering officer, at orange Substation.
aboveriGhtCindy Lee farras, administrative officer, Catherine Mulligan, recruitment officer, and kathryn edwards, human resources officer, Metropolitan regional Centre.
TransGridannualreporT2010>corPorateGovernance 81
meetinGsoftheboardThenumberofmeetingsattendedbyourBoardmembersduringtheyearisshownbelow:
name
transGridboard boardauditandriskcommittee
boardremunerationandstructurecommittee
meetinGsattended
meetinGsentitledto
attend
meetinGsattended
meetinGsentitledto
attend
meetinGsattended
meetinGsentitledto
attend
MrBeFoy 12 12 5 5 4 4
MrKnMurray* 10 10 4 4 3 3
MsMpapathanasiou 11 12 4 5 X X
MrnBetts 9 12 X X X X
TheHon.Jprice** 12 12 2 2 4 4
MrMnugent*** 11 12 3 3 4 4
MrpMcintyre# 3 3 1 1## 1 1##
* retired 26 april 2010x Not a member of this committee# Was appointed Managing Director from 27 april 2010## Standing invitee to this Committee Meeting** Chair of Board audit and risk Committee to September 2009*** Chair of Board audit and risk Committee from october 2009 to present
strateGicPlanninGourBoardandexecutiveholdannualstrategicplanningconferencestosetourcorporategoalsforthefollowingyear.TheoutcomesofthisplanningarereflectedinthesCiandtheCorporateplan.
ThesCiandCorporateplansetoutourstrategicdirectionwhichbecomesthebasisforindividualbusinessunitplans.ourCorporateplandefinesthekeyobjectives,strategicinitiativesandperformancetargetstomeasureachievement.italsoincludesadetailedoverviewofourcapitalworksprogramforthefollowingyear.
BoththesCiandCorporateplanarepresentedtoourshareholdingministers.
boardcommitteesTohelptheBoardfulfilitscorporategovernanceresponsibilities,itutilisestheexecutiveBoardCommittee,theBoardauditandriskCommitteeandtheBoardremunerationandstructureCommittee.
achartergovernsthesecommitteesandtheBoarddelegatesspecificpowersandprocedures.eachcharterisreviewedannuallyandincludesthecommittee’sprimaryfunction,structureandresponsibilities.
TheBoardauditandriskCommitteeandtheBoardremunerationandstructureCommitteemeetatleastonaquarterlybasisoratsuchtimesasconsideredappropriate.
TheexecutiveBoardCommitteemeetasandwhenrequired.
non-executivedirectorschairtheBoardcommittees.seniorexecutivesandmanagementmaybeinvitedtoattendcommitteemeetings.
areportdetailingtheitemsconsideredbythecommitteeistabledatthefollowingBoardmeeting.
Executive Board Committee TheprimaryroleoftheexecutiveBoardCommitteeistoconsidermattersbetweenBoardmeetingswhichwouldotherwiserequireBoardapproval.ThematterisdelegatedtotheexecutiveBoardCommitteeatthepriorBoardmeetingandareportisprovidedtotheBoardatthemeetingfollowingtheexerciseofthedelegation.
Generally,theexecutiveBoardCommitteeismadeupoftheChairmanandtheManagingdirector.However,otherdirectorsmaybeinvitedtositonthiscommitteeasandwhenrequired.
82 corPorateGovernance>TransGridannualreporT2010
Board Audit & Risk CommitteeTheBoardauditandriskCommitteeincludesthefollowingdirectors:
>> MrMnugent(chairofthecommitteefromoctober2009topresent).
>> TheHon.Jprice(chairofthecommitteetoseptember2009).
>> MrBFoy.>> MsMpapathanasiou.
TheprimaryroleoftheBoardauditandriskCommitteeistohelptheBoardfulfilitsoversightresponsibilitiesbyreviewingtheoverallauditprocessoftheorganisation,thesystemofinternalcontrolwhichmanagementandtheboardofdirectorshaveestablishedandthefinancialinformationwhichwillbeprovidedtoshareholdingministersandothers.
Board Remuneration and Structure CommitteeTheBoardremunerationandstructureCommitteeincludesthefollowingdirectors:
>> MrBFoy(chairofthecommittee).>> TheHon.Jprice(nolongeramemberofthiscommittee).
>> Mrnnugent.
TheprimaryroleoftheBoardremunerationandstructureCommitteeistohelptheBoarddeterminetheremunerationandemploymentconditionsofourexecutiveandseniormanagementandreviewourorganisationalstructure.
remunerationofdirectorsMrBruceFoy $115,420
MsMatinapapathanasiou $64,860
TheHon.Johnprice $63,100
MrnevilleBetts $60,600
MrMichaelnugent $69,500
executiveleadershiPteam
Remuneration objectiveourexecutiveremunerationframeworkisdeterminedbytheBoardremunerationandstructureCommittee.
Thegoalistoprovidecompetitivereward,basedonmarketbestpracticefordemonstratedperformanceandresults.Theframeworkisconsistentwithourstrategicobjectivesandthecreationofshareholdervalue.
allourexecutiveofficershaveawrittenperformanceagreementalignedtoourcorporategoals.TheBoardcommitteecommissionsareportfromanexternalremunerationconsultanteachyeartoprovidemarketremunerationtrendsandtorecommendappropriateremunerationlevels.remunerationforexecutiveofficersisbasedontheirdocumentedperformanceoutcomesagainstsettargets.
Performance statementsMr k Murray, Managing Director (1 July 2009 to 26 april 2010),wasassessedbytheBoardashavingachievedallkeyperformancecriteriasetintheCorporateplanandthestatementofCorporateintent.Thisincluded:
>> meetingthecapital,operating,reliabilityandefficiencytargetssetbytheaerforthe2004to2009period
>> submissionandfinalisationofourrevenuedeterminationforthe2009to2014period.
Mr P Mcintyre, general Manager/network Development and regulatory affairs,wasassessedbytheManagingdirectorashavingachievedallperformancecriteria,including:
>> achievementofthetransmissionplanninganddevelopmentrequirementsforourcapitalworksprogram
>> theproductionofthe2009apr>> theimplementationofthelargestnetworksupportarrangementintheneM
>> improvedcustomerandstakeholderrelationships
>> theeffectivemanagementofourinputintothedevelopmentoftheregulatoryregimefortransmissionintheneM
>> themanagementofour2009to2014revenueresetprocesswiththeaer.
Note: Mr McIntyre was appointed Managing Director on 27 April 2010.
Mr C Fitzgerald, general Manager/Capital Program Delivery,wasassessedbytheManagingdirectorashavingachievedallperformancecriteria,including:
>> successfulcommencementofthechallengingmajorcapitalworksprogramforthe2009to2014regulatoryperiod
>> deliveredmorethan$300millioninexpenditureonthedeliveryofover60projectsduring2009/10
>> completionoftheWestern500kVprojectontimeandtobudget,withtheWollarandBannabysubstationsbeingenergisedat500kV
>> completionoftheWollartoWellington330kVtransmissionline,theQueanbeyansubstationreconstructionandtheWaggaWaggasubstationtransformerreplacementprojects
>> commencementofconstructionontheBeaconsfieldsubstationrefurbishment
>> progresstowardstenderofthecomponentpartsoftheWesternsydneysupply.
TheincreasedcapabilityoftheCapitalprogramdeliverybusinessunittodeliverthelargeprogramofworkshascontinuedtobekeytotheseachievements.Theincreasingcontributionofthosemembersoftheteambroughtinduringthegraduateandtraineeintakesofthepastfiveyearshasbeenahighlightofthiseffort.
Mr M gatt, general Manager/Corporate,wasassessedbytheManagingdirectorashavingachievedallperformancecriteria,including:
>> addressingtheneedsofstakeholders>> managingmediaandgovernmentrelationsactivities
>> deliveringeffectivecorporatecommunicationsbothinternallyandexternally.
additionally,Michaelhasmanagedthepropertyportfolio,legalservicesandcorporateplanningfunctions.TheCorporatebusinessunit,throughMichael’sleadership,hasledanumberofkeychangeinitiativesoverthelastperiodincludingconsultationtrackingandimprovedpropertyprocesses.
Mr T Meehan, Chief Financial Officer,wasassessedbytheManagingdirectorashavingachievedallperformancecriteria,including:
>> effectivecontroloftheorganisation’sfinancialpositionandstatutoryreportingrequirements
>> developmentofnewfinancialplanningsystemsandmanagementaccountingreportingfortheexecutiveandBoard
>> implementationofnewdebtandinvestmentriskManagementpolicies
>> changestoworkingcapitalarrangementsandreviewoftheorganisation’sinsuranceprogram
>> achievedtheplacementandmanagementofcontractstodeliverTransGrid’scapitalandmaintenanceprograms.
“ourleadershipteamexecuteourvisionwithefficiency,goodcommercialmindsetandaneyeforthefuture.Theylookaheadtoseehowwecancontinuetodobetterandbetter.ithankthemfortheirstrongleadership”.
brucefoy,chairman
TransGridannualreporT2010>corPorateGovernance 83
Mr P Phillips, general Manager/business Services,wasassessedbytheManagingdirectorashavingachievedallperformancecriteria,including:
>> workforcedevelopmentandresourceplanning
>> enhancementandongoingmanagementoftheleadershipdevelopmentprograms
>> establishmentofthestructuredthreeyeardevelopmentprogramforGraduates
>> implementationoftheenvironmentalrulesforprojects
>> theestablishmenttheJointVenturewithpowerlinkfortelecommunicationservices
>> maintainingcertificationsofTransGrid’ssafetyManagementsystemtoas4801,theenvironmentalManagementsystemtoiso14001andQualitysystemtoiso9001.
Mr n Smith, executive Manager/System Operations,wasassessedbytheManagingdirectorashavingachievedallperformancecriteriaincluding:
>> majorrefurbishmentofthestatesystemoperationsCentreatWallgrovetoachieveimprovedsituationalawarenessforoperationsstaff
>> instigatingdynamictransmissionlineratingstoallowforgreaternetworkoptimisation
>> improvedmonitoringofenvironmentalriskstothenetworkbydirectstreamingofrFsdata
>> furtherdevelopmentofthensWsystemrestartplaninconjunctionwithelectricitydistributioncompanies
>> optimisingofshiftrosteringtomatchworkloadandunifyingofoperatingproceduresacrossgeographicregions
>> implementingimprovedplanningtools>> deliveringahigherbonuspaymentthananticipatedfromtheaertransmissionconstraintincentivescheme.
Mr l Smyth, general Manager/network,wasassessedbytheManagingdirectorashavingachievedallperformancecriteriaincluding:
>> allkeynetworkreliability,availability,maintenanceandconstructiontargetswithinapprovedbudgetsandtimeframeswhilemaintaininghighlevelsafetyperformanceandenvironmentalcompliance
>> deliveredandcommissionedallplannedmajorprojectsandassetreplacementprograms
>> refinedassetmanagementstrategiesanddevelopedconceptsthatwillimproveprocessesformaintenanceandfuturecapitalworksandreduceoperationalcosts
>> maintainedasustainablehumanresourceplanthatincludessuccessionanddevelopmentplanstomeetfuturerequirements.
remunerationPaid
name titleremuneration
Paid($2009/10)
MrKevinMurray* Managingdirector $543,146
MrpeterMcintyre** GeneralManager/networkdevelopment®ulatoryaffairs $368,780
MrChrisFitzGerald GeneralManager/Capitalprogramdelivery $319,823
Mrlionelsmyth GeneralManager/network $309,319
Mrpaulphillips GeneralManager/Businessservices $300,609
MrTonyMeehan ChiefFinancialofficer $295,854
MrMichaelGatt GeneralManager/Corporate $274,665
Mrneilsmith executiveManager/systemoperations $238,136
* retired on 26 april 2010.** appointed Managing Director on 27 april 2010. above
Gordon Baseley, voice System Specialist and Gordon keen, Broadband optical fibre and Microwave Specialist, Newcastle regional Centre
84 corPorateGovernance>TransGridannualreporT2010
leGislativechanGesduringthereportingperiod,theEnergy Legislation Amendment (Infrastructure Protection) Act 2009 No 31wasenactedandstartedon1July2010.Thepurposeoftheactistoprotectundergroundelectricityassets.However,itwasrepealedbysection30Cofthe Interpretation Act 1987 No 15 witheffectfrom2July2010.
TheElectricity Supply (Corrosion Protection) Regulation 2008andtheElectricity Supply (Safety and Network Management) Regulation 2008wereamendedbytheElectricity Supply Amendment (GGAS) Act 2009 No 100.However,theamendmentsdidnotaffectouroperations,financialpositionorfinancialperformancetoamaterialextent.
Judicialdecisionsduringthereportingperiod,therewerenodecisions,whichre-interpretedlegislationinanyway,whichaffectedouroperations,financialpositionorfinancialperformancetoamaterialextent.
consumerresPonseTransGridreceivesarelativelysmallnumberofcomplaintsinthefollowingareas:
>> sitemaintenance>> substationnoiselevels>> easementmaintenance.
Wealsoreceivepropertyinformationenquiriesfromsolicitors,conveyancersandthegeneralpublicregardingourrightsandintereststhatmayaffecttitletoland.Fortheyearending30June2010,werespondedto52,658suchenquiries.allenquiriesarenowprocessedusingonlineaccessfacilitiesprovidedbytheCentralregisterofrestrictionsadministeredbythelandandpropertyManagementauthority.
Thefollowingserviceshaveimproved/changedwithaviewtocontinuousimprovement:
>> appointmentoftwoCommunityliaisonofficerstobetterservicethebroadercommunity
>> improvedwebsiteinformationandtransparencytosatisfyarangeofenquiries
>> phoneandwebsiteenquiriesonourcapitalworksprogramcannowbeloggedthroughthewebsiteforimmediateaction
>> noisestudiesareconductedanddependentonresults,soundwallsareinstalledtominimiseimpactonaffectedareas
>> easementmaintenanceguideshavebeendistributedtoover6,000landowners.
creditcardusaGeourcreditcardusageisinaccordancewithourdocumentedprocedures.
Wecontinuetopromotethecorrectusageofourcorporatecreditcardsandwecontinuallyreviewusagecharacteristicsandauthorisations.
consultantfeesduringtheyear,$74,987wasspentonconsultingservicesrelatingtothepreparationofenvironmentalimpactassessmentsandtechnicaltreasuryadvice.
qualifications
name title qualifications
MrKevinMurray* Managingdirector Be(elec),dipBusstudies,FaiCd
MrpeterMcintyre** GeneralManager/networkdevelopment®ulatoryaffairs
Bsc,Be(Hons),MBa(TechnologyManagement),Fieaust,FaiCd
MrChrisFitzGerald GeneralManager/Capitalprogramdelivery Bsc,Be(Hons),Me,Graddip(Busadmin),Fieaust,Cpeng
Mrlionelsmyth GeneralManager/network Be(elec),GradMgtQual,GaiCd
Mrpaulphillips GeneralManager/Businessservices Be(Hons),Bsc,MMgt
MrTonyMeehan ChiefFinancialofficer B.Comm(accounting,Finance&systems)FCpa
MrMichaelGatt GeneralManager/Corporate adv.Certelectrotechnology,dip.elecengineering,B.Comm,(Business)
Mrneilsmith executiveManager/systemoperations Bsc(Hons),FieT,Fieaust,Cpeng
* retired on 26 april 2010.** appointed Managing Director on 27 april 2010.
TransGridannualreporT2010>corPorateGovernance 85
riskmanaGementTheexecutiveauditandriskCommitteeisresponsibleforensuringourrisksareidentifiedandeffectivelymanaged.
implementationofriskmanagementstrategiesaretheresponsibilityofalllevelsofmanagementandaframeworkexiststoensurethatallrisksareproactivelyandexplicitlymanagedonanongoingbasis.
TheCorporateauditandriskgroupprovidesassistanceinthedevelopmentandmaintenanceofenterprise-wideriskmanagementplans,trainingstaffinriskmanagementandtheongoingverificationandreviewofriskmitigationactionsacrosstheorganisation.
ourBoardareoftheopinionthattheBoardauditandriskCommitteeisconstitutedandoperatesinaccordancewiththeindependenceandgovernancerequirementsofTreasuryCircularnsWTC09/08.
ThechairandmembersoftheauditandriskCommitteeare:
>> MrMichaelnugent,chairofthecommittee>> MrBruceFoy>> MsMatinapapathanasiou
Theabovechairandmembersareappointedforaperiodofthreeyears.
insuranceourinsurancestrategyistoobtainthemostcomprehensiveinsurancecoverageavailableatthemosteconomicalcost.eachyear,welookattherisksforwhichwearepreparedtoseekcover,theavailableinsurancecoverageorothermeanstomeettheremainingrisksandthecostsofcoveringtheserisks.
GuaranteeofserviceTransGridhasdefinedservicecommitmentswithourcustomersthroughourConnectionagreements.TransGrid’sservicelevelsaremonitoredbytheaerandthensWdepartmentofWaterandenergy(dWe).
freedomofinformationWereceivedfiveFreedomofinformation(Foi)applicationsundertheFreedom of Information Act 1989 in2009/10.
Thefollowingtableprovidesanoverviewofresponsestorequestsmadeundertheact.
total
foirequests 2009/10 2008/09
numbersofrequestsreceived 5 2
Broughtforward 0 0
Completed 5 2
Transferredout 0 0
unfinished(Carriedforward) 0 0
Grantedinfull 4 0
partiallygranted 1 2
refused 0 0
Feesreceived $590 $35
duringtheyear:
>> Theimpactoftherequirementsoftheactonouractivitieswasminimal.>> noissuesaroseinconnectionwithourcompliancewiththerequirementsoftheact.>> nodeterminationbyTransGridwasthesubjectofreviewbytheombudsman,theadministrativedecisionsTribunalorthesupremeCourt.
statementofaffairsinformationrequiredundersection14(2)oftheFreedomofinformationact1989,islocatedasfollows:
>> Theagency’sstructureandfunctions:TransGridataglance.>> Thewayinwhichitsfunctionsaffectthepublic:ourCommunityandourCapitalWorksprogram.
>> Howthepublicmaytakepartinagencypolicydevelopment:TheMarket,Community.
abovelefthieu Nguyen, Control Design engineer, Metropolitan regional Centre.
aboveL-r – karl Sturmer, electrical fitter, Isabel Shanahan, Grid engineering officer, and roslyn ryan, Corporate Business analyst, at Wallerawang Substation.
86 corPorateGovernance>TransGridannualreporT2010
rePortinGexemPtionsThefollowingreportingexemptionshavebeengrantedbynsWTreasurytoenablefinancialreportingrequirementsthatapply,tobebroadlyconsistentwithCorporationsactreportingrequirements,giventhattheentityoperatesinthecompetitiveneM
statutoryrequirements act/reGulationreferences
comments
Budgets:
>> detailedbudgetfortheyearreportedon. s.7(1)(a)(iii)arsBa
>> outlinebudgetfornextyear. s.7(1)(a)(iii)arsBa
>> particularsofmaterialadjustmentstodetailedbudgetfortheyearreportedon.
cl6arsBr
reportofoperations s.7(1)(a)(iv)arsBa exemptionsubjecttotheconditionthatinformationrelatingtothe“summaryreviewofoperations”istobedisclosedinasummarisedform.
Managementandactivities schedule1arsBr exemptionsubjecttotheconditionthatrelevantinformationistobedisclosedinasummarisedform.
research&development schedule1arsBr
Humanresources schedule1arsBr
Consultants schedule1arsBr exemptionsubjecttotheconditionthatthetotalamountspentonconsultantsistobedisclosedalongwithasummaryofthemainpurposesoftheengagements.
landdisposal schedule1arsBr
paymentofaccounts schedule1arsBr
Timeforpaymentofaccounts schedule1arsBr
reportonriskManagementandinsuranceactivities
schedule1arsBr exemptionsubjecttotheconditionthatrelevantinformationistobedisclosedinasummarisedform.
investmentperformance cl12arsBr
liabilityManagementperformance cl13arsBr
abbreviations:
arSBa annual reports (Statutory Bodies) act 1984
arSBr annual reports (Statutory Bodies) regulation 2005
aboveriGhtGreg Lodge, Protection Metering Technician, Newcastle regional Centre.
TransGridannualreporT2010>corPorateGovernance 87
PrivacyWearecommittedtotheprinciplesofsoundprivacymanagementinlinewiththePrivacy and Personal Protection Act 1998.
WehaveaprivacyManagementplan,whichfacilitatescompliancewiththeactandtellsouremployeeshowwemanageprivacy.Theplanisaccessibleviaourintranet.
overseastravelBelowisalisoftheoverseasvisitsundertakenbyouremployeesduringthereportingperiod.
overseasvisitsprovideouremployeeswiththechancetobenchmarkourperformancewithotherleadersintheindustryandlearnfromthem.overseasvisitsplayakeyroleinhelpingusdeterminethebestwaytobuildasafe,reliableandsecurenetwork.
name title countries PurPoseofvisit
s.dowling professionalofficer Japan Witnessfactorytestingof330kVpowertransformers.
M.Grierson engineeringofficer China Witnessfactorytestingof330kVpowertransformersforVineyardsubstation.
J.abbatantuono professionalofficer sweden Witnessfactorytestingof362kVseriesreactorforsydneysouthsubstation.
C.FitzGerald Generalmanager newZealand MeetingwithTranspowerandGissubstationsitevisit.
s.Jones Manager newZealand MeetingwithTranspowerandGissubstationsitevisit.
W.Goldsmith engineeringofficer sweden TwooverseastripsassociatedwiththesCada/eMsupgradeproject.
a.Hammond engineeringofficer sweden sCada/eMsupgradeproject.
C.Hitchen professionalofficer China inspectionsofVTaandVTdtowersfortheBannaby500kVand330kVlinerearrangement.
p.antuch engineeringofficer China inspectionsofVTaandVTdtowersfortheBannaby500kVand330kVlinerearrangement.
a.Kingsmill Manager newZealand participateintheiToMs2009resultsworkshop.
J.Howland Manager newZealand participateintheiToMs2009resultsworkshop.
a.Meehan Chieffinancialofficer unitedKingdom
undertakeworkassociatedwithplacementofTransGrid’sinsurancecoverage.
d.Guille engineeringofficer newZealand MaterialsinspectionatelectroparassociatedwithWilliamsdale330/132kVsubstation.
a.Klepac Manager HongKong inspectGissubstationsassociatedwithrookwoodandHolroyd330/132kVsubstations.
J.abbatantuono professionalofficer HongKong inspectGissubstationsassociatedwithrookwoodandHolroyd330/132kVsubstations.
a further three trips, where the majority of costs were funded by other organisations, were undertaken by Transgrid officers as follows:
s.dowling professionalofficer China inspectdismantlingofToshiba330kVTransformer.
G.Mackay engineeringofficer austria attendconferenceonpowertransformerdiagnosticmeasurements.
e.lamplough professionalofficer China WitnessrepeatfactoryacceptancetestingofToshiba330kVTransformer.
landdisPosalBelowisalistingofthelandwedisposedofduringtheyear.
month disPlayname lot dP saledate newowner comment
February2010 CarlingfordsystemControlCentre241-245pennantHillsroadCarlingfordnsW2118
1-2and5-6
805059 12February2010
TripleeightCorpptyltd
landandbuildingwassurplustooperationalneeds.
soldbytenderfor$2.6millionplusGsTsubjecttositecompatibilityforcommercialuse.
March2010 portKembla–sydney66kVtransmissionline
1 727968 March2010 deCC–npWs TransferredtodeCCWatnilvalueresidueofsubtransmissiontransfers.
March2010 landatearlwood–480m2formingpartoftheWolliCreekregionalpark,earlwood.
66 16629 March2010 deCC–npWs originallytransferredtodeCCWinMay2008buttransfernotlodgedbydeCCWuntilMarch2010.
July2009 parkvilleradiorepeatersiteWallingtonrd,parkville,2337
1 232278 23July2009 HuntershireCouncil
surplustooperationalneeds.soldbytender$5,000for0.1954perhectare.
88 corPorateGovernance>TransGridannualreporT2010
2009/10financialscontents90 statementoffinancialPosition
91 statementofcomPrehensiveincome
92 statementofchanGesinequity
93 statementofcashflows
94 notestothefinancialstatements
121statementbymembersoftheboard
122indePendentauditor’srePort
abovekayle Mabagos, human resources advisor and kathy Mirzaian, executive assistant, Metropolitan regional Centre.
TransGridannualreporT2010>commercial report 89
commercial reportby the chief financial officer
Withtotalrevenuein2009/10of$695millionandexpensesincludingfinancecostsof$470millionwehaveachievedaprofitbeforetaxof$225millionandanoperatingprofitaftertaxof$162million.
Theprofitsgeneratedintheyearhaveresultedinusdeclaringdividendpaymentstoshareholdersof$135million.
ourregulatedrevenueincreasedby$72millionthisyearduetotheaustralianenergyregulatorrevenuedeterminationorthe2009/10to2013/14regulatoryperiodandtheaustralianCompetitionTribunalreviewofthisdetermination.
Wehaveexperiencedasignificantdecreaseinourcapitalexpenditureoverthelastyear,adecreaseof$191million.Thisyearmarksthebeginningofthecurrent2009/10to2013/14regulatoryperiod.Capitalexpenditurefortheyearwas$428millionwithtotalapprovedcapitalexpenditureforthecurrentregulatoryperiodof$2.6billion.Thisapprovedcapitalexpenditureforthecurrentregulatorycontrolperiodwillbeusedtoupgradeournetworktomeettheincreasingdemandforelectricity,replacementofageingassetsandimprovingoverallnetworksecurityandreliability.
Weincreasedourdebtlastyearby$205millioninordertofundourincreasedcapitalworksprogram,resultinginasubstantialincreaseinfinancingcharges.afterareviewofourdebtandinvestmentriskManagementpolicylastyear,thedebtportfoliohasundergonesignificantchangesduring2009/10tominimiseinterestexpenseandprofitvolatilitywhilemitigatingpotentialrefinancingrisks.
Therehasbeenasteadyincreaseinourdefinedbenefitsuperannuationliabilityoverrecentyears.Thisisaresultofincreasesinthepresentvalueofthedefinedbenefit
obligationsandreductionsinthefairvalueoftheschemeassets.during2009/10therewassomerecoveryinthevalueofthescheme’sassetsbutsuperannuationlossescontinuedtoeroderetainedearnings.Wehavehadtobemoreproactiveinmanagingthisliabilitywithmorefrequentengagementwithsuperfundprovidersonthefactorsaffectinginvestmentfundperformanceandthevalueofthedefinedbenefitobligations.
Theincreaseinrevenueduring2009/10hasresultedinarequirementtoreversetheimpairmentlosstoproperty,plantandequipmentrecordedin2008/09financialstatements.Thereversalofsomeofthisimpairmentlosshasresultedina$365millionincreaseinassetswhichalongwithcapitalexpenditureseesthetotalproperty,plantandequipmentnowbeingvaluedat$5.1billion.overthelasttwoyearsassetrevaluationshaveincreasedthevaluesofourproperty,plantandequipmentbyaround$900million.Theserevaluationshaveimpactedtwoofourfinancialperformanceindicators.asignificantfactorinthedecreaseinourreturnonassetsandreturnonequityrecordedin2008/09and2009/10istheincreaseinproperty,plantandequipmentfromassetrevaluations.
duringtheyear,wecarriedoutareviewtodeterminetheappropriatelevelofworkingcapitalthatweshouldholdinordertomeetourobligationsandcoverpossiblecontingencies.asaresultofthisreview,wehaverevampedourworkingcapitalmanagementprocessesresultinginTransGridoperatingwithaminimalcashbalancetherebydeliveringfundingcostsavings.
Wearecommittedtofinancialgovernancepoliciesandpracticesthatprovideappropriateaccountabilityandcontrolsystemstoencourageandenhancesustainablebusinessperformance.ourfinancialgovernancepoliciesandpractices
aredocumentedinasuiteofpoliciesandproceduresthatarethefoundationforourfinancialmanagementframework.Weregularlyreviewthesepoliciesandproceduresinlightofnewstandardsandimprovedbusinesspractices.
oursub-delegationsofauthorityproceduresetsoutthepowersheldbytheBoard,ManagingdirectorandTransGridemployeesinensuringthereisadequateprobityandcontrolsaroundexpenditure.
ourannualcapitalandoperatingbudgetpreparationcycleformspartoftheTransGridCorporateandBusinessplanningprocessesandensuresthattheshortandmediumtermresourcesrequiredtomeetbusinessobjectivesareidentified.Budgettargetsaresettopromotegoodfinancialperformanceandareusedalongsideotherkeyfinancialindicators,asstandardsforjudgingperformance.Budgets,bothcapitalandoperating,takeintoconsiderationdecisionsandallowanceslaiddownbyourregulator.
WealsohaveawellestablishedchartofaccountsandcostallocationmethodologythatensuresfinancialtransactionsarecorrectlyrecordedinTransGrid’sfinancialsystems.Thishelpstopromotetransparency,consistencyandcomparabilityinhowweprovideandreportfinancialinformation.
intermsofthefuture,thefocuswillbetoputgreateremphasisonourmediumtermfinancialforecastingtoassistincontrollingcostsandmonitoringandmeasuringourfinancialperformance.
Withastrongfocusoncontrollingexpenditureandincreasedregulatedincomewehaveachievedarecordoperatingprofitbeforetaxof$225million,exceedingourtargetof$179million.
90 statement of financial position > TransGridannualreporT2010
beginning of audited financial statements
statement of financial positionasaT30ThJune2010
note2010
$’0002009 $’000
current assets
Cashandcashequivalents 7 1,144 20,861
Tradeandotherreceivables 8 131,177 110,096
inventories 9 28,818 27,634
Currenttaxassets 2,120 –
derivatives 10 1,472 3,018
other 11 2,389 2,295
Total Current Assets 167,120 163,904
non-current assets
deferredtaxassets 6(b) 84,653 73,658
derivatives 10 57 1,521
property,plantandequipment 12 5,135,747 4,393,175
intangibles 13 545,761 534,635
other 14 5,793 4,008
Total Non-Current Assets 5,772,011 5,006,997
Total Assets 5,939,131 5,170,901
current liabilities
Borrowings 302,401 375,738
Tradeandotherpayables 16 134,066 130,894
provisions 17 202,093 189,616
Currenttaxliabilities – 17,877
derivatives 18 1,103 1,020
other 19 3,064 13,288
Total Current Liabilities 642,727 728,433
non-current liabilities
Borrowings 1,891,929 1,613,190
deferredtaxliabilities 6(b) 847,956 664,768
Tradeandotherpayables 16 – 2,973
provisions 17 215,057 173,721
derivatives 18 892 279
Total Non-Current Liabilities 2,955,834 2,454,931
Total Liabilities 3,598,561 3,183,364
Net Assets 2,340,570 1,987,537
equity
Capital 20 651,967 651,967
reserves 21 1,642,671 1,286,367
retainedearnings 22 45,932 49,203
Total Equity 2,340,570 1,987,537
Theaccompanyingnotesformanintegralpartofthesefinancialstatements.
TransGridannualreporT2010>statement of comprehensive income 91
statement of comprehensive incomeForTheyearended30ThJune2010
note2010
$’0002009 $’000
income 3 695,033 652,797
expensesexcludingFinanceCosts 4 (330,983) (330,304)
FinanceCosts 4 (138,753) (105,072)
Profit/(Loss) Before Income Tax Expense 225,297 217,421
incomeTaxBenefit/(expense) 6(a)(i) (63,224) (67,130)
Profit/(Loss) For The Year 162,073 150,291
Other Comprehensive Income
assetrevaluationsurplus:netincrease/(decrease)inrevaluations,includingimpairments 21 513,250 414,560
CashFlowhedgereserve:netmovementinequity 21 (3,706) 14,397
superannuationactuarialGains/(losses) 5(b) (44,034) (133,287)
incomeTaxrelatingtocomponentsofotherComprehensiveincome 6(a)(ii) (139,654) (88,701)
Other Comprehensive Income For The Year, Net of Tax 325,856 206,969
Total Comprehensive Income For The Year 487,929 357,260
Theaccompanyingnotesformanintegralpartofthesefinancialstatements.
92 statement of changes in equity > TransGridannualreporT2010
statement of changes in equityForTheyearended30ThJune2010
capital $’000
retained earnings
$’000
cash flow hedge
reserve $’000
asset revaluation
surplus $’000
total $’000
Balance at 1 July 2008 651,967 111,472 (7,810) 994,589 1,750,218
comprehensive income for the year:
profit/(loss)fortheyear – 150,291 – – 150,291
othercomprehensiveincomefortheyearbeforerelatedtaxeffects
– (133,287) 14,397 414,560 295,670
incometaxrelatingtocomponentsofothercomprehensiveincome
– 39,986 (4,319) (124,368) (88,701)
Total Comprehensive Income For The Year – 56,990 10,078 290,192 357,260
owner related equity transactions:
dividend – (120,233) – – (120,233)
Transfersfromassetrevaluationsurplus – 974 – (974) –
incometaxrelatingtoTransfersfromassetrevaluationsurplus
– – – 292 292
Total Owner Related Equity Transactions – (119,259) – (682) (119,941)
Balance at 30 June 2009 651,967 49,203 2,268 1,284,099 1,987,537
Balance at 1 July 2009 651,967 49,203 2,268 1,284,099 1,987,537
comprehensive income for the year:
profit/(loss)fortheyear – 162,073 – – 162,073
othercomprehensiveincomefortheyearbeforerelatedtaxeffects
– (44,034) (3,706) 513,250 465,510
incometaxrelatingtocomponentsofothercomprehensiveincome
– 13,209 1,112 (153,975) (139,654)
Total Comprehensive Income For The Year – 131,248 (2,594) 359,275 487,929
owner related equity transactions:
dividend – (135,058) – – (135,058)
Transfersfromassetrevaluationsurplus – 539 – (539) –
incometaxrelatingtoTransfersfromassetrevaluationsurplus
– – – 162 162
Total Owner Related Equity Transactions – (134,519) – (377) (134,896)
Balance at 30 June 2010 651,967 45,932 (326) 1,642,997 2,340,570
Theaccompanyingnotesformanintegralpartofthesefinancialstatements.
TransGridannualreporT2010>statement of cash flows 93
note2010
$’0002009 $’000
cash flows from operating activities
CashreceiptsfromCustomers 745,630 664,245
Cashpaidtosuppliersandemployees (255,000) (269,018)
FinanceCostspaid (148,042) (111,057)
interestreceived 275 2,028
incomeTaxpaid (50,520) (42,424)
Net Cash Inflows / (Outflows) from Operating Activities 30(d) 292,343 243,774
cash flows from investing activities
purchaseofproperty,plantandequipment,andintangibles (403,204) (607,327)
proceedsfromthesaleofproperty,plantandequipment 6,479 2,268
Net Cash Inflows / (Outflows) from Investing Activities (396,725) (605,059)
cash flows from financing activities
proceedsfromBorrowings 1,379,093 1,245,985
repaymentsofBorrowings (1,174,195) (788,500)
dividendspaid 17(a) (120,233) (105,910)
Net Cash Inflows / (Outflows) from Financing Activities 84,665 351,575
netincrease/(decrease)inCashandcashequivalents (19,717) (9,710)
CashandcashequivalentsatBeginningoftheFinancialyear 20,861 30,571
Cash and cash equivalents at the End of the Financial Year 30(a) 1,144 20,861
Theaccompanyingnotesformanintegralpartofthesefinancialstatements.
statement of cash flowsForTheyearended30ThJune2010
94 notes to the financial statements > TransGridannualreporT2010
1. reporting entityThefinancialstatementsofTransGridfortheyearended30June2010wereauthorisedforissueinaccordancewitharesolutionofthedirectorson21september2010.
TransGridisastatutorystateownedCorporationunderthestateownedCorporationsact1989andwascorporatisedundertheenergyservicesCorporationsamendment(TransGridCorporatisation)act1998.
2. summary of significant accounting policies
(a) BasisofPreparationThefinancialstatementsaregeneral-purposefinancialstatements,andhavebeenpreparedinaccordancewithaustralianaccountingstandardsincludingaccountinginterpretations,therequirementsofthepublicFinanceandauditact1983,thepublicFinanceandauditregulation2010,thestateownedCorporationsact1989,andrelevantTreasuryCirculars.
property,plantandequipmentandderivativefinancialinstrumentsaremeasuredatfairvalue.otherfinancialstatementitemsarepreparedinaccordancewiththehistoricalcostconvention,exceptasotherwisestatedinthefinancialstatements.
Wherenecessary,comparativeinformationhasbeenreclassifiedtoconformtothecurrentyear’spresentation.
allamountsareroundedtothenearestthousanddollars($’000)andareexpressedinaustraliancurrency.
(b) StatementofCompliance
(i) Financial Statement ComplianceThefinancialstatementscomplywiththeinternationalFinancialreportingstandards(iFrs)asissuedbytheinternationalaccountingstandardsBoard(iasB).
(ii) Financial Statement PresentationTransGridhasappliedtherevisedaasB101Presentation of Financial Statementswhichbecameeffectiveon1January2009.TherevisedstandardrequirestheseparatepresentationofastatementofComprehensiveincomeandastatementofChangesinequity.allnon-ownerchangesinequitymustnowbepresentedinthestatementofComprehensiveincome.asaconsequence,TransGridhadtochangethepresentationofitsfinancialstatements.Comparativeinformationhasbeenre-presentedsothatitisalsoinconformitywiththerevisedstandard.
(c) NewAustralianAccountingStandardsandInterpretationsnotyetadopted
australianaccountingstandardsandinterpretationsthathaverecentlybeenissuedoramended,butarenotyeteffective,havenotbeenadoptedbyTransGridinpreparingthefinancialstatementsinaccordancewithTreasuryCircularnsWTC10-08Mandates of Options and Major Policy Decisions under Australian Accounting Standards.
Thefollowingstandards,amendmentstostandardsandinterpretationshavebeenidentifiedasthosewhichmayimpactTransGridintheperiodofinitialapplication:
>> aasB9andaasB2009-11relatetofinancialinstruments.>> aasB2009-5relatestoamendmentstoaustralianaccountingstandardsarisingfromtheannualimprovementsproject.
>> aasB124andaasB2009-12relatetorelatedpartytransactions.>> aasB2009-14relatestoprepaymentsofaminimumfundingrequirement.
allofthesestandardsareapplicabletofuturereportingperiods.ThenewstandardsareconcernedwithdisclosuresandwillhavenodirectimpactonTransGrid’sfinancialresults.
(d) SignificantAccountingJudgements,EstimatesandAssumptionsmadebymanagement
inapplyingTransGrid’saccountingpolicies,managementevaluatesjudgements,estimatesandassumptionsbasedonexperienceandotherfactors,includingexpectationsoffutureeventsthatmayhaveanimpactonTransGrid.alljudgements,estimatesandassumptionsmadearebelievedtobereasonable,basedonthemostcurrentsetofcircumstancesknowntomanagement.actualresultsmaydifferfromthejudgements,estimatesandassumptions.significantjudgements,estimatesandassumptionsmadebymanagementinthepreparationofthesefinancialstatementsareoutlinedbelow:
(i) Significant accounting judgements
ImpairmentTransGridassessesimpairmentofallassetsattheendofthereportingperiodbyevaluatingconditionsspecifictoTransGrid’sbusinessasawhole,whichmayleadtoimpairment.ifanimpairmenttriggerexists,therecoverableamountofthevalueinuseforthebusinessisdetermined.Furtherdetailsonthevalueinusecalculationsandadjustmentforimpairmentaredisclosedinnote2(f)(ii).
Recovery of Deferred Tax Assetsdeferredtaxassetsarerecognisedfordeductibletemporarydifferencesasmanagementconsidersthatitisprobablethatfuturetaxableprofitswillbeavailabletoutilisethosetemporarydifferences.
Long Service Leave ProvisionTransGrid’sliabilityforemployeebenefitsrelatingtolongserviceleaveismeasuredusingthecurrentcostapproach,whichapproximatesthepresentvaluebasis.periodiccomparisonisundertakenofthetwomeasurementbases,inconjunctionwithanindependentactuarialreview.Management’sjudgement,basedonhistoricalexperience,isappliedindeterminingwhethertheresultingdifferencemateriallyimpactsontheliabilityvaluationrecognisedinthefinancialstatementsandrequiresanadjustmenttoaligntopresentvaluemeasurement.
Workers’ Compensation ProvisionTheliabilityforworkers’compensationisbasedonanannualindependentactuarialassessment,supplementedbymanagementconsiderations,toarriveatabestestimateoftheexpenditurerequiredtosettlepresentconsiderationsattheendofthereportingperiod.
(ii) Significant accounting estimates and assumptions
Allowance for impairment loss on trade and other receivablesWherereceivablesareoutstandingbeyondthenormaltradingterms,thelikelihoodofrecoveryofthesereceivablesisassessedbymanagement.Thisassessmentisbasedonsupportablepastcollectionhistoryandhistoricalwrite-offsofbaddebts.
notes to the financial statementsForTheyearended30ThJune2010
TransGridannualreporT2010>notes to the financial statements 95
Estimation of useful lives of assetsTheestimationoftheusefullivesofassetsisbasedonhistoricalexperience,industrycomparisons,aswellasexpectedusage,physicalwearandtear,andtherateoftechnicalandcommercialobsolescence.Furtherinformationontheestimationofusefullivesisdisclosedinnote2(f)(v).
(e) ChangesinAccountingPoliciesaccountingpoliciesareconsistentwiththoseappliedinthepreviousyear.
(f) Property,PlantandEquipment
Acquisition of AssetsThecostmethodofaccountingisusedfortheinitialrecordingofallacquisitionsofassetscontrolledbyTransGrid.Costistheamountofcashorcashequivalentspaidatthetimeofacquisitionorconstruction.CostincludesinterestonborrowingsrelatedtoQualifyingassetsasdetailedinnote2(f)(iv).
assetsacquiredatnocost,orfornominalconsideration,areinitiallyrecognisedattheirfairvalueatthedateofacquisition.
Revaluationsproperty,plantandequipmentarevaluedinaccordancewithnsWTreasurypolicyTpp07-1Valuation of Physical Non-Current Assets at Fair Value.Thevaluationofproperty,plantandequipmentisdeterminedinatwo-stepprocess.First,fairvalueisdeterminedinaccordancewithaasB116Property, Plant and Equipment.second,thefairvalueissubjecttoaseparateimpairmenttestinaccordancewithaasB136Impairment of Assets.
Fair ValueFairvalueofproperty,plantandequipmentisdeterminedbasedonthebestavailablemarketevidence,includingcurrentmarketsellingpricesforthesameorsimilarassets.Wherethereisnoavailablemarketevidence,theasset’sfairvalueismeasuredatitsmarketbuyingprice,thebestindicatorofwhichisdepreciatedreplacementcost.
TransGridrevaluesdepreciableproperty,plantandequipmentbyreferencetoitscurrentdepreciatedreplacementcost.Theaccumulateddepreciationfortherevaluedassetisrestatedproportionatelywiththechangeinthegrosscarryingamountoftheasset,sothatthecarryingamountoftheassetafterrevaluationequalsitsrevaluedamount,inlinewithnsWTreasurypolicy.
TransGridassessesattheendofthereportingperiodwhetherthereisanyindicationthatanasset’scarryingamountdiffersmateriallyfromfairvalue.ifanyindicationexists,theassetisrevalued.
TransGrid’svaluationpolicyprovidesforafullanddetailedvaluationoftheseassetstobeundertakenatfive-yearintervals,inaccordancewithnsWTreasurypolicy.intheinterveningyears,arevaluationbasedonpriceindexmovementsisundertaken.
Whereanasset’scarryingamountisincreasedasaresultofarevaluation,theincreaseisrecognisedinotherComprehensiveincomeandaccumulatedinequityundertheheadingofassetrevaluationsurplus.
Whereanasset’scarryingamountisdecreasedasaresultofarevaluation,thedecreaseisrecognisedinotherComprehensiveincometotheextentofanycreditbalanceexistingintheassetrevaluationsurplusinrespectofthatasset.ThedecreaserecognisedinotherComprehensiveincomereducestheamountaccumulatedinequityundertheheadingofassetrevaluationsurplus.
Impairment Assessmenteachyear,TransGrid’sspecialisedplantandinfrastructureassets,landandbuildings,andeasementsaretestedforimpairment.shouldtherebeanyindicationthatthecash-generatingunitmaybeimpaired,TransGridmakesanestimateoftherecoverableamount.TransGridasawholerepresentsacashgeneratingunit.
Therecoverableamountisbasedonthevalueinuseforthebusinessasawhole.inassessingvalueinuse,theestimatedfuturecashflowsforthebusinessarediscountedtotheirpresentvalueusingadiscountratethatreflectstherisksspecifictothebusinessandrelevantmarketassessments.
ifthecarryingamountsoftheassets,asrepresentedbythecurrentdepreciatedreplacementcost,exceedtherecoverableamountofthebusiness,theassetscomprisingthebusinessasawholeareconsideredtobeimpaired.Theassetsarewrittendownproportionatelytoensuretheircarryingamountsreflecttherecoverableamountandacorrespondingimpairmentlossisrecognisedasarevaluationdecrease.
attheendofeachyear,anassessmentismadeastowhetherthereisanyindicationthatanimpairmentlossrecognisedinpriorperiodsforanassetmaynolongerexistormayhavedecreased.ifanysuchindicationexists,TransGridestimatestherecoverableamountofthatasset.animpairmentlossisreversediftherehasbeenachangeintheestimatesusedtodeterminetherecoverableamountsincethelastimpairmentlosswasrecognised.areversalofanimpairmentlossisallocatedproportionatelytotheassetstoensuretheircarryingamountsreflecttherecoverableamount.acorrespondingamountisrecognisedasarevaluationincrease.
Retirements or Disposalsuponretirementordisposal,anyrevaluationsurplusrelatingtotheparticularassetistransferredtoretainedearnings.
(iii) Categoriesproperty,plantandequipmentcomprisethefollowingtypesofassets:
Prescribed Assets prescribedassetscompriseproperty,plantandequipmentusedbyTransGridtoprovideelectricitytransmissionservicesthatareregulatedbytheaustralianenergyregulator(aer).prescribedassetsasdisclosedinnotes12(a)and(b)are:
>> networkasset>> otherassets
Thenetworkassetisacomplexinfrastructureassetthatworkstogetherasanintegratedwholetoprovideregulatedelectricitytransmissionservices.itincludesthefollowingmajorparts:
>> land>> Buildings>> systemplantandequipment>> Communicationequipment
Thefiveyeardetailedvaluationsofthenetworkassetwereundertakenasat30June2009usingacombinationofindependentvaluersandinternalexpertise.
96 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
Negotiated Assetsnegotiatedassetsincludethoseassetsrelatingtoconnectionservicesbetween:
>> TransGridandnewgenerators;and>> TransGridtoneworexpandedloads.
Thisexcludesassetsrelatingtoservicesthataresubjecttograndfatheringprovisionswhichpreservethehistorical‘prescribed’status.
Non-regulated Assetsnon-regulatedassetscompriseproperty,plantandequipmentusedbyTransGridtoprovideservicesotherthanprescribedandnegotiatedelectricitytransmissionservices.non-regulatedassetsasdisclosedinnotes12(a)and(b)are:
>> systemplantandequipment>> Communicationequipment>> otherassets
(iv) Capitalisation Capitalexpenditureisdefinedasexpenditureinrelationto:
>> acquisitionofanewunitofplant;>> installationofanewunitofplant;>> workperformedonaunitofplant,wheretheneedfortheworkexistedatthetimetheunitwasacquiredandtheworkwascarriedoutpriortoitbeingputintooperation;
>> replacementofaunitofplant,orofasubstantialpartofaunitofplant;
>> anadditionoralterationtoaunitofplant,whichresultsinanincreaseineconomicbenefits.
interestonborrowingsiscapitalisedagainstQualifyingassetsinaccordancewithaasB123Borrowing Costs.Qualifyingassetsareassetswhichtakemorethan12monthstobereadyfortheirintendeduse.
expenditureisnotcapitalisedbelowaminimumthresholdof$1,000.
(v) Depreciationproperty,plantandequipment,excludingland,aredepreciatedovertheirestimatedusefullives.Thestraight-linedepreciationmethodisused.assetsaredepreciatedfromthemonthofacquisitionorinrespectofconstructedassets,fromthetimetheassetreachespracticalcompletionandisreadyforuse.
assetlivesarereviewedannuallyinaccordancewithaasB116Property,PlantandEquipment,andwhererequired,adjustmentshavebeenmadetotheremainingusefullivesofseparatelyidentifiablepartsofassetshavingregardtofactorssuchasassetusageandtherateoftechnicalandcommercialobsolescence.
Withintheprescribed,non-regulatedandnegotiatedassetbasethefollowingsub-categorieshavebeenestablished.Theusefullivespresentlyassignedtotheseassetsare:
Prescribed & Non-regulated Assets
networkasset Buildings 40years
systemplantandequipment
20–50years
Communicationequipment
10–35years
otherassets 2–10years
Negotiated Assets
systemplantandequipment
20–30years
(g) IntangibleassetsintangibleassetsaremeasuredatcostandcompriseeasementsandComputersoftwareasdisclosedinnotes13(a)and(b).TransGridhasnointernallygeneratedintangibleassets.
Capitalexpenditureonintangibleassetsisdefinedasexpenditureinrelationto:
>> acquisitionofcomputersoftwareoreasements;>> installationofcomputersoftware;>> anadditionoralterationtocomputersoftware,whichresultsinanincreaseineconomicbenefits.
easementsareacomponentofTransGrid’sinfrastructureassetsthatprovideelectricitytransmissionservicesthatareregulatedbytheaer.easementsareassessedforimpairmentonanannualbasisandarenotamortisedastheyaregrantedforanunlimitedtime,andthushaveanindefiniteusefullife.
Computersoftwareisamortisedoveraperiodof5yearsusingthestraight-lineamortisationmethod.amortisationexpenseisincludedinthe“expensesexcludingFinanceCosts”lineitemofthestatementofComprehensiveincome.Theusefullifeforsoftwareisreviewedannually,andadjustmentswhereapplicable,aremadeonaprospectivebasis.
expenditureisnotcapitalisedbelowaminimumthresholdof$1,000.
(h) InventoriesinventoriesofstoresandMaterialsarevaluedatthelowerofcostandnetrealisablevalue.CostisdeterminedbyTransGridtobetheweightedaveragecostofitemsinstore,separatelydeterminedforeachlocation.TransGrid’sinventoriesrelatemostlytospecialistequipment.asthereisnoactivemarketinrespectofthemajorityofTransGrid’sinventories,TransGridrecognisestheweightedaveragecostofitemsasaproxyforlowerofcostandnetrealisablevalue.
(i) CashandcashequivalentsCashandcashequivalentsinthestatementofFinancialpositionandforpurposesofthestatementofCashFlowscomprisecashonhand,cashatbankanddepositswithfinancialinstitutions.
(j) Borrowingsallborrowingsaremeasuredatamortisedcostusingtheeffectiveinterestmethod.
interestonborrowingsisrecognisedasexpenseintheperiodinwhichitisincurredunlessitrelatestoqualifyingassets.Qualifyingassetsareassets,whichtakemorethan12monthstogetreadyfortheirintendeduse.Wherefundsareborrowedgenerally,interestontheborrowingsiscapitalisedtoqualifyingassetsinaccordancewithaasB123Borrowing Costs.
Theamountofinterestattributedtoqualifyingassetsduringtheyearwas$21.7m(2009–$19.4m)ataweightedaveragerateof7.6%(2009–7.2%).Thetotalinterestexpenseforthefinancialyearisreportedat$129.7m(2009–$107.8m)
loansareclassifiedascurrentwhentheyhaveamaturityoflessthanoneyearfromtheendofthereportingperiod.
(k) Dividendsprovisionismadefortheamountofdividendpayableinrelationtothecurrentfinancialyear,inaccordancewiththedividendrecognitionpolicysetoutinTreasuryCircularnsWTC05-11Accounting for Dividends.accordingly,adividendinrelationtothefinancialyearistakentobedeterminedbeforetheendofthereportingperiod,consistentwiththerequirementsofaasB137Provisions, Contingent Liabilities and Contingent Assets.
TransGridannualreporT2010>notes to the financial statements 97
ThedividendiscalculatedinaccordancewithTpp02-3Financial Distribution Policy for Government Businesses.Thedividendpayableof$135.1m(2009:$120.2m)iscalculatedbasedonprofitfortheyear.ThedividendsaredeterminedbyTransGrid’sBoardafterdiscussionwithnsWTreasury.
(l) EmployeeBenefitsacalculationinaccordancewithaasB119Employee BenefitsismadeeachyearinrespectofTransGrid’sliabilityattheendofthereportingperiodforemployeebenefitsrelatingtolongserviceleaveandannualleave,andanannualcontributionismadetoadjusttheprovisiontoanamountwhichisconsideredadequatetomeetthatliability.
(i) Annual LeaveTheprovisionforemployeebenefitsrelatingtoannualleaverepresentstheamountwhichTransGridhasapresentobligationtopayresultingfromemployees’servicesprovideduptotheendofthereportingperiod.
Theprovisionhasbeencalculatedatnominalamountsbasedontheremunerationratesthatareexpectedtobepaidwhentheleaveistaken.
(ii) Long Service LeaveTheliabilityforemployeebenefitsrelatingtolongserviceleavehasbeencalculatedonthebasisofcurrentsalaryratestobepaidbyTransGridresultingfromemployees’servicesprovideduptotheendofthereportingperiodandincludesrelatedon-costs,inaccordancewiththeguidelinesofTreasuryCircularnsWTC09/04Accounting for Long Service Leave and Annual Leave.Theliabilityforlongserviceleaveisrecognisedandmeasuredasthepresentvalueofexpectedfuturepaymentstobemadeinrespectofservicesprovidedbyemployeesuptothereportingdate.expectedfuturepaymentsarediscountedusingmarketyieldsatthereportingdateonCommonwealthGovernmentbondswithtermstomaturitythatmatch,ascloselyaspossible,theestimatedfuturecashoutflows.
(m)SuperannuationTransGridcontributestotheenergyindustriessuperannuationschemepoolB(eiss)whichisadefinedbenefitsuperannuationschemeforwhichliabilitiesaccrue.
TransGridceasedcontributingtothefollowingdefinedbenefitschemesduringthe2008/09financialyear:
>> stateauthoritiessuperannuationscheme(sass);>> stateauthoritiesnon-Contributorysuperannuationscheme(sanCs);and
>> statesuperannuationscheme(sss).
TransGridalsocontributestoanumberofaccumulationsuperannuationschemesforwhichnolong-termliabilityaccrues.
Withthedefinedbenefitschemes,acomponentofthefinalbenefitisderivedfromamultipleofmembersalaryandyearsofmembership.allthedefinedbenefitschemesareclosedtonewmembers.
eachsuperannuationschemeadvisethelevelofliabilityinrespectofTransGrid’ssuperannuationcommitmentstoitsemployeeswhoaremembersofthevariousdivisionsoftheschemes.ThecalculationofthesuperannuationpositionisbaseduponactuarialreviewsindependentofTransGrid’songoingactivitiesandinvolvement.VariousactuarialassumptionsunderpinthedeterminationofTransGrid’sdefinedbenefitobligations.Theseassumptionsandtherelatedcarryingamountsforeissaredisclosedinnote5.
TransGridrecognisesthenettotalofthefollowingasanassetoraliabilityinitsstatementofFinancialposition:
>> presentvalueofthedefinedbenefitobligationattheendofthereportingperiod;and
>> Fairvalueofplanassetsinthedefinedbenefitschemesattheendofthereportingperiod.
Thetotalofthenetsuperannuationexpense(orrevenue)fortheyear,includingamountsrecognisedintheaccounts,isthedifferencebetweentheopeningandclosingbalancesofthenetdefinedsuperannuationliability(orprepaidsuperannuationcontributions)plusthecontributionspaidbyTransGridtotheeiss.
inaccordancewithnsWTreasuryCircularnsWTC09/01Accounting for Superannuation,actuarialgainsandlossesarerecognisedinotherComprehensiveincomewhilenon-actuarialgainsandlossesarerecognisedinprofitorloss.
TransGridhasreviewedtheclassificationofitssuperannuationliability.accordingly,thesuperannuationliabilityhasbeenreclassifiedfromaCurrentliabilitytoanon-currentliabilityinordertomoreappropriatelyreflectthetimingoftheobligation.Thecomparativeamountof$161.8mwasalsoreclassified.
(n) InsuranceTransGridmaintainsamixofexternalinsurancepoliciesandinternalprovisioninginaccordancewithaasB137Provisions, Contingent Liabilities and Contingent Assets.Thetreatmentofrisksandassociatedliabilitiesaredeterminedinconjunctionwithindependentinsuranceadvisersandlossadjusters.
TransGridisaself-insurerforWorkers’Compensation.Theliabilityforclaimsmade,ortobemade,againsttheinsuranceprovisionisdeterminedbyreferencetotheWorkers’Compensationact1987andtheWorkCoverauthority’sguidelinestoself-insurers.
(o) TradeandOtherReceivablesreceivablesfromtradeandotherdebtorsarerecognisedatamountsduelessanallowanceforanyuncollectibleamounts.Collectibilityofthesereceivablesisreviewedonanongoingbasis.debtsthatareknowntobeuncollectiblearewrittenoffwhenidentified.anallowanceforimpairmentlossontradeandotherreceivablesisraisedwhenthereisobjectiveevidencethatTransGridwillnotbeabletocollectthedebt.
Prescribed Customer Receivablesasat30June2010,TransGrid’stotalrevenuereceivedforprescribedtransmissionservices,includingintra-regionalsettlementresiduesandinter-regionalsettlementresidueauctionproceeds,waslessthantherevenueentitlementforthefinancialyear.inaccordancewiththenationalelectricityrules(ner),theunder-recoveredamountandassociatedinterestisentitledtoberecoveredwhensettingfuturetransmissionserviceprices.Therevenueunder-recoveryhasbeenrecognisedinprescribedCustomerreceivables.
(p) Payablesaccountspayable,includingaccrualsnotyetbilled,arerecognisedwhenTransGridhasanobligationtopayasaresultofthecompletionofaworkorservice.
(q) RevenuerevenueisrecognisedtotheextentthatitisprobablethattheeconomicbenefitswillflowtoTransGridandtherevenuecanbereliablymeasured.Thefollowingspecificrecognitioncriteriamustalsobemetbeforerevenueisrecognised:
98 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
(i) Sale of goodsrevenueisrecognisedwhenthesignificantrisksandrewardsofownershipofthegoodshavepassedtothebuyerandcanbemeasuredreliably.risksandrewardsareconsideredpassedtothebuyeratthetimeofdeliveryofthegoodstothecustomer.
(ii) Rendering of servicesrevenuefromelectricitytransmissionservicesissubjecttotheapplicationofanaerdeterminedMaximumallowablerevenue(Mar)forthefinancialyear.TransGridisinthefirstyearofthecurrentfiveyearregulatorydeterminationwhichoperatesfromJuly2009toJune2014.ThetransmissionservicepricesaresetatthebeginningofthefinancialyearinaccordancewiththeMar.
revenuefromtherenderingofotherservicesisrecognisedwhentheserviceisprovidedorbyreferencetothestageofcompletion.Wherethecontractoutcomecannotbemeasuredreliably,revenueisrecognisedonlytotheextentoftheexpensesrecognisedthatarerecoverable.
(iii) Interestinterestrevenueisrecognisedasitisearned,usingtheeffectiveinterestmethod.
(iv) Contributions for Capital WorksCashandnon-cashcapitalcontributionshavebeenrecognisedinaccordancewithaccountinginterpretation18Transfers of Assets from Customers.
Contributionsofnon-currentassetsarerecognisedasrevenueandanassetwhenTransGridgainscontroloftheasset.Theamountrecognisedisthefairvalueofthecontributedassetatthedateonwhichcontrolisgained.
Cashcapitalcontributionsarerecognisedasrevenuewhenthenetworkisextendedormodified,consistentwiththetermsofthecontribution.
(r) IncomeTaxTransGridissubjecttothenationalTaxequivalentregime(nTer)administeredbytheaustralianTaxationoffice.ThenTerisbasedonapplicationoffederalincometaxlawsunderwhichTransGridpaysincometaxequivalentstonsWTreasury.
deferredincometaxisprovidedonalltemporarydifferencesattheendofthereportingperiodbetweenthetaxbasesofassetsandliabilitiesandtheircarryingamountsforfinancialreportingpurposes.
deferredincometaxliabilitiesarerecognisedforalltaxabletemporarydifferencesexceptwherethedeferredincometaxliabilityarisesfromtheinitialrecognitionofanassetorliability,andatthetimeofthetransaction,affectsneithertheaccountingprofitnortaxableprofitorloss.
deferredincometaxassetsarerecognisedforalldeductibletemporarydifferences,carry-forwardofunusedtaxassetsandunusedtaxlosses,totheextentthatitisprobablethattaxableprofitwillbeavailableagainstwhichthedeductibletemporarydifferences,andthecarry-forwardofunusedtaxassetsandunusedtaxlossescanbeutilised,exceptwherethedeferredincometaxassetarisesfromtheinitialrecognitionofanassetorliability,andatthetimeofthetransaction,affectsneithertheaccountingprofitnortaxableprofitorloss.
Thecarryingamountofdeferredincometaxassetsisreviewedattheendofeachreportingperiodandreducedtotheextentthatitisnolongerprobablethatsufficienttaxableprofitwillbeavailabletoallowallorpartofthedeferredincometaxassettobeutilised.
deferredincometaxassetsandliabilitiesaremeasuredatthetaxratethatisexpectedtoapplytotheyearwhentheassetisrealisedortheliabilityissettled,basedontaxrate(andtaxlaws)thathavebeenenactedorsubstantivelyenactedattheendofeachreportingperiod.
incometaxesrelatingtoitemsrecogniseddirectlyinequity(suchasassetrevaluationsurplus,cashflowhedgesandsuperannuationactuarialgainsandlosses)arerecognisedinequityandnotinprofitorloss.
(s) FinancialRiskManagement
OverviewTransGridhasexposuretothefollowingrisksfromitsuseoffinancialinstruments:
>> Creditrisk>> liquidityandfundingrisk>> interestraterisk>> Foreignexchangerisk>> Commodityrisk>> operationalrisk
Credit RiskCreditriskistheriskthatarisesifafinanciallossissufferedduetotheinabilityofthecounterpartybeingabletomeetitsfinancialobligationstoTransGrid.
Theriskismanagedbyonlyundertakingtransactionswithgovernmentownedfinancialinstitutionsandcommercialbankswithaminimumcreditratingthreshold.Monetarylimitsapplytocontaintheexposurewithinreasonablelevels.
Trade and other receivablesTransGrid’sexposuretocreditriskisinfluencedmainlybytheindividualcharacteristicsofeachcustomer.ThedemographicsofTransGrid’scustomerbase,includingthedefaultriskoftheindustryandcountryinwhichcustomersoperate,haslessofaninfluenceoncreditrisk.
TransGridconsidersaconcentrationofcreditrisktoexistwhenanindividualcustomer’soutstandingtradereceivablebalanceexceeds10%ofthetotaltradereceivablesbalance.approximately88%(2009–88%)ofTransGrid’stradereceivablesbalanceisattributabletothreedistributioncustomerswhohaveindividualtradereceivablebalancesinexcessof10%ofthetotalbalance.allofTransGrid’sdistributioncustomershavebeentransactingwiththeorganisationsinceitsinception,withnocreditlossesoccurringinthatperiodoftime.
Liquidity and Funding RiskThemainobjectiveofliquidityriskmanagementistoensurethatTransGridhassufficientfundsavailabletomeetitsfinancialobligationsandinatimelymanner.
TransGridmaintainsdetailedcashflowforecastsanduseapprovedinstrumentswithliquiditylimitstomaintainadequatecashflow.Borrowinglimitsaremonitoredtoensurefundingcommitmentformajorcapitalworksareinplace.Thedebtportfolioismanagedinsuchawaythatnomorethan20%oftheportfoliowillmatureinany12monthperiod.
TransGridannualreporT2010>notes to the financial statements 99
Interest Rate Riskinterestrateriskistheriskofamaterialchangeinearningsasaconsequenceofadversemovementsininterestrates.
Theobjectiveinmanaginginterestrateriskistominimiseinterestexpensevolatilitywhilstensuringthatanappropriatelevelofflexibilityexiststoaccommodatepotentialchangesinfundingrequirementsandmovementinmarketinterestrates.Toachievethis,TransGrid’soveralldebtportfoliocomprisesamixofnominalfixedrateandlongdatedCpilinkeddebtwithsomeshorttermnominaldebt.
Foreign Exchange RiskForeignexchangeriskistheriskthatTransGridsuffersfinanciallossduetoachangeinforeignexchangerates.
TransGrid’spolicyistohedgeallforeigncurrencyexposuresinexcessofaud0.5millionequivalent.
Commodity RiskTransGridmaybeexposedtocommoditypricerisktypicallyinrelationtoadverseandunexpectedincreasesincostsforinfrastructurerelatedcapitalexpenditure.TransGrid’spreferredpositioninrelationtocommodityriskistonegotiatefixedpricecontractswithitssuppliers.inaddition,appropriatepoliciesareinplacetomonitormovementsincommoditypriceswithhedgingstrategiestomitigaterisk.
Operational RiskoperationalriskistheriskthatTransGridsuffersfinanciallossduetomismanagement,error,fraudorunauthoriseduseoftechniquesand/orfinancialproducts.
ThepolicyobjectiveistominimisetheriskthatTransGridsuffersanyfinanciallossarisingfromoperationalrisk.
appropriatesegregationofdutiesandmaintenanceofcontrolsystemsareinplacetomitigateoperationalrisk.
(t) CapitalManagementTransGridhasbeensubjecttothensWGovernment’sFinancialdistributionpolicysinceitsinceptionandisfullycommittedtoprovidinganadequatereturntoitsshareholder.Thisobjectivemustbemanagedwithintheregulatoryframeworkprovidedbythener,giventhatthevastmajorityofTransGrid’srevenueissubjecttoregulation.
TransGrid’sreturnoncapitalisbasedonaWeightedaverageCostofCapitalsetbytheaer,aspartoftherevenuecapdeterminationprocessatfive-yearintervals.TheregulatoryrateofreturnissetataleveldeemedsufficienttoensurethecontinuingviabilityofTransGrid’sbusinessandtoencouragenecessaryinvestmentinnewandreplacementassets.TheWeightedaverageCostofCapitalapplicabletoTransGridforthecurrentfive-yearregulatoryperiodending30June2014is10.05%.
TherewerenochangesinTransGrid’sapproachtocapitalmanagementduringtheyear.
TransGridisnotsubjecttoexternallyimposedcapitalrequirements.
(u) GoodsandServicesTaxrevenues,expensesandassetsarerecognisednetoftheamountofGoodsandservicesTax(GsT),withthefollowingexceptions:
>> WheretheamountofGsTincurredisnotrecoverablefromtheaustralianTaxationoffice.inthesecircumstances,theGsTisrecognisedaspartofthecostofacquisitionoftheassetoraspartofanitemoftheexpense.
>> receivablesandpayablesarestatedwiththeamountofGsTincluded.
ThenetamountofGsTrecoverablefrom,orpayableto,theaustralianTaxationofficeisincludedasacurrentassetorcurrentliabilityinthestatementofFinancialposition.
CashflowsareincludedinthestatementofCashFlowsonagrossbasis.TheGsTcomponentofcashflowsarisingfrominvestingandfinancingactivitieswhicharerecoverablefrom,orpayableto,theaustralianTaxationofficeareclassifiedasoperatingcashflows.
(v) DerivativeFinancialInstrumentsTransGridusesderivativefinancialinstrumentssuchasforwardforeigncurrencycontractstohedgeitsrisksassociatedwithforeigncurrencyfluctuations.
Forthepurposesofhedgeaccounting,TransGridclassifiesitshedgesascashflowhedges.Thehedgesareundertakentoaddressexposuretovariabilityincashflowsthatiseitherattributabletoaparticularriskassociatedwitharecognisedassetorliabilityoraforecastedtransaction.
inrelationtocashflowhedgestohedgefirmcommitmentswhichmeetthespecificconditionsforhedgeaccounting,theportionofthegainorlossonthehedginginstrumentthatisdeterminedtobeaneffectivehedgeisrecogniseddirectlyinotherComprehensiveincomeandtheineffectiveportionisrecognisedinprofitorloss.
Whenthehedgedfirmcommitmentresultsintherecognitionofanassetorliability,then,atthetimetheassetorliabilityisrecognised,theassociatedgainsorlossesthathadpreviouslybeenrecognisedinotherComprehensiveincomeareincludedintheinitialmeasurementoftheacquisitioncostorothercarryingamountoftheassetorliability.
aasB7Financial Instruments: Disclosuresrequiresclassificationoffairvaluemeasurementsusingafairvaluehierarchythatreflectsthesignificanceoftheinputsusedinmakingthemeasurements.Thefairvaluehierarchyismadeupofthefollowinglevels:
>> level1–quotedprices(unadjusted)inactivemarketsforidenticalassetsorliabilities;
>> level2–inputs,otherthanquotedpricesincludedwithinlevel1,thatareobservablefortheassetorliability,eitherdirectly(i.e.asprices)orindirectly(i.e.derivedfromprices);and
>> level3–inputsfortheassetorliabilitythatarenotbasedonobservablemarketdata(unobservableinputs).
Thelevelinthefairvaluehierarchyinwhichthefairvaluemeasurementiscategorisedinitsentiretyshallbedeterminedonthebasisofthelowestlevelinputthatissignificanttothefairvaluemeasurementinitsentirety.
ForTransGrid,theabovedisclosuresonlyapplytoderivativetransactions.
(w)JointVenturesTransGridhasenteredintoanunincorporatedJointVentureagreementinordertoaccommodatethefutureprovisionoftelecommunicationsservices.
inaccordancewithaasB131Interests in Joint Ventures,thejointventureisdeemedtobeajointlycontrolledoperationaseachventurerusesitsownassetsinpursuitofthejointoperations.uponcommencementofactivities,TransGrid’sinterestinthejointventurewillbebroughttoaccountbyrecognisinginitsfinancialstatementstheassetsitcontrols,theliabilitiesandexpensesitincurs,anditsshareofincomethatitearnsfromthesaleofgoodsorservicesbythejointventure.
100 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
3. income
2010 $’000
2009 $’000
Revenue
Transmissionofelectricity 675,044 602,789
non-prescribedWork 14,543 22,716
CapitalContributions 53 18,546
interest 1,615 2,028
sundry 3,778 5,721
Total Revenue 695,033 651,800
Net Gain on Cash Flow Hedges – 997
Total Income 695,033 652,797
4. expenses
2010 $’000
2009 $’000
Expenses excluding Losses & Finance Costs
Transmissionofelectricity 320,596 309,730
otherservices 9,368 14,109
Total Expenses excluding Losses & Finance Costs 329,964 323,839
netlossondisposalofproperty,plantandequipment 477 2,150
netlossonCashFlowhedges 542 –
impairmentadjustmentonintangibles – 4,315
Total Expenses excluding Finance Costs 330,983 330,304
FinanceCosts 138,753 105,072
Total Expenses 469,736 435,376
Total Expenses above include:
2010 $’000
2009 $’000
depreciationofproperty,plantandequipment(refertonote12(b)) 174,925 148,272
amortisationofintangibles(refertonote13(b)) 6,374 4,612
impairmentlossonTradeandotherreceivables (35) 45
inventoryexpense 3,063 2,736
inventoryWrite-downs 418 402
EmployeeBenefitsExpense:
netsuperannuationexpense,excludingactuariallosses(refernote5(a)) 11,004 5,348
otheremployeeBenefitsexpense 79,926 85,278
Total Employee Benefits Expense 90,930 90,626
Maintenanceexpensesareasubsetoftheabovetotalexpenses:
MaintenanceExpense:
Transmissionofelectricity
employee-relatedmaintenanceexpense 27,219 24,149
othermaintenanceexpense 37,958 40,248
Transmissionofelectricity–Maintenanceexpense 65,177 64,397
otherservices–Maintenanceexpense 251 251
Total Maintenance Expense 65,428 64,648
TransGridannualreporT2010>notes to the financial statements 101
5. superannuation defined benefit plansThefollowingtablessummarisethecomponentsofmovementinemployer’ssuperannuationreserverecognisedinprofitorlossandotherComprehensiveincome,andthefundedstatusandamountsrecognisedinthestatementofFinancialpositionforthedefinedbenefitsuperannuationplans.
TheassetsandliabilitiesofTransGrid’seissdefinedBenefitplansareprovidedbythescheme’sactuary,Mercer(australia)ptyltd.
(a) Movements in Superannuation Reserves recognised in profit or loss
2010 $’000
2009 $’000
EISS
Currentservicecost (10,060) (8,375)
interestcostonbenefitobligation (25,424) (26,299)
expectedreturnonplanassets 24,475 29,320
EISS net income/(expense) (11,009) (5,354)
SSS, SASS and SANCS net income/(expense) 5 6
Total net income/(expense) (11,004) (5,348)
(b) Movements in Superannuation Reserves recognised in Other Comprehensive Income
2010 $’000
2009 $’000
eissactuarialgains/(losses) (44,029) (133,170)
sss,sassandsanCsactuarialgains/(losses) (5) (117)
Total Actuarial gains/(losses) (44,034) (133,287)
(c) EISS Superannuation Surplus/(Liability)
2010 $’000
2009 $’000
FairValueofplanassetsatendofyear 346,559 307,166
presentValueofdefinedBenefitobligationatendofyear (547,814) (468,958)
Net Asset/(Liability) Recognised in Statement of Financial Position at End of Year (201,255) (161,792)
(d) Reconciliation of the present value of the EISS defined benefit obligations
2010 $’000
2009 $’000
Present value of defined benefit obligations at beginning of the year (468,958) (412,716)
Currentservicecost (10,060) (8,375)
interestcost (25,424) (26,299)
Contributionsbyschemeparticipants (3,893) (4,238)
actuarialgains/(losses) (49,876) (34,330)
Benefitspaid 10,397 17,000
Present value of defined benefit obligations at the end of the year (547,814) (468,958)
102 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
(e) Reconciliation of the EISS fair value of plan assets
2010 $’000
2009 $’000
Fair value of plan assets at beginning of the year 307,166 385,164
expectedreturnonplanassets 24,475 29,320
actuarialgains/(losses) 5,847 (98,840)
employerContributions 15,575 4,284
Contributionsbyplanparticipants 3,893 4,238
Benefitspaid (10,397) (17,000)
Fair value of plan assets at the end of the year 346,559 307,166
(f) Percentage invested in each asset class at the end of the reporting period:
2010 2009
australianequities 36.4% 34.3%
overseasequities 32.3% 33.1%
australianfixedinterestsecurities 14.6% 9.0%
australianinflation-linkedbonds 3.8% –
overseasfixedinterestsecurities – 6.9%
property 2.5% 6.1%
Cash 5.7% 6.1%
other 4.7% 4.5%
(g) Fair value of EISS scheme assetsallschemeassetsareinvestedbytheTrusteesatarm’slengththroughindependentmanagers.
(h) Expected rate of return on assetsTheexpectedreturnonassetsassumptionisdeterminedbyweightingtheexpectedlong-termreturnforeachassetclassbythetargetallocationofassetstoeachclass.Thereturnsusedforeachclassarenetofinvestmenttaxandinvestmentfees.
(i) Actual return on EISS plan assets
2010 $’000
2009 $’000
actualreturnonplanassets 34,442 (67,367)
(j) Valuation MethodTheprojectedunitCredit(puC)valuationmethodwasusedtodeterminethepresentvalueofthedefinedbenefitobligationsandtherelatedcurrentservicecosts.Thismethodseeseachperiodofserviceasgivingrisetoanadditionalunitofbenefitentitlementandmeasureseachunitseparatelytobuildupthefinalobligation.
(k) Economic Assumptions
30 June 2010
salaryincreaserate(excludingpromotionalincrease) 4.0%p.a.
rateofCpiincrease 2.5%p.a.
expectedrateofreturnonassets 8.10%p.a.
discountrate 5.17%p.a.
TransGridannualreporT2010>notes to the financial statements 103
(l) Demographic AssumptionsThedemographicassumptionsat30June2010arethoseusedinthe2009triennialactuarialvaluation.
(m) Historical Information
2010 $’000
2009 $’000
2008 $’000
2007 $’000
2006 $’000
presentvalueofdefinedbenefitobligation (547,814) (468,958) (412,716) (409,747) (405,668)
Fairvalueofschemeassets 346,559 307,166 385,164 430,848 387,067
surplus/(deficit)inscheme (201,255) (161,792) (27,552) 21,101 (18,601)
experienceadjustments–schemeliabilities (49,876) (34,330) 32,850 5,103 15,036
experienceadjustments–schemeassets 5,847 (98,840) (72,279) 24,780 32,968
(n) Expected Contributions
2010 $’000
expectedemployercontributionstobepaidinthenextreportingperiod 22,250
(o) Funding Arrangements for Employer Contributions
(i)NetSurplus/(Liability)Thefollowingisasummaryofthefinancialpositionoftheschemeattheendofthereportingperiodcalculatedinaccordancewithaas25Financial Reporting by Superannuation Plans.
2010 $’000
2009 $’000
netMarketValueofschemeassets 346,559 307,166
accruedBenefits (417,574) (368,099)
Net Surplus/(Liability) (71,015) (60,933)
(ii)FundingMethod
ThemethodusedtodeterminetheemployercontributionrecommendationswastheAggregate Funding method.Themethodadoptedaffectsthetimingofthecosttotheemployer.
undertheAggregate Funding method,theemployercontributionrateisdeterminedsothatsufficientassetswillbeavailabletomeetbenefitpaymentstoexistingmembers,takingintoaccountthecurrentvalueofassetsandfuturecontributions.
(iii)EconomicAssumptionsTheeconomicassumptionsadoptedforthe2009actuarialreviewoftheschemewere:
Weighted Average Assumptions
expectedrateofreturnonschemeassets 7.0%p.a.
expectedsalaryincreaserate 4.0%p.a.
expectedrateofCpiincrease 2.5%p.a.
(iv)NatureofAsset/Liability
asaliabilityisrecognisedinthestatementofFinancialpositionasat30June2010,TransGridisresponsibleforthedifferencebetweentheorganisation’sshareofschemeassetsandthedefinedbenefitobligation.
(p) OtherThesuperannuationexpenserecognisedinprofitorlossisincludedinthelineitem“expensesexcludingFinanceCosts”.superannuationactuariallossesinrespectofeiss,sss,sassandsanCsof$44m(2009:$133.3m)areseparatelyidentifiedinotherComprehensiveincome.
104 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
6. income tax
(a) Income Tax Expense Majorcomponentsofincometaxexpensefortheyearsended30June2010and2009are:
(i)Profitorloss
2010 $’000
2009 $’000
Current Income Tax
Currentincometaxcharge 30,512 37,487
adjustmentsinrespectofcurrentincometaxofpreviousyears 10 (750)
Deferred Income Tax
relatingtooriginationandreversaloftemporarydifferences 32,702 30,393
Income tax expense 63,224 67,130
(ii)OtherComprehensiveIncome
2010 $’000
2009 $’000
Deferred Income Tax
nettax(gain)/lossonrevaluationofproperty,plantandequipment 153,975 124,368
nettax(gain)/lossonsuperannuationreserve–actuariallosses (13,209) (39,986)
nettax(gain)/lossoncashflowhedges (1,112) 4,319
Income tax on items taken directly to equity during the year 139,654 88,701
(iii)StatementofChangesinEquity
2010 $’000
2009 $’000
Deferred Income Tax
nettax(gain)/lossontransfersfromassetrevaluationsurplus (162) (292)
Income tax on items taken directly to equity during the year (162) (292)
(iv)Reconciliationofincometaxexpenseonpre-taxaccountingprofittoincometaxexpensereportedinprofitorlossTheprimafacieincometaxexpenseonpre-taxaccountingprofitfromoperationsreconcilestotheincometaxexpenseinprofitorlossasfollows:
2010 $’000
2010 $’000
2009 $’000
2009 $’000
profit/(loss)BeforeincomeTaxexpense 225,297 217,421
incometaxexpense/(benefit)calculatedatstatutoryincometaxrateof30% 67,589 65,226
Capitalallowances (2,219) (131)
expenditurenotallowedforincometaxpurposes 55 16
reversaloftemporarydifferencesrecognisedinpreviousyears (2,211) 2,769
adjustmentsinrespectofcurrentincometaxofpreviousyears 10 (750)
Income tax expense reported in profit or loss 63,224 67,130
TransGridannualreporT2010>notes to the financial statements 105
(b) Deferred Income TaxdeferredincomeTaxat30Junerelatestothefollowing:
Recognised in Statement of Financial Position
Recognised in Profit or Loss
2010 $’000
2009 $’000
2010 $’000
2009 $’000
DeferredTaxAssets
provisions 21,274 21,839 565 (685)
superannuationliability 60,377 48,538 1,370 (321)
property,plantandequipmentandintangibles 1,578 2,018 440 (1,106)
other 1,424 1,263 48 (68)
Gross Deferred Tax Assets 84,653 73,658
DeferredTaxLiabilities
property,plantandequipmentandintangibles (845,148) (661,617) 29,719 32,248
superannuationsurplus – – – 5
other (2,808) (3,151) 560 320
Gross Deferred Tax Liabilities (847,956) (664,768)
Deferred Tax Charge 32,702 30,393
7. cash and cash equivalents
2010 $’000
2009 $’000
Cashonhand 13 13
deposits 1,131 20,848
Total 1,144 20,861
8. trade and other receivables
2010 $’000
2009 $’000
Current
Debtors
Tradedebtors 86,171 67,481
debtorsotherThanTrade 5,365 7,742
91,536 75,223
allowanceforimpairmentlossonTradeandotherreceivables – (50)
Total Debtors 91,536 75,173
Other
prescribedCustomerreceivables 39,541 34,822
other 100 101
Total Other 39,641 34,923
Total 131,177 110,096
106 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
9. inventories
2010 $’000
2009 $’000
Transmissionplantspares 28,647 27,451
other 171 183
Total 28,818 27,634
10. derivatives (assets)
2010 $’000
2009 $’000
Current
ForwardForeignCurrencyContracts 1,472 3,018
Non-Current
ForwardForeignCurrencyContracts 57 1,521
Total 1,529 4,539
11. other current assets
2010 $’000
2009 $’000
prepayments 1,912 1,774
insurancerecoveryasset 477 521
Total 2,389 2,295
TransGridannualreporT2010>notes to the financial statements 107
12. property, plant and equipment
(a) Valuation and accumulated depreciation for each class of property, plant and equipment
2010 $’000
2009 $’000
PrescribedAssets
networkasset 9,746,991 8,042,105
accumulateddepreciation (5,090,029) (4,317,538)
Workinprogress 348,045 537,737
5,005,007 4,262,304
otherassets 104,267 91,953
accumulateddepreciation (59,052) (50,906)
Workinprogress 16,843 17,813
62,058 58,860
Total Prescribed Assets 5,067,065 4,321,164
Non-regulatedAssets
systemplantandequipment 14,111 13,729
accumulateddepreciation (4,979) (4,366)
Workinprogress – 1,868
9,132 11,231
Communicationequipment 489 198
accumulateddepreciation (124) (67)
Workinprogress – 19
365 150
otherassets 1,269 1,260
accumulateddepreciation (220) (245)
Workinprogress 30 –
1,079 1,015
Total Non-regulated Assets 10,576 12,396
NegotiatedAssets
systemplantandequipment 61,479 29,215
accumulateddepreciation (3,373) (911)
Workinprogress – 31,311
Total Negotiated Assets 58,106 59,615
Total Property, Plant and Equipment 5,135,747 4,393,175
108 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
(b) Reconciliations of the carrying amounts of each class of Property, Plant and Equipment at the beginning and end of the financial year
property,plantandequipmentistreatedinaccordancewiththevariousexplanationssetoutinnote2.property,plantandequipmentarevaluedinaccordancewithnsWTreasurypolicyTpp07-1Valuation of Physical Non-Current Assets at Fair Value.
attheendofthereportingperiodnonon-currentassetsheldforsalewererecognisedinTransGrid’saccounts(2009–nil).
2010
Carrying Amount at Beginning
of year $’000
Movements $’000
Disposals $’000
Depreciation $’000
Revaluation Increments/
(Decrements) excluding
Impairments $’000
(Impairments)/Impairment
Reversals $’000
Carrying Amount
at End of year
$’000
PrescribedAssets:
networkasset 4,262,304 394,061 (3,921) (160,687) 148,229 365,021 5,005,007
otherassets 58,860 16,697 (2,583) (10,916) – – 62,058
Total Prescribed Assets 4,321,164 410,758 (6,504) (171,603) 148,229 365,021 5,067,065
Non-regulatedAssets:
systemplantandequipment 11,231 (1,486) – (613) – – 9,132
Communicationequipment 150 273 – (58) – – 365
otherassets 1,015 702 (449) (189) – – 1,079
Total Non-regulated Assets 12,396 (511) (449) (860) – – 10,576
NegotiatedAssets:
systemplantandequipment 59,615 953 – (2,462) – – 58,106
Total Negotiated Assets 59,615 953 – (2,462) – – 58,106
Total 4,393,175 411,200 (6,953) (174,925) 148,229 365,021 5,135,747
2009
Carrying Amount at Beginning
of year $’000
Movements $’000
Disposals $’000
Depreciation $’000
Revaluation Increments/
(Decrements) excluding
Impairments $’000
(Impairments)/Impairment
Reversals $’000
Carrying Amount
at End of year
$’000
PrescribedAssets:
networkasset 3,441,875 545,122 (1,427) (137,826) 1,333,560 (919,000) 4,262,304
otherassets 49,988 20,411 (2,576) (8,963) – – 58,860
Total Prescribed Assets 3,491,863 565,533 (4,003) (146,789) 1,333,560 (919,000) 4,321,164
Non-regulatedAssets:
systemplantandequipment 9,972 1,869 – (610) – – 11,231
Communicationequipment 140 19 – (9) – – 150
otherassets 982 651 (409) (209) – – 1,015
Total Non-regulated Assets 11,094 2,539 (409) (828) – – 12,396
NegotiatedAssets:
systemplantandequipment 28,959 31,311 – (655) – – 59,615
Total Negotiated Assets 28,959 31,311 – (655) – – 59,615
Total 3,531,916 599,383 (4,412) (148,272) 1,333,560 (919,000) 4,393,175
TransGridannualreporT2010>notes to the financial statements 109
(c) Property, Plant and Equipment Impairment Impact
TransGrid’svaluationpolicyprovidesforafullanddetailedvaluationofassetstobeundertakenatfiveyearintervalsinconjunctionwithnsWTreasurypolicyTpp07-01Valuation of Physical Non-Current Assets at Fair Value.inaccordancewiththiscycle,anextensiverevaluationwasundertakenin2009whichdeterminedthecarryingamountstoberecordedinTransGrid’saccounts,priortoanypotentialimpairmentimpact.Therevaluationoutcomewastestedagainstaseparatevaluationprocesstodeterminetherecoverableamountofthecashgeneratingunit.TherecoverableamountwasdeterminedwiththeassistanceofindependentvaluersusingtheValueinusemethodologyandcomparedtothecarryingamount.asthecarryingamountwasdeterminedtobehigherthantherecoverableamountanimpairmentlosswasbroughttoaccountin2009.
on25november2009,theaustralianCompetitionTribunalgrantedTransGridanincreaseinitsprescribedrevenueforthe2009/10to2013/14regulatoryperiod.Thisincreasedrevenuesignificantlychangedthebasisonwhichanimpairmentlosswasrecognisedin2009.inaccordancewithaasB136 Impairment of Assets,thischangeinrevenuerequirestheimpairmenttobereviewedandasaresultanimpairmentreversalisrequired.anassetimpairmentreversalof$365mhasbeenbroughttoaccountasanincreasetotheassetrevaluationsurplusin2010withrespecttothefollowingclassesofassets.
2010 $’000
Asset Class
Transmissionlines–impairmentreversal 219,086
substationequipment–impairmentreversal 145,935
Total Impairment Impact 365,021
ThediscountrateusedintheestimateofTransGrid’svalueinusewas7.70%(2009–7.75%).
(d) Cost Model
As at 30 June 2010Cost
$’000
Accumulated Depreciation
$’000Net Book Value
$’000
PrescribedAssets:
networkasset 3,843,789 (955,226) 2,888,563
As at 30 June 2009Cost
$’000
Accumulated Depreciation
$’000Net Book Value
$’000
PrescribedAssets:
networkasset 3,252,298 (829,639) 2,422,659
110 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
13. intangibles
(a) Valuation and Accumulated Amortisation of Intangibles
2010 $’000
2009 $’000
easements 510,534 497,748
Workinprogress 3,480 6,572
514,014 504,320
Computersoftware 51,911 45,494
accumulatedamortisation (39,960) (33,794)
Workinprogress 19,796 18,615
31,747 30,315
Total Intangibles 545,761 534,635
(b) Reconciliations of the carrying amounts of intangibles at the beginning and end of the financial year
2010
Carrying Amount at
Beginning of Year
$’000Additions
$’000Disposals
$’000Amortisation
$’000Impairments
$’000Adjustments
$’000
Carrying Amount at
End of Year $’000
IntangibleAssets
easements 504,320 9,694 – – – – 514,014
Computersoftware 30,315 7,810 (4) (6,374) – – 31,747
Total 534,635 17,504 (4) (6,374) – – 545,761
2009
Carrying Amount at
Beginning of Year
$’000Additions
$’000Disposals
$’000Amortisation
$’000Impairments
$’000Adjustments*
$’000
Carrying Amount at
End of Year $’000
IntangibleAssets
easements 493,975 10,351 (6) – – – 504,320
Computersoftware 21,877 13,050 – (4,612) – – 30,315
airspacerights 7,215 – – – (4,315) (2,900) –
Total 523,067 23,401 (6) (4,612) (4,315) (2,900) 534,635
*The2009adjustmentsrelatetoairspacerightswhichhavebeenreclassifiedfromintangiblestoproperty,plantandequipmentarisingfromachangeinthenatureofthedevelopmentproposal.
14. other non-current assets
2010 $’000
2009 $’000
insurancerecoveryasset 5,793 4,008
Total 5,793 4,008
TransGridannualreporT2010>notes to the financial statements 111
15. expenditure commitments
(a) Capital expenditure commitments Commitmentsarisingfromcontractsforexpenditureinrespectofproperty,plantandequipmentandintangibles,totheextentnotprovidedforintheaccounts:
2010 $’000
2009 $’000
payableWithinoneyear 233,306 255,694
payableonetoFiveyears 74,657 18,222
payablelaterthanFiveyears – 2,022
Total (including GST) 307,963 275,938
TotalexpenditureCommitmentsaboveincludeinputtaxcreditsof$28m(2009–$25.1m)thatareexpectedtoberecoverablefromtheaustralianTaxationoffice.
(b) Operating expenditure commitments Majorcommitmentsarisingfromcontractsforexpenditureassociatedwithnetworksupport,totheextentnotprovidedforintheaccounts:
2010 $’000
2009 $’000
payableWithinoneyear 220 20,900
payableonetoFiveyears – –
payablelaterthanFiveyears – –
Total (including GST) 220 20,900
TotalexpenditureCommitmentsaboveincludeinputtaxcreditsof$20K(2009–$1,900K)thatareexpectedtoberecoverablefromtheaustralianTaxationoffice.
16. trade and other payables
2010 $’000
2009 $’000
Current
Creditors 62,693 75,503
accruedFinanceCosts 66,148 54,358
other 5,225 1,033
134,066 130,894
Non-Current
Creditors – 2,973
Total 134,066 133,867
112 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
17. provisions
2010 $’000
2009 $’000
Current
dividend 135,058 120,233
employees’accruedBenefits 65,922 68,036
insurance 1,113 1,347
202,093 189,616
Non-Current
employees’accruedBenefits 4,319 4,027
insurance 9,483 7,902
superannuationliability 201,255 161,792
215,057 173,721
Total 417,150 363,337
(a) Dividends
2010 $’000
2009 $’000
openingBalance 120,233 105,910
dividendpayments (120,233) (105,910)
dividendfortheyear 135,058 120,233
Closing Balance 135,058 120,233
(b) Employees’ Accrued Benefits Thefollowingtabledetailsthemovementsintheemployees’accruedBenefitsprovisionduringtheyear:
2010 $’000
2009 $’000
openingBalance 72,063 65,121
Contributions 9,319 18,302
payments (11,141) (11,360)
Closing Balance 70,241 72,063
Thefollowingtableshowsabreakdownoftheemployees’accruedBenefitsprovisionattheendofthereportingperiod:
2010 $’000
2009 $’000
annualleave 16,596 16,998
longserviceleave 53,645 55,065
Total 70,241 72,063
ThefollowingtableshowsabreakdownoftheCurrentportionoftheemployees’accruedBenefitsprovisionattheendofthereportingperiod,splitintotheperiodoftimethebenefitsareexpectedtobesettled:
2010 $’000
2009 $’000
Withinoneyear 13,390 15,581
laterthanoneyear 52,532 52,455
Total 65,922 68,036
TransGridannualreporT2010>notes to the financial statements 113
(c) InsuranceinaccordancewithCondition6(a)(iii)ofthelicensegrantedundersection211oftheWorker’sCompensationact,1987,theprovisionfortotaloutstandingworkers’compensationclaimsliabilityincludingincurredbutnotreportedclaimsandadministrationis$10.6m(2009–$9.2m).duringthefinancialyear,$2.4m(2009–$1.3m)wascontributedtotheprovisionforWorkers’Compensation.
Theprovisionincludes$6.3mforaworkers’compensationclaimthathasbeenactivatedunderTransGrid’sreinsurancepolicy.reinsurancerecoverieshavecommencedandfuturerecoveriesforthisclaimareconsideredtobevirtuallycertain.TransGridhasrecognisedaninsurancerecoveryassetof$6.3mbasedonindependentactuarialadvice(refertonotes11and14).
Thefollowingtabledetailsthemovementsintheinsuranceprovisionduringtheyear:
Class Opening Balance $’000
Contributions $’000
Payments $’000
Closing Balance $’000
Workers’Compensation 9,249 2,377 (1,031) 10,595
Total 9,249 2,377 (1,031) 10,595
18. derivatives (liabilities)
2010 $’000
2009 $’000
Current
ForwardForeignCurrencyContracts 1,103 1,020
Non-Current
ForwardForeignCurrencyContracts 892 279
Total 1,995 1,299
19. other current liabilities
2010 $’000
2009 $’000
electricityCreditors – 10,391
other 3,064 2,897
Total 3,064 13,288
20. capital TransGridcommencedoperationson1February1995onseparationfrompacificpowerundertheelectricityTransmissionauthorityact,1994atwhichtimeaseriesofassetsandliabilitiesweretransferred.
TransGridwascorporatisedasastatutorystateownedCorporationon14december1998,withsharecapitaloftwo$1.00shares.TheseshareswereissuedtotheTreasurerandtheMinisterforFinance,asVotingshareholdersonbehalfofthensWGovernment,asat30June2010.The$2.00isreportedaspartofCapital.
2010 $’000
2009 $’000
Capital
openingBalance 651,967 651,967
Movements – –
Closing Balance 651,967 651,967
114 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
21. reserves
Reserves
Asset Revaluation
Surplus $’000
Cash Flow Hedge
Reserve $’000
Total $’000
At 1 July 2008 994,589 (7,810) 986,779
revaluationofproperty,plant&equipment,excludingimpairments(note12(b)) 1,333,560 1,333,560
impairments(note12(b)) (919,000) (919,000)
Transferstoretainedearnings–revaluationsurplusforassetsdisposed(note22) (974) (974)
Taxeffectofproperty,plant&equipmentrevaluation,andimpairments(note6(a)(ii)) (124,368) (124,368)
TaxeffectofTransferstoretainedearnings(note6(a)(iii)) 292 292
revaluationofCashFlowhedges 24,282 24,282
realisedGains/(losses)onCashFlowhedgesremovedfromequityandincludedinassets (9,885) (9,885)
TaxeffectofCashFlowhedgeequityMovements(note6(a)(ii)) (4,319) (4,319)
At 30 June 2009 1,284,099 2,268 1,286,367
revaluationofproperty,plant&equipment,excludingimpairments(note12(b)) 148,229 148,229
impairments(note12(b)) 365,021 365,021
Transferstoretainedearnings–revaluationsurplusforassetsdisposed(note22) (539) (539)
Taxeffectofproperty,plant&equipmentrevaluation,andimpairments(note6(a)(ii)) (153,975) (153,975)
TaxeffectofTransferstoretainedearnings(note6(a)(iii)) 162 162
revaluationofCashFlowhedges (3,405) (3,405)
realisedGains/(losses)onCashFlowhedgesremovedfromequityandincludedinassets (301) (301)
TaxeffectofCashFlowhedgeequityMovements(note6(a)(ii)) 1,112 1,112
At 30 June 2010 1,642,997 (326) 1,642,671
AssetRevaluationSurplusThisreserveisusedtorecordincreasesinthefairvalueofproperty,plantandequipment,anddecreasestotheextentthatsuchdecreasesrelatetoanincreaseonthesameassetpreviouslyrecognisedinequity.assetsarerevaluedinaccordancewithnsWTreasurypolicyTpp07-1Valuation of Physical Non-Current Assets at Fair Value.
CashFlowHedgeReserveThisreserverecordstheportionofthegainorlossonahedginginstrumentinacashflowhedgethatisdeterminedtobeeffective.
22. retained earnings
2010 $’000
2009 $’000
openingBalance 49,203 111,472
netprofit/(loss)Beforedividend 162,073 150,291
superannuationactuarialGains/(losses) (44,034) (133,287)
incomeTaxBenefit/(expense)onsuperannuationactuarialGains/(losses) 13,209 39,986
dividend (135,058) (120,233)
Transfersfromassetrevaluationsurplus 539 974
Closing Balance 45,932 49,203
23. dividend and contributions to shareholderadividendof$135.1m(2009–$120.2m)hasbeenrecognisedfordistributiontotheshareholder.Thedividendwillbepaidduringthecourseofthe2010/11financialyearandisrepresentedbythedividendprovision.
TransGridannualreporT2010>notes to the financial statements 115
24. secured liabilitiesattheendofthereportingperiod,therewasnoloanliabilityofTransGridsecuredbyachargeoverTransGrid’sassets.
25. audit feesamountsreceived,ordueandreceivable,bytheauditorsfor:
2010 $’000
2009 $’000
auditingthefinancialstatements 172 168
26. compensation of Key management personnel
2010 $’000
2009 $’000
short-termemployeebenefits 2,356 2,387
post-employmentbenefits 791 845
otherlong-termbenefits 338 238
Total 3,485 3,470
Fees Paid to DirectorsFees,includingsuperannuationbenefitspaidtodirectors,otherthansalariespaidtofull-timedirectors,were$0.4m(2009–$0.5m).
27. contingent liabilities and contingent assets
(a) Contingent Liabilities
2010 $’000
2009 $’000
Contractliability 1,548 247
ClaimsforcompensationassociatedwithdelayedcontractualmilestonesarebeingpursuedagainstTransGridbyacontractor.TheamountdisclosedrepresentsTransGridmanagement’sbestestimateattheendofthereportingperiod.atthisstage,itisnotpossibleformanagementtoformanopiniononthelikelyoutcomeoftheclaims.
aclaimforcompensationisbeingpursuedagainstTransGridassociatedwithrolesandresponsibilitiesunderthenationalelectricityrules.TheamountdisclosedrepresentsTransGridmanagement’sbestestimateattheendofthereportingperiod.atthisstage,itisnotpossibleformanagementtoformanopiniononthelikelyoutcomeoftheclaim.
ClaimsforcompensationassociatedwithdelayedcontractualmilestonesanddiscrepanciesinthevalueofworksarebeingpursuedagainstTransGridbyacontractor.atthisstage,itisnotpossibleformanagementtoformanopinionaboutthelikelyoutcomeorreliablyestimatethevalueofclaims.
Thereareasmallnumberofnon-contractualclaimsthathavebeenmadeagainstTransGridwhichhavebeeneitherdenied,areconsideredtobeoflowriskoratastagewhereareliablefinancialestimatecannotbemade.
(b) Contingent AssetsTransGridhasinitiatedlegalproceedingstorecoverdamagesof$15.7millionassociatedwithitscontractor.atthisstage,itisnotpossibleformanagementtoformanopiniononthelikelyoutcomeoftheproceedings.
28. fair compensation trust accountinaccordancewiththelandacquisition(JustTermsCompensation)act,TransGridmaintainsaTrustaccount.Theaccountbalanceattheendofthereportingperiodwas$38K(2009–$1,886K).
116 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
29. leases TransGridhasnofinanceleasecommitments.Thefollowingleasecommitmentsdisclosedareinthenatureofnon-cancellableoperatingleases.
LesseeTransGridhasoneoperatingleasecommitmentunderacommercialleasewhichcommencedon9May2007.Theleasetermis6yearswithanoptiontoextendforanother4years.leasepaymentsareincreasedannuallyby4%.Theleaseexpenditurerecognisedinprofitorlossforthefinancialyear,GsT-exclusive,was$1.9m(2009–$1.9m).
MinimumrentalspayableGsT-inclusive,asat30Juneareasfollows:
2010 $’000
2009 $’000
Withinoneyear 2,143 2,044
laterthanoneyearbutnotlaterthan5years 4,217 6,244
laterthan5years – –
Total (including GST) 6,360 8,288
30. notes to statement of cash flows
(a) Reconciliation of Cash CashasattheendofthefinancialyearasshowninthestatementofCashFlowsisreconciledtotherelateditemsinthestatementofFinancialpositionasfollows:
2010 $’000
2009 $’000
CashandCashequivalents 1,144 20,861
(b) Dividends and Taxesnodividendswerereceived.dividendsandtaxequivalentspaidduringtheyearamountedto$170.8m(2009–$148.3m).
(c) Acquisitions and Disposals of Entitiesnoentitieswereacquiredordisposedofduringtheyear.
TransGridannualreporT2010>notes to the financial statements 117
(d) Reconciliation of Profit after Income Tax Equivalent Expense to Net Cash Provided by Operating Activities
2010 $’000
2009 $’000
Profit/(Loss) after Income Tax Equivalent Expense 162,073 150,291
Add/(Less): Items Classified as Financing/Investing Activities
loss/(Gain)ondisposalofproperty,plantandequipment 478 2,150
Add/(Less) Non-Cash Items
depreciationandamortisation 181,299 152,884
amortisationof(premium)/discountonloans 504 (149)
impairmentadjustment – 4,315
Capitalisedinterest (21,723) (19,370)
CapitalContributions (53) (18,546)
Net Cash Provided by Operating Activities Before Change in Assets and Liabilities 322,578 271,575
Net Changes in Assets and Liabilities During the Financial Year
(increase)/decreaseinTradedebtors&otherreceivables (21,081) (39,206)
(increase)/decreaseininventories (1,184) (1,935)
(increase)/decreaseinotherCurrentassets (94) (1,066)
(increase)/decreaseinothernon-Currentassets (1,785) (405)
increase/(decrease)inTradeCreditors&otherpayables (3,525) 8,462
increase/(decrease)inprovisions (475) 7,241
increase/(decrease)inincomeTax&deferredTaxes 12,704 24,706
increase/(decrease)inotherCurrentliabilities (14,795) (25,598)
Net Cash Provided by Operating Activities 292,343 243,774
(e) Financing ArrangementsTransGridhasarangeoffacilitiesinplacetomeetliquidityrequirements.
31. financial instruments disclosure
(a) Credit Risk
ExposuretocreditriskThecarryingamountofTransGrid’sfinancialassetsrepresentsthemaximumcreditexposure.TransGrid’smaximumexposuretocreditriskattheendofthereportingperiodwas:
Carrying Amount Note2010
$’0002009 $’000
Tradeandotherreceivables 131,177 110,146
Cashandcashequivalents 7 1,144 20,861
Forwardexchangecontractsusedforhedging(assets) 10 1,529 4,539
133,850 135,546
118 notes to the financial statements > TransGridannualreporT2010
notes to the financial statementsForTheyearended30ThJune2010
ImpairmentlossesTheagingofTransGrid’stradeandotherreceivablesattheendofthereportingperiodwas:
Gross Receivables 2010
$’000
Impairment Losses 2010
$’000
Gross Receivables 2009
$’000
Impairment Losses 2009 $’000
notpastdue 129,096 – 107,135 –
pastdue1-30days 1,416 – 596 –
pastdue31-60days 44 – 38 –
Morethan60days 621 – 2,377 50
131,177 – 110,146 50
TheabovetabledefinestheGrossreceivablesexpectedtobereceivedbyTransGrid.
asat30June2010,allreceivabletransactionswereassessedtodeterminetheirfairvalueandthatcollectabilitywashighlyprobable.Therewasnoimpairmentfor2010($49,500in2009).
Themovementintheallowanceforimpairmentlossontradeandotherreceivablesaccountduringtheyearwasasfollows:
2010 $’000
2009 $’000
Balanceat1July 50 –
reversalofpreviousallowance (50) –
impairmentlossrecognised – 50
Balance at 30 June – 50
Basedonhistoricdefaultrates,TransGridbelievesthatnoimpairmentallowanceisnecessaryinrespectoftradereceivableseithernotpastdueorpastdue.Thetradereceivablesbalance,whichincludestheamountsowedbyTransGrid’sthreemostsignificantcustomers,relatestocustomersthathaveagoodcredithistorywithTransGrid.
(b) Liquidity and Funding Risk Thefollowingarethecontractualmaturitiesoffinancialliabilities,includingestimatedinterestpayments:
30 June 2010
Carrying Amount
$’000
Contractual Cash flows
$’000
Less than 1 year $’000
1 year to 5 years
$’000
More than 5 years
$’000
Non-derivativefinancialliabilities
Borrowings 2,194,330 3,208,646 412,261 1,043,211 1,753,174
Tradeandotherpayables 134,066 134,066 134,066 – –
otherfinancialliabilities – – – – –
Derivativefinancialliabilities
Forwardexchangecontractsusedforhedging:Grossoutflow 1,995 32,621 9,151 23,470 –
Total 2,330,391 3,375,333 555,478 1,066,681 1,753,174
30 June 2009
Carrying Amount
$’000
Contractual Cash flows
$’000
Less than 1 year $’000
1 year to 5 years
$’000
More than 5 years
$’000
Non-derivativefinancialliabilities
Borrowings 1,988,928 2,616,580 485,892 1,064,758 1,065,930
Tradeandotherpayables 133,867 133,867 130,894 2,973 –
otherfinancialliabilities 10,391 10,391 10,391 – –
Derivativefinancialliabilities
Forwardexchangecontractsusedforhedging:Grossoutflow 1,299 9,695 7,479 2,216 –
Total 2,134,485 2,770,533 634,656 1,069,947 1,065,930
TransGridannualreporT2010>notes to the financial statements 119
(c) Foreign Exchange Risk
CashFlowHedgesThecashflowsarisingfromcashflowhedgesarenotexpectedtoaffectprofitorloss.
CashFlowHedgeEquityMovements
2010
Carrying Amount at beginning of period (1/7/09)
$’000
Amount recognised in equity during
the period $’000
Amount removed from equity
and included in profit or loss
$’000
Amount removed from equity and
included in assets $’000
Carrying Amount at end of period
(30/6/10) $’000
equity 3,240 (3,405) – (301) (466)
2009
Carrying Amount at
beginning of period (1/7/08)
$’000
Amount recognised
in equity during the period
$’000
Amount removed from equity
and included in profit or loss
$’000
Amount removed from equity
and included in assets
$’000
Carrying Amount at
end of period (30/6/09)
$’000
equity (11,156) 24,282 – (9,886) 3,240
Sensitivity analysisTransGridemployscashflowhedgestoremovecurrencyriskassociatedwithpurchaseofoverseasequipment.
a10percentstrengtheningandweakeningoftheaustraliandollaragainstthefollowingcurrencieswouldhaveincreased/(decreased)equitybytheamountsshownbelow.Thisanalysisassumesthatallothervariables,inparticularinterestrates,remainconstant.Theanalysisisperformedonthesamebasisfor2009.
asthesearealleffectivecashflowhedges,therearenoprofitorlossimpacts.
Impact on Equity in AUD
$’000 +10%
$’000 -10%
30June2010
usd (313) 383
ChF (163) 199
eur (2,916) 3,563
Jpy (1,019) 1,245
seK (50) 61
30June2009
usd (288) 352
Cad (6) 7
eur (513) 627
Jpy (3,943) 4,819
120 notes to the financial statements > TransGridannualreporT2010
(d) Interest Rate Risk interestrateriskistheriskofamaterialchangeinearningsandultimatelydividendpaymentsasaconsequenceofadversemovementsininterestrates.ThepolicyobjectiveistoensurethatTransGridisnotexposedtointerestratemovementswhichcouldadverselyimpactonitsabilitytomeetitsfinancialobligationsastheyfalldue.
Cash flow sensitivity analysis for variable rate instrumentsachangeof100basispointsininterestratesattheendofthereportingperiodwouldhaveincreased/(decreased)profitorlossbytheamountsshownbelow.Thisanalysisassumesthatallothervariables,inparticularforeigncurrencyrates,remainconstant.Theanalysisisperformedonthesamebasisfor2009.
Impact on Profit or Loss
$’000 -100bp
$’000 +100bp
30June2010
prescribedCustomerreceivables (395) 395
electricityCreditors – –
WestpacBankaccounts (11) 11
nsWTreasuryCorporationComeandGoFacility 303 (303)
Cash flow sensitivity (net) (103) 103
30June2009
prescribedCustomerreceivables (348) 348
electricityCreditors 104 (104)
WestpacBankaccounts (88) 88
Cash flow sensitivity (net) (332) 332
(e) Net Fair Value of Financial Assets and Liabilities Thenetfairvalueoffinancialassetsandliabilities,withtheexceptionofborrowings,isreflectedbytheircarryingamountsinthestatementofFinancialposition,inaccordancewithaasB132andaasB7.
ThenetfairvalueofborrowingsisbasedonmarketvaluederivedbyBarringtonTreasuryservicesusingmarketinterestratescurrentattheendofthereportingperiod.
Thecarryingamountsandnetfairvaluesoffinancialassetsandliabilitiesattheendofthereportingperiodare:
2010 2009
Carrying Amount
$’000Fair Value
$’000
Carrying Amount
$’000Fair Value
$’000
FinancialAssets
Cashandcashequivalents 1,144 1,144 20,861 20,861
Tradeandotherreceivables 131,177 131,177 110,096 110,096
derivatives 1,529 1,529 4,539 4,539
Total Financial Assets 133,850 133,850 135,496 135,496
FinancialLiabilities
Tradeandotherpayables 134,066 134,066 133,867 133,867
Borrowings 2,194,330 2,277,759 1,988,928 2,000,231
otherfinancialliabilities – – 10,391 10,391
derivatives 1,995 1,995 1,299 1,299
Total Financial Liabilities 2,330,391 2,413,820 2,134,485 2,145,788
inaccordancewiththerequirementsofaasB7Financial Instruments: Disclosures,allofTransGrid’sderivativefinancialinstrumentsfallwithinthelevel2categoryofthefairvaluehierarchy.Therewerenotransfersbetweencategoriesduringtheyear.
end of audited financial statements
notes to the financial statementsForTheyearended30ThJune2010
124 index > TransGridannualreporT2010
index
aaboriginalandTorresstraitislander 45employmentactionplan
apprentices 40
assetBase 29
bBoardofdirectors 12,79
cCapitalinvestment($Million) 26
CapitalWorksprojects 72
ChairmanandManagingdirector’sreview 10
Chairmanenvironmentalaward 68
Chairmansafetyaward 65
Charter 78
ClimateChangestrategy 68
Commercialreport 89
CommunityConsultation 58
Communityinformationsessions 30
ConsultantFees 84
Consumerresponse 84
Contents 1
CorporateGovernance 78
Costofannualreport insidefrontcover
CreditCardusage 84
CustomerConnections 30
ddemandGraphs 35
demandManagementinitiatives 36
disabilityactionplan 46
eeeoachievements(2009/2010) 46
eeodisclosures 44
eeoplannedachievements(2010/2011) 47
electronicservicedelivery 59
employeeBenefits 43
environmentalincidentnotification 30
executiveleadershipTeam 12,82
fFinancialreport 90
Freedomofinformation 85
gGlossary 126
Graduateprogram 41
Guaranteeofservice 85
iindependentauditor’sreport 122
index 123
industrialrelationspoliciesandpractices 43
informationTechnology 51
insurance 85
intranet 53
internetContactdetails Backpage
JJudicialdecisions 84
llanddisposal 70
leadershipdevelopmentprograms 40
legislativeChange 84
lettertoshareholders insideFrontCover
lost-TimeinjuryFrequencyrate–Contractors 26
lost-TimeinjuryFrequencyrate–employees 26,62
TransGridannualreporT2010>index 125
index continued
mMaintenanceexpenditure 29
Managingdirectorsscholarship 41
Mediastatistics 31
MeetingsoftheBoard 81
Minister 78
Multi-Culturalpoliciesandservicesprogram(Mpsp) 45
nnationalMarketreviews 37
networkavailability(%) 28
networkreliability(systemMinuteslost) 28
notestotheFinancialstatements 94
ooccupationalhealthandsafetyperformance 62
operationalexcellence 49
ourCommunity 54
ourdirection 9
ournetwork 6
overseasVisits 87
pperformanceManagement 42
performancesummary:executive 82
pricing 50
privacy 87
promotion 59
qQualifications:executive 84
rremuneration:Boardofdirectors 82
remuneration:executive 83
reportingexemptions 86
returnonassets(%) 22
returnonequity(%) 22
revenue($Million) 20
riskManagement 85
sschoolssponsorshipprogram 58
shareholders 78
sponsorships 57
staffnumbers:Comparisonofstaffnumbers 25
staffnumbers:staffbyCategory 24
staffnumbers:numbersofexecutiveofficers 25
staffnumbers:numbersbyGender 25
statementbyMembersoftheBoard 121
statementofaffairs 84
statementofCashFlows 93
statementofChangesinequity 92
statementofComprehensiveincome 91
tTransGridataGlance 4
TransGridContactdetails BackCover
wWastereductionandpurchasingpoliCy(Wrapp) 69
Womenprograms 51
Workforcediversitystrategy 49
Workforceprofile 24
126 glossary > TransGridannualreporT2010
Term Explanation/Comments
aer(“theregulator”) Theaustralianenergyregulator
aeMC TheaustralianenergyMarketCommission
aeMo TheaustralianenergyMarketoperator
annualplanningreport(apr200X) adocumentthatsetsoutissuesandprovidesinformationtothemarketthatisrelevanttotransmissionplanninginnewsouthWales.Thisdocumentistheapr2010.
annualplanningreview TheannualplanningprocesscoveringelectricitytransmissionnetworksinnewsouthWales.
“assets” TransGrid’s‘polesandwires’,allthesubstationsandelectricitytransmissionlinesthatformournetwork.
CBd CentralBusinessdistrict
Constraint aninabilityofanelectricitytransmissionordistributionsystemtosupplyarequiredamountofelectricitytoarequiredstandard.
Customers TransGrid’scustomersarethosedirectlyconnectedtoournetwork.Theyareeitherdistributionnetworkserviceproviders,directlyconnectedgenerators,largeindustrialcustomers,customersconnectedthroughinter-regionalconnectionsorpotentialnewcustomers.
dM demandmanagement.asetofinitiativesthatisputinplaceatthepointofend-usetoreducethetotaland/orpeakconsumptionofelectricity.
dnsp(distributor) distributionnetworkserviceprovider.abodythatowns,controlsoroperatesadistributionsystemintheneM.
easement aneasementoverapropertygivesTransGridtherighttoconstructandmaintainourassets,whileownershipofthepropertyremainswiththeoriginallandowner.
eia environmentalimpactassessment
GWh aunitofenergyconsumptionequalto1,000MWh.
interconnection Thepointsonanelectricitytransmissionnetworkthatcrossjurisdictional/stateboundaries.
iparT independentpricingandregulatoryTribunalofnsW
kV operatingvoltageofelectricitytransmissionequipment.onekilovoltisequaltoonethousandvolts.
lidar lightdetectionandranging
load Theamountofelectricalpowerthatisdrawnfromthenetwork.
localGeneration agenerationorcogenerationfacilitythatislocatedontheloadsideofatransmissionconstraint.
glossary
TransGridannualreporT2010>glossary 127
lTiFr losttimeinjuryfrequencyrate
MWh aunitofenergyconsumption.oneMegawatthouristheamountofenergyconsumedinonehouratarateofoneMegawatt.
nationalelectricitylaw CommonlawsacrossthestateswhichcomprisetheneM,whichmakethenerenforceable.
nationalelectricityrules(neror“therules”)
TherulesthatgoverntheoperationoftheneM.
neM ThenationalelectricityMarket
networkaugmentation anexpansionoftheexistingelectricitytransmissionnetwork.
non-networksolutions alternativestonetworkaugmentationwhichaddressapotentialshortageinelectricitysupplyinaregion.
outage anoutageiswhenpartofthenetworklosespower.Thiscanbeeitherplanned(i.e.whenworkneedstobedoneontheline)orunplanned.
reF reviewofenvironmentalFactors
regulatoryTest atestpromulgatedbytheaerthatisrequiredbythenertobeappliedwhendeterminingtherelativeeconomicmeritsofoptionsforthereliefoftransmissionconstraints.
rFp requestforproposal
riT-T regulatoryinvestmentTest–Transmission
sVC staticVarCompensator.adevicethatprovidesforcontrolofreactivepower.
switchbay asitecontaininghighvoltageswitchgear,usedtoconnectordisconnectasectionofthenetwork.
theMinister ThenewsouthWalesMinisterforenergy.
Tnsp Transmissionnetworkserviceprovider.abodythatowns,controlsandoperatesanelectricitytransmissionsystemintheneM.
Transmissionline ahigh-voltagepowerlinerunningat500kV,330kVor132kV.
glossary continued
128 environmental production notes > TransGridannualreporT2010
environmental production notes
printingTheprinteroftheannualreportholdsanFsCChainofCustody(CoC)Certificationensuringthehigheststandardsofsustainablepracticehavebeenusedthroughouttheprintingprocess.
environmentallyfriendlysoy-basedinksandlow-alcoholproductionmethodshavebeenused.
cover and editorial pagesThecoverandeditorialsectionpagesareprintedonMonzarecycled,whichcontains55%recycledfibre(25%postconsumerand30%preconsumer)andFsCcertifiedpulp,ensuringallvirginpulpisderivedfromwell-managedforests,andismanufacturedbyaniso14001certifiedmill.
ThepaperisFsCMixedsourceCertified.
financial pagesThefinancialpagesareprintedonTudorrp,whichisFsCrecycledCertifiedandaustralianMade.itcontains100%recycledfibreandnochlorinebleachingoccursintherecyclingprocess.Themilllisiso14001certified.salesofTudiorrpsupportlandcareaustralia.
TransGrid’scommitmenttotheenvironmentisreflectedinthesustainableprintingpracticesandpaperusedintheproductionofthisannualreport.
TransGrid ConTaCT deTailsSydney201 Elizabeth Street PO Box A1000 Sydney South NSW 1235
Telephone +61 2 9284 3000 Facsimile +61 2 9284 3456
Business Hours 8:00am – 5:00pm
Metropolitan Telephone +61 2 9620 0777
OrangeTelephone +61 2 6360 8711
NewcastleTelephone +61 2 4967 8678
TamworthTelephone +61 2 6765 1666
WaggaTelephone +61 2 6922 0222
YassTelephone +61 2 6226 9666
TransGrid ABN: 19 622 755 774
This report is available on CD and on TransGrid’s website.
www.transgrid.com.au
aCknowledGemenTs Published by TransGrid Corporate Communications Group
Designed and produced by Equation Corporate Design Pty Ltd
Photographs by:>> Gavin Jowitt>> Karl Hofman>> Neil Billington