GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAM (TRANCHE 2) (ADB LOAN NO: 3483/3484) PACKAGE 8 - LOT A Procurement of Plant Design, Supply, and Installation Single-Stage: Two-Envelope Bidding Procedure BIDDING DOCUMENT for Procurement of Augmentation of: Aniyakanda 132/33kV Grid Substation Chunnakam 132/33kV Grid Substation Nadukuda 220/33kV Grid Substation VOLUME 6 of 8 Part II- REQUIREMENTS Section 6 - Employer’s Requirements: Part C-Drawings Issued on: 25 June 2020 Invitation for Bids No.: CEB/AGM/PRO/2019/ÌFB/GPDEEIIP-T2-P8-LOT A ICB No.: CEB/AGM/PRO/2019/ICB/GPDEEIIP-T2-P8-LOT A Employer: Ceylon Electricity Board Country: Sri Lanka © Transmission Design & Environment Branch, CEB CEYLON ELECTRICITY BOARD SRI LANKA Projects Division Ceylon Electricity Board, P.O. Box 540, Colombo 02 Sri Lanka Document Revision 1 Information Copy-Not for Bidding

Transcript of GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV...

Page 1: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAM (TRANCHE 2) (ADB LOAN NO: 3483/3484)

PACKAGE 8 - LOT A

Procurement of Plant Design, Supply, and Installation

Single-Stage: Two-Envelope Bidding Procedure

BIDDING DOCUMENT for

Procurement of

Augmentation of:

Aniyakanda 132/33kV Grid Substation

Chunnakam 132/33kV Grid Substation

Nadukuda 220/33kV Grid Substation

VOLUME 6 of 8 Part II- REQUIREMENTS

Section 6 - Employer’s Requirements: Part C-Drawings

Issued on: 25 June 2020Invitation for Bids No.: CEB/AGM/PRO/2019/ÌFB/GPDEEIIP-T2-P8-LOT A

ICB No.: CEB/AGM/PRO/2019/ICB/GPDEEIIP-T2-P8-LOT A

Employer: Ceylon Electricity Board

Country: Sri Lanka

© Transmission Design & Environment Branch, CEB

CEYLON ELECTRICITY BOARD SRI LANKA

Projects Division

Ceylon Electricity Board,

P.O. Box 540, Colombo 02

Sri Lanka

Document – Revision 1

Inform

ation

Cop

y-Not

for B

idding

Page 2: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAM (TRANCHE-2) PACKAGE 8 - LOT A

DRAWINGS

General

1 TD/CE/1/184/ D/09/00 Map Showing the Location of Site in Year 2027

2 TD/CE/1/184/ D/08/00 CEB Power System Diagram in Year 2027

3 TD/CE/1/184/ D/00/00 Symbols

4 TD/CE/1/184/ D/60/00-01

5 TD/CE/1/184/ D/60/00-02

6 TD/CE/1/184/ D/60/00-03

Aniyakanda GSS

7 TD/CE/1/184/ D/00/01

8 TD/CE/1/184/ D/01/01

9 TD/CE/1/184/ D/01/01-A

10 TD/CE/1/184/ D/60/01

11 TD/CE/1/185/ D/07/01

Chunnakam GSS

12 TD/CE/1/184/ D/00/02

13 TD/CE/1/184/ D/00/02

14 TD/CE/1/184/ D/00/02-A

15 TD/CE/1/184/ D/60/02-A

16 TD/CE/1/184/ D/60/02-B

17 TD/CE/1/185/ D/07/02-A

18 TD/CE/1/185/ D/07/02-B

Nadukuda GSS

19 TD/CE/1/184/ D/00/03-A

20 TD/CE/1/184/ D/00/03-B

21 TD/CE/1/184/ D/00/03-C

22 TD/CE/1/184/ D/01/03

23 TD/CE/1/184/ D/07/03

Chain Link Fence

Barbed Wire Fence Post

Doors & Windows Details

Proposed Single Line Diagram for Aniyakanda GSS

General Layout for Aniyakanda GSS

33kV Cabel Arrangemant for Outdoor Gantry

Layout of Control Building for Aniyakanda GSS

Architecture for the Substation Automation System for Aniyakanda GSS

Proposed Single Line Diagram for Chunnakam GSS

General Layout for Chunnakam GSS

33kV Feeder Arrengement for Chunnakam GSS

Layout of Control Building for Chunnakam GSS

Typical Site Office Layout for Chunnakam GSS

Architecture for the Substation Automation System for Chunnakam GSS Extention Substation Automation System Architecture for Chunnakam GSS

Proposed Single Line Diagram for Nadukuda GSS

Proposed Single Line Diagram for Nadukuda GSS (Part 1)

Proposed Single Line Diagram for Nadukuda GSS (Part 2)

General Layout for Nadukuda GSS

Architecture for the Substation Automation System for Nadukuda GSS

TABLE OF CONTENTS

Content

Inform

ation

Cop

y-Not

for B

idding

Page 3: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

EM

BIL

IPIT

IYA

MA

TA

RA

GA

LL

E

DE

NIY

AY

A

SA

MA

NA

LA

WE

WA

BA

LA

NG

OD

A

PA

NA

DU

RA

RA

NT

EM

BE

RA

ND

EN

IGA

LA

VIC

TO

RIA

ING

INIY

AG

AL

A

AM

PA

RA

BO

WA

TE

NN

A

UK

UW

EL

A

KIR

IBA

TH

KU

MB

UR

A

KO

TM

AL

E

WIM

AL

AS

UR

EN

DR

A

BA

DU

LL

A

NU

WA

RA

EL

IYA

MA

DA

MP

E

BO

LA

WA

TT

A

TH

UL

HIR

IYA

KU

RU

NE

GA

LA

KO

LO

NN

AW

A

KO

TU

GO

DA

RA

TM

AL

AN

A

TR

INC

OM

AL

EE

AN

UR

AD

HA

PU

RA

PU

TT

AL

AM

HA

BA

RA

NA

RA

TM

AL

AN

A

PA

NN

IPIT

IYA

OR

UW

AL

A

KO

LO

NN

AW

A

S'K

AN

DA

NE

W

LA

XA

PA

NA

RA

TN

AP

UR

A

KE

LA

NIY

A

KO

TU

GO

DA

KE

LA

NIT

ISS

A

KO

SG

AM

A

VA

VU

NIA

HA

MB

AN

TO

TA

KU

KU

LE

SE

ET

HA

WA

KA

NE

W A

NU

RA

DH

AP

UR

A

KE

LA

NIT

ISS

A

CH

UN

NA

KA

M

KIL

INO

CH

CH

I

VA

LA

CH

CH

AN

AI

SR

I J

'PU

RA

HA

VE

LO

CK

TO

WN

DE

HIW

AL

A

PA

NN

AL

A

KE

RA

WA

LA

PIT

IYA

AN

IYA

KA

ND

A

AM

BA

LA

NG

OD

A

UP

PE

R K

OT

MA

LE

PU

TT

AL

AM

PS

BE

LIA

TT

A

KA

TU

NA

YA

KE

Th

e M

ap

of

Sri

Lan

ka

Tra

nsm

issi

on

Sy

stem

in

Yea

r 2

02

7

MA

HIY

AN

GA

NE

MA

HO

PA

LL

EK

EL

E

PO

LO

NN

AR

UW

A

MO

NA

RA

GA

LA

NA

UL

A

VA

VU

NA

TIV

U

NE

W C

HIL

AW

NE

W H

AB

AR

AN

A

UM

A O

YA

PA

DU

KK

A

LA

XA

PA

NA

NA

WA

LA

PIT

IYA

VE

YA

NG

OD

A

KE

GA

LL

E

KIR

IND

IWE

LA

BA

TT

AR

AM

UL

LA

MA

NN

AR

PO

RT

KE

RA

WA

LA

PIT

IYA

PO

RT

CIT

Y

BA

TT

AR

AM

UL

LA

PE

TT

AH

HU

NU

PIT

IYA

KO

LL

UP

ITIY

A

MA

RA

DA

NA

SL

AV

E I

SL

AN

D

SR

I J

'PU

RA

WE

LL

AW

AT

TA

AT

HU

RU

GIR

IYA

MO

RA

GO

LL

A

TIS

SA

MA

HA

RA

MA

BIY

AG

AM

A

KO

TA

HE

NA

BIY

AG

AM

A

KIR

IND

IWE

LA

MA

TU

GA

MA

NE

WP

OL

PIT

IYA

SA

PU

GA

SK

AN

DA

AT

HU

RU

GIR

IYA

SA

MP

OO

R

CA

NY

ON

WE

WA

LW

AT

TA

BR

OA

DL

AN

DS

KA

PP

AL

TH

UR

EI

HO

RA

NA

KE

SB

EW

A

PA

NN

IPIT

IYA

KA

LU

TA

RA

OR

UW

AL

A

PA

DU

KK

A

NA

DU

KU

DA

TH

AL

AP

ITIG

AL

A

RA

GA

LA

KA

LA

WA

NA

MA

LIB

OD

A

KA

ND

Y C

ITY

CH

EM

MA

NY

HA

MB

AN

TO

TA

PO

RTSE

RU

NU

WA

RA

KO

KIL

AI

NO

TH

ER

N N

CR

E

PO

ON

ER

YN

CO

LL

EC

TO

R

MIR

IGA

MA

SS PO

LP

ITIY

A

WE

LIM

AD

A

ET

HIM

AL

E S

OL

AR

WE

LIG

AM

A

BA

DD

EG

AM

AG

IN G

AN

GA

MIL

LA

NIY

A

HO

MA

GA

MA

MIL

LA

WA

WA

RIY

AP

OL

A

PU

TT

AL

AM

NE

W

NE

GO

MB

O

KA

TU

NA

YA

KE

LE

CO

JA

-EL

A L

EC

O

BIY

AG

AM

A Z

ON

E

RA

JA

GIR

IYA

NA

RA

HE

NP

ITA

TO

WN

HA

LL

FO

RT

HA

MB

AN

TO

TA

SO

LA

R

KIR

IYA

NK

AL

LIY

A

YA

KK

AL

A

MA

NN

AR

SO

LA

R

PS

PP

13

2k

V L

ine

13

2k

V :

Un

der

gro

un

d C

ab

le

22

0k

V L

ine

22

0/1

32

kV

GS

13

2/3

3 k

V G

S

Hy

dro

Po

wer

Sta

tio

n

Th

erm

al

Po

wer

Sta

tio

n

22

0k

V

: U

nd

erg

rou

nd

Ca

ble

22

0/3

3 k

V G

S

13

2/2

2 k

V G

S

So

lar

Pa

rk

Win

d P

ark

22

0 k

V S

wit

chin

g S

tati

on

KO

TA

DE

NIY

AW

A

WA

RIY

AP

OL

AS

OU

TH

SC

OP

E O

F W

OR

KS

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

26.04.2019

Bhasura

Sandamali

16.06.2020

NTS

TD/CE/1/184/D/09/00

LOCATION OF SITES

MAP SHOWING THE ADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 4: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

132kV

132kV132kV

132kV

132kV

132 kV

132kV

132kV

132kV132kV

132kV

132kV 132kV

132kV

132kV

132kV

33kV

MVA33kV

33kV

2x27

MVA MVA

33kV

1x50

MVA

12.5kV

33kV

MVA

33kV

2x60

MW

2x71

MVA

10.5kV

MVA

33kV

132kV

3x31.5

MVA

33kV

12.5kV 12.5kV

220kV

13.8kV

12.5kV 220kV

132kV

132kV

3x31.5

MVA

33kV

MVA

33kV

132kV

220kV

5x31.5

MVA

33kV

132kV

2x53.7

MVA

12.5kV

2x37.5

MW

2x25

MW

11kV

2x32.1

MVA

33 kV

3x31.5

MVA

33kV

33kV

2x15

MVA

2x10

MVA12.5kV

2x27

MW

2x34.5

MVA

2x105

MVA

33

kV

6.6

kV

13

2k

V

33

kV

4x31.5 MVA

22

0k

V

13

2k

V

3x31.5MVA

2x250

2x60MVA

25 Mvar

2x250

2x60MVA

33kV

3x31.5

MVA

132kV

33kVMVA

Lyn

x, 1.5

km

10

20Mvar

132kV

220kV

Invar 2.2 km

2xZebra, 48km

2xZebra, 30km 2xZebra, 16.4km

Lynx, 8.3km

2xZebra, 3km

Lyn

x, 13k

m

Lyn

x, 25k

m

Lynx, 38km

Zebra, 19 km

Zeb

ra, 35 k

m

Lynx, 0.6kmLynx, 10 km

Zeb

ra,

12.5kV

Lynx, 30km

Lyn

x, 8.3

km

Zeb

ra, 5.1

km

Zeb

ra, 44 k

m

Lynx, 19km

3x31.5MVA

132kV

MADAMPE

BOLAWATTA

VEYANGODA

KOTUGODA

KURUNEGALA

PUTTALAM

NEW ANURADHAPURA

ANURADHAPURA

(GS) SAPUGASKANDA

KOLONNAWAKELANITISSA

PANNIPITIYA

PANADURA

UKUWELA

KOTMALE

VICTORIA RANDENIGALA

12.5kV

RANTAMBE

DENIYAYA

GALLE

BALANGODA

SAMANALAWEWA

EMBILIPITIYA

HAMBANTOTA

NUWARA ELIYA

INGINIYAGALA

WIMALASURENDRA

BADULLA

LAXAPANANEW LAXAPANA

POLPITIYA

CANYON

HABARANA

BIYAGAMA

ORUWALA2x60

MVA

33kVMW

Zeb

ra,

113k

m

Zebra,4.6km

KELANIYA

132kV

2x150

MVA

2x40

MVA

13

2k

V

220kV 220kV

MATUGAMA

BOWATENNA

3x35

33kV

4x31.5 3x31.5

3x31.5

3x31.5

2x31.5

3x31.5

Lynx, 34.6 km

1x40

MW

2xZebra, 18 km

132kV

Zebra, 18.5km

15.5

km

220kV

2x60

2x250

MVA

ATHURUGIRIYA

2x31.5

MVA 33

kV

13

2k

V

11kV

132kV

Zebra, 4.2km

33kV

33kV

MVA

13

2k

V

Zebra, 6.6km

10Mvar

MATARA

33kV

Lyn

x,5

2.0

km

132kV

132kV

33kV

KUKULE

11kV

2x38MW

Lynx, 30 km

132kV

132kV

MVA3x31.5

HORANA

Zebra,20 km

2xZ

ebra

,

1k

m

2xZebra, 5km

33kV

VALACHCHENA

132kV

33kV

20 Mvar

MVA

1x5+1x10

2x2.4+2x3.1

MW

6.9 kV

2xGoat, 12.5km

CC

20 Mvar

33kV

3x31.5

MVA

AMPARA

132kV

2x30MVA 2x150

MVA

20

Mvar

MH61.8 MW

33.3 MW

MH

48.3 MWMH

DEHIWALA132kV

33kV

3x31.5

MVA

11kV

3x31.5

MVA

MVA

3x31.5

11kV

HAVELOCK TOWN

MARADANA

1000 X

LP

E, 9k

m

13

2k

V

PANNALA

33

kV

33

kV

13

2k

V

ANIYAKANDA

132kV

33kV

3x31.5MVA

AMBALANGODA

Zeb

ra,

KERAWALAPITIYA

Schematic Diagram of the 2027 Transmission System

KATUNAYAKE

MVA

33

kV

3x31.5

20 Mvar

PUTTALAM COAL

3x300 MW

2x50

17 km2xZebra,

33kV

POLONNARUWA

132kV

2x31.5MVA

NAULA

13

2k

V

33

kV

Zebra, 17 km

20Mvar

PALLEKELE

MVA

2x31.5

33kV

132kV

MVA

33kV

2x31.5

VAUNATIV

Zeb

ra, 21 k

m

MAHIYANGANE

2.4 MW

33kV

MONARAGALA

2x31.5

MVA

132kV

Zebra ,48.5 km

Oriole,47.5km

132kV

33

kV

MAHO

MVA

33kV

2x31.5

BELIATTA

132kV

2x250MVA

NEW CHILAW

132kV

220kV

22

0k

V

UPPER KOTMALE

2x250

MVA

NEW POLPITIYA

13

2k

V

22

0k

V

MVA

THULHIRIYA

2x31.5MVA

33kV

13

2k

V

KEGALLE

2x31.5MVA 3

3k

V

13

2k

V

KOSGAMA

3x31.5 MVA

33

kV

13

2k

V

SEETHAWAKA

KIRINDIWELA

2x250 MVA

22

0k

V

13

2k

V

2x250 MVA

2x45

MVA

33kV

PADUKKA

22

0k

V

13

2k

V

10Mvar

132kV

3x31.5

MVA

33kV

KALUTARA

22

0k

V

132kV

11kVMVA

2x31.5

11kV

132kV

KOTAHENA

PETTAH

132kV

Zebra, 42 km

Zeb

ra, 111k

mZ

ebra

, 50 k

m

Zeb

ra, 97 k

m

Zebra, 44km

Zebra, 56 km

Zeb

ra L

L, 47 k

m

2xZebra, 1.5km

2xZebra, 7km

Zebra, 10km

2xL

L Z

ebra

, 23 k

m

2xZebra, 51km2xZebra, 19.2 km

22

0k

V

2xZebra, 23km

220kV

2xAAAC 630, 74 km

2xA

AA

C 4

00, 43k

m

22

0k

V

30 Mvar

33

kV

15Mvar

30Mvar

20

Mvar

33kV

40Mvar

27.8 MW

MH

24.5 MWMH

38.2 MWMH

13

2k

V

33

kV

0.5 MWMH

9.4 MWMH

MH2.9 MW

7 MWD

5 MW

DMH

WELIMADA

132kV

Zeb

ra, 25k

m

2x60MW

2xAAAC 400, 100km

Lynx, 7km

Zeb

ra, 10 k

m

Zebra,14 km

2xZ

ebra

,

Zebra, 6 km

Zeb

ra, 23k

m

Zeb

ra,1

3k

m

Zebra, 19 km

Zebra, 7km

Zebra, 44 km

Lynx, 8km

2xZ

ebra

, 28k

m

Lyn

x, 20 k

m

Zeb

ra, 18.5

km

800 XLPE 4km

800 XLPE 2km 800 XLPE 2km

20 Mvar

Zebra, 100 km

(SUB A)

(SUB I)

LAK WIJAYA

33kV

Lynx3.4km

104MW+

54 MW

161 MVA+81 MVA

11kV

Zebra, 10km

Zeb

ra, 11k

m

Zebra, 11km

MVA

3x31.5

MVA2x63

2x31.5

MVA

2x31.5

MVA

MVA2x31.5

2x19

MW

2x31.5

MVA

75 MVA

20

kV

60 MWWind

MVA

3x31.5

3x31.5MVA

2x31.5MVA

33

kV

MVA3x31.5

33kV

33.3 MWMH

2x150

MVA

33

kV

MVA3x31.5

Lyn

x, 37k

m

3x90MVA

3x67MW 3x70

MW

3x96

MVA2x75

MW

2x60

MW

2x81

MVA

132 kV

3x31.5

MVA

2x16+

3x13.33

MVA

2x12.5+

3x8.33

MW

2x72

MVA

2x50

MW2x30

MW

2x38

MVA

13

2k

V

MVA4x1.5

MH14.6 MW

3x31.5

MVA

MVA

3x31.5

41.1 MW

MH

2x46MVA

13

2k

V

MVA

3x31.5

2x31.5

MVA

132kV

132kV

MVA2x31.5

33

kV

33kV

20Mvar

2x10 MWWind

MVA2x31.5

3x31.5

MVA

Lynx,39km

TISSAMAHARAMA

2x31.5 MVA

33kV132kV

Zebra, 22km

(SUB B)

(SUB C)

(Steel Corp)

Zeb

ra L

L , 8

2 k

m

Zebra LL, 37km

46 k

m NEW

PORT

(SUB L)

Cu

XL

PE

1600, 13.5

km

Cu

XL

PE

1600, 6.5

km

Cu

XL

PE

1200, 1.2

km

2x250

MVA

MVA11kV

2x45

MVA

11kV

3x30

KOLLUPITIYA

(SUB E)

MVA

11kV

2x45

SLAVE ISLAND(SUB M)

1200 XLPE 2.5km

Cu

XL

PE

800, 1.2

km

800 XLPE 6.5km

132kV

3x30

FORT

(SUB F)

MVA

11kV

2x45

HUNUPITIYA(SUB N)

11kV

MVA2x45

11kV

MVA2x45

33kV

MVA2x80

33kV

MVA2x80

PORT CITY R2

132kV

MORAGOLLA

31MW

33kV2x31.5MVA

KESBEWA

WEWALWATTA

MVA2x31.5

132kV

MVA

Zebra,38 km

220 kV

12 Mvar

MVA

2x250

2x31.5MVA

33

kV

132kV

VAVUNIA

13

2k

V

KILINOCHCHI

3x31.5MVA

CHUNNAKKAM

45MVA

33

kV

22

0k

V

MANNAR

2xZ

ebra

, 55k

m

Zebra, 73 km

Zebra, 103.3 km

24 MW

300 MWWind

2x31.5MVA

33

kV

13

2k

V

TRINCOMALEE

15 MW

D

Zebra, 67.2 km

2x150

MVA

MVA

MVA

33

kV

3x31.5

MVA

Cu

XL

PE

1200

0.6

km

2xZ

ebra

, 12.5

km

2xL

L A

CS

R, 17.5

km

Zebra LL,23km

20Mvar

132kV

132kV

132kV

132kV

Zebra, 3km

900 MW

220kV

220kV

4xZebra, 95 km

2xZebra, 45 km

10 Mvar

2xLL TACSR550, 35.5km

2x250MVA

4xZebra, 20km

BAT'AMULLA 2x45MVA

ZTACSR (GAP), 4km

2xZebra, 150 km

RATNAPURA

Zebra,3km,

KAPPALTHURAI

35Mvar

22

0k

V

2xZebra, 30km

NADUKUDA

33kV

220kV

132kV

2xZebra,

1km

NAWALAPITIYA

132kV

2x31.5 MVA

Zeb

ra L

L, 10.5

km

33kVMVA3x31.5

J'PURA

132kV

SRI

20

Mvar

33

kV

3x360MVA

5 MW

D1 MW

D

5 MWD

5 MWD

20 MWWind

5 MW

D

9.2 MWMH

D5 MW

S20 MW

25.1 MWMH

RAGALA

MVA2x31.5

14.5 MW

MH

D5 MWMvar

14.5 MWMH

4 MWWind

5 MWD

20MVA2x7.5

MW

THALPITIGALA

10 MWS

5 MWD

D5 MW

D5 MW

S

30 MWD

2.5 MW

MVA2x31.5

MH4 MW

KALAWANA

800 XLPE 2.8km

5 MWD

D5.5 MW

S0.12 MW

MVA31.5

33kV

20 MWWind

SEGUWANTHIV VIDATHAMUNAI

6x63MVA

33kV

3x31.5MVA

Zebra, 4km

33

kV

Lynx, 75km

132kV

33kV

2x31.5MVA

CHEMMANY

Zeb

ra, 70k

m

132kV

33kV

MVA

2x31.5

Zebra, 50km

33kV

SERUNUWARA

2x31.5

MVA

2x63MVA

33kV

10 MWS

HABARANA

Quadraple Tower

MVA2x31.5

11

kV

KANDY CITY

10 MWS

13.4 MW

MH

31.5MVA

33kV

13

2k

V

GIN GANGA

20 MW

250 MVA

WELLAWATTA

(SUB K)

220kV

33kV

2x63MVA

20Mvar

30Mvar

6.3 kV

SAMPOOR COAL

Zebra, 70 km

MVA2x88

Lyn

x, 20k

m

Zeb

ra, 57k

m

Lyn

x, 32 k

m

Zebra, 30km

Zebra, 40km

Cu 1600 XLPE, 14km

2xZ

ebra

, 15k

m

Zeb

ra, 20k

m

Zebra,

21km

1600 X

LP

E,

9k

m

Zebra,17km

100 Mvar

Zebra,1 km

2x31.5MVA

33

kV

1x31.5MVA 20 MW

Wind

Zebra, 48 km

25 Mvar

100Mvar

ZT

AC

SR

(G

AP

)

11 k

m

200 Mvar

33kV

50 MWWind

MVA2x60

Zeb

ra

10 k

m

PUTTALAM NEW

63+45 MVA

75 MW

Wind

10 MWS

+100/-50 Mvar

SVC

BIYAGAMA NEW

Zebra LL, 22km

800 XLPE, 4.5km

MALIBODA

13.1 MWMH

2x31.5MVA

33 kV

Zebra,

18.5km

20 MW

20 Mvar

20 Mvar

20 Mvar 20 Mvar

Zebra, 8km

Cu

XL

PE

1200

Cu XLPE 800

2k

m

1.5km

220kV

220kV

PORT CITY R1

300MW

LNG

Zebra, 80km

MVA

2x45

33kV

Zebra, 22km

Zeb

ra, 9k

m

HOMAGAMA

132kV

2xZebra, 19.4km

Cu XLPE 800, 1.35km

220kV LINE

132kV LINE

THERMAL POWER STATION

220 kVCABLE LINE

Legend

MH - Mini-Hydro Power

CC Combined Cycle

ST Steam Turbine

GT Gas Turbine

SVC STATIC VAR COMPENSATOR

HYDRO POWER STATION

BREAKER SWITCH CAPACITOR

33kV LINE

11kV LINE

TRANSFORMER

3 WINDING AUTO TRANSFORMER

DG Diesel Generator

Wind - Wind Power

D - Dendro Power

400kV LINE

132kV LINE-NOT IN OPERATION

132kV CABLE LINE

REACTOR

MVA

11kV

2x45

TOWN HALL(SUB Q)

132kV

1200 X

LP

E 2

.4k

m

MVA

11kV

2x45

NARAHENPITA(SUB P)

132kV

1200 XLPE, 4km

HAMBANTOTA SOLAR

30 MW

33 kV

13

2k

V

MVA

2x31.5

Zebra, 5km

ETHIMALE SOLAR

100 MW

Zebra, 33 kV

13

2k

V

MVA2x63

100 MW

220kV

2xZebra, 1km

22

0k

V

SAMPOOR

2x31.5MVA

WARIYAPOLA

132kV

33kV

2x45MVA

6km

33

kV

13

2k

V

BIYAGAMA ZONE

2x45

132kV

MVA

JA-ELA LECO

Zebra, 16km

11kV

MVA

2x45KATUNAYAKE

LECO

Zebra, 7km Zebra, 4km

22

0k

V

2x63MVA

33

kV

MIRIGAMA SS

Zebra, 19.6km

2x250

MVA

Zeb

ra, 25k

m

13

2k

V

33kV

MVA2x63

NEGOMBO

Zebra, 10km

2x31.5MVA

33kV

13

2k

V

KAHAWATTA

Zebra, 15km

Zeb

ra,

39k

mZ

ebra

,

47k

m

33 kV

2x31.5

MVA

UMA OYA

Lyn

x,

16k

m

Lynx, 35km

Lynx, 39km

28 k

m

14k

m

WAGAWATTA

MVA2x45

13

2k

V

MVA

2x45

MILLEWA

132kV

33kV

2xZ

ebra

, 28k

mZ

ebra

, 19.1

km

Zebra, 18km

MVA2x45RAJAGIRIYA

Zebra LL,

3km

13

2k

V

BROADLAND

35

MW

Zebra,

13.2km

Zebra, 5.3km

Zeb

ra L

L, 16k

m

Zeb

ra L

L, 25.5

km

Lynx, 1km

4x63 MVA170 MWWind

33

kV 2xZebra, 75km

2xZebra, 25km

N-COLLECTOR

POONERYN

22

0k

V

220kV

2x63 MVA100 MW

S

33

kV

Zeb

ra, 17k

m

31.5 MVA

15 MWW

33kVZebra, 45km

132kV

10km

Zeb

ra L

L, 27k

m

Zeb

ra L

L, 26.5

km

2x31.5 MVA

33kV132kV

Zebra, 10km HAMBANTOTA PORT

Zeb

ra L

L,

3.5

km

Zebra,

5km

WELIGAMA

2x31.5 MVA

33kV132kV

Zebra, 27km

Zebra, 8km

BADDEGAMA

2x45 MVA

33kV132kV

Zeb

ra, 14k

m

22

0k

V

2xZebra, 85km

2xLL TACSR550, 14.5km

KOKKILAI

100 MW

33 kVMVA2x63

33kV

10MVA

MH0.9 MW

10 MWS

S10 MW

S10 MW

10 MWS

10 MW

S

100 MWS2

20

kV

MANNAR SOLAR

2x63MVA

2xZebra, 15km

2xZ

ebra

, 70k

m

300MW

LNG30

Mvar

100MW

618 MWPSPP

2xLL TACSR550,

40km

2xZ

ebra

, 125k

m

Zebra LL, 11km

KIRIBATHKUMBURA

Zebra, 22.5km

33kV

15

MH1 MWMvar25 MW

25MW

25MW

20MW

25MW

20 Mvar

16 Mvar

16 Mvar

16 Mvar

16 Mvar

16 Mvar

30 Mvar30 Mvar

500 XLPE

50 Mvar

Cu

XL

PE

1600, 16.2

km

(2n

d c

ab

le)

50 MvarZebra, 27kmZebra, 34km

Zebra, 61km

33kV

MVA2x31.5

132kV

Zeb

ra, 1.9

km

11

kV280MW

YUGADHANAVI

2x31.5 MVA

33kVZebra, 10km

YAKKALA

13

2k

V

POTTUVIL

20 Mvar

KIRIYANKALLI

33kV

2x63MVA

33kV

132kV

33kV

3x31.5MVA

RATMALANA

Zebra LL,

7km

Cu

XL

PE

800, 6.3

km

1200 X

LP

E, 5k

m

33

kV

33kV

Cu

XL

PE

800, 8.5

km

Cu

XL

PE

1200, 3.6

km

132kV

Cu XLPE 1000, 4.6km

Cu XLPE 1000, 8km

11kV

KOTADENIYAWA

Zebra, 10km

2xLL TACSR550, 102.5km

132kV

132kV

220kV

MVA

Zeb

ra, 20k

m

132kV

11kV

Zebra,24 km

WARIYAPOLA SOUTH

22

0k

V LL

TA

CS

R550

13

2k

V

3x31.5

132kV

132kV

33kV

SCOPE OF WORKS

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

26.04.2019

Bhasura

Sandamali

16.06.2020

NTS

TD/CE/1/184/D/08/00

CEB POWER SYSTEM DIAGRAM IN YEAR 2027ADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 5: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

26.04.2019

Bhasura

Sandamali

16.06.2020

NTS

TD/CE/1/184/D/00/00

SYMBOLSADB

IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

0

Inform

ation

Cop

y-Not

for B

idding

Page 6: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

L75x75x8

L60x60x6

L75 x 75 x 8

TENSION WIRE

BARBED WIRE STRAINER

ELEVATION

CHAIN LINK

50x50

450

L75x75x8

SECTION A-A

2600

G.L.

300

2600

45°

300

ALL STEEL COMPONENTS SHALL BE GALVANIZED

NOTE

3000 3000

ALL DIMENSIONS ARE IN MILLIMETRES

STRAINER

300

R/F CONCRETE

DRAIN

100

75

A

A

G.L.

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

26.04.2019

Bhasura

Sandamali

17.06.2020

NTS

TD/CE/1/184/D/60/00-01

CHAIN LINK FENCEADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 7: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

20 20

DETAIL AT ' P '

365

220

125

70

01

00

250

250

250

225

175

150

125

125

125

23

75

375

175

200

75

DPC

C25 Concrete

375X375x800

16

75

A

B B

INTERMEDIATE POST

(1:25)

A

NOTES -:

1. All demensions are in Millimeters.

2. Grade 25 Concrete for Foundation.

3. Minimum cover for main Reinforcement - 20mm

4. Straining Post to be provided at every 06th

fence post & at all bends.

150

250

125125

10 10

TURN BUCKLE FOR STRAINING

(1:5)

300

150

50

Fence Post

Washer nut &

check nut

50mm dia. STRAINING BOLT

(1:5)

Washer nut &

check nut

12

100 40

6mm dia. G.I. HOOK BOLT

(1:5)

25

75

75

2Y08Stirrups

R6 at 125 c/c

2Y08

SECTION

A - A

125

125

2Y08

Stirrups

R6 at 125 c/c

2Y08

SECTION

B - B

1675

25

02

50

25

02

25

17

51

50

12

51

25

12

5

2425

2400

475

600

750

100

475

125

C25 Concrete

475X375x850

DPC

30

0

See Detail ' P '

FRONT ELEVATIONSTRAINING POST / CORNER POST

(1:25)

Y

Y

X X

Min

100

Min 100

2Y08

Stirrups

R6 at 125 c/c

SECTION

Y - Y

2Y08

100

10

0

125

12

5

2Y08

Stirrups

R6 at 125 c/c

2Y08

SECTION

B - B

1675

36

5

220

12

51

25

12

51

50

17

52

25

25

02

50

25

0

2425

750

100

125

475

C25 Concrete

475X375x850

DPC

SIDE ELEVATION

STRAINING POST / CORNER POST

(1:25)

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

26.04.2019

Bhasura

Sandamali

16.06.2020

As Shown

TD/CE/1/184/D/60/00-02

BENT TYPE BARBED WIRE FENCE POSTADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 8: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

50

1200

120

1 HOUR FIRE PROOF

SINGLE STEEL DOOR WITH

PANIC LATCHES TO

MANUFACTURER DETAILS

GALVANIZED

FRAME

F.F.L.

1000

2400

50

900

2100

1050

DETAIL OF D1 DETAIL OF D2

50

800

2100

1050

DETAIL OF D4

100

300

75x50 ALUMINIUM

FRAME

ALUMINIUM

HALF PANEL

WIRE GLASS

ALUMINIUM

DOOR

75x50 ALUMINIUM

FRAME

1 HOUR FIRE PROOF

SINGLE STEEL DOOR WITH

PANIC LATCHES TO

MANUFACTURER DETAILS

ALUMINIUM DOOR

FULLY COVERED

DETAIL OF D5

50

1800

120

F.F.L.

1050

2400

DETAIL OF D6

75x50 ALUMINIUM

FRAME

100

700 700

ALUMINIUM HALF

PANEL

WIRE GLASS

150

50

900

2100

1050

DETAIL OF D3

GALVANIZED

STEEL FRAME

1 HOUR FIRE PROOF

SINGLE STEEL DOOR WITH

PANIC LATCHES TO

MANUFACTURER DETAILS

1700

SHUTTERED GLASS

75x50 ALUMINIUM

FRAME

ALUMINIUM WITH 6mm

WIRED GLASS SHUTTERS

WITH CURTAIN

SOLARLAMINATION

50 500

50

500

50

500

50

1350

300

50

F.F.L.

750

2400

DETAIL OF W1

50

900

2100

1050

DETAIL OF D3A

DOOR PANEL

75x50 ALUMINIUM

FRAME

DOOR PANEL

1 1

SECTION 1-1

2 2

SECTION 2-2 SECTION 3-3 SECTION 4-4

4 4

SECTION 5-5

55

SECTION 6-6

50

900

1950

450

50

50

F.F.L.

DETAIL OF W2

F.F.L.

1200 x 2400D1 GALVANIZED STEEL FRAME FIRE PROOF STEEL DOOR WITH

PANIC LATCHES SINGLE DOOR

900 x 2100D2 ALUMINIUM HALF PANEL WITH WIRED GLAZED DOOR

900 x 2100D3 GALVANIZED STEEL FRAME FIRE PROOF STEEL DOOR

WITH PANIC LATCHES SINGLE DOOR

800 x 2100D4

1700 x 1650W1 ALUMINIAM FRAME GLASZED WINSDOWS

600 x 450F

900 x 2100D3A ALUMINIUM DOOR

ALUMINIUM DOOR

1800 x 2400D5 GALVANIZED STEEL FRAME FIRE PROOF STEEL DOOR WITH

PANIC LATCHES DOUBLE DOOR

1800 x 2400D6 ALUMINIUM HALF PANEL WITH WIRED GLAZED DOOR

ALUMINIAM FRAME GLASZED FANLIGHT

50

1800

120

F.F.L.

2400

700 700

ALUMINIUM HALF

PANEL

150

3 3

1700

50

600

1950

450

50

50

75x50 ALUMINIUM

FRAME

DETAIL OF F

F.F.L.

900 x 450W2 PRESSURE RELEIFE WINSDOWS

66

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

26.04.2019

Bhasura

Sandamali

16.06.2020

1:50

TD/CE/1/184/D/60/00-03

DETAILS OF DOORS & WINDOWSADB IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 9: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

F5 F3 F1 F4

Gen.

Feeder 2

Ö Ö Ö

ÖÖ

Ö Ö Ö

OHL 132kV

KELANIYA

ÖÖ

SCOPE OF WORKS

+C2

CAP2

Gen.

Feeder 1

(=H13) (=H11) (=H09) (=H12)(=H03)

(=H04)

(=E01)

(=E02)

(=E03)

(=E04)

(=E05)

OHL 132kV

KOTUGODA

(BS1) (BS2)

(=E00) (=E00)

(=H01) (=H02) (=H08)(=H07)

+C1

CAP1

(=H05)

(5MVAr)

ES

CAP2

P2

P1

DSES

*

+C1(5MVAr)

ESP2

P1

DSES

*

(=H06)

MTR NO.3

31.5MVA

132/33kV

36kV CABLES

145kV DS

1250A

31.5kA/ 1 sec

145kV CB

1250A

31.5kA/ 1 sec

145kV CT

31.5kA/ 1 sec

EARTHING TRANSFO

800A,30s ZG

P1

P2

120kV SA

10kA

CL 2

400/200/1A,5P20,60VA

40

0/2

00

/1A

,5P

20

40

0/2

00

/1A

,5P

20

80

0/1

A,5

P2

0,6

0V

A

80

0/1

A,5

P2

0,6

0V

A

HV

NC

TM

V N

CT

400/200/1A,5P20,60VA

400/200/1A,CL 0.2,30VA

2000/1A,5P20,80VA

(=E06)

800/400/1A

1250A

25kA

800/400/1A

1250A

25kA

(=H10) (=H14)

36kV SA

10kA

CL 2

CAP2

36kV VT

33/Ö3:0.11/Ö3:0.11/Ö3:0.11/Ö3kV3P, 3P, CL 0.2

36kV CT

31.5kA/ 1 sec

800/1A,5P20,60VA

800/1A,CL 0.2,20VA

800/1A,5P20,60VA

F2 F6

(=H00)

CAP1

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARD

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

17.04.2019

Bhasura

Anusha

16.06.2020

NTS

TD/CE/1/184/D/00/01

ANIYAKANDA GSS

PROPOSED SINGAL LINE DIAGRAM FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 10: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

17500

WASTE

WATER

PIT

SP SOKAGE

PIT

CONTROL BUILDING

GU

AR

D H

OU

SE

GENERATOR

ROOM

CA

R P

AR

K

WASTE

WATER

PIT

SPSOKAGE

PIT

33kV

Gantr

y

77000

WATCH

TOWER

KELANIYA KOTUGODA

L1 L2 L3 L1 L2 L3

L1

L2

L3

L1

L2

L3

BS

1B

S2

ET1

AT1

ET2

AT2

CB

1C

B2

=E02 =E04

=E01 =E03

GA

TE SCOPE OF WORK

=H14

=H12

=H10

=H08

=H06

=H04

=H02

=H00

=H01

=H05

=H07

=H03

=H09

=H11

=H13

=H00

=E06

ET3

WELL

EXISTING CABLE ROUTE

NCTTR3

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARD

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

19.06.2019

Bhasura

Anusha

16.06.2020

NTS

TD/CE/1/184/D/01/01

ANIYAKANDA GSS

PROPOSED LAYOUT FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

DS

CB

CT

SA

Inform

ation

Cop

y-Not

for B

idding

Page 11: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

33

kV

GA

NT

RY

F6

F4

F2 (NOT CONNECTED)

GEN 2 (NOT CONNECTED)

EXISTING 33kV CABLE

ARRANGEMENT FOR OUTDOOR

GANTRY

F6 F4 F2Tr.

2

Cap

2

Gen

2

VT

BBR

VT

ACap

1

Tr.

1

Gen.

1F1 F3 F5BS

36kV SWITCHGEAR

33kV

GA

NT

RY

GEN 2

F6

F4

F2

F6

PROPOSED 33kV CABLE

ARRANGEMENT FOR OUTDOOR

GANTRY

F2F4Tr.

2

Cap

2

F8

Gen

2

Bus

VT

2

BRVT

ACap

1

Tr.

1

F7

Gen.

1

F1 F3 F5BS

36kV SWITCHGEAR

TO TRANSFORMER 2

TO

TR

AN

SF

OR

ME

R 3

TO

TR

AN

SF

OR

ME

R 2

OUT DOOR

SWITCHGEAR

OUT DOOR

SWITCHGEAR

SCOPE OF WORK

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARD

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

19.06.2019

Bhasura

Anusha

16.06.2020

NTS

TD/CE/1/184/D/01/01-A

FOR OUTDOOR GANTRY

33kV CABLE ARRANGEMENTADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 12: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

2265 345 3205 1200

1200

5050

3000

1200

W1 W1 W1 W1 W1

W1W1W1W1W1

W1

36kV SWITCHGEAR ROOM

132kV CONTROL &

PROTECTION ROOM

CONTROL

ROOM

STORE

ROOM

OFFICE

ROOM

TOILET

BATTERY

ROOMPANTRY &

REST ROOM

AUXILIARY

ROOM

W1

=H

14

=H

12

=H

10

=H

08

=H

06

=H

04

=H

02

=H

00

=H

01

=H

05

=H

07

=H

03

=H

09

=H

11

=H

13

OPENING

23705

23905

1200

12130

D1D3A

D6

D3

D4

D4

D3A

D3

D5

D3

4350

1200

AC

DC

1200

2000

EYE

WASHER

110VDC BATTERY

CHARGE

48VDC BATTERY

CHARGE

BA

TT

ER

Y 0

2

48

VD

C

BA

TT

ER

Y 0

1

48

VD

C

EN

TR

AN

CE

3550

25003600

165

424040003550

D1

D1D1

4080

1600

D6

5180

1240

HOLLOW BRICK WALLFILLED

WITH CONC. 1:2:4

48VDC

FUSE BOX110VDC

FUSE BOX

RD

1340

990 850

550 550

=W9

600

800

OPENING

W2

W1

1420

1420

110VDC

BATTERY 1

11

0V

DC

BA

TT

ER

Y 2

=H

00

- SCOPE OF WORK

160

4860

1080

TR 3 CONTROL &

PROTECTION

PANEL

TR 3 AVR &

MECHANICAL

PROTECTION

PANEL

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Revision Record

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCYADB PROPOSED CONTROL BUILDING LAYOUT

FOR ANIYAKANDA GSS

1:100

A3 18.06.2020

Anusha

Bhasura

TD/CE/1/184/D/60/01

19.06.2019

IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 13: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

NATIONAL SYSTEM CONTROL

CENTER

SAS Architecture with IEC 61850 Communication

NSCC link

02 Nos. IEC 60870-5-101

- Fiber Optic Connection

- Electrical LAN Connection

GPS ANTENA

Siemens SICAM AK1703 ACP

NTP Server

Meinberg Lantime V4

172.17.204.137

172.17.204.138 , 172.17.204.140

HMI 1

Andritz Hydro 250

SCALA 6.80.00

172.17.204.133

RSTP

Moxa Turbo Ring Multimode fiber SC connectors Switch SCS 1

Moxa EDS-508A-MM-SC

172.17.204.142

Switch SCS 2

Moxa EDS-508A-MM-SC

172.17.204.143

Switch SCS 3

Moxa EDS-508A-MM-SC

172.17.204.144

HMI 2

Andritz Hydro 250

SCALA 6.80.00

172.17.204.134

Gateway

LEGEND

Switch E01

Moxa

Switch E02

Moxa

EDS-508A-MM-SC

172.17.204.167

EDS-508A-MM-SC

172.17.204.207

Switch E03

Moxa

EDS-508A-MM-SC

172.17.204.177

Switch E04

Moxa

EDS-508A-MM-SC

172.17.204.217

Switch E05

Moxa

EDS-508A-MM-SC

172.17.204.197

Bay Controller

SiemensSICAM BC1703 ACP

172.17.204.128

Main 1 Protection

Siemens 7SD522

172.17.204.149

Main 2 Protection

Siemens 7SJ610

172.17.204.150

Bay Controller

SiemensSICAM BC1703 ACP

172.17.204.198

Bay Controller

SiemensSICAM BC1703 ACP

172.17.204.158

Bay Controller

SiemensSICAM BC1703 ACP

172.17.204.208

Bay Controller

SiemensSICAM BC1703 ACP

172.17.204.188

Switch E06

Switch H12

Moxa

EDS-508A-MM-SC

172.17.204.243

Main 1

Protection &

Bay Controller

IED

Main 1 Protection

Siemens

7UT613 M1

172.17.204.199

Main 2 Protection

Siemens

7UT613 M2

172.17.204.200

AVR

MR Tapcon 260

172.17.204.202

Main 1 Protection

Siemens 7SA522

172.17.204.159

Main 2 Protection

Siemens 7SJ610

172.17.204.160

Main 1 Protection

Siemens

7UT613 M1

172.17.204.209

Main 2 Protection

Siemens

7UT613 M2

172.17.204.210

AVR

MR Tapcon 260

172.17.204.212

Main 1 Protection

Siemens 7SJ640

172.17.204.190

Main 2 Protection

Siemens 7SJ610

172.17.204.189

BBP Central Unit

Siemens 7SS52

172.17.204.191

Main 2

Protection &

Bay Controller

IED

Siemens 7SJ642

172.17.204.242

33 kV H12 F4 C &

P IED

Siemens 7SJ642

172.17.204.240

IO Box for

TF Mechanical

Protection

33 kV H10 F2 C &

P IED

Siemens 7SJ642

172.17.204.238

Siemens 7SJ641

172.17.204.236

33 kV H06 CAP 2

C & P IED

Siemens 7SJ641

172.17.204.234

33 kV H06 CAP2

A11 C & P IED

GE F 650

172.17.204.250

33 kV H06 CAP 2

A12 C & P IED

AVR GE F650

172.17.204.251

33 kV H04 GEN 2

C & P IED

BBP Bay Unit

Siemens 7SS523

BBP Bay Unit 2

Siemens 7SS523

E01

132 kV Kelaniya Line

E02

132kV Transformer 01

E03

132kV Kotugoda Line

E04

132kV Transformer 02E05

132kV Bus section

E06

Transformer 03

(New)

(New)

BBP Bay Unit

Siemens 7SS523

BBP Bay Unit

Siemens 7SS523

BBP Bay Unit

Siemens 7SS523

BBP Bay Unit 1

Siemens 7SS523BBP Bay Unit

Siemens 7SJ642

172.17.204.232

Siemens 7SJ647

172.17.204.228

Siemens 7SJ642

172.17.204.231

33 kV H05 CAP 1

C & P IED

Siemens 7SJ641

172.17.204.233

33 kV H05 CAP 1

A11 C & P IED

GE F650

172.17.204.248

33 kV H05 CAP 1

A12 C & P IED

GE F650

172.17.204.249

33 kV H07 TR1

C & P IED

Siemens 7SJ641

172.17.204.235

Siemens 7SJ642

172.17.204.237

33 kV H11 F3 C &

P IED

Siemens 7SJ642

172.17.204.239

33 kV H13 F5 C &

P IED

Siemens 7SJ642

172.17.204.241

33 kV H14 F6 C &

P IED

Switch H06

Moxa

EDS-508A-MM-SC

172.17.204.244

33 kV H08 TR 2

C & P IED

Switch H00

Moxa

EDS-508A-MM-SC

172.17.204.245

33 kV H00 BS C

& P IED

Switch H05

Moxa

EDS-508A-MM-SC

172.17.204. 246

33 kV H03 GEN 1

C & P IED

Switch H11

Moxa

EDS-508A-MM-SC

172.17.204.247

33 kV H09 F1 C &

P IED

Switch H04A

33kV

H04 TR03

C & P IED

IEC

- 6

0870 -

5 -

101

IEC

- 6

0870 -

5 -

101

Revision Record

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

01.07.2019

Bhasura

Anusha

18.06.2020

0

NTS

TD/CE/1/184/D/07/01

AUTOMATION SYSTEM FOR ANIYAKANDA GSS

ARCHITECTURE FOR THE SUBSTATIONADBGREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 14: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

Ö Ö Ö

ÖÖ

Ö Ö Ö

ÖÖ

KILINOCHCHI 1KILINOCHCHI 2

33/ 3:0.11/ 3:0.1133/ 3:0.11/ 3:0.11

TO LVAC

SCOPE OF WORKS

145kV,2000A,31.5kA/1s

BUS BAR-1

MTR NO.1

31.5MVA

132/33kV

36kV CABLES

145kV DS

1250A

31.5kA/ 1 sec

145kV CB

1250A

31.5kA/ 1 sec

145kV CT

31.5kA/ 1 sec

EARTHING TRANSFO

800A,30s ZG

P1

P2

36kV SA

10kA

CL 2

120kV SA

10kA

CL 2

400/200/1A,5P20,60VA

40

0/2

00

/1A

,5P

20

,60

VA

40

0/2

00

/1A

,5P

20

,60

VA

80

0/1

A,5

P2

0,6

0V

A

80

0/1

A,5

P2

0,6

0V

A

HV

NC

TM

V N

CT

400/200/1A,5P20,60VA

400/200/1A,CL 0.2,30VA

2000/1A,5P20,80VA

F4F3

36kV, 2000A, 25kA

36kV DS/ES

1250A

25kA/ 1sec

36kV CB

1250A

25kA/ 1sec

36kV VT

33/Ö3:0.11/Ö3:0.11/Ö3:0.11/Ö3kV

3P, 3P, CL0.2

36kV CT

25kA/ 1 secP2

P1

36kV CB

1250A

25kA/ 1sec

36kV DS/ES

1250A

25kA/ 1sec

36kV SA

3X10kA

CL 2

36kV CT

25kA/ 1sec

36kV DS/ES

2500A

25kA/ 1sec

36kV DS/ES

2500A

25kA/ 1sec

P1

P2

P1

P2

36kV CB

1250A

25kA/ 1sec

36kV DS/ES

1250A

25kA/ 1sec

36kV CT

25kA/ 1sec

36kV SA

3X10kA

CL 2

36kV CB

2500A

25kA/ 1sec

P2

F2F1

P2

800/1A,5P20,60VA

800/1A,5P20,60VA

800/1A,CL 0.2,20VA

36kV VT

33/Ö3:0.11/Ö3:0.11/Ö3kV

P1P1

400/1A,5P20

400/1A,CL 0.2

800/400/1A,5P20

800/400/1A,CL 0.2

36kV BUS VT

33/Ö3:0.11/Ö3:0.11/Ö3:0.11/Ö3kV

3P, 3P, CL 0.2

2500/1A,5P20

36kV CT

25kA

36kV VT

33/Ö3:0.11/Ö3:0.11/Ö3kV

145kV,2000A,25kA/1s

BUS BAR-1

GENERATOR

FEEDER

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

28.06.2019

Bhasura

Ranjana

16.06.2020

NTS

TD/CE/1/184/D/00/02

SUBSTATION AT CHUNNAKAM

SINGLE LINE DIAGRAM FOR 132/33 kVADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 15: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

KIL

INO

CH

CH

I 2

GA

TE

KIL

INO

CH

CH

I 1

R

Y

B

R

Y

B

NCT

NCT10001500

R

Y

B

NCT

NCT

10001500

℄OF

CT

℄OF

CB

Y

℄OF

CT

B

R RY

B

NCTNCT

B

8000

CA

R

PA

RK

GE

NE

RA

TO

R

R

OO

M

R

Y

B

R

Y

B

UP

D1

EX

HA

US

T P

AN

ROAD (PS)

TO

C

HU

NN

AK

AM

5000mm WIDE ROAD

50

00

mm

WID

E R

OA

D

5000mm WIDE ROAD

5000mm WIDE ROAD

GU

AR

D

HO

US

E

CONTROL ROOM

BUILDING

WASTE

WATER

PIT

SP

SOAKAGE

PIT

145 kV BUS BAR-1

145 kV BUS BAR-2

℄ OF TOWER

& LA

℄ OF TOWER & LA 132 kV YARD

WATCH TOWER

7535

4465

PROPERTY OF CENTRAL POWER STATION CHUNNAKAM

PROPERTY OF LANKA SIDDHA

AYURVEDIC MEDICAL COLLEGE

PR

OP

ER

TY

OF

CE

NT

RA

L P

OW

ER

ST

AT

ION

CH

UN

NA

KA

M

- SCOPE OF WORK

TR.1

TR.2

TR.3

Y

R

CO

NF

ER

EN

CE

RO

OM

SIT

E E

NG

INE

ER

'S

OF

FIC

E

CS

/ES

OF

FIC

EP

AN

TR

Y

OP

EN

VE

RA

ND

AH

TO

ILE

T

GA

TE

SIT

E O

FF

ICE

SA PIPI

ETR

PIAUX. TF

PROVISION

CABLE TO INDOOR

SWITCHGEAR

SA CT

CB

DS

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

04.09.2018

Bhasura

Ranjana

16.06.2020

1:600

TD/CE/1/184/D/01/02

SUBSTATION AT CHUNNAKAM

LAYOUT FOR 132/33 kVADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 16: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

1500 1000 15001000

7000

4000

3500

1500 1000 15001000

8450

1500 1000 15001000 1500 1000 15001000

7000

A=

4000

3500

200

5000 5000 5005 5000

1000 1000

5000 5000 5000 5000

1000 1000

1000 1000

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Revision Record

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

TD/CE/1/184/D/01/02-A

ADB 33kV FEEDER TAKE-OFF STRUCTURE

NTS

A3

Ranjana

Bhasura

16.06.2020

16.06.2020GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

PACKAGE 8 - LOT AARRENGEMENT FOR CHUNNAKAM GSS

Inform

ation

Cop

y-Not

for B

idding

Page 17: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

1200

70

0

104906370

4870 4350

1752017520

2400

2400

45

00

41

90

LOBBY

UP

12

00

12

00

36kV SWITCHGEAR ROOM

1440

9290

3000 4550

REST ROOM

& PANTRY

D3

TOILET

D2

120

1440

D3 D3STORE

ROOM

2400

3600

12

00

OFFICE

ROOM

36

00

F

D2

1200

12

00

24

0

3600

DOWN

D2

CONTROL

ROOM

3670

4770

LOADING

BAYD1

AUXILIARY

ROOM

600

1350

68

50

10

37

0

W1

28

00

46

00

10

37

0

50

50

60

0

10

00

600

350

D

W1

W1

W1 W1

W1

W1

W1

W1 W1 W1

W1 W1W1

W1

F F

D2

D2

D2

F

F

FF

D3

D1

F12F11TR3F9

BS

2-B

BS

2-A

F8 F10TR2F7F6F5F4

BS

1-A

BS

1-B

BATTERY

ROOM

D2

D2

D2

W1

D1

1500

TOILET12

00

D3

24

0

60

502

70

01

20

0

12

0

95

0

F

SCOPE OF WORKS

TR1 F3F2F1

NEW ENERGY

METER PANEL

132kV PROTECTION & COMMUNICATION ROOM

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Revision Record

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY ADB PROPOSED CONTROL BUILDING LAYOUT

FOR CHUNNAKAM GSS

1:125

A3 16.06.2020

Anusha

Bhasura

28.06.20111

TD/CE/1/184/D/60/02 - A

19.06.2019

IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 18: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

PES-1 PES-2

PAS PANEL 1 PAS PANEL 2

HMI-1 HMI-2 ENGINEERING STATION

LASER PRINTER

EVENT / ALARM PRINTER

(DOT MATRIX)

PARALLEL PORT

EXPANDER

EVENT / ALARM PRINTER

(DOT MATRIX)

PARALLEL PORT

EXPANDER

HMI-1 HMI-2

KVM SWITCH-1 KVM SWITCH-2

GPS

GPS ANTENA

PAS SERVER1/

GATEWAY

RS232 PORT

KVM SWITCH-1 KVM SWITCH-2

PAS SERVER2/

GATEWAY

RS232 PORT

OVER IEC 60870-5-101 PROTOCOL

ENGG.WS.

KVM SWITCH - 3 KVM SWITCH - 4

DIAL -UP MODEM

TELEPHONE LINE

DIAL -UP MODEM

LAPTOP

SYSTEM CONTROL CENTRE

ABB MICROSCADA

OPGW

(NOT IN SIEMENS SCOPE)

AVR-2 AVR-3 6MD61 6MD66 6MD66 6MD66 6MD66 6MD66

7SS522

7SJ61 7SA522 7SJ612 7UT612 7UT613 7SA522 7SJ61 7SJ612 7ST612 7UT613 7SJ61

7SS523 7SS523 7SS523 7SS5237SS523 7SS523

Lin

e F

eeder

KIL

INO

CH

CH

I 2

Tra

nsfo

rmer

3 (

FU

TU

RE

)

Lin

e F

eeder

KIL

INO

CH

CH

I 1

Tra

nsfo

rmer

2

Bus S

ection

Busbar

Lin

e F

eeder

KIL

INO

CH

CH

I 2

Tra

nsfo

rmer

3(F

)

Lin

e F

eeder

KIL

INO

CH

CH

I 1

Tra

nsfo

rmer

2

Bus S

ection

ALM ALM ALM CP-E06 CP-E05 CP-E02 CP-E03 CP-E04 RP-BB RP-E06 RP-E05 RP-E02 RP-E03 RP-E04

132kV

ELECTRICAL TO FOR

MEDIA CONVERTERS

33kV

7SJ645 7SJ6451 7SJ8021 7SJ6451 7SJ8022 7SJ6451 7SJ8022 7SJ6102 7SJ64517SJ6451

7RW8020 7RW8020 7SJ6451 7SJ8022 7SJ6451 7SJ8022 7SJ6102 7SJ6451 7SJ8022 7SJ6451 7SJ80227SJ6451

33kV

Genera

tor

Feeder-

1

33kV

O/H

Feeder

33kV

O/H

Feeder

33kV

Tra

fo B

ay-1

33kV

Genera

tor

Feeder-

2

33kV

Bus C

ouple

r

33kV

Bus R

iser

33kV

O/H

Feeder

33kV

Tra

fo B

ay-2

33kV

O/H

Feeder

33kV

O/H

Feeder

33kV

Genera

tor

Feeder-

1

H06+CRP H07+CRP H08+CRP H09+CRP H10+CRP H11A+CRP H11B+CRP H12+CRP H13+CRP H14+CRP H15+CRP H16+CRP

LEGEND

FO PATCH CABLE

CAT VI RJ45 CABLE

RS232 COMMUNICATION CABLE

2 CORE RUGGEDISED ST-ST FO CABLE

ELECTRICAL TO FO MEDIA CONVERTER

2 CORE RUGGEDISED ST-LC FO CABLE

NOTE: It is assumed that data from Gateway to System control center is going on IEC-60870-5-101 Protocol on OPGW.

Two Ports of IEC-104 are available if connectivity between Gateway and SCC is required to be done on IEC- 104.

PES1-8 FO+24 RJ45 PORT

USED

SPARE

7

1

6

18

FO PORT RJ45 PORT

PES2-8 FO+24 RJ45 PORT

USED

SPARE

7

1

7

17

FO PORT RJ45 PORT

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

26.06.2019

Bhasura

Ranjana

16.06.2020

NTS

TD/CE/1/184/D/07/02-A

AUTOMATION SYSTEM FOR CHUNNAKAM GSS

ARCHITECTURE FOR THE SUBSTATIONADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 19: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

SAS Panel

Existing PES-1

Rugged Com

RSG2300N

Ethernet Copper

RJ45

Existing PES-2

Rugged Com

RSG2300NC

Fibre Duplex

ST Port

LEGEND

- Fiber Optic Connection

- Electrical LAN Connection

RSTP Ring Network

PES-3

PES-4 PES-5

Main 1

Protection &

Bay Controller

IED

Main 2

Protection &

Bay Controller

IED

IO Box

33kV

TR1 C & P

IED

33kV

Feeder C & P

IED

33kV

Feeder C & P

IED

AVR 33kV

Feeder C & P

IED

BBP Bay Unit

33kV

Feeder C & P

IED

33kV

BS C & P

IED

Revision Record

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

01.07.2019

Bhasura

PRJ

16.06.2020

0

NTS

TD/CE/1/184/D/07/02-B

FOR CHUNNAKAM GSS

EXTENTION TO SAS ARCHITECTURE ADBGREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

IMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 20: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

CONFERENCE ROOM

SITE ENGINEER'S

OFFICE

CS/ES OFFICE4

00

0PANTRY

OPEN

VERANDAH

TOILET

ALL DIMENSIONS ARE IN MILLIMETRES

20

00

D3 750 x 2100 Pvc door

D2 900 x 2100 Plywood door

F 600 x 450 Glazed Fanlight (Aluminium frame)

D1 1200 x 2400 Plywood door with 300mm Fanlight

W1 1800 x 1500 Glazed Window (Timber frame)

NOTE

AIR CONDITION PLANT

CEILING FAN

11060

W2 900 x 1500 Glazed Window (Timber frame)

30

00

30

00

90

0

67

20

67

20

3600 2500

11060

44

00

16

00

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

27.06.2019

Bhasura

Anusha

16.06.2020

1:50

TD/CE/1/184/D/60/02 - B

FOR CHUNNAKAM GSS

TYPICAL SITE OFFICE LAYOUTADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 21: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

192kV SA

10kA,

CL:2

245kV DS

2000A

40kA/ 1 sec

2000/1000/1A, 5P20

BUS 1 245kV, 3150A, 40kA/1sec

LINE FEEDER CONTROL

245kV LINE CONTROL &

PROTECTION

BUSBAR & BREAKER FAILURE

TO DIGITAL DISTURBANCE

RECORDER PANEL

WDGI: CL.0.5

WDG2: CL3P

P2

P1245kV CT

40kA/ 1 sec

2000/1000/1A, CL0.5

3000/1A, 5P20

MANNAR 1

BUS 2 245kV, 3150A, 40kA/1sec

WDG3: CL3P

MANNAR 2

245kV DS

2000A

40kA/ 1 sec245kV DS

2000A

40kA/ 1 sec

TO DIGITAL DISTURBANCE

RECORDER PANEL

P2 P1

P2 P1

800/1A,

5P20

TO DIGITAL DISTURBANCE

RECORDER PANEL

36kV SA

10kA,CL:2

800/1A,

5P20

NCT

245kV DS1250A

40kA/ 1 sec

P2

P1245kV CT

40kA/ 1 sec

192kV SA

10kA, CL:2

TRANSFORMER CONTROL & PROTECTION

P2

P2 P1

P1

800/1A,

5P20

TO LVAC

P1

P2

TO DIGITAL DISTURBANCE

RECORDER PANEL

36kV DS/ES

1600A

25kA/ 1 sec

800/1A,

5P20

NCT

200/1A,

5P20

NCT

AUX. TRAFO.

160kV

33kV/0.4kV ONAN

EARTH. TRAFO.

800A/30 sec

33kV, ONAN

36kV CB

1600A

25kA/ 1 sec

TR No.2

63MVA,220/33kV

P2

800/1A,

5P20

NCTP2

800/1A,

5P20

NCT

36kV DS/ES

1250A

25kA/ 1 sec

36kV CB

1250A

25kA/ 1 sec

36kV CT

25kA/ 1 sec

800/ 400 /1A, CL 0.2

800/ 400 /1A, 5P 20

33kV Cable

36kV, 2500A, 25kA/1sec Bus Section A2

LINE FEEDER

CONTROL

ENERGY METERING

SYSTEM

TRANSCO

DISCO

TO

36kV BUS VT

WDG I: CL.0.2

TO

36kV BUS VT

WDG 2: CL3P

LINE FEEDER

PROTECTION

36kV CB

2500A

25kA

36kV DS

2500A

25kA

36kV DS

2500A

25kA

2500/1A

2000/1000/1A, 5P20

P2

P1

245kV DS

2000A

40kA/ 1 sec

245kV CB

2000A

40kA/ 1 sec

200/1A ,5P20

Bus Section A3 Bus Section B2

36kV DS/ES

1250A

25kA/ 1 sec

36kV CB1250A

25kA/ 1 sec

36kV CT

25kA/ 1 sec

800/ 400 /1A, CL 0.2

800/ 400 /1A, 5P 20

36kV DS/ES

1250A

25kA/ 1 sec

36kV CB

1250A

25kA/ 1 sec

36kV CT

25kA/ 1 sec

800/ 400 /1A, CL 0.2

800/ 400 /1A, 5P 20

36kV DS/ES

1250A

25kA/ 1 sec

36kV CB

1250A

25kA/ 1 sec

36kV CT

25kA/ 1 sec

800/ 400 /1A, CL 0.2

800/ 400 /1A, 5P 20

36kV CB

2500A

25kA

36kV DS

2500A

25kA

36kV DS

2500A

25kA

2500/1A

P2

P1

P1

P2

P2

P1

P1

P2

P2

P1

P1

P2

245kV DS1250A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

36kV DS/ES

1600A

25kA/ 1 sec

36kV CB

1600A

25kA/ 1 sec

245kV DS1250A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

36kV DS/ES

1600A

25kA/ 1 sec

36kV CB

1600A

25kA/ 1 sec

245kV DS1250A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

36kV DS/ES

1600A

25kA/ 1 sec

36kV CB

1600A

25kA/ 1 sec

200/1A ,5P20

200/1A ,CL0.5

3000/1A ,5P20

200/1A ,5P20

200/1A ,5P20

200/1A ,5P20

200/1A ,5P20

200/1A ,5P20

200/1A ,5P20

200/1A ,CL0.5 200/1A ,CL0.5 200/1A ,CL0.5

3000/1A ,5P20 3000/1A ,5P20 3000/1A ,5P20

BUS 1

BUS 2

WDG I: CL.3P

WDG 2: CL0.2

WDG I: CL.3P

WDG 2: CL0.2

WDG I: CL.3P

WDG 2: CL0.2

WDG I: CL.3P

WDG 2: CL0.2

33kV Cable 33kV Cable 33kV Cable

Bus Section B1

36kV GIS

IN DOOR

OUT DOOR

OUT DOOR

IN DOOR

245kV GIS

IN DOOR

OUT DOOR

P2

800/1A,

5P20

800/1A,

5P20

NCTP2

800/1A,

5P20

TO LVAC

800/1A,

5P20

NCT

36kV DS/ES

1250A

25kA/ 1 sec

36kV CB

1250A

25kA/ 1 sec

36kV CT

25kA/ 1 sec

800/ 400 /1A, CL 0.2

800/ 400 /1A, 5P 20

P2

P1

P1

P2

245kV CB

1250A

40kA/ 1 sec

36kV SA

10kA,CL:2

245kV DS1250A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

192kV SA

10kA, CL:2

36kV DS/ES

1600A

25kA/ 1 sec

AUX. TRAFO.

160kV

33kV/0.4kV ONAN

EARTH. TRAFO.

800A/30 sec

33kV, ONAN

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV CT

25kA/ 1 sec

1600/1A, 5P20

1600/1A, 5P20

36kV CB

1600A

25kA/ 1 sec

TR No.1

63MVA,220/33kV

200/1A ,5P20

200/1A ,5P20

200/1A ,CL0.5

3000/1A ,5P20

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

33kV Cable

36kV DS/ES

1250A

25kA/ 1 sec

36kV CB

1250A

25kA/ 1 sec

36kV CT

25kA/ 1 sec

800/ 400 /1A, CL 0.2

800/ 400 /1A, 5P 20

P2

P1

P1

P2

245kV DS1250A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

36kV DS/ES

1600A

25kA/ 1 sec

36kV CB

1600A

25kA/ 1 sec

200/1A ,5P20

200/1A ,5P20

200/1A ,CL0.5

3000/1A ,5P20

WDG I: CL.3P

WDG 2: CL0.2

33kV Cable

36kV SA

10kA,CL:2

192kV SA

10kA, CL:2

EARTH. TRAFO.

800A/30 sec

33kV, ONAN

TR No.5

63MVA,220/33kV

OUT DOOR

IN DOOR

245kV BUS VT

220/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.5

Bus Section B3Bus Section A1

36kV CB

2500A

25kA

36kV DS

2500A

25kA

36kV DS

2500A

25kA

2500/1A

36kV CB

2500A

25kA

36kV DS

2500A

25kA

36kV DS

2500A

25kA

2500/1A

36kV BUS VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

P1P1 P1P1

1600/1A, CL 0.2

36kV CT

25kA/ 1 sec

1600/1A, 5P20

1600/1A, 5P20

1600/1A, CL 0.2

36kV CT

25kA/ 1 sec

1600/1A, 5P20

1600/1A, 5P20

1600/1A, CL 0.2

36kV CT

25kA/ 1 sec

1600/1A, 5P20

1600/1A, 5P20

1600/1A, CL 0.2

36kV CT

25kA/ 1 sec

1600/1A, 5P20

1600/1A, 5P20

1600/1A, CL 0.2

36kV CT

25kA/ 1 sec

1600/1A, 5P20

1600/1A, 5P20

1600/1A, CL 0.2

WDG I: CL0.2

WDG 2: CL.3P

WDG I: CL0.2

WDG 2: CL.3PWDG I: CL0.2

WDG 2: CL.3P

WDG I: CL0.2

WDG 2: CL.3P

WDG I: CL0.2

WDG 2: CL.3P

WDG I: CL0.2

WDG 2: CL.3P

LEGEND

SCOPE OF WORK

245kV XLPE,CU

CABLE

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

HSES

245 kV

ES

245 kV

ES 245 kV

ES 245 kV

245kV CB

1250A

40kA/ 1 sec

245kV CB1250A

40kA/ 1 sec

245kV CB

1250A

40kA/ 1 sec

245kV CB

1250A

40kA/ 1 sec

245kV CB

1250A

40kA/ 1 sec

245kV VT

220/Ö3 : 0.11/Ö3 : 0.11/Ö3 : 0.11/Ö3 kV

ES

245 kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV BUS VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

36kV BUS VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

36kV BUS VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

36kV BUS VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

36kV BUS VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

ES 245 kV

ES 245 kV

ES 245 kV

ES 245 kV

HSES

245 kV

ES 245 kV

ES 245 kV

ES 245 kV

ES 245 kV

ES 245 kV

ES 245 kV

P2

800/1A,

5P20

NCTP2

800/1A,

5P20

NCT

36kV SA

10kA,CL:2

192kV SA

10kA, CL:2

EARTH. TRAFO.

800A/30 sec

33kV, ONAN

TR No.6

63MVA,220/33kV

P1P1P2

800/1A,

5P20

NCTP2

800/1A,

5P20

NCT

36kV SA

10kA,CL:2

192kV SA

10kA, CL:2

EARTH. TRAFO.

800A/30 sec

33kV, ONAN

TR No.4

63MVA,220/33kV

P1P1

ES

245 kV

ES

245 kV

192kV SA

10kA,

CL:2

245kV DS

2000A

40kA/ 1 sec

2000/1000/1A, 5P20

245kV CT

40kA/ 1 sec

2000/1000/1A, CL0.5

3000/1A, 5P20

245kV DS

2000A

40kA/ 1 sec

2000/1000/1A, 5P20

245kV CB

2000A

40kA/ 1 sec

245kV XLPE,CU

CABLE

HSES

245 kV

ES

245 kV

245kV VT

220/Ö3 : 0.11/Ö3 : 0.11/Ö3 : 0.11/Ö3 kV

ES

245 kV

ES

245 kV

ES

245 kV

WDGI: CL.0.5

WDG2: CL3P

WDG3: CL3P

245kV BUS VT

220/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.5

HSES

245 kV

HSES

245 kV

HSES

245 kV

HSES

245 kV

245kV DS

3150A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

3000/1A, 5P20

245kV DS

3150A

40kA/ 1 sec

3000/1A, 5P20

245kV CB

3150A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

3000/1A, 5P20

3000/1A, CL 0.5

EARTH. TRAFO.

800A/30 sec

33kV, ONAN

TR No.3

63MVA,220/33kV

P2 P1

P2 P1

P2 P1

HV NCT

800/400/1A,5P20,60VA800/400/1A,5P20,60VA

MV NCT

800/1A,5P20,60VA800/1A,5P20,60VA

36kV SA

10kA,CL:2

192kV SA

10kA, CL:2

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

22.05.2019

Bhasura

Anusha

16.06.2020

0301

NTS

TD/CE/1/184/D/00/03-A

NADUKUDA GSS

PROPOSED SINGLE LINE DIAGRAM FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 22: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

BUS 1 245kV, 3150A, 40kA/1sec

BUS 2 245kV, 3150A, 40kA/1sec

TO DIGITAL DISTURBANCE

RECORDER PANEL

P2 P1

P2 P1

800/1A,

5P20

TO DIGITAL DISTURBANCE

RECORDER PANEL

36kV SA

10kA,CL:2

800/1A,

5P20

NCT

245kV DS

1250A

40kA/ 1 sec

P2

P1245kV CT

40kA/ 1 sec

192kV SA

10kA, CL:2

TRANSFORMER CONTROL & PROTECTION

P2

P2 P1

P1

800/1A,

5P20

TO LVAC

P1

P2

TO DIGITAL DISTURBANCE

RECORDER PANEL

36kV DS/ES

1600A

25kA/ 1 sec

800/1A,

5P20

NCT

200/1A,

5P20

NCT

AUX. TRAFO.

160kV

33kV/0.4kV ONAN

EARTH. TRAFO.

800A/30 sec

33kV, ONAN

36kV CB

1600A

25kA/ 1 sec

TR No.2

63MVA,220/33kV

36kV DS/ES

1250A

25kA/ 1 sec

36kV CB

1250A

25kA/ 1 sec

36kV CT

25kA/ 1 sec

800/ 400 /1A, CL 0.2

800/ 400 /1A, 5P 20

33kV Cable

36kV, 2500A, 25kA/1sec Bus Section A2

LINE FEEDER

CONTROL

ENERGY METERING

SYSTEM

TRANSCO

DISCO

TO

36kV BUS VT

WDG I: CL.0.2

TO

36kV BUS VT

WDG 2: CL3P

LINE FEEDER

PROTECTION

36kV CB

2500A

25kA

36kV DS

2500A

25kA

36kV DS

2500A

25kA

2500/1A

200/1A ,5P20

Bus Section A3

36kV DS/ES

1250A

25kA/ 1 sec

36kV CB

1250A

25kA/ 1 sec

36kV CT

25kA/ 1 sec

800/ 400 /1A, CL 0.2

800/ 400 /1A, 5P 20

P2

P1

P1

P2

245kV DS

1250A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

36kV DS/ES

1600A

25kA/ 1 sec

36kV CB

1600A

25kA/ 1 sec

200/1A ,5P20

200/1A ,CL0.5

3000/1A ,5P20

200/1A ,5P20

200/1A ,5P20

200/1A ,CL0.5

3000/1A ,5P20

BUS 1

BUS 2

WDG I: CL.3P

WDG 2: CL0.2

WDG I: CL.3P

WDG 2: CL0.2

33kV Cable

36kV GIS

IN DOOR

OUT DOOR

OUT DOOR

IN DOOR

P2

800/1A,

5P20

800/1A,

5P20

NCTP2

800/1A,

5P20

TO LVAC

800/1A,

5P20

NCT

36kV DS/ES

1250A

25kA/ 1 sec

36kV CB

1250A

25kA/ 1 sec

36kV CT

25kA/ 1 sec

800/ 400 /1A, CL 0.2

800/ 400 /1A, 5P 20

P2

P1

P1

P2

36kV SA

10kA,CL:2

245kV DS

1250A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

192kV SA

10kA, CL:2

36kV DS/ES

1600A

25kA/ 1 sec

AUX. TRAFO.

160kV

33kV/0.4kV ONAN

EARTH. TRAFO.

800A/30 sec

33kV, ONAN

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV CT

25kA/ 1 sec

1600/1A, 5P20

1600/1A, 5P20

36kV CB

1600A

25kA/ 1 sec

TR No.1

63MVA,220/33kV

200/1A ,5P20

200/1A ,5P20

200/1A ,CL0.5

3000/1A ,5P20

WDG I: CL.3P

WDG 2: CL0.2

33kV Cable

OUT DOOR

IN DOOR

Bus Section A1

36kV CB

2500A

25kA

36kV DS

2500A

25kA

36kV DS

2500A

25kA

2500/1A

P1P1

1600/1A, CL 0.2

36kV CT

25kA/ 1 sec

1600/1A, 5P20

1600/1A, 5P20

1600/1A, CL 0.2

36kV CT

25kA/ 1 sec

1600/1A, 5P20

1600/1A, 5P20

1600/1A, CL 0.2

WDG I: CL0.2

WDG 2: CL.3P

WDG I: CL0.2

WDG 2: CL.3P

WDG I: CL0.2

WDG 2: CL.3P

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

245kV CB

1250A

40kA/ 1 sec

245kV CB

1250A

40kA/ 1 sec

245kV CB

1250A

40kA/ 1 sec

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

36kV BUS VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

36kV BUS VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

36kV BUS VT

33/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.2

ES 245 kV

ES 245 kV

ES 245 kV

ES 245 kV

ES 245 kV

ES 245 kV

HSES

245 kV

HSES

245 kV

HSES

245 kV

SCOPE OF WORK

LEGEND

P2EARTH. TRAFO.

800A/30 sec

33kV, ONAN

TR No.3

63MVA,220/33kV

P1

P2 P1

HV NCT

800/400/1A,5P20,60VA800/400/1A,5P20,60VA

MV NCT

800/1A,5P20,60VA800/1A,5P20,60VA

36kV SA

10kA,CL:2

192kV SA

10kA, CL:2

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

22.05.2019

Bhasura

Anusha

16.06.2020

0302

NTS

TD/CE/1/184/D/00/03-B

NADUKUDA GSS (PART I)

PROPOSED SINGLE LINE DIAGRAM FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 23: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

192kV SA

10kA,

CL:2

245kV DS

2000A

40kA/ 1 sec

2000/1000/1A, 5P20

LINE FEEDER CONTROL

245kV LINE CONTROL &

PROTECTION

BUSBAR & BREAKER FAILURE

TO DIGITAL DISTURBANCE

RECORDER PANEL

P2

P1245kV CT

40kA/ 1 sec

2000/1000/1A, CL0.5

3000/1A, 5P20

MANNAR 1 MANNAR 2

245kV DS

2000A

40kA/ 1 sec245kV DS

2000A

40kA/ 1 sec

2000/1000/1A, 5P20

P2

P1

245kV DS

2000A

40kA/ 1 sec

245kV CB

2000A

40kA/ 1 sec

245kV XLPE,CU

CABLE

HSES

245 kV

ES

245 kV

245kV VT

220/Ö3 : 0.11/Ö3 : 0.11/Ö3 : 0.11/Ö3 kV

ES

245 kV

192kV SA

10kA,

CL:2

245kV DS

2000A

40kA/ 1 sec

2000/1000/1A, 5P20

245kV CT

40kA/ 1 sec

2000/1000/1A, CL0.5

3000/1A, 5P20

245kV DS

2000A

40kA/ 1 sec

2000/1000/1A, 5P20

245kV CB

2000A

40kA/ 1 sec

245kV XLPE,CU

CABLE

HSES

245 kV

ES

245 kV

245kV VT

220/Ö3 : 0.11/Ö3 : 0.11/Ö3 : 0.11/Ö3 kV

ES

245 kV

245kV BUS VT

220/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.5

ES

245 kV

ES

245 kV

245kV BUS VT

220/Ö3 : 0.11/Ö3 : 0.11/Ö3kV

WDG I: CL.3P

WDG 2: CL0.5

WDGI: CL.0.5

WDG2: CL3P

WDG3: CL3P

WDGI: CL.0.5

WDG2: CL3P

WDG3: CL3P

ES

245 kV

ES

245 kV

245kV DS

3150A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

3000/1A, 5P20

245kV DS

3150A

40kA/ 1 sec

3000/1A, 5P20

245kV CB

3150A

40kA/ 1 sec

245kV CT

40kA/ 1 sec

3000/1A, 5P20

3000/1A, CL 0.5

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

28.08.2015

Kushan

Buddhika

16.06.2020

A0303

NTS

TD/CE/1/184/D/00/03-C

NADUKUDA GSS (PART II)

PROPOSED SINGLE LINE DIAGRAM FORADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 24: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

100.0m

LA

WasteWater

Pit

SP

Sokage

Pit

GuardRoom

Control Building

BarbwireFence

Chain LinkFence

63MVA

220/33kV

B

Y

R

220kV CableTermination

220kV Cable

Termination

Aux. ETR

Car shed

TR 1

TR 2

220kV Under

Ground Cable

Access Road

90

.0m

Ro

ad

TR 3

9000

12000

Fire Wall

(Concrete)

TR 5

Fire Wall

(Concrete)

Fire Wall

(Concrete)

GeneratorRoom

13

00

1500

GE

NE

RA

TO

R

STORAGE AREA

FOR FUEL

1500

Road

Road

ETR

ETR

Road

LEGEND

Aux. ETR

ETR

TR 4TR 6

ETR

Rain Water

Drainage System

Fire Wall

(Concrete)

LA

B

Y

R

Gate

Cable Trench for

Wind Farm Feeders

Tal

aim

ann

ar -

Med

awac

hch

iya

- A

14

Nad

uk

ud

a

Connection to the Building Rain

Water Drainage System

5000

12000

9000

30000 12600

Road

Cable Trench for

33kV Power Cables

33

kV

SW

ITC

HG

EA

R R

OO

M

FFTRFBS

BRFFTRF

FFTRFBS

BRFFTRF

TR

1T

R1

L1

L1

TR

2T

R2

TR

4T

R4

L2

L2

TR

5T

R5

22

0k

V G

IS

EM1EM2EM3EM4EM5EM6

W1

W1

D6

W1

W1

W1

W1

W1

W1

D5

D1

D3

RO

LL

ER

DO

OR

RO

LL

ER

DO

OR

W2

W2

W2

W2

W2

W2

W2

W2

DOWN

D3

D6

W2

W2

PR

OT

EC

TIO

N / C

OM

MU

NIC

AT

ION

RO

OM

UP

DOWN

CC

TV

SA

S

1

SA

S

2

COM.1 DFRCOM.2 COM.3

TR

3T

R3

BC

BB

TR

6T

R6

BS

BRFFTRF

BS

BRFFTRF

BC

TR

1

TR

2

L1

L2

TR

3

TR

4

TR

5

TR

6

22

0k

V P

RO

TE

CT

ION

PA

NE

LS

CC

TV

SAS

Prin

ter

Fax

D2

D2

CO

NT

RO

LR

OO

M

D1

80002000

1300

1800

2700

1800

1200

2500 20000

2000

3300

128004000

5500

W2

W2

W2

W2

W2

W1

W2

W2

ENERGY METERS

MA

N

HO

LE

1800

1000

MA

N

HO

LE

1900

2897

220kV

Cable

Cubic

le

PQM

BU

S V

T

TR

3A

VR

PA

NE

L

Fire Wall (Concrete)

to Protect Earthing & AuxiliaryTransformer.

SCOPE OF WORK

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

22.05.2019

Bhasura

Anusha

16.06.2020

1:450

TD/CE/1/184/D/01/03

NADUKUDA GSS

PROPOSED LAYOUT OFADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding

Page 25: GREEN POWER DEVELOPMENT AND ENERGY ......2x60 ORUWALA MVA MW Zebra, 113km Zebra,4.6km KELANIYA 132kV 2x150 2x40 MVA 132kV 220kV 220kV MATUGAMA BOWATENNA 3x35 4x31.5 3x31.5 3x31.5 2x31.5

ANTENNA

TIME DISPLAY UNIT

21" DISPLAY FOR HMI-1

SPEAKER

KVM EXTENDER(R)

AUDIOUSB

VG

A

VG

A

KEXT-1

AA

KEXT-2

AA

KEXT-2

BB

KEXT-1

BB

KEXT-3

AA

KEXT-3

BB

SPEAKER

KVM EXTENDER(R)

AUDIOUSB

VG

A

VG

A

SPEAKER

KVM EXTENDER(R)

AUDIOUSB

VG

A

VG

A

LAZER PRINTER

LAPTOP

NATIONAL SYSTEM CONTROL CENTRE

KEXT-1

A

KEXT-1

B

KEXT-2

A

KEXT-2

B

KEXT-3

A

KEXT-3

B

HMI-1 HMI-2 EWS

KVM EXTENDER(L) KVM EXTENDER(L) KVM EXTENDER(L)

VG

A

VG

A

VG

A

VG

A

VG

A

USB

USB

USB

AU

DIO

AU

DIO

AU

DIO

GPS

DIALUPMODEM

DIA

LU

P

MO

DEM

TELEPH

ON

E L

INE

GE-e Terra

OPGW

(NOT IN SIEMENS

SCOPE)

RJ45 PORT FOR REMOTE

COMMUNICATION VIA CEB NETWORK

SES-1 SES-2220/kV RSTP RING ON IEC 61850 PROTOCOL

SAS PANEL

GATEWAY-1 GATEWAY-2

220/kV RSTP RING ON IEC 61850 PROTOCOL

IEC 60870-5-101 PORTSIEC 60870-5-101 PORTS

OVER IEC 60870-5-104 PROTOCOL

220kV SWITCH BOARD

DO1RP DO2RP DO3RP DO4RP DO5RP DO6RP DO7RP DO8RP DO9RP DOBBRP RTCC-TR01 RTCC-TR02RTCC-TR03 FUTURE

RTCC-TR04 FUTURE RTCC-TR03

FUTURE

RTCC-TR05FUTURE

RTCC-TR06 FUTURE RTCC-TR03

FUTURE

2ES-1(14FO+2RJ) 2ES-2(14FO+2RJ)

A201 A201 A201 A201 A201 A201 A201 A201 A201

6M

D66

6M

D66

6M

D66

6M

D66

6M

D66

6M

D66

6M

D66

6M

D66

6M

D66

D09CP D08CP D07CP D06CP D05CP D04CP D03CP D02CP D01CP

220/33kV TRAFO-6

CONTROL PANEL

220/33kV TRAFO-5

CONTROL PANEL

220/33kV TRAFO-4

CONTROL PANEL

220kV BUS COUPLER

CONTROL PANEL

220/33kV TRAFO-3

CONTROL PANEL

220kV MANNAR LINE-2

CONTROL PANEL

220/33kV TRAFO-2

CONTROL PANEL

220/33kV TRAFO-1

CONTROL PANEL

220kV MANNAR LINE-1

& BUS PT CONTROL PANEL

2ES-3(14FO+2RJ) 2ES-4(14FO+2RJ) 2ES-5(6FO+8RJ)

87T.2 87T.2 87T.2 87T.2 87T.2 87T.287T.1 87T.1 87T.1 87T.1 87T.1 87T.187L.1 87L.1 A20250/51N

7U

T61

7U

T61

7U

T61

7U

T61

7U

T61

7U

T61

7U

T61

P546

7SD

52

7U

T61

7U

T61

7SJ8

0

6M

D61

7U

T61

7U

T61

7U

T61

7U

T61

7U

T61

7U

T61

7SS523

7SS523

7SS523

7SS523

7SS523

7SS523

7SS523

7SS523

7SS523

7SS523

87BB2 87BB 87BB 87BB

7SS522MCU

220/33kV TRAFO-2

RELAY PANEL

220/33kV TRAFO-1

RELAY PANEL

220kV MANNAR LINE-1

& BUS PT RELAY PANEL

220kV MANNAR

LINE-2 RELAY PANEL

220/33kV TRAFO-3

RELAY PANEL

220kV BUS COUPLER

RELAY PANEL

220/33kV TRAFO-4

RELAY PANEL

220/33kV TRAFO-5

RELAY PANEL

220/33kV TRAFO-6

RELAY PANEL

220kV BUSBAR

RELAY PANEL AVR AVR AVR AVR AVR AVR

3ES-1(14FO+2RJ) 3ES-2(14FO+2RJ) 3ES-3(14FO+2RJ) 3ES-4(14FO+2RJ)

H01 H01 H01 H01 H01 H01 H01 H01 H01 H10 H11 H14 H15H13 H16H12

33kV INCOMING-A 33kV FEEDER-1 33kV FEEDER-2 33kV FEEDER-3 33kV BUS

RISER -A-B 33kV BUS

SECTION-A-B33kV INCOMING-B 33kV FEEDER-4 33kV FEEDER-5 33kV FEEDER-6 33kV BUS

RISER -B-C

33kV BUS

SECTION-B-C33kV FEEDER-7 33kVFEEDER-8 33kV FEEDER-9 33kV INCOMING-C

7SJ80 7SJ80 7SJ80 7SJ80 7SJ80 7SJ807SJ647 7SJ647 7SJ647 7SJ647 7SJ6477SJ645 7SJ645 7SJ645 7SJ645 7SJ645 7SJ645 7SJ645 7SJ645 7SJ645

21" DISPLAY FOR HMI-2 21" DISPLAY FOR EWS

87BB 87BB 87BB87BB87BB87BB87BB

LEGEND :-

LC-LC FO PATCH CABLE

LC-ST FO PATCH CABLE

CAT VI STP PATCH CABLE

RS232 COMMUNICATION CABLE

2 CORE RUGGEDISED LC-LC FO CABLE

ST-ST FO RUGGEDISED PATCH CABLE

RG-58 CO-AXIAL ANTENNA CABLE

SR.NO DESCRIPTION FO PORT(LC) RJ45 PORT

USED SPARE USED SPARE

1 SES-1 RSG2100 (6F0+12RJ45) 2 4 7 5

2 SES-2 RSG2100 (6F0+12RJ45) 2 4 7 5

3 2ES-1 RSG2100 (14F0+2RJ45) 6 8 - 2

4 2ES-2 RSG2100 (14F0+2RJ45) 7 7 - 2

5 2ES-3 RSG2100 (14F0+12RJ45) 10 4 - 2

6 2ES-4 RSG2100 (14F0+2RJ45) 12 2 - 2

7 2ES-5 RSG2100 (6F0+8RJ45) 3 3 6 2

8 3ES-1 RSG2100 (14F0+2RJ45) 7 7 -

9 3ES-2 RSG2100 (14F0+2RJ45) 7 7 -

10 3ES-3 RSG2100 (14F0+2RJ45) 7 7 -

11 3ES-4 RSG2100 (14F0+2RJ45) 7 7 -

2

2

2

2

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

CE

B T

r. D

esig

n B

ranch

Pro

pert

y o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARDTRANSMISSION DESIGN

Project Title Funding Agency Drawing Title DrawnDesigned

Checked

Approved

Signature Date

Tendering

Construction

Rele

ased

for

Funding Agency Drawing Title

A3

28.06.2019

Bhasura

Pooja

16.06.2020

NTS

TD/CE/1/184/D/07/03

AUTOMATION SYSTEM FOR NADUKUDA GSS

ARCHITECTURE FOR THE SUBSTATIONADBIMPROVEMENT INVESTMENT PROGRAM - (TRANCHE 2)

GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY

PACKAGE 8 - LOT A

Inform

ation

Cop

y-Not

for B

idding