GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAM (TRANCHE 2) (ADB LOAN NO: 3483/3484)
PACKAGE 8 - LOT A
Procurement of Plant Design, Supply, and Installation
Single-Stage: Two-Envelope Bidding Procedure
BIDDING DOCUMENT for
Procurement of
Augmentation of:
Aniyakanda 132/33kV Grid Substation
Chunnakam 132/33kV Grid Substation
Nadukuda 220/33kV Grid Substation
VOLUME 6 of 8 Part II- REQUIREMENTS
Section 6 - Employer’s Requirements: Part C-Drawings
Issued on: 25 June 2020Invitation for Bids No.: CEB/AGM/PRO/2019/ÌFB/GPDEEIIP-T2-P8-LOT A
ICB No.: CEB/AGM/PRO/2019/ICB/GPDEEIIP-T2-P8-LOT A
Employer: Ceylon Electricity Board
Country: Sri Lanka
© Transmission Design & Environment Branch, CEB
CEYLON ELECTRICITY BOARD SRI LANKA
Projects Division
Ceylon Electricity Board,
P.O. Box 540, Colombo 02
Sri Lanka
Document – Revision 1
Inform
ation
Cop
y-Not
for B
idding
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAM (TRANCHE-2) PACKAGE 8 - LOT A
DRAWINGS
General
1 TD/CE/1/184/ D/09/00 Map Showing the Location of Site in Year 2027
2 TD/CE/1/184/ D/08/00 CEB Power System Diagram in Year 2027
3 TD/CE/1/184/ D/00/00 Symbols
4 TD/CE/1/184/ D/60/00-01
5 TD/CE/1/184/ D/60/00-02
6 TD/CE/1/184/ D/60/00-03
Aniyakanda GSS
7 TD/CE/1/184/ D/00/01
8 TD/CE/1/184/ D/01/01
9 TD/CE/1/184/ D/01/01-A
10 TD/CE/1/184/ D/60/01
11 TD/CE/1/185/ D/07/01
Chunnakam GSS
12 TD/CE/1/184/ D/00/02
13 TD/CE/1/184/ D/00/02
14 TD/CE/1/184/ D/00/02-A
15 TD/CE/1/184/ D/60/02-A
16 TD/CE/1/184/ D/60/02-B
17 TD/CE/1/185/ D/07/02-A
18 TD/CE/1/185/ D/07/02-B
Nadukuda GSS
19 TD/CE/1/184/ D/00/03-A
20 TD/CE/1/184/ D/00/03-B
21 TD/CE/1/184/ D/00/03-C
22 TD/CE/1/184/ D/01/03
23 TD/CE/1/184/ D/07/03
Chain Link Fence
Barbed Wire Fence Post
Doors & Windows Details
Proposed Single Line Diagram for Aniyakanda GSS
General Layout for Aniyakanda GSS
33kV Cabel Arrangemant for Outdoor Gantry
Layout of Control Building for Aniyakanda GSS
Architecture for the Substation Automation System for Aniyakanda GSS
Proposed Single Line Diagram for Chunnakam GSS
General Layout for Chunnakam GSS
33kV Feeder Arrengement for Chunnakam GSS
Layout of Control Building for Chunnakam GSS
Typical Site Office Layout for Chunnakam GSS
Architecture for the Substation Automation System for Chunnakam GSS Extention Substation Automation System Architecture for Chunnakam GSS
Proposed Single Line Diagram for Nadukuda GSS
Proposed Single Line Diagram for Nadukuda GSS (Part 1)
Proposed Single Line Diagram for Nadukuda GSS (Part 2)
General Layout for Nadukuda GSS
Architecture for the Substation Automation System for Nadukuda GSS
TABLE OF CONTENTS
Content
Inform
ation
Cop
y-Not
for B
idding
EM
BIL
IPIT
IYA
MA
TA
RA
GA
LL
E
DE
NIY
AY
A
SA
MA
NA
LA
WE
WA
BA
LA
NG
OD
A
PA
NA
DU
RA
RA
NT
EM
BE
RA
ND
EN
IGA
LA
VIC
TO
RIA
ING
INIY
AG
AL
A
AM
PA
RA
BO
WA
TE
NN
A
UK
UW
EL
A
KIR
IBA
TH
KU
MB
UR
A
KO
TM
AL
E
WIM
AL
AS
UR
EN
DR
A
BA
DU
LL
A
NU
WA
RA
EL
IYA
MA
DA
MP
E
BO
LA
WA
TT
A
TH
UL
HIR
IYA
KU
RU
NE
GA
LA
KO
LO
NN
AW
A
KO
TU
GO
DA
RA
TM
AL
AN
A
TR
INC
OM
AL
EE
AN
UR
AD
HA
PU
RA
PU
TT
AL
AM
HA
BA
RA
NA
RA
TM
AL
AN
A
PA
NN
IPIT
IYA
OR
UW
AL
A
KO
LO
NN
AW
A
S'K
AN
DA
NE
W
LA
XA
PA
NA
RA
TN
AP
UR
A
KE
LA
NIY
A
KO
TU
GO
DA
KE
LA
NIT
ISS
A
KO
SG
AM
A
VA
VU
NIA
HA
MB
AN
TO
TA
KU
KU
LE
SE
ET
HA
WA
KA
NE
W A
NU
RA
DH
AP
UR
A
KE
LA
NIT
ISS
A
CH
UN
NA
KA
M
KIL
INO
CH
CH
I
VA
LA
CH
CH
AN
AI
SR
I J
'PU
RA
HA
VE
LO
CK
TO
WN
DE
HIW
AL
A
PA
NN
AL
A
KE
RA
WA
LA
PIT
IYA
AN
IYA
KA
ND
A
AM
BA
LA
NG
OD
A
UP
PE
R K
OT
MA
LE
PU
TT
AL
AM
PS
BE
LIA
TT
A
KA
TU
NA
YA
KE
Th
e M
ap
of
Sri
Lan
ka
Tra
nsm
issi
on
Sy
stem
in
Yea
r 2
02
7
MA
HIY
AN
GA
NE
MA
HO
PA
LL
EK
EL
E
PO
LO
NN
AR
UW
A
MO
NA
RA
GA
LA
NA
UL
A
VA
VU
NA
TIV
U
NE
W C
HIL
AW
NE
W H
AB
AR
AN
A
UM
A O
YA
PA
DU
KK
A
LA
XA
PA
NA
NA
WA
LA
PIT
IYA
VE
YA
NG
OD
A
KE
GA
LL
E
KIR
IND
IWE
LA
BA
TT
AR
AM
UL
LA
MA
NN
AR
PO
RT
KE
RA
WA
LA
PIT
IYA
PO
RT
CIT
Y
BA
TT
AR
AM
UL
LA
PE
TT
AH
HU
NU
PIT
IYA
KO
LL
UP
ITIY
A
MA
RA
DA
NA
SL
AV
E I
SL
AN
D
SR
I J
'PU
RA
WE
LL
AW
AT
TA
AT
HU
RU
GIR
IYA
MO
RA
GO
LL
A
TIS
SA
MA
HA
RA
MA
BIY
AG
AM
A
KO
TA
HE
NA
BIY
AG
AM
A
KIR
IND
IWE
LA
MA
TU
GA
MA
NE
WP
OL
PIT
IYA
SA
PU
GA
SK
AN
DA
AT
HU
RU
GIR
IYA
SA
MP
OO
R
CA
NY
ON
WE
WA
LW
AT
TA
BR
OA
DL
AN
DS
KA
PP
AL
TH
UR
EI
HO
RA
NA
KE
SB
EW
A
PA
NN
IPIT
IYA
KA
LU
TA
RA
OR
UW
AL
A
PA
DU
KK
A
NA
DU
KU
DA
TH
AL
AP
ITIG
AL
A
RA
GA
LA
KA
LA
WA
NA
MA
LIB
OD
A
KA
ND
Y C
ITY
CH
EM
MA
NY
HA
MB
AN
TO
TA
PO
RTSE
RU
NU
WA
RA
KO
KIL
AI
NO
TH
ER
N N
CR
E
PO
ON
ER
YN
CO
LL
EC
TO
R
MIR
IGA
MA
SS PO
LP
ITIY
A
WE
LIM
AD
A
ET
HIM
AL
E S
OL
AR
WE
LIG
AM
A
BA
DD
EG
AM
AG
IN G
AN
GA
MIL
LA
NIY
A
HO
MA
GA
MA
MIL
LA
WA
WA
RIY
AP
OL
A
PU
TT
AL
AM
NE
W
NE
GO
MB
O
KA
TU
NA
YA
KE
LE
CO
JA
-EL
A L
EC
O
BIY
AG
AM
A Z
ON
E
RA
JA
GIR
IYA
NA
RA
HE
NP
ITA
TO
WN
HA
LL
FO
RT
HA
MB
AN
TO
TA
SO
LA
R
KIR
IYA
NK
AL
LIY
A
YA
KK
AL
A
MA
NN
AR
SO
LA
R
PS
PP
13
2k
V L
ine
13
2k
V :
Un
der
gro
un
d C
ab
le
22
0k
V L
ine
22
0/1
32
kV
GS
13
2/3
3 k
V G
S
Hy
dro
Po
wer
Sta
tio
n
Th
erm
al
Po
wer
Sta
tio
n
22
0k
V
: U
nd
erg
rou
nd
Ca
ble
22
0/3
3 k
V G
S
13
2/2
2 k
V G
S
So
lar
Pa
rk
Win
d P
ark
22
0 k
V S
wit
chin
g S
tati
on
KO
TA
DE
NIY
AW
A
WA
RIY
AP
OL
AS
OU
TH
SC
OP
E O
F W
OR
KS
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
26.04.2019
Bhasura
Sandamali
16.06.2020
NTS
TD/CE/1/184/D/09/00
LOCATION OF SITES
MAP SHOWING THE ADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
132kV
132kV132kV
132kV
132kV
132 kV
132kV
132kV
132kV132kV
132kV
132kV 132kV
132kV
132kV
132kV
33kV
MVA33kV
33kV
2x27
MVA MVA
33kV
1x50
MVA
12.5kV
33kV
MVA
33kV
2x60
MW
2x71
MVA
10.5kV
MVA
33kV
132kV
3x31.5
MVA
33kV
12.5kV 12.5kV
220kV
13.8kV
12.5kV 220kV
132kV
132kV
3x31.5
MVA
33kV
MVA
33kV
132kV
220kV
5x31.5
MVA
33kV
132kV
2x53.7
MVA
12.5kV
2x37.5
MW
2x25
MW
11kV
2x32.1
MVA
33 kV
3x31.5
MVA
33kV
33kV
2x15
MVA
2x10
MVA12.5kV
2x27
MW
2x34.5
MVA
2x105
MVA
33
kV
6.6
kV
13
2k
V
33
kV
4x31.5 MVA
22
0k
V
13
2k
V
3x31.5MVA
2x250
2x60MVA
25 Mvar
2x250
2x60MVA
33kV
3x31.5
MVA
132kV
33kVMVA
Lyn
x, 1.5
km
10
20Mvar
132kV
220kV
Invar 2.2 km
2xZebra, 48km
2xZebra, 30km 2xZebra, 16.4km
Lynx, 8.3km
2xZebra, 3km
Lyn
x, 13k
m
Lyn
x, 25k
m
Lynx, 38km
Zebra, 19 km
Zeb
ra, 35 k
m
Lynx, 0.6kmLynx, 10 km
Zeb
ra,
12.5kV
Lynx, 30km
Lyn
x, 8.3
km
Zeb
ra, 5.1
km
Zeb
ra, 44 k
m
Lynx, 19km
3x31.5MVA
132kV
MADAMPE
BOLAWATTA
VEYANGODA
KOTUGODA
KURUNEGALA
PUTTALAM
NEW ANURADHAPURA
ANURADHAPURA
(GS) SAPUGASKANDA
KOLONNAWAKELANITISSA
PANNIPITIYA
PANADURA
UKUWELA
KOTMALE
VICTORIA RANDENIGALA
12.5kV
RANTAMBE
DENIYAYA
GALLE
BALANGODA
SAMANALAWEWA
EMBILIPITIYA
HAMBANTOTA
NUWARA ELIYA
INGINIYAGALA
WIMALASURENDRA
BADULLA
LAXAPANANEW LAXAPANA
POLPITIYA
CANYON
HABARANA
BIYAGAMA
ORUWALA2x60
MVA
33kVMW
Zeb
ra,
113k
m
Zebra,4.6km
KELANIYA
132kV
2x150
MVA
2x40
MVA
13
2k
V
220kV 220kV
MATUGAMA
BOWATENNA
3x35
33kV
4x31.5 3x31.5
3x31.5
3x31.5
2x31.5
3x31.5
Lynx, 34.6 km
1x40
MW
2xZebra, 18 km
132kV
Zebra, 18.5km
15.5
km
220kV
2x60
2x250
MVA
ATHURUGIRIYA
2x31.5
MVA 33
kV
13
2k
V
11kV
132kV
Zebra, 4.2km
33kV
33kV
MVA
13
2k
V
Zebra, 6.6km
10Mvar
MATARA
33kV
Lyn
x,5
2.0
km
132kV
132kV
33kV
KUKULE
11kV
2x38MW
Lynx, 30 km
132kV
132kV
MVA3x31.5
HORANA
Zebra,20 km
2xZ
ebra
,
1k
m
2xZebra, 5km
33kV
VALACHCHENA
132kV
33kV
20 Mvar
MVA
1x5+1x10
2x2.4+2x3.1
MW
6.9 kV
2xGoat, 12.5km
CC
20 Mvar
33kV
3x31.5
MVA
AMPARA
132kV
2x30MVA 2x150
MVA
20
Mvar
MH61.8 MW
33.3 MW
MH
48.3 MWMH
DEHIWALA132kV
33kV
3x31.5
MVA
11kV
3x31.5
MVA
MVA
3x31.5
11kV
HAVELOCK TOWN
MARADANA
1000 X
LP
E, 9k
m
13
2k
V
PANNALA
33
kV
33
kV
13
2k
V
ANIYAKANDA
132kV
33kV
3x31.5MVA
AMBALANGODA
Zeb
ra,
KERAWALAPITIYA
Schematic Diagram of the 2027 Transmission System
KATUNAYAKE
MVA
33
kV
3x31.5
20 Mvar
PUTTALAM COAL
3x300 MW
2x50
17 km2xZebra,
33kV
POLONNARUWA
132kV
2x31.5MVA
NAULA
13
2k
V
33
kV
Zebra, 17 km
20Mvar
PALLEKELE
MVA
2x31.5
33kV
132kV
MVA
33kV
2x31.5
VAUNATIV
Zeb
ra, 21 k
m
MAHIYANGANE
2.4 MW
33kV
MONARAGALA
2x31.5
MVA
132kV
Zebra ,48.5 km
Oriole,47.5km
132kV
33
kV
MAHO
MVA
33kV
2x31.5
BELIATTA
132kV
2x250MVA
NEW CHILAW
132kV
220kV
22
0k
V
UPPER KOTMALE
2x250
MVA
NEW POLPITIYA
13
2k
V
22
0k
V
MVA
THULHIRIYA
2x31.5MVA
33kV
13
2k
V
KEGALLE
2x31.5MVA 3
3k
V
13
2k
V
KOSGAMA
3x31.5 MVA
33
kV
13
2k
V
SEETHAWAKA
KIRINDIWELA
2x250 MVA
22
0k
V
13
2k
V
2x250 MVA
2x45
MVA
33kV
PADUKKA
22
0k
V
13
2k
V
10Mvar
132kV
3x31.5
MVA
33kV
KALUTARA
22
0k
V
132kV
11kVMVA
2x31.5
11kV
132kV
KOTAHENA
PETTAH
132kV
Zebra, 42 km
Zeb
ra, 111k
mZ
ebra
, 50 k
m
Zeb
ra, 97 k
m
Zebra, 44km
Zebra, 56 km
Zeb
ra L
L, 47 k
m
2xZebra, 1.5km
2xZebra, 7km
Zebra, 10km
2xL
L Z
ebra
, 23 k
m
2xZebra, 51km2xZebra, 19.2 km
22
0k
V
2xZebra, 23km
220kV
2xAAAC 630, 74 km
2xA
AA
C 4
00, 43k
m
22
0k
V
30 Mvar
33
kV
15Mvar
30Mvar
20
Mvar
33kV
40Mvar
27.8 MW
MH
24.5 MWMH
38.2 MWMH
13
2k
V
33
kV
0.5 MWMH
9.4 MWMH
MH2.9 MW
7 MWD
5 MW
DMH
WELIMADA
132kV
Zeb
ra, 25k
m
2x60MW
2xAAAC 400, 100km
Lynx, 7km
Zeb
ra, 10 k
m
Zebra,14 km
2xZ
ebra
,
Zebra, 6 km
Zeb
ra, 23k
m
Zeb
ra,1
3k
m
Zebra, 19 km
Zebra, 7km
Zebra, 44 km
Lynx, 8km
2xZ
ebra
, 28k
m
Lyn
x, 20 k
m
Zeb
ra, 18.5
km
800 XLPE 4km
800 XLPE 2km 800 XLPE 2km
20 Mvar
Zebra, 100 km
(SUB A)
(SUB I)
LAK WIJAYA
33kV
Lynx3.4km
104MW+
54 MW
161 MVA+81 MVA
11kV
Zebra, 10km
Zeb
ra, 11k
m
Zebra, 11km
MVA
3x31.5
MVA2x63
2x31.5
MVA
2x31.5
MVA
MVA2x31.5
2x19
MW
2x31.5
MVA
75 MVA
20
kV
60 MWWind
MVA
3x31.5
3x31.5MVA
2x31.5MVA
33
kV
MVA3x31.5
33kV
33.3 MWMH
2x150
MVA
33
kV
MVA3x31.5
Lyn
x, 37k
m
3x90MVA
3x67MW 3x70
MW
3x96
MVA2x75
MW
2x60
MW
2x81
MVA
132 kV
3x31.5
MVA
2x16+
3x13.33
MVA
2x12.5+
3x8.33
MW
2x72
MVA
2x50
MW2x30
MW
2x38
MVA
13
2k
V
MVA4x1.5
MH14.6 MW
3x31.5
MVA
MVA
3x31.5
41.1 MW
MH
2x46MVA
13
2k
V
MVA
3x31.5
2x31.5
MVA
132kV
132kV
MVA2x31.5
33
kV
33kV
20Mvar
2x10 MWWind
MVA2x31.5
3x31.5
MVA
Lynx,39km
TISSAMAHARAMA
2x31.5 MVA
33kV132kV
Zebra, 22km
(SUB B)
(SUB C)
(Steel Corp)
Zeb
ra L
L , 8
2 k
m
Zebra LL, 37km
46 k
m NEW
PORT
(SUB L)
Cu
XL
PE
1600, 13.5
km
Cu
XL
PE
1600, 6.5
km
Cu
XL
PE
1200, 1.2
km
2x250
MVA
MVA11kV
2x45
MVA
11kV
3x30
KOLLUPITIYA
(SUB E)
MVA
11kV
2x45
SLAVE ISLAND(SUB M)
1200 XLPE 2.5km
Cu
XL
PE
800, 1.2
km
800 XLPE 6.5km
132kV
3x30
FORT
(SUB F)
MVA
11kV
2x45
HUNUPITIYA(SUB N)
11kV
MVA2x45
11kV
MVA2x45
33kV
MVA2x80
33kV
MVA2x80
PORT CITY R2
132kV
MORAGOLLA
31MW
33kV2x31.5MVA
KESBEWA
WEWALWATTA
MVA2x31.5
132kV
MVA
Zebra,38 km
220 kV
12 Mvar
MVA
2x250
2x31.5MVA
33
kV
132kV
VAVUNIA
13
2k
V
KILINOCHCHI
3x31.5MVA
CHUNNAKKAM
45MVA
33
kV
22
0k
V
MANNAR
2xZ
ebra
, 55k
m
Zebra, 73 km
Zebra, 103.3 km
24 MW
300 MWWind
2x31.5MVA
33
kV
13
2k
V
TRINCOMALEE
15 MW
D
Zebra, 67.2 km
2x150
MVA
MVA
MVA
33
kV
3x31.5
MVA
Cu
XL
PE
1200
0.6
km
2xZ
ebra
, 12.5
km
2xL
L A
CS
R, 17.5
km
Zebra LL,23km
20Mvar
132kV
132kV
132kV
132kV
Zebra, 3km
900 MW
220kV
220kV
4xZebra, 95 km
2xZebra, 45 km
10 Mvar
2xLL TACSR550, 35.5km
2x250MVA
4xZebra, 20km
BAT'AMULLA 2x45MVA
ZTACSR (GAP), 4km
2xZebra, 150 km
RATNAPURA
Zebra,3km,
KAPPALTHURAI
35Mvar
22
0k
V
2xZebra, 30km
NADUKUDA
33kV
220kV
132kV
2xZebra,
1km
NAWALAPITIYA
132kV
2x31.5 MVA
Zeb
ra L
L, 10.5
km
33kVMVA3x31.5
J'PURA
132kV
SRI
20
Mvar
33
kV
3x360MVA
5 MW
D1 MW
D
5 MWD
5 MWD
20 MWWind
5 MW
D
9.2 MWMH
D5 MW
S20 MW
25.1 MWMH
RAGALA
MVA2x31.5
14.5 MW
MH
D5 MWMvar
14.5 MWMH
4 MWWind
5 MWD
20MVA2x7.5
MW
THALPITIGALA
10 MWS
5 MWD
D5 MW
D5 MW
S
30 MWD
2.5 MW
MVA2x31.5
MH4 MW
KALAWANA
800 XLPE 2.8km
5 MWD
D5.5 MW
S0.12 MW
MVA31.5
33kV
20 MWWind
SEGUWANTHIV VIDATHAMUNAI
6x63MVA
33kV
3x31.5MVA
Zebra, 4km
33
kV
Lynx, 75km
132kV
33kV
2x31.5MVA
CHEMMANY
Zeb
ra, 70k
m
132kV
33kV
MVA
2x31.5
Zebra, 50km
33kV
SERUNUWARA
2x31.5
MVA
2x63MVA
33kV
10 MWS
HABARANA
Quadraple Tower
MVA2x31.5
11
kV
KANDY CITY
10 MWS
13.4 MW
MH
31.5MVA
33kV
13
2k
V
GIN GANGA
20 MW
250 MVA
WELLAWATTA
(SUB K)
220kV
33kV
2x63MVA
20Mvar
30Mvar
6.3 kV
SAMPOOR COAL
Zebra, 70 km
MVA2x88
Lyn
x, 20k
m
Zeb
ra, 57k
m
Lyn
x, 32 k
m
Zebra, 30km
Zebra, 40km
Cu 1600 XLPE, 14km
2xZ
ebra
, 15k
m
Zeb
ra, 20k
m
Zebra,
21km
1600 X
LP
E,
9k
m
Zebra,17km
100 Mvar
Zebra,1 km
2x31.5MVA
33
kV
1x31.5MVA 20 MW
Wind
Zebra, 48 km
25 Mvar
100Mvar
ZT
AC
SR
(G
AP
)
11 k
m
200 Mvar
33kV
50 MWWind
MVA2x60
Zeb
ra
10 k
m
PUTTALAM NEW
63+45 MVA
75 MW
Wind
10 MWS
+100/-50 Mvar
SVC
BIYAGAMA NEW
Zebra LL, 22km
800 XLPE, 4.5km
MALIBODA
13.1 MWMH
2x31.5MVA
33 kV
Zebra,
18.5km
20 MW
20 Mvar
20 Mvar
20 Mvar 20 Mvar
Zebra, 8km
Cu
XL
PE
1200
Cu XLPE 800
2k
m
1.5km
220kV
220kV
PORT CITY R1
300MW
LNG
Zebra, 80km
MVA
2x45
33kV
Zebra, 22km
Zeb
ra, 9k
m
HOMAGAMA
132kV
2xZebra, 19.4km
Cu XLPE 800, 1.35km
220kV LINE
132kV LINE
THERMAL POWER STATION
220 kVCABLE LINE
Legend
MH - Mini-Hydro Power
CC Combined Cycle
ST Steam Turbine
GT Gas Turbine
SVC STATIC VAR COMPENSATOR
HYDRO POWER STATION
BREAKER SWITCH CAPACITOR
33kV LINE
11kV LINE
TRANSFORMER
3 WINDING AUTO TRANSFORMER
DG Diesel Generator
Wind - Wind Power
D - Dendro Power
400kV LINE
132kV LINE-NOT IN OPERATION
132kV CABLE LINE
REACTOR
MVA
11kV
2x45
TOWN HALL(SUB Q)
132kV
1200 X
LP
E 2
.4k
m
MVA
11kV
2x45
NARAHENPITA(SUB P)
132kV
1200 XLPE, 4km
HAMBANTOTA SOLAR
30 MW
33 kV
13
2k
V
MVA
2x31.5
Zebra, 5km
ETHIMALE SOLAR
100 MW
Zebra, 33 kV
13
2k
V
MVA2x63
100 MW
220kV
2xZebra, 1km
22
0k
V
SAMPOOR
2x31.5MVA
WARIYAPOLA
132kV
33kV
2x45MVA
6km
33
kV
13
2k
V
BIYAGAMA ZONE
2x45
132kV
MVA
JA-ELA LECO
Zebra, 16km
11kV
MVA
2x45KATUNAYAKE
LECO
Zebra, 7km Zebra, 4km
22
0k
V
2x63MVA
33
kV
MIRIGAMA SS
Zebra, 19.6km
2x250
MVA
Zeb
ra, 25k
m
13
2k
V
33kV
MVA2x63
NEGOMBO
Zebra, 10km
2x31.5MVA
33kV
13
2k
V
KAHAWATTA
Zebra, 15km
Zeb
ra,
39k
mZ
ebra
,
47k
m
33 kV
2x31.5
MVA
UMA OYA
Lyn
x,
16k
m
Lynx, 35km
Lynx, 39km
28 k
m
14k
m
WAGAWATTA
MVA2x45
13
2k
V
MVA
2x45
MILLEWA
132kV
33kV
2xZ
ebra
, 28k
mZ
ebra
, 19.1
km
Zebra, 18km
MVA2x45RAJAGIRIYA
Zebra LL,
3km
13
2k
V
BROADLAND
35
MW
Zebra,
13.2km
Zebra, 5.3km
Zeb
ra L
L, 16k
m
Zeb
ra L
L, 25.5
km
Lynx, 1km
4x63 MVA170 MWWind
33
kV 2xZebra, 75km
2xZebra, 25km
N-COLLECTOR
POONERYN
22
0k
V
220kV
2x63 MVA100 MW
S
33
kV
Zeb
ra, 17k
m
31.5 MVA
15 MWW
33kVZebra, 45km
132kV
10km
Zeb
ra L
L, 27k
m
Zeb
ra L
L, 26.5
km
2x31.5 MVA
33kV132kV
Zebra, 10km HAMBANTOTA PORT
Zeb
ra L
L,
3.5
km
Zebra,
5km
WELIGAMA
2x31.5 MVA
33kV132kV
Zebra, 27km
Zebra, 8km
BADDEGAMA
2x45 MVA
33kV132kV
Zeb
ra, 14k
m
22
0k
V
2xZebra, 85km
2xLL TACSR550, 14.5km
KOKKILAI
100 MW
33 kVMVA2x63
33kV
10MVA
MH0.9 MW
10 MWS
S10 MW
S10 MW
10 MWS
10 MW
S
100 MWS2
20
kV
MANNAR SOLAR
2x63MVA
2xZebra, 15km
2xZ
ebra
, 70k
m
300MW
LNG30
Mvar
100MW
618 MWPSPP
2xLL TACSR550,
40km
2xZ
ebra
, 125k
m
Zebra LL, 11km
KIRIBATHKUMBURA
Zebra, 22.5km
33kV
15
MH1 MWMvar25 MW
25MW
25MW
20MW
25MW
20 Mvar
16 Mvar
16 Mvar
16 Mvar
16 Mvar
16 Mvar
30 Mvar30 Mvar
500 XLPE
50 Mvar
Cu
XL
PE
1600, 16.2
km
(2n
d c
ab
le)
50 MvarZebra, 27kmZebra, 34km
Zebra, 61km
33kV
MVA2x31.5
132kV
Zeb
ra, 1.9
km
11
kV280MW
YUGADHANAVI
2x31.5 MVA
33kVZebra, 10km
YAKKALA
13
2k
V
POTTUVIL
20 Mvar
KIRIYANKALLI
33kV
2x63MVA
33kV
132kV
33kV
3x31.5MVA
RATMALANA
Zebra LL,
7km
Cu
XL
PE
800, 6.3
km
1200 X
LP
E, 5k
m
33
kV
33kV
Cu
XL
PE
800, 8.5
km
Cu
XL
PE
1200, 3.6
km
132kV
Cu XLPE 1000, 4.6km
Cu XLPE 1000, 8km
11kV
KOTADENIYAWA
Zebra, 10km
2xLL TACSR550, 102.5km
132kV
132kV
220kV
MVA
Zeb
ra, 20k
m
132kV
11kV
Zebra,24 km
WARIYAPOLA SOUTH
22
0k
V LL
TA
CS
R550
13
2k
V
3x31.5
132kV
132kV
33kV
SCOPE OF WORKS
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
26.04.2019
Bhasura
Sandamali
16.06.2020
NTS
TD/CE/1/184/D/08/00
CEB POWER SYSTEM DIAGRAM IN YEAR 2027ADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
26.04.2019
Bhasura
Sandamali
16.06.2020
NTS
TD/CE/1/184/D/00/00
SYMBOLSADB
IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
0
Inform
ation
Cop
y-Not
for B
idding
L75x75x8
L60x60x6
L75 x 75 x 8
TENSION WIRE
BARBED WIRE STRAINER
ELEVATION
CHAIN LINK
50x50
450
L75x75x8
SECTION A-A
2600
G.L.
300
2600
45°
300
ALL STEEL COMPONENTS SHALL BE GALVANIZED
NOTE
3000 3000
ALL DIMENSIONS ARE IN MILLIMETRES
STRAINER
300
R/F CONCRETE
DRAIN
100
75
A
A
G.L.
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
26.04.2019
Bhasura
Sandamali
17.06.2020
NTS
TD/CE/1/184/D/60/00-01
CHAIN LINK FENCEADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
20 20
DETAIL AT ' P '
365
220
125
70
01
00
250
250
250
225
175
150
125
125
125
23
75
375
175
200
75
DPC
C25 Concrete
375X375x800
16
75
A
B B
INTERMEDIATE POST
(1:25)
A
NOTES -:
1. All demensions are in Millimeters.
2. Grade 25 Concrete for Foundation.
3. Minimum cover for main Reinforcement - 20mm
4. Straining Post to be provided at every 06th
fence post & at all bends.
150
250
125125
10 10
TURN BUCKLE FOR STRAINING
(1:5)
300
150
50
Fence Post
Washer nut &
check nut
50mm dia. STRAINING BOLT
(1:5)
Washer nut &
check nut
12
100 40
6mm dia. G.I. HOOK BOLT
(1:5)
25
75
75
2Y08Stirrups
R6 at 125 c/c
2Y08
SECTION
A - A
125
125
2Y08
Stirrups
R6 at 125 c/c
2Y08
SECTION
B - B
1675
25
02
50
25
02
25
17
51
50
12
51
25
12
5
2425
2400
475
600
750
100
475
125
C25 Concrete
475X375x850
DPC
30
0
See Detail ' P '
FRONT ELEVATIONSTRAINING POST / CORNER POST
(1:25)
Y
Y
X X
Min
100
Min 100
2Y08
Stirrups
R6 at 125 c/c
SECTION
Y - Y
2Y08
100
10
0
125
12
5
2Y08
Stirrups
R6 at 125 c/c
2Y08
SECTION
B - B
1675
36
5
220
12
51
25
12
51
50
17
52
25
25
02
50
25
0
2425
750
100
125
475
C25 Concrete
475X375x850
DPC
SIDE ELEVATION
STRAINING POST / CORNER POST
(1:25)
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
26.04.2019
Bhasura
Sandamali
16.06.2020
As Shown
TD/CE/1/184/D/60/00-02
BENT TYPE BARBED WIRE FENCE POSTADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
50
1200
120
1 HOUR FIRE PROOF
SINGLE STEEL DOOR WITH
PANIC LATCHES TO
MANUFACTURER DETAILS
GALVANIZED
FRAME
F.F.L.
1000
2400
50
900
2100
1050
DETAIL OF D1 DETAIL OF D2
50
800
2100
1050
DETAIL OF D4
100
300
75x50 ALUMINIUM
FRAME
ALUMINIUM
HALF PANEL
WIRE GLASS
ALUMINIUM
DOOR
75x50 ALUMINIUM
FRAME
1 HOUR FIRE PROOF
SINGLE STEEL DOOR WITH
PANIC LATCHES TO
MANUFACTURER DETAILS
ALUMINIUM DOOR
FULLY COVERED
DETAIL OF D5
50
1800
120
F.F.L.
1050
2400
DETAIL OF D6
75x50 ALUMINIUM
FRAME
100
700 700
ALUMINIUM HALF
PANEL
WIRE GLASS
150
50
900
2100
1050
DETAIL OF D3
GALVANIZED
STEEL FRAME
1 HOUR FIRE PROOF
SINGLE STEEL DOOR WITH
PANIC LATCHES TO
MANUFACTURER DETAILS
1700
SHUTTERED GLASS
75x50 ALUMINIUM
FRAME
ALUMINIUM WITH 6mm
WIRED GLASS SHUTTERS
WITH CURTAIN
SOLARLAMINATION
50 500
50
500
50
500
50
1350
300
50
F.F.L.
750
2400
DETAIL OF W1
50
900
2100
1050
DETAIL OF D3A
DOOR PANEL
75x50 ALUMINIUM
FRAME
DOOR PANEL
1 1
SECTION 1-1
2 2
SECTION 2-2 SECTION 3-3 SECTION 4-4
4 4
SECTION 5-5
55
SECTION 6-6
50
900
1950
450
50
50
F.F.L.
DETAIL OF W2
F.F.L.
1200 x 2400D1 GALVANIZED STEEL FRAME FIRE PROOF STEEL DOOR WITH
PANIC LATCHES SINGLE DOOR
900 x 2100D2 ALUMINIUM HALF PANEL WITH WIRED GLAZED DOOR
900 x 2100D3 GALVANIZED STEEL FRAME FIRE PROOF STEEL DOOR
WITH PANIC LATCHES SINGLE DOOR
800 x 2100D4
1700 x 1650W1 ALUMINIAM FRAME GLASZED WINSDOWS
600 x 450F
900 x 2100D3A ALUMINIUM DOOR
ALUMINIUM DOOR
1800 x 2400D5 GALVANIZED STEEL FRAME FIRE PROOF STEEL DOOR WITH
PANIC LATCHES DOUBLE DOOR
1800 x 2400D6 ALUMINIUM HALF PANEL WITH WIRED GLAZED DOOR
ALUMINIAM FRAME GLASZED FANLIGHT
50
1800
120
F.F.L.
2400
700 700
ALUMINIUM HALF
PANEL
150
3 3
1700
50
600
1950
450
50
50
75x50 ALUMINIUM
FRAME
DETAIL OF F
F.F.L.
900 x 450W2 PRESSURE RELEIFE WINSDOWS
66
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
26.04.2019
Bhasura
Sandamali
16.06.2020
1:50
TD/CE/1/184/D/60/00-03
DETAILS OF DOORS & WINDOWSADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
F5 F3 F1 F4
Gen.
Feeder 2
Ö Ö Ö
ÖÖ
Ö Ö Ö
OHL 132kV
KELANIYA
ÖÖ
SCOPE OF WORKS
+C2
CAP2
Gen.
Feeder 1
(=H13) (=H11) (=H09) (=H12)(=H03)
(=H04)
(=E01)
(=E02)
(=E03)
(=E04)
(=E05)
OHL 132kV
KOTUGODA
(BS1) (BS2)
(=E00) (=E00)
(=H01) (=H02) (=H08)(=H07)
+C1
CAP1
(=H05)
(5MVAr)
ES
CAP2
P2
P1
DSES
*
+C1(5MVAr)
ESP2
P1
DSES
*
(=H06)
MTR NO.3
31.5MVA
132/33kV
36kV CABLES
145kV DS
1250A
31.5kA/ 1 sec
145kV CB
1250A
31.5kA/ 1 sec
145kV CT
31.5kA/ 1 sec
EARTHING TRANSFO
800A,30s ZG
P1
P2
120kV SA
10kA
CL 2
400/200/1A,5P20,60VA
40
0/2
00
/1A
,5P
20
40
0/2
00
/1A
,5P
20
80
0/1
A,5
P2
0,6
0V
A
80
0/1
A,5
P2
0,6
0V
A
HV
NC
TM
V N
CT
400/200/1A,5P20,60VA
400/200/1A,CL 0.2,30VA
2000/1A,5P20,80VA
(=E06)
800/400/1A
1250A
25kA
800/400/1A
1250A
25kA
(=H10) (=H14)
36kV SA
10kA
CL 2
CAP2
36kV VT
33/Ö3:0.11/Ö3:0.11/Ö3:0.11/Ö3kV3P, 3P, CL 0.2
36kV CT
31.5kA/ 1 sec
800/1A,5P20,60VA
800/1A,CL 0.2,20VA
800/1A,5P20,60VA
F2 F6
(=H00)
CAP1
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARD
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
17.04.2019
Bhasura
Anusha
16.06.2020
NTS
TD/CE/1/184/D/00/01
ANIYAKANDA GSS
PROPOSED SINGAL LINE DIAGRAM FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
17500
WASTE
WATER
PIT
SP SOKAGE
PIT
CONTROL BUILDING
GU
AR
D H
OU
SE
GENERATOR
ROOM
CA
R P
AR
K
WASTE
WATER
PIT
SPSOKAGE
PIT
33kV
Gantr
y
77000
WATCH
TOWER
KELANIYA KOTUGODA
L1 L2 L3 L1 L2 L3
L1
L2
L3
L1
L2
L3
BS
1B
S2
ET1
AT1
ET2
AT2
CB
1C
B2
=E02 =E04
=E01 =E03
GA
TE SCOPE OF WORK
=H14
=H12
=H10
=H08
=H06
=H04
=H02
=H00
=H01
=H05
=H07
=H03
=H09
=H11
=H13
=H00
=E06
ET3
WELL
EXISTING CABLE ROUTE
NCTTR3
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARD
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
19.06.2019
Bhasura
Anusha
16.06.2020
NTS
TD/CE/1/184/D/01/01
ANIYAKANDA GSS
PROPOSED LAYOUT FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
DS
CB
CT
SA
Inform
ation
Cop
y-Not
for B
idding
33
kV
GA
NT
RY
F6
F4
F2 (NOT CONNECTED)
GEN 2 (NOT CONNECTED)
EXISTING 33kV CABLE
ARRANGEMENT FOR OUTDOOR
GANTRY
F6 F4 F2Tr.
2
Cap
2
Gen
2
VT
BBR
VT
ACap
1
Tr.
1
Gen.
1F1 F3 F5BS
36kV SWITCHGEAR
33kV
GA
NT
RY
GEN 2
F6
F4
F2
F6
PROPOSED 33kV CABLE
ARRANGEMENT FOR OUTDOOR
GANTRY
F2F4Tr.
2
Cap
2
F8
Gen
2
Bus
VT
2
BRVT
ACap
1
Tr.
1
F7
Gen.
1
F1 F3 F5BS
36kV SWITCHGEAR
TO TRANSFORMER 2
TO
TR
AN
SF
OR
ME
R 3
TO
TR
AN
SF
OR
ME
R 2
OUT DOOR
SWITCHGEAR
OUT DOOR
SWITCHGEAR
SCOPE OF WORK
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARD
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
19.06.2019
Bhasura
Anusha
16.06.2020
NTS
TD/CE/1/184/D/01/01-A
FOR OUTDOOR GANTRY
33kV CABLE ARRANGEMENTADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
2265 345 3205 1200
1200
5050
3000
1200
W1 W1 W1 W1 W1
W1W1W1W1W1
W1
36kV SWITCHGEAR ROOM
132kV CONTROL &
PROTECTION ROOM
CONTROL
ROOM
STORE
ROOM
OFFICE
ROOM
TOILET
BATTERY
ROOMPANTRY &
REST ROOM
AUXILIARY
ROOM
W1
=H
14
=H
12
=H
10
=H
08
=H
06
=H
04
=H
02
=H
00
=H
01
=H
05
=H
07
=H
03
=H
09
=H
11
=H
13
OPENING
23705
23905
1200
12130
D1D3A
D6
D3
D4
D4
D3A
D3
D5
D3
4350
1200
AC
DC
1200
2000
EYE
WASHER
110VDC BATTERY
CHARGE
48VDC BATTERY
CHARGE
BA
TT
ER
Y 0
2
48
VD
C
BA
TT
ER
Y 0
1
48
VD
C
EN
TR
AN
CE
3550
25003600
165
424040003550
D1
D1D1
4080
1600
D6
5180
1240
HOLLOW BRICK WALLFILLED
WITH CONC. 1:2:4
48VDC
FUSE BOX110VDC
FUSE BOX
RD
1340
990 850
550 550
=W9
600
800
OPENING
W2
W1
1420
1420
110VDC
BATTERY 1
11
0V
DC
BA
TT
ER
Y 2
=H
00
- SCOPE OF WORK
160
4860
1080
TR 3 CONTROL &
PROTECTION
PANEL
TR 3 AVR &
MECHANICAL
PROTECTION
PANEL
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Revision Record
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCYADB PROPOSED CONTROL BUILDING LAYOUT
FOR ANIYAKANDA GSS
1:100
A3 18.06.2020
Anusha
Bhasura
TD/CE/1/184/D/60/01
19.06.2019
IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
NATIONAL SYSTEM CONTROL
CENTER
SAS Architecture with IEC 61850 Communication
NSCC link
02 Nos. IEC 60870-5-101
- Fiber Optic Connection
- Electrical LAN Connection
GPS ANTENA
Siemens SICAM AK1703 ACP
NTP Server
Meinberg Lantime V4
172.17.204.137
172.17.204.138 , 172.17.204.140
HMI 1
Andritz Hydro 250
SCALA 6.80.00
172.17.204.133
RSTP
Moxa Turbo Ring Multimode fiber SC connectors Switch SCS 1
Moxa EDS-508A-MM-SC
172.17.204.142
Switch SCS 2
Moxa EDS-508A-MM-SC
172.17.204.143
Switch SCS 3
Moxa EDS-508A-MM-SC
172.17.204.144
HMI 2
Andritz Hydro 250
SCALA 6.80.00
172.17.204.134
Gateway
LEGEND
Switch E01
Moxa
Switch E02
Moxa
EDS-508A-MM-SC
172.17.204.167
EDS-508A-MM-SC
172.17.204.207
Switch E03
Moxa
EDS-508A-MM-SC
172.17.204.177
Switch E04
Moxa
EDS-508A-MM-SC
172.17.204.217
Switch E05
Moxa
EDS-508A-MM-SC
172.17.204.197
Bay Controller
SiemensSICAM BC1703 ACP
172.17.204.128
Main 1 Protection
Siemens 7SD522
172.17.204.149
Main 2 Protection
Siemens 7SJ610
172.17.204.150
Bay Controller
SiemensSICAM BC1703 ACP
172.17.204.198
Bay Controller
SiemensSICAM BC1703 ACP
172.17.204.158
Bay Controller
SiemensSICAM BC1703 ACP
172.17.204.208
Bay Controller
SiemensSICAM BC1703 ACP
172.17.204.188
Switch E06
Switch H12
Moxa
EDS-508A-MM-SC
172.17.204.243
Main 1
Protection &
Bay Controller
IED
Main 1 Protection
Siemens
7UT613 M1
172.17.204.199
Main 2 Protection
Siemens
7UT613 M2
172.17.204.200
AVR
MR Tapcon 260
172.17.204.202
Main 1 Protection
Siemens 7SA522
172.17.204.159
Main 2 Protection
Siemens 7SJ610
172.17.204.160
Main 1 Protection
Siemens
7UT613 M1
172.17.204.209
Main 2 Protection
Siemens
7UT613 M2
172.17.204.210
AVR
MR Tapcon 260
172.17.204.212
Main 1 Protection
Siemens 7SJ640
172.17.204.190
Main 2 Protection
Siemens 7SJ610
172.17.204.189
BBP Central Unit
Siemens 7SS52
172.17.204.191
Main 2
Protection &
Bay Controller
IED
Siemens 7SJ642
172.17.204.242
33 kV H12 F4 C &
P IED
Siemens 7SJ642
172.17.204.240
IO Box for
TF Mechanical
Protection
33 kV H10 F2 C &
P IED
Siemens 7SJ642
172.17.204.238
Siemens 7SJ641
172.17.204.236
33 kV H06 CAP 2
C & P IED
Siemens 7SJ641
172.17.204.234
33 kV H06 CAP2
A11 C & P IED
GE F 650
172.17.204.250
33 kV H06 CAP 2
A12 C & P IED
AVR GE F650
172.17.204.251
33 kV H04 GEN 2
C & P IED
BBP Bay Unit
Siemens 7SS523
BBP Bay Unit 2
Siemens 7SS523
E01
132 kV Kelaniya Line
E02
132kV Transformer 01
E03
132kV Kotugoda Line
E04
132kV Transformer 02E05
132kV Bus section
E06
Transformer 03
(New)
(New)
BBP Bay Unit
Siemens 7SS523
BBP Bay Unit
Siemens 7SS523
BBP Bay Unit
Siemens 7SS523
BBP Bay Unit 1
Siemens 7SS523BBP Bay Unit
Siemens 7SJ642
172.17.204.232
Siemens 7SJ647
172.17.204.228
Siemens 7SJ642
172.17.204.231
33 kV H05 CAP 1
C & P IED
Siemens 7SJ641
172.17.204.233
33 kV H05 CAP 1
A11 C & P IED
GE F650
172.17.204.248
33 kV H05 CAP 1
A12 C & P IED
GE F650
172.17.204.249
33 kV H07 TR1
C & P IED
Siemens 7SJ641
172.17.204.235
Siemens 7SJ642
172.17.204.237
33 kV H11 F3 C &
P IED
Siemens 7SJ642
172.17.204.239
33 kV H13 F5 C &
P IED
Siemens 7SJ642
172.17.204.241
33 kV H14 F6 C &
P IED
Switch H06
Moxa
EDS-508A-MM-SC
172.17.204.244
33 kV H08 TR 2
C & P IED
Switch H00
Moxa
EDS-508A-MM-SC
172.17.204.245
33 kV H00 BS C
& P IED
Switch H05
Moxa
EDS-508A-MM-SC
172.17.204. 246
33 kV H03 GEN 1
C & P IED
Switch H11
Moxa
EDS-508A-MM-SC
172.17.204.247
33 kV H09 F1 C &
P IED
Switch H04A
33kV
H04 TR03
C & P IED
IEC
- 6
0870 -
5 -
101
IEC
- 6
0870 -
5 -
101
Revision Record
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
01.07.2019
Bhasura
Anusha
18.06.2020
0
NTS
TD/CE/1/184/D/07/01
AUTOMATION SYSTEM FOR ANIYAKANDA GSS
ARCHITECTURE FOR THE SUBSTATIONADBGREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
Ö Ö Ö
ÖÖ
Ö Ö Ö
ÖÖ
KILINOCHCHI 1KILINOCHCHI 2
33/ 3:0.11/ 3:0.1133/ 3:0.11/ 3:0.11
TO LVAC
SCOPE OF WORKS
145kV,2000A,31.5kA/1s
BUS BAR-1
MTR NO.1
31.5MVA
132/33kV
36kV CABLES
145kV DS
1250A
31.5kA/ 1 sec
145kV CB
1250A
31.5kA/ 1 sec
145kV CT
31.5kA/ 1 sec
EARTHING TRANSFO
800A,30s ZG
P1
P2
36kV SA
10kA
CL 2
120kV SA
10kA
CL 2
400/200/1A,5P20,60VA
40
0/2
00
/1A
,5P
20
,60
VA
40
0/2
00
/1A
,5P
20
,60
VA
80
0/1
A,5
P2
0,6
0V
A
80
0/1
A,5
P2
0,6
0V
A
HV
NC
TM
V N
CT
400/200/1A,5P20,60VA
400/200/1A,CL 0.2,30VA
2000/1A,5P20,80VA
F4F3
36kV, 2000A, 25kA
36kV DS/ES
1250A
25kA/ 1sec
36kV CB
1250A
25kA/ 1sec
36kV VT
33/Ö3:0.11/Ö3:0.11/Ö3:0.11/Ö3kV
3P, 3P, CL0.2
36kV CT
25kA/ 1 secP2
P1
36kV CB
1250A
25kA/ 1sec
36kV DS/ES
1250A
25kA/ 1sec
36kV SA
3X10kA
CL 2
36kV CT
25kA/ 1sec
36kV DS/ES
2500A
25kA/ 1sec
36kV DS/ES
2500A
25kA/ 1sec
P1
P2
P1
P2
36kV CB
1250A
25kA/ 1sec
36kV DS/ES
1250A
25kA/ 1sec
36kV CT
25kA/ 1sec
36kV SA
3X10kA
CL 2
36kV CB
2500A
25kA/ 1sec
P2
F2F1
P2
800/1A,5P20,60VA
800/1A,5P20,60VA
800/1A,CL 0.2,20VA
36kV VT
33/Ö3:0.11/Ö3:0.11/Ö3kV
P1P1
400/1A,5P20
400/1A,CL 0.2
800/400/1A,5P20
800/400/1A,CL 0.2
36kV BUS VT
33/Ö3:0.11/Ö3:0.11/Ö3:0.11/Ö3kV
3P, 3P, CL 0.2
2500/1A,5P20
36kV CT
25kA
36kV VT
33/Ö3:0.11/Ö3:0.11/Ö3kV
145kV,2000A,25kA/1s
BUS BAR-1
GENERATOR
FEEDER
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
28.06.2019
Bhasura
Ranjana
16.06.2020
NTS
TD/CE/1/184/D/00/02
SUBSTATION AT CHUNNAKAM
SINGLE LINE DIAGRAM FOR 132/33 kVADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
KIL
INO
CH
CH
I 2
GA
TE
KIL
INO
CH
CH
I 1
R
Y
B
R
Y
B
NCT
NCT10001500
R
Y
B
NCT
NCT
10001500
℄OF
CT
℄OF
CB
Y
℄OF
CT
B
R RY
B
NCTNCT
B
8000
CA
R
PA
RK
GE
NE
RA
TO
R
R
OO
M
R
Y
B
R
Y
B
UP
D1
EX
HA
US
T P
AN
ROAD (PS)
TO
C
HU
NN
AK
AM
5000mm WIDE ROAD
50
00
mm
WID
E R
OA
D
5000mm WIDE ROAD
5000mm WIDE ROAD
GU
AR
D
HO
US
E
CONTROL ROOM
BUILDING
WASTE
WATER
PIT
SP
SOAKAGE
PIT
145 kV BUS BAR-1
145 kV BUS BAR-2
℄ OF TOWER
& LA
℄ OF TOWER & LA 132 kV YARD
WATCH TOWER
7535
4465
PROPERTY OF CENTRAL POWER STATION CHUNNAKAM
PROPERTY OF LANKA SIDDHA
AYURVEDIC MEDICAL COLLEGE
PR
OP
ER
TY
OF
CE
NT
RA
L P
OW
ER
ST
AT
ION
CH
UN
NA
KA
M
- SCOPE OF WORK
TR.1
TR.2
TR.3
Y
R
CO
NF
ER
EN
CE
RO
OM
SIT
E E
NG
INE
ER
'S
OF
FIC
E
CS
/ES
OF
FIC
EP
AN
TR
Y
OP
EN
VE
RA
ND
AH
TO
ILE
T
GA
TE
SIT
E O
FF
ICE
SA PIPI
ETR
PIAUX. TF
PROVISION
CABLE TO INDOOR
SWITCHGEAR
SA CT
CB
DS
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
04.09.2018
Bhasura
Ranjana
16.06.2020
1:600
TD/CE/1/184/D/01/02
SUBSTATION AT CHUNNAKAM
LAYOUT FOR 132/33 kVADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
1500 1000 15001000
7000
4000
3500
1500 1000 15001000
8450
1500 1000 15001000 1500 1000 15001000
7000
A=
4000
3500
200
5000 5000 5005 5000
1000 1000
5000 5000 5000 5000
1000 1000
1000 1000
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Revision Record
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
TD/CE/1/184/D/01/02-A
ADB 33kV FEEDER TAKE-OFF STRUCTURE
NTS
A3
Ranjana
Bhasura
16.06.2020
16.06.2020GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
PACKAGE 8 - LOT AARRENGEMENT FOR CHUNNAKAM GSS
Inform
ation
Cop
y-Not
for B
idding
1200
70
0
104906370
4870 4350
1752017520
2400
2400
45
00
41
90
LOBBY
UP
12
00
12
00
36kV SWITCHGEAR ROOM
1440
9290
3000 4550
REST ROOM
& PANTRY
D3
TOILET
D2
120
1440
D3 D3STORE
ROOM
2400
3600
12
00
OFFICE
ROOM
36
00
F
D2
1200
12
00
24
0
3600
DOWN
D2
CONTROL
ROOM
3670
4770
LOADING
BAYD1
AUXILIARY
ROOM
600
1350
68
50
10
37
0
W1
28
00
46
00
10
37
0
50
50
60
0
10
00
600
350
D
W1
W1
W1 W1
W1
W1
W1
W1 W1 W1
W1 W1W1
W1
F F
D2
D2
D2
F
F
FF
D3
D1
F12F11TR3F9
BS
2-B
BS
2-A
F8 F10TR2F7F6F5F4
BS
1-A
BS
1-B
BATTERY
ROOM
D2
D2
D2
W1
D1
1500
TOILET12
00
D3
24
0
60
502
70
01
20
0
12
0
95
0
F
SCOPE OF WORKS
TR1 F3F2F1
NEW ENERGY
METER PANEL
132kV PROTECTION & COMMUNICATION ROOM
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Revision Record
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY ADB PROPOSED CONTROL BUILDING LAYOUT
FOR CHUNNAKAM GSS
1:125
A3 16.06.2020
Anusha
Bhasura
28.06.20111
TD/CE/1/184/D/60/02 - A
19.06.2019
IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
PES-1 PES-2
PAS PANEL 1 PAS PANEL 2
HMI-1 HMI-2 ENGINEERING STATION
LASER PRINTER
EVENT / ALARM PRINTER
(DOT MATRIX)
PARALLEL PORT
EXPANDER
EVENT / ALARM PRINTER
(DOT MATRIX)
PARALLEL PORT
EXPANDER
HMI-1 HMI-2
KVM SWITCH-1 KVM SWITCH-2
GPS
GPS ANTENA
PAS SERVER1/
GATEWAY
RS232 PORT
KVM SWITCH-1 KVM SWITCH-2
PAS SERVER2/
GATEWAY
RS232 PORT
OVER IEC 60870-5-101 PROTOCOL
ENGG.WS.
KVM SWITCH - 3 KVM SWITCH - 4
DIAL -UP MODEM
TELEPHONE LINE
DIAL -UP MODEM
LAPTOP
SYSTEM CONTROL CENTRE
ABB MICROSCADA
OPGW
(NOT IN SIEMENS SCOPE)
AVR-2 AVR-3 6MD61 6MD66 6MD66 6MD66 6MD66 6MD66
7SS522
7SJ61 7SA522 7SJ612 7UT612 7UT613 7SA522 7SJ61 7SJ612 7ST612 7UT613 7SJ61
7SS523 7SS523 7SS523 7SS5237SS523 7SS523
Lin
e F
eeder
KIL
INO
CH
CH
I 2
Tra
nsfo
rmer
3 (
FU
TU
RE
)
Lin
e F
eeder
KIL
INO
CH
CH
I 1
Tra
nsfo
rmer
2
Bus S
ection
Busbar
Lin
e F
eeder
KIL
INO
CH
CH
I 2
Tra
nsfo
rmer
3(F
)
Lin
e F
eeder
KIL
INO
CH
CH
I 1
Tra
nsfo
rmer
2
Bus S
ection
ALM ALM ALM CP-E06 CP-E05 CP-E02 CP-E03 CP-E04 RP-BB RP-E06 RP-E05 RP-E02 RP-E03 RP-E04
132kV
ELECTRICAL TO FOR
MEDIA CONVERTERS
33kV
7SJ645 7SJ6451 7SJ8021 7SJ6451 7SJ8022 7SJ6451 7SJ8022 7SJ6102 7SJ64517SJ6451
7RW8020 7RW8020 7SJ6451 7SJ8022 7SJ6451 7SJ8022 7SJ6102 7SJ6451 7SJ8022 7SJ6451 7SJ80227SJ6451
33kV
Genera
tor
Feeder-
1
33kV
O/H
Feeder
33kV
O/H
Feeder
33kV
Tra
fo B
ay-1
33kV
Genera
tor
Feeder-
2
33kV
Bus C
ouple
r
33kV
Bus R
iser
33kV
O/H
Feeder
33kV
Tra
fo B
ay-2
33kV
O/H
Feeder
33kV
O/H
Feeder
33kV
Genera
tor
Feeder-
1
H06+CRP H07+CRP H08+CRP H09+CRP H10+CRP H11A+CRP H11B+CRP H12+CRP H13+CRP H14+CRP H15+CRP H16+CRP
LEGEND
FO PATCH CABLE
CAT VI RJ45 CABLE
RS232 COMMUNICATION CABLE
2 CORE RUGGEDISED ST-ST FO CABLE
ELECTRICAL TO FO MEDIA CONVERTER
2 CORE RUGGEDISED ST-LC FO CABLE
NOTE: It is assumed that data from Gateway to System control center is going on IEC-60870-5-101 Protocol on OPGW.
Two Ports of IEC-104 are available if connectivity between Gateway and SCC is required to be done on IEC- 104.
PES1-8 FO+24 RJ45 PORT
USED
SPARE
7
1
6
18
FO PORT RJ45 PORT
PES2-8 FO+24 RJ45 PORT
USED
SPARE
7
1
7
17
FO PORT RJ45 PORT
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
26.06.2019
Bhasura
Ranjana
16.06.2020
NTS
TD/CE/1/184/D/07/02-A
AUTOMATION SYSTEM FOR CHUNNAKAM GSS
ARCHITECTURE FOR THE SUBSTATIONADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
SAS Panel
Existing PES-1
Rugged Com
RSG2300N
Ethernet Copper
RJ45
Existing PES-2
Rugged Com
RSG2300NC
Fibre Duplex
ST Port
LEGEND
- Fiber Optic Connection
- Electrical LAN Connection
RSTP Ring Network
PES-3
PES-4 PES-5
Main 1
Protection &
Bay Controller
IED
Main 2
Protection &
Bay Controller
IED
IO Box
33kV
TR1 C & P
IED
33kV
Feeder C & P
IED
33kV
Feeder C & P
IED
AVR 33kV
Feeder C & P
IED
BBP Bay Unit
33kV
Feeder C & P
IED
33kV
BS C & P
IED
Revision Record
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
01.07.2019
Bhasura
PRJ
16.06.2020
0
NTS
TD/CE/1/184/D/07/02-B
FOR CHUNNAKAM GSS
EXTENTION TO SAS ARCHITECTURE ADBGREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
CONFERENCE ROOM
SITE ENGINEER'S
OFFICE
CS/ES OFFICE4
00
0PANTRY
OPEN
VERANDAH
TOILET
ALL DIMENSIONS ARE IN MILLIMETRES
20
00
D3 750 x 2100 Pvc door
D2 900 x 2100 Plywood door
F 600 x 450 Glazed Fanlight (Aluminium frame)
D1 1200 x 2400 Plywood door with 300mm Fanlight
W1 1800 x 1500 Glazed Window (Timber frame)
NOTE
AIR CONDITION PLANT
CEILING FAN
11060
W2 900 x 1500 Glazed Window (Timber frame)
30
00
30
00
90
0
67
20
67
20
3600 2500
11060
44
00
16
00
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
27.06.2019
Bhasura
Anusha
16.06.2020
1:50
TD/CE/1/184/D/60/02 - B
FOR CHUNNAKAM GSS
TYPICAL SITE OFFICE LAYOUTADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
192kV SA
10kA,
CL:2
245kV DS
2000A
40kA/ 1 sec
2000/1000/1A, 5P20
BUS 1 245kV, 3150A, 40kA/1sec
LINE FEEDER CONTROL
245kV LINE CONTROL &
PROTECTION
BUSBAR & BREAKER FAILURE
TO DIGITAL DISTURBANCE
RECORDER PANEL
WDGI: CL.0.5
WDG2: CL3P
P2
P1245kV CT
40kA/ 1 sec
2000/1000/1A, CL0.5
3000/1A, 5P20
MANNAR 1
BUS 2 245kV, 3150A, 40kA/1sec
WDG3: CL3P
MANNAR 2
245kV DS
2000A
40kA/ 1 sec245kV DS
2000A
40kA/ 1 sec
TO DIGITAL DISTURBANCE
RECORDER PANEL
P2 P1
P2 P1
800/1A,
5P20
TO DIGITAL DISTURBANCE
RECORDER PANEL
36kV SA
10kA,CL:2
800/1A,
5P20
NCT
245kV DS1250A
40kA/ 1 sec
P2
P1245kV CT
40kA/ 1 sec
192kV SA
10kA, CL:2
TRANSFORMER CONTROL & PROTECTION
P2
P2 P1
P1
800/1A,
5P20
TO LVAC
P1
P2
TO DIGITAL DISTURBANCE
RECORDER PANEL
36kV DS/ES
1600A
25kA/ 1 sec
800/1A,
5P20
NCT
200/1A,
5P20
NCT
AUX. TRAFO.
160kV
33kV/0.4kV ONAN
EARTH. TRAFO.
800A/30 sec
33kV, ONAN
36kV CB
1600A
25kA/ 1 sec
TR No.2
63MVA,220/33kV
P2
800/1A,
5P20
NCTP2
800/1A,
5P20
NCT
36kV DS/ES
1250A
25kA/ 1 sec
36kV CB
1250A
25kA/ 1 sec
36kV CT
25kA/ 1 sec
800/ 400 /1A, CL 0.2
800/ 400 /1A, 5P 20
33kV Cable
36kV, 2500A, 25kA/1sec Bus Section A2
LINE FEEDER
CONTROL
ENERGY METERING
SYSTEM
TRANSCO
DISCO
TO
36kV BUS VT
WDG I: CL.0.2
TO
36kV BUS VT
WDG 2: CL3P
LINE FEEDER
PROTECTION
36kV CB
2500A
25kA
36kV DS
2500A
25kA
36kV DS
2500A
25kA
2500/1A
2000/1000/1A, 5P20
P2
P1
245kV DS
2000A
40kA/ 1 sec
245kV CB
2000A
40kA/ 1 sec
200/1A ,5P20
Bus Section A3 Bus Section B2
36kV DS/ES
1250A
25kA/ 1 sec
36kV CB1250A
25kA/ 1 sec
36kV CT
25kA/ 1 sec
800/ 400 /1A, CL 0.2
800/ 400 /1A, 5P 20
36kV DS/ES
1250A
25kA/ 1 sec
36kV CB
1250A
25kA/ 1 sec
36kV CT
25kA/ 1 sec
800/ 400 /1A, CL 0.2
800/ 400 /1A, 5P 20
36kV DS/ES
1250A
25kA/ 1 sec
36kV CB
1250A
25kA/ 1 sec
36kV CT
25kA/ 1 sec
800/ 400 /1A, CL 0.2
800/ 400 /1A, 5P 20
36kV CB
2500A
25kA
36kV DS
2500A
25kA
36kV DS
2500A
25kA
2500/1A
P2
P1
P1
P2
P2
P1
P1
P2
P2
P1
P1
P2
245kV DS1250A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
36kV DS/ES
1600A
25kA/ 1 sec
36kV CB
1600A
25kA/ 1 sec
245kV DS1250A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
36kV DS/ES
1600A
25kA/ 1 sec
36kV CB
1600A
25kA/ 1 sec
245kV DS1250A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
36kV DS/ES
1600A
25kA/ 1 sec
36kV CB
1600A
25kA/ 1 sec
200/1A ,5P20
200/1A ,CL0.5
3000/1A ,5P20
200/1A ,5P20
200/1A ,5P20
200/1A ,5P20
200/1A ,5P20
200/1A ,5P20
200/1A ,5P20
200/1A ,CL0.5 200/1A ,CL0.5 200/1A ,CL0.5
3000/1A ,5P20 3000/1A ,5P20 3000/1A ,5P20
BUS 1
BUS 2
WDG I: CL.3P
WDG 2: CL0.2
WDG I: CL.3P
WDG 2: CL0.2
WDG I: CL.3P
WDG 2: CL0.2
WDG I: CL.3P
WDG 2: CL0.2
33kV Cable 33kV Cable 33kV Cable
Bus Section B1
36kV GIS
IN DOOR
OUT DOOR
OUT DOOR
IN DOOR
245kV GIS
IN DOOR
OUT DOOR
P2
800/1A,
5P20
800/1A,
5P20
NCTP2
800/1A,
5P20
TO LVAC
800/1A,
5P20
NCT
36kV DS/ES
1250A
25kA/ 1 sec
36kV CB
1250A
25kA/ 1 sec
36kV CT
25kA/ 1 sec
800/ 400 /1A, CL 0.2
800/ 400 /1A, 5P 20
P2
P1
P1
P2
245kV CB
1250A
40kA/ 1 sec
36kV SA
10kA,CL:2
245kV DS1250A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
192kV SA
10kA, CL:2
36kV DS/ES
1600A
25kA/ 1 sec
AUX. TRAFO.
160kV
33kV/0.4kV ONAN
EARTH. TRAFO.
800A/30 sec
33kV, ONAN
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV CT
25kA/ 1 sec
1600/1A, 5P20
1600/1A, 5P20
36kV CB
1600A
25kA/ 1 sec
TR No.1
63MVA,220/33kV
200/1A ,5P20
200/1A ,5P20
200/1A ,CL0.5
3000/1A ,5P20
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
33kV Cable
36kV DS/ES
1250A
25kA/ 1 sec
36kV CB
1250A
25kA/ 1 sec
36kV CT
25kA/ 1 sec
800/ 400 /1A, CL 0.2
800/ 400 /1A, 5P 20
P2
P1
P1
P2
245kV DS1250A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
36kV DS/ES
1600A
25kA/ 1 sec
36kV CB
1600A
25kA/ 1 sec
200/1A ,5P20
200/1A ,5P20
200/1A ,CL0.5
3000/1A ,5P20
WDG I: CL.3P
WDG 2: CL0.2
33kV Cable
36kV SA
10kA,CL:2
192kV SA
10kA, CL:2
EARTH. TRAFO.
800A/30 sec
33kV, ONAN
TR No.5
63MVA,220/33kV
OUT DOOR
IN DOOR
245kV BUS VT
220/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.5
Bus Section B3Bus Section A1
36kV CB
2500A
25kA
36kV DS
2500A
25kA
36kV DS
2500A
25kA
2500/1A
36kV CB
2500A
25kA
36kV DS
2500A
25kA
36kV DS
2500A
25kA
2500/1A
36kV BUS VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
P1P1 P1P1
1600/1A, CL 0.2
36kV CT
25kA/ 1 sec
1600/1A, 5P20
1600/1A, 5P20
1600/1A, CL 0.2
36kV CT
25kA/ 1 sec
1600/1A, 5P20
1600/1A, 5P20
1600/1A, CL 0.2
36kV CT
25kA/ 1 sec
1600/1A, 5P20
1600/1A, 5P20
1600/1A, CL 0.2
36kV CT
25kA/ 1 sec
1600/1A, 5P20
1600/1A, 5P20
1600/1A, CL 0.2
36kV CT
25kA/ 1 sec
1600/1A, 5P20
1600/1A, 5P20
1600/1A, CL 0.2
WDG I: CL0.2
WDG 2: CL.3P
WDG I: CL0.2
WDG 2: CL.3PWDG I: CL0.2
WDG 2: CL.3P
WDG I: CL0.2
WDG 2: CL.3P
WDG I: CL0.2
WDG 2: CL.3P
WDG I: CL0.2
WDG 2: CL.3P
LEGEND
SCOPE OF WORK
245kV XLPE,CU
CABLE
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
HSES
245 kV
ES
245 kV
ES 245 kV
ES 245 kV
245kV CB
1250A
40kA/ 1 sec
245kV CB1250A
40kA/ 1 sec
245kV CB
1250A
40kA/ 1 sec
245kV CB
1250A
40kA/ 1 sec
245kV CB
1250A
40kA/ 1 sec
245kV VT
220/Ö3 : 0.11/Ö3 : 0.11/Ö3 : 0.11/Ö3 kV
ES
245 kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV BUS VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
36kV BUS VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
36kV BUS VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
36kV BUS VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
36kV BUS VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
ES 245 kV
ES 245 kV
ES 245 kV
ES 245 kV
HSES
245 kV
ES 245 kV
ES 245 kV
ES 245 kV
ES 245 kV
ES 245 kV
ES 245 kV
P2
800/1A,
5P20
NCTP2
800/1A,
5P20
NCT
36kV SA
10kA,CL:2
192kV SA
10kA, CL:2
EARTH. TRAFO.
800A/30 sec
33kV, ONAN
TR No.6
63MVA,220/33kV
P1P1P2
800/1A,
5P20
NCTP2
800/1A,
5P20
NCT
36kV SA
10kA,CL:2
192kV SA
10kA, CL:2
EARTH. TRAFO.
800A/30 sec
33kV, ONAN
TR No.4
63MVA,220/33kV
P1P1
ES
245 kV
ES
245 kV
192kV SA
10kA,
CL:2
245kV DS
2000A
40kA/ 1 sec
2000/1000/1A, 5P20
245kV CT
40kA/ 1 sec
2000/1000/1A, CL0.5
3000/1A, 5P20
245kV DS
2000A
40kA/ 1 sec
2000/1000/1A, 5P20
245kV CB
2000A
40kA/ 1 sec
245kV XLPE,CU
CABLE
HSES
245 kV
ES
245 kV
245kV VT
220/Ö3 : 0.11/Ö3 : 0.11/Ö3 : 0.11/Ö3 kV
ES
245 kV
ES
245 kV
ES
245 kV
WDGI: CL.0.5
WDG2: CL3P
WDG3: CL3P
245kV BUS VT
220/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.5
HSES
245 kV
HSES
245 kV
HSES
245 kV
HSES
245 kV
245kV DS
3150A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
3000/1A, 5P20
245kV DS
3150A
40kA/ 1 sec
3000/1A, 5P20
245kV CB
3150A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
3000/1A, 5P20
3000/1A, CL 0.5
EARTH. TRAFO.
800A/30 sec
33kV, ONAN
TR No.3
63MVA,220/33kV
P2 P1
P2 P1
P2 P1
HV NCT
800/400/1A,5P20,60VA800/400/1A,5P20,60VA
MV NCT
800/1A,5P20,60VA800/1A,5P20,60VA
36kV SA
10kA,CL:2
192kV SA
10kA, CL:2
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
22.05.2019
Bhasura
Anusha
16.06.2020
0301
NTS
TD/CE/1/184/D/00/03-A
NADUKUDA GSS
PROPOSED SINGLE LINE DIAGRAM FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
BUS 1 245kV, 3150A, 40kA/1sec
BUS 2 245kV, 3150A, 40kA/1sec
TO DIGITAL DISTURBANCE
RECORDER PANEL
P2 P1
P2 P1
800/1A,
5P20
TO DIGITAL DISTURBANCE
RECORDER PANEL
36kV SA
10kA,CL:2
800/1A,
5P20
NCT
245kV DS
1250A
40kA/ 1 sec
P2
P1245kV CT
40kA/ 1 sec
192kV SA
10kA, CL:2
TRANSFORMER CONTROL & PROTECTION
P2
P2 P1
P1
800/1A,
5P20
TO LVAC
P1
P2
TO DIGITAL DISTURBANCE
RECORDER PANEL
36kV DS/ES
1600A
25kA/ 1 sec
800/1A,
5P20
NCT
200/1A,
5P20
NCT
AUX. TRAFO.
160kV
33kV/0.4kV ONAN
EARTH. TRAFO.
800A/30 sec
33kV, ONAN
36kV CB
1600A
25kA/ 1 sec
TR No.2
63MVA,220/33kV
36kV DS/ES
1250A
25kA/ 1 sec
36kV CB
1250A
25kA/ 1 sec
36kV CT
25kA/ 1 sec
800/ 400 /1A, CL 0.2
800/ 400 /1A, 5P 20
33kV Cable
36kV, 2500A, 25kA/1sec Bus Section A2
LINE FEEDER
CONTROL
ENERGY METERING
SYSTEM
TRANSCO
DISCO
TO
36kV BUS VT
WDG I: CL.0.2
TO
36kV BUS VT
WDG 2: CL3P
LINE FEEDER
PROTECTION
36kV CB
2500A
25kA
36kV DS
2500A
25kA
36kV DS
2500A
25kA
2500/1A
200/1A ,5P20
Bus Section A3
36kV DS/ES
1250A
25kA/ 1 sec
36kV CB
1250A
25kA/ 1 sec
36kV CT
25kA/ 1 sec
800/ 400 /1A, CL 0.2
800/ 400 /1A, 5P 20
P2
P1
P1
P2
245kV DS
1250A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
36kV DS/ES
1600A
25kA/ 1 sec
36kV CB
1600A
25kA/ 1 sec
200/1A ,5P20
200/1A ,CL0.5
3000/1A ,5P20
200/1A ,5P20
200/1A ,5P20
200/1A ,CL0.5
3000/1A ,5P20
BUS 1
BUS 2
WDG I: CL.3P
WDG 2: CL0.2
WDG I: CL.3P
WDG 2: CL0.2
33kV Cable
36kV GIS
IN DOOR
OUT DOOR
OUT DOOR
IN DOOR
P2
800/1A,
5P20
800/1A,
5P20
NCTP2
800/1A,
5P20
TO LVAC
800/1A,
5P20
NCT
36kV DS/ES
1250A
25kA/ 1 sec
36kV CB
1250A
25kA/ 1 sec
36kV CT
25kA/ 1 sec
800/ 400 /1A, CL 0.2
800/ 400 /1A, 5P 20
P2
P1
P1
P2
36kV SA
10kA,CL:2
245kV DS
1250A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
192kV SA
10kA, CL:2
36kV DS/ES
1600A
25kA/ 1 sec
AUX. TRAFO.
160kV
33kV/0.4kV ONAN
EARTH. TRAFO.
800A/30 sec
33kV, ONAN
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV CT
25kA/ 1 sec
1600/1A, 5P20
1600/1A, 5P20
36kV CB
1600A
25kA/ 1 sec
TR No.1
63MVA,220/33kV
200/1A ,5P20
200/1A ,5P20
200/1A ,CL0.5
3000/1A ,5P20
WDG I: CL.3P
WDG 2: CL0.2
33kV Cable
OUT DOOR
IN DOOR
Bus Section A1
36kV CB
2500A
25kA
36kV DS
2500A
25kA
36kV DS
2500A
25kA
2500/1A
P1P1
1600/1A, CL 0.2
36kV CT
25kA/ 1 sec
1600/1A, 5P20
1600/1A, 5P20
1600/1A, CL 0.2
36kV CT
25kA/ 1 sec
1600/1A, 5P20
1600/1A, 5P20
1600/1A, CL 0.2
WDG I: CL0.2
WDG 2: CL.3P
WDG I: CL0.2
WDG 2: CL.3P
WDG I: CL0.2
WDG 2: CL.3P
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
245kV CB
1250A
40kA/ 1 sec
245kV CB
1250A
40kA/ 1 sec
245kV CB
1250A
40kA/ 1 sec
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
36kV BUS VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
36kV BUS VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
36kV BUS VT
33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.2
ES 245 kV
ES 245 kV
ES 245 kV
ES 245 kV
ES 245 kV
ES 245 kV
HSES
245 kV
HSES
245 kV
HSES
245 kV
SCOPE OF WORK
LEGEND
P2EARTH. TRAFO.
800A/30 sec
33kV, ONAN
TR No.3
63MVA,220/33kV
P1
P2 P1
HV NCT
800/400/1A,5P20,60VA800/400/1A,5P20,60VA
MV NCT
800/1A,5P20,60VA800/1A,5P20,60VA
36kV SA
10kA,CL:2
192kV SA
10kA, CL:2
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
22.05.2019
Bhasura
Anusha
16.06.2020
0302
NTS
TD/CE/1/184/D/00/03-B
NADUKUDA GSS (PART I)
PROPOSED SINGLE LINE DIAGRAM FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
192kV SA
10kA,
CL:2
245kV DS
2000A
40kA/ 1 sec
2000/1000/1A, 5P20
LINE FEEDER CONTROL
245kV LINE CONTROL &
PROTECTION
BUSBAR & BREAKER FAILURE
TO DIGITAL DISTURBANCE
RECORDER PANEL
P2
P1245kV CT
40kA/ 1 sec
2000/1000/1A, CL0.5
3000/1A, 5P20
MANNAR 1 MANNAR 2
245kV DS
2000A
40kA/ 1 sec245kV DS
2000A
40kA/ 1 sec
2000/1000/1A, 5P20
P2
P1
245kV DS
2000A
40kA/ 1 sec
245kV CB
2000A
40kA/ 1 sec
245kV XLPE,CU
CABLE
HSES
245 kV
ES
245 kV
245kV VT
220/Ö3 : 0.11/Ö3 : 0.11/Ö3 : 0.11/Ö3 kV
ES
245 kV
192kV SA
10kA,
CL:2
245kV DS
2000A
40kA/ 1 sec
2000/1000/1A, 5P20
245kV CT
40kA/ 1 sec
2000/1000/1A, CL0.5
3000/1A, 5P20
245kV DS
2000A
40kA/ 1 sec
2000/1000/1A, 5P20
245kV CB
2000A
40kA/ 1 sec
245kV XLPE,CU
CABLE
HSES
245 kV
ES
245 kV
245kV VT
220/Ö3 : 0.11/Ö3 : 0.11/Ö3 : 0.11/Ö3 kV
ES
245 kV
245kV BUS VT
220/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.5
ES
245 kV
ES
245 kV
245kV BUS VT
220/Ö3 : 0.11/Ö3 : 0.11/Ö3kV
WDG I: CL.3P
WDG 2: CL0.5
WDGI: CL.0.5
WDG2: CL3P
WDG3: CL3P
WDGI: CL.0.5
WDG2: CL3P
WDG3: CL3P
ES
245 kV
ES
245 kV
245kV DS
3150A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
3000/1A, 5P20
245kV DS
3150A
40kA/ 1 sec
3000/1A, 5P20
245kV CB
3150A
40kA/ 1 sec
245kV CT
40kA/ 1 sec
3000/1A, 5P20
3000/1A, CL 0.5
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
28.08.2015
Kushan
Buddhika
16.06.2020
A0303
NTS
TD/CE/1/184/D/00/03-C
NADUKUDA GSS (PART II)
PROPOSED SINGLE LINE DIAGRAM FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
100.0m
LA
WasteWater
Pit
SP
Sokage
Pit
GuardRoom
Control Building
BarbwireFence
Chain LinkFence
63MVA
220/33kV
B
Y
R
220kV CableTermination
220kV Cable
Termination
Aux. ETR
Car shed
TR 1
TR 2
220kV Under
Ground Cable
Access Road
90
.0m
Ro
ad
TR 3
9000
12000
Fire Wall
(Concrete)
TR 5
Fire Wall
(Concrete)
Fire Wall
(Concrete)
GeneratorRoom
13
00
1500
GE
NE
RA
TO
R
STORAGE AREA
FOR FUEL
1500
Road
Road
ETR
ETR
Road
LEGEND
Aux. ETR
ETR
TR 4TR 6
ETR
Rain Water
Drainage System
Fire Wall
(Concrete)
LA
B
Y
R
Gate
Cable Trench for
Wind Farm Feeders
Tal
aim
ann
ar -
Med
awac
hch
iya
- A
14
Nad
uk
ud
a
Connection to the Building Rain
Water Drainage System
5000
12000
9000
30000 12600
Road
Cable Trench for
33kV Power Cables
33
kV
SW
ITC
HG
EA
R R
OO
M
FFTRFBS
BRFFTRF
FFTRFBS
BRFFTRF
TR
1T
R1
L1
L1
TR
2T
R2
TR
4T
R4
L2
L2
TR
5T
R5
22
0k
V G
IS
EM1EM2EM3EM4EM5EM6
W1
W1
D6
W1
W1
W1
W1
W1
W1
D5
D1
D3
RO
LL
ER
DO
OR
RO
LL
ER
DO
OR
W2
W2
W2
W2
W2
W2
W2
W2
DOWN
D3
D6
W2
W2
PR
OT
EC
TIO
N / C
OM
MU
NIC
AT
ION
RO
OM
UP
DOWN
CC
TV
SA
S
1
SA
S
2
COM.1 DFRCOM.2 COM.3
TR
3T
R3
BC
BB
TR
6T
R6
BS
BRFFTRF
BS
BRFFTRF
BC
TR
1
TR
2
L1
L2
TR
3
TR
4
TR
5
TR
6
22
0k
V P
RO
TE
CT
ION
PA
NE
LS
CC
TV
SAS
Prin
ter
Fax
D2
D2
CO
NT
RO
LR
OO
M
D1
80002000
1300
1800
2700
1800
1200
2500 20000
2000
3300
128004000
5500
W2
W2
W2
W2
W2
W1
W2
W2
ENERGY METERS
MA
N
HO
LE
1800
1000
MA
N
HO
LE
1900
2897
220kV
Cable
Cubic
le
PQM
BU
S V
T
TR
3A
VR
PA
NE
L
Fire Wall (Concrete)
to Protect Earthing & AuxiliaryTransformer.
SCOPE OF WORK
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
22.05.2019
Bhasura
Anusha
16.06.2020
1:450
TD/CE/1/184/D/01/03
NADUKUDA GSS
PROPOSED LAYOUT OFADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding
ANTENNA
TIME DISPLAY UNIT
21" DISPLAY FOR HMI-1
SPEAKER
KVM EXTENDER(R)
AUDIOUSB
VG
A
VG
A
KEXT-1
AA
KEXT-2
AA
KEXT-2
BB
KEXT-1
BB
KEXT-3
AA
KEXT-3
BB
SPEAKER
KVM EXTENDER(R)
AUDIOUSB
VG
A
VG
A
SPEAKER
KVM EXTENDER(R)
AUDIOUSB
VG
A
VG
A
LAZER PRINTER
LAPTOP
NATIONAL SYSTEM CONTROL CENTRE
KEXT-1
A
KEXT-1
B
KEXT-2
A
KEXT-2
B
KEXT-3
A
KEXT-3
B
HMI-1 HMI-2 EWS
KVM EXTENDER(L) KVM EXTENDER(L) KVM EXTENDER(L)
VG
A
VG
A
VG
A
VG
A
VG
A
USB
USB
USB
AU
DIO
AU
DIO
AU
DIO
GPS
DIALUPMODEM
DIA
LU
P
MO
DEM
TELEPH
ON
E L
INE
GE-e Terra
OPGW
(NOT IN SIEMENS
SCOPE)
RJ45 PORT FOR REMOTE
COMMUNICATION VIA CEB NETWORK
SES-1 SES-2220/kV RSTP RING ON IEC 61850 PROTOCOL
SAS PANEL
GATEWAY-1 GATEWAY-2
220/kV RSTP RING ON IEC 61850 PROTOCOL
IEC 60870-5-101 PORTSIEC 60870-5-101 PORTS
OVER IEC 60870-5-104 PROTOCOL
220kV SWITCH BOARD
DO1RP DO2RP DO3RP DO4RP DO5RP DO6RP DO7RP DO8RP DO9RP DOBBRP RTCC-TR01 RTCC-TR02RTCC-TR03 FUTURE
RTCC-TR04 FUTURE RTCC-TR03
FUTURE
RTCC-TR05FUTURE
RTCC-TR06 FUTURE RTCC-TR03
FUTURE
2ES-1(14FO+2RJ) 2ES-2(14FO+2RJ)
A201 A201 A201 A201 A201 A201 A201 A201 A201
6M
D66
6M
D66
6M
D66
6M
D66
6M
D66
6M
D66
6M
D66
6M
D66
6M
D66
D09CP D08CP D07CP D06CP D05CP D04CP D03CP D02CP D01CP
220/33kV TRAFO-6
CONTROL PANEL
220/33kV TRAFO-5
CONTROL PANEL
220/33kV TRAFO-4
CONTROL PANEL
220kV BUS COUPLER
CONTROL PANEL
220/33kV TRAFO-3
CONTROL PANEL
220kV MANNAR LINE-2
CONTROL PANEL
220/33kV TRAFO-2
CONTROL PANEL
220/33kV TRAFO-1
CONTROL PANEL
220kV MANNAR LINE-1
& BUS PT CONTROL PANEL
2ES-3(14FO+2RJ) 2ES-4(14FO+2RJ) 2ES-5(6FO+8RJ)
87T.2 87T.2 87T.2 87T.2 87T.2 87T.287T.1 87T.1 87T.1 87T.1 87T.1 87T.187L.1 87L.1 A20250/51N
7U
T61
7U
T61
7U
T61
7U
T61
7U
T61
7U
T61
7U
T61
P546
7SD
52
7U
T61
7U
T61
7SJ8
0
6M
D61
7U
T61
7U
T61
7U
T61
7U
T61
7U
T61
7U
T61
7SS523
7SS523
7SS523
7SS523
7SS523
7SS523
7SS523
7SS523
7SS523
7SS523
87BB2 87BB 87BB 87BB
7SS522MCU
220/33kV TRAFO-2
RELAY PANEL
220/33kV TRAFO-1
RELAY PANEL
220kV MANNAR LINE-1
& BUS PT RELAY PANEL
220kV MANNAR
LINE-2 RELAY PANEL
220/33kV TRAFO-3
RELAY PANEL
220kV BUS COUPLER
RELAY PANEL
220/33kV TRAFO-4
RELAY PANEL
220/33kV TRAFO-5
RELAY PANEL
220/33kV TRAFO-6
RELAY PANEL
220kV BUSBAR
RELAY PANEL AVR AVR AVR AVR AVR AVR
3ES-1(14FO+2RJ) 3ES-2(14FO+2RJ) 3ES-3(14FO+2RJ) 3ES-4(14FO+2RJ)
H01 H01 H01 H01 H01 H01 H01 H01 H01 H10 H11 H14 H15H13 H16H12
33kV INCOMING-A 33kV FEEDER-1 33kV FEEDER-2 33kV FEEDER-3 33kV BUS
RISER -A-B 33kV BUS
SECTION-A-B33kV INCOMING-B 33kV FEEDER-4 33kV FEEDER-5 33kV FEEDER-6 33kV BUS
RISER -B-C
33kV BUS
SECTION-B-C33kV FEEDER-7 33kVFEEDER-8 33kV FEEDER-9 33kV INCOMING-C
7SJ80 7SJ80 7SJ80 7SJ80 7SJ80 7SJ807SJ647 7SJ647 7SJ647 7SJ647 7SJ6477SJ645 7SJ645 7SJ645 7SJ645 7SJ645 7SJ645 7SJ645 7SJ645 7SJ645
21" DISPLAY FOR HMI-2 21" DISPLAY FOR EWS
87BB 87BB 87BB87BB87BB87BB87BB
LEGEND :-
LC-LC FO PATCH CABLE
LC-ST FO PATCH CABLE
CAT VI STP PATCH CABLE
RS232 COMMUNICATION CABLE
2 CORE RUGGEDISED LC-LC FO CABLE
ST-ST FO RUGGEDISED PATCH CABLE
RG-58 CO-AXIAL ANTENNA CABLE
SR.NO DESCRIPTION FO PORT(LC) RJ45 PORT
USED SPARE USED SPARE
1 SES-1 RSG2100 (6F0+12RJ45) 2 4 7 5
2 SES-2 RSG2100 (6F0+12RJ45) 2 4 7 5
3 2ES-1 RSG2100 (14F0+2RJ45) 6 8 - 2
4 2ES-2 RSG2100 (14F0+2RJ45) 7 7 - 2
5 2ES-3 RSG2100 (14F0+12RJ45) 10 4 - 2
6 2ES-4 RSG2100 (14F0+2RJ45) 12 2 - 2
7 2ES-5 RSG2100 (6F0+8RJ45) 3 3 6 2
8 3ES-1 RSG2100 (14F0+2RJ45) 7 7 -
9 3ES-2 RSG2100 (14F0+2RJ45) 7 7 -
10 3ES-3 RSG2100 (14F0+2RJ45) 7 7 -
11 3ES-4 RSG2100 (14F0+2RJ45) 7 7 -
2
2
2
2
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
CE
B T
r. D
esig
n B
ranch
Pro
pert
y o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN
Project Title Funding Agency Drawing Title DrawnDesigned
Checked
Approved
Signature Date
Tendering
Construction
Rele
ased
for
Funding Agency Drawing Title
A3
28.06.2019
Bhasura
Pooja
16.06.2020
NTS
TD/CE/1/184/D/07/03
AUTOMATION SYSTEM FOR NADUKUDA GSS
ARCHITECTURE FOR THE SUBSTATIONADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)
GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PACKAGE 8 - LOT A
Inform
ation
Cop
y-Not
for B
idding