     Anchor testing at the River Thames – England

    Testing of 340 ground anchors after 30 years of service

    ▲  Anchors at Tilbury Fort and Tilbury Power Station.

    The Environment Agency awarded

    VSL a contract to carry out testing of

    a large number of ground anchors

    following a competitive tender

    process. The anchors had been

    installed by VSL more than 30 years

    ago and the testing showed them to

    have lasted very well despite the

    The locations form part of a flood

    defence system, which was installed

    in the mid- to late-1970s and

    incorporates approximately 340 VSL

    ground anchors, many of which are

    submerged twice daily by the tide.

    Some have been under water since

    the 1970s. The testing programme is

    Scope of works performed

    • Testing and inspection of▲ Grease that formed around the head

    harsh tidal conditions.

    The testing works were sited at fourseparate locations along the left bank

    of the River Thames.

    spread over a four year period and

    includes testing and inspection worksin two phases.

    The year 1 phase 1 testing and

    inspection works were 100%

    successful across all four sites. Out

    of the 115 anchors tested during this

       I   D

       2   6   5   7

    • Phase 1 and 2 type testing

    • Suitability and acceptance

    • Re-loading and adjustment

    • Refurbishment

    • Re-monitoring works

    • Report and recommendations

    o anc or num er was v s e

    following removal of the

    top hat cover. Remarkably the grease

    was not adversely contaminated.

    phase, a total of 76 anchors needed

    to be re-adjusted to re-commission

    them back to the original designed

    lock-off loads. This enabled the

    areas of the flood wall to return to

    being fully effective in the event of

    a flood.

    www.vsl.com

  • 8/18/2019 VSL_____(2657)-1

    2/2

    The inspection works proved that the

    overall condition of the VSL anchors

    and components at the live ends was

    generally good. The corrosion

    present was mainly at the surface.

    This surface corrosion was removed

    CLIENT

    Environment Agency

    MAIN CONTRACTOR

    VSL Systems (UK) LTD

     

    protected with new ‘hot applied’

    grease, Denso Void Filler No 1,

    which is specifically designed as a

    dedicated corrosion-preventiongrease. The properties of the new

    grease will help to arrest and prevent

    the progression of future corrosion

    DATE

    2007-2010

    ▲ Prior to works commencing, ananchor shows heavy corrosion built

    ▼ The onset of high tide has fully submerged the anchors twicedaily for more than 30 years.

    There would be high costs

    associated with replacement of

    anchors. It is more cost-effective and

    .  

    the operational life span of the

    existing anchors now, rather than to

    delay refurbishment work.

    The VSL Ground Anchor System

    installed in the late 1970s has proved

    to be durable and dependable in the

    this time that not a single individual

    anchor has been adversely affected.

     

    site and has stood the test of time,

    despite a lack of maintenance.

    The client, the Environment Agency,

    is both impressed and delighted. Theresults are a tribute to the VSL

    Ground Anchor System and All of the 115 live-end anchors have

    been successfully inspected and fully

    ▼  A completely refurbished anchor with

    a new ‘top hat’ protective cover 

      ,

    and durability in withstanding such a

    corrosive environment over such a

    long period.

    ,