Copyright © 2006 VMware, Inc. All rights reserved.
VMware Virtual Infrastructure Solutions for Financial Services
2Copyright © 2006 VMware, Inc. All rights reserved.
Agenda
• Virtualized IT Strategy
• IT Challenges for Financial Services
• Solutions
• Customer Proof Points
• Benefits
• Next Steps
3Copyright © 2006 VMware, Inc. All rights reserved.
IT—Core to an Organization’s Success
IT Scorecard
Responsiveness Availability Security Compliance Provisioning
Flexibility Disaster Recovery Desktop Management Utilization Cost
Virtual infrastructure allows you to dynamically map your IT assets
to your organization’s needs
4Copyright © 2006 VMware, Inc. All rights reserved.
Datacenter Flexibility—Make IT Assets Work for you
Partitioning
Isolation
Hardware Independence
Centralized Management
Encapsulation Flexibility Disaster Recovery Desktop Management Utilization Cost
IT Scorecard
Responsiveness Availability Security Compliance Provisioning
5Copyright © 2006 VMware, Inc. All rights reserved.
IT Challenges for Financial Services
Technologies to support new business strategy
Successful execution requires:
• Speed• Flexibility• Efficiency
Standards across the desktop – unmanaged endpoints create risk
• Virus control • Business transition• Outsourcing
Agility with Performance
Risk Management and Compliance
Resource Optimization
Your systems will not go down, BUT…
at what cost?
Increasing demand and capacity
• Systems refresh• Server sprawl• High availability
6Copyright © 2006 VMware, Inc. All rights reserved.
• Time-to-market: fast delivery of IT services to match business strategy
• Performance for customer service
• 100% uptime with cost control
• Managing multiple data centers across wide geographic area
Agility with Performance Flexibility to rapidly execute to business strategy
• Provision new servers in a fraction of the time to more quickly and cost-effectively match needs of business units
• Provision, migrate and maintain servers across geographic areas, from main datacenter
• Automatically load balance between pools of virtual machines for high performance 24 x 365
• Move virtual machines, while running, to other server for maintenance with no downtime
• Centrally manage, monitor and control entire virtual infrastructure
Challenges Use Cases/Solutions
7Copyright © 2006 VMware, Inc. All rights reserved.
Empower Staff to Do More with Less
Provision virtual machines as servers or desktops
Secure access
Migrate with zero downtime
Monitor system performance and utilization
Manage resources from central datacenter with remote capabilities
Centralize management of virtual machines for a standardize computing environment and efficient resource utilization
VirtualCenter
8Copyright © 2006 VMware, Inc. All rights reserved.
Breakthrough Levels of Availability
800 days of continuous uptime and counting
9Copyright © 2006 VMware, Inc. All rights reserved.
Flexibility and Performance Cuts Costs and Drives Revenue
The ChallengeAn important loan-processing initiative, which would increase performance by a factor of 4, was costly, requiring over a year to realize return, and, therefore, faced business challenges.
The VMware SolutionUsed ESX Server to deploy equivalent of 100 physical servers as virtual machines hosted on 12 physical servers, realizing return in three months. Virtualized applications included Citrix, SAP, Siebel and customer client-server applications.
• Delivered ROI in three months
• Rollout across 3 datacenters
• Supported 1,400 users on virtual machines
• Reduced time spent on server provisioning, backups and recovery by a factor of 10
• Improved responsiveness of applications driving more revenue
“We found the flexibility offered by VMware server software in building servers to be highly valuable. We found the stability of Citrix on VMware software to be excellent.”
Rod Lucero Chief Architect
Conseco Finance
10Copyright © 2006 VMware, Inc. All rights reserved.
• Secure access for remote or outsource groups
• Continuing operations in event of pandemic
• Virus proliferation from uncontrolled desktop
• Compliance to desktop standards
• Managing change
Risk Management and Compliance Better manage endpoints to reduce IT supported risk
Use Cases/Solutions
• Provide a virtual desktop on a PC (ACE) or via a thin client (VDI) to better secure data, ease management, contain virus attacks and improve compliance to standards
• Virtual desktops (networked via thin client) can be rapidly deployed without physical contact and hardware transfer
• Extend life of proprietary application by virtualizing it and upgrade after risk is mitigated
• Manage remote or branch offices from central location: deploy, migrate, monitor, backup and maintain
• Isolated virtual machines (desktop and server) eliminate virus proliferation
Challenges
11Copyright © 2006 VMware, Inc. All rights reserved.
Multiple Levels of Endpoint Management
Isolation
• Isolation of independent virtual machines allows for various levels of control
• Protect other systems from attack• Control network access to and from the
virtual machine
Data Encryption
• Each virtual machine is encrypted and password protected
• Requires no action on part of end-user for compliance
• Additional layer for hack protection
Central Management
• User can not install additional applications on virtual machine
• Determine network access, if any• Quickly deploy images on any x86 PC• Maintain compliance with latest software
and security patches
Data Control
• Prohibit printing • Copy protect• Maintain all sensitive information in
datacenter—no information located on hardware (on-line deployment)
• Expire access to virtual machine
12Copyright © 2006 VMware, Inc. All rights reserved.
Rapid Desktop Deployment at Lower Costs
The ChallengePrudential UK needed to provide 850 employees at its new Mumbai center with the complete Prudential desktop comprised of more than 100 applications needed to service customers
The VMware SolutionESX Server enabled Prudential UK to run its standard desktop remotely without rewriting any of its applications
• Implemented in less than six months
• Substantial cost savings
• All IT management is done at headquarters in Reading
• Allowed company to extend remote access to third parties and home workers
• Server best practices have allowed greater business agility
“Without a means to host our existing standard desktop in the UK, we would not have been able to provide remote access to our Mumbai employees in such a short space of time, and VMware server virtualization proved to be the most flexible and cost effective approach.”
Andy RubyManager of Infrastructure Design
Prudential UK
13Copyright © 2006 VMware, Inc. All rights reserved.
• Costly infrastructure refresh
• Low server utilization
• Managing mix of application computing platforms
• High cost to 24 x 365 service
• Disaster recovery
Resource OptimizationBring cost control to high IT service levels
Use Cases/Solutions
• Consolidate servers to reduce hardware and operational costs, such as space and power
• Increase server utilization and automatically load balance
• Standardize on virtual infrastructure and utilize O/S and hardware that maximizes performance
• Virtualize legacy and proprietary applications to run on newer machines
• Maintain duplicate IT datacenter for disaster recovery (DR) at a fraction of the cost
• A virtual infrastructure enables consolidated backup and complete DR testing without disruption to service
Challenges
14Copyright © 2006 VMware, Inc. All rights reserved.
Prime Time
Peak
20%
40%
60%
80%
0%
100%
20% 40% 60% 80%
% of Servers
CPU Utilization
Server Utilization Profile
Source: Capacity Planner customer analysis
Paying for Unused Computing Power
100%
“… organizations with more than
200 servers will waste between
$500,000 and $720,000 annually
supporting underutilized
application/server combinations.”
Gartner Research
15Copyright © 2006 VMware, Inc. All rights reserved.
65% TCO Reduction with Virtualization
TCO Components Without With
Hardware and Software Costs
Number of Physical Servers Required
Total Hardware Costs
VMware Software, Support & Services
Total Hardware and Software Costs
IT Operations
Affected Datacenter Costs: (Network & other costs)
Total Server Deployment: (hrs) x $75/hr
Server Support
Total Affected IT operations Costs
Total Affected Costs
92
$690,000
$0
$690,000
$169,533
(552 hrs) = $41,400
$221,697
$432,630
$1,122,630
6
$201,999
$56,006
$258,005
$14,721
(368 hrs) = $27,600
87,650
$129,971
$387,976
Virtualization Comparison
Savings of over $700K and 189% ROI in first 6 months
16Copyright © 2006 VMware, Inc. All rights reserved.
Proven Results with VMware Virtualization
VMware customers have experienced:
ROI in 6-9 months
35%-75% TCO savings
10-15 : 1 consolidation ratios
60%-80% utilization
Provisioning time cut from hours to minutes
Zero downtime
Confidence IT is at it’s best
Financial Services
17Copyright © 2006 VMware, Inc. All rights reserved.
Conclusion
Reduce TCO of server infrastructure• Cut hardware costs by 50%
• Decrease operational costs by 70+%
• Slash overall deployment costs by 60+%
Deploy and test disaster recovery systems
Ensure ZERO downtime
Secure data at endpoints
Manage computing resources strategically
17
Do More With Less
18Copyright © 2006 VMware, Inc. All rights reserved.
Next Steps
• Prove value• Capacity Planner
• Pilot
• Proof of Concept
• Jumpstart
• Assess• What do I have?
• How am I using it?
• How much does it cost?
• Make the business case
Getting Started
Copyright © 2006 VMware, Inc. All rights reserved.
VMware Virtual Infrastructure Solutions for Financial Services
Case Studies
20Copyright © 2006 VMware, Inc. All rights reserved.
Prudential Solution
• Desktop environment and data reside in existing UK datacenter
• Running full Windows XP Pro desktop environments on ESX Server
• Remote access to desktops via RDP over WAN
Reading, UK OfficeMumbai, India Center
ESX Server
Database &File Servers
SAN
21Copyright © 2006 VMware, Inc. All rights reserved.
Virtual Standard Applied to New Data Center
The ChallengeRetire 2,000 Intel Servers in six months
The VMware SolutionESX Server to consolidate applications regardless of OS or compatibility, saving rack space and resources in newly built Pheonix data center
• Fewer physical machines to manage
• Provisioning new instances of applications and services instantly and remotely
• Delivering capacity on demand by cloning and instantly deploying machines
• ROI within 6 months
22Copyright © 2006 VMware, Inc. All rights reserved.
Secure Desktop Environments
The ChallengeBuilding solutions to streamline processes at financial institutions, Baker Hill needed a secure way to collect and work with sensitive client data, including private financial databases
The VMware SolutionDeploying VMware ACE for professional services agents, Baker Hill is able to protect client and company data while building its award-winning solutions.
• Professional services agents are able to work with private client information in virtual machines to do their jobs
• Data is encrypted to prevent theft
• Policies protect company and client data from being moved into or out of virtual machines
“We work with private financial information, so we need a way to protect client data. With VMware ACE, Baker Hill can provide employees with the tools they need to create powerful solutions for customers, while protecting valuable client data.”
Eric BeasleySenior Network Administrator
Baker Hill
23Copyright © 2006 VMware, Inc. All rights reserved.
Test, Development and Production
The ChallengeProviding solutions for financial institutions, Baker Hill needed a large amount of hardware for test, development and production.
The VMware SolutionBaker Hill uses the entire suite of VMware products to increase flexibility and productivity for QA and development, and to provide a stable, reliable production environment.
• 15 virtual machines per CPU in QA; 7-8 virtual machines per CPU in production
• Reduced response time for new servers from 2-3 weeks to 2 days or less
• Increased productivity; developers work from their desks instead of walking to and from a lab
• Can emulate complex production environments
“By standardizing on VMware virtualization products across the entire software lifecycle, all the way from development to production, we are able to increase productivity, build higher quality software and decrease our time to market."
Eric Beasley Senior Network Administrator
Baker Hill
24Copyright © 2006 VMware, Inc. All rights reserved.
Cost Savings with High Performance Continuity
The ChallengeDuring an IT restructuring, Commerzbank realized its traditional physical infrastructure was inadequate in terms of flexibility, as well as continually more expensive to maintain.
The VMware SolutionVMware Server enabled Commerzbank to shrink its machine pool to 24 servers running the workload of 60 servers and 120 clients.
• Achieved a 10:1 server consolidation ratio
• Created a standard platform for the bank
• Immense time savings due to automatic setup of guest operating systems
• Reduced downtime and costs of replacing or retrofitting hardware
“By virtualizing the test and development environments, we were able to achieve considerable hardware savings without users experiencing any loss of performance.”
Dr. Reinhard Leuchs VCP
Commerzbank
25Copyright © 2006 VMware, Inc. All rights reserved.
Doing More in Less Time
The ChallengeDesert Schools Federal Credit Union needed an IT infrastructure that could accommodate an increasing demand for new applications and increase productivity.
The VMware SolutionVMware ESX Server, Workstation, VirtualCenter, and VMotion not only saved Desert Schools Federal Credit Union $50,000 in hardware costs, but also increased IT responsiveness and application availability.
• Achieved 6:1 server consolidation rate
• Saved $50,000 in hardware costs, plus additional savings for maintenance, heating, cooling, and physical space
• Reduced server deployment time
• Improved application availability with VMotion
“We are able to do much more in less time. Before, we would be waiting two weeks to get a server. With a virtual infrastructure, we can do it now.”
Doug Baer Systems Engineer
Desert Schools Federal Credit Union
26Copyright © 2006 VMware, Inc. All rights reserved.
Legacy Migration Avoided $40M in Capital Spend
The ChallengeSafely deploy proprietary DOS-based applications across 500+ systems at more than 200 acquired branches
The VMware SolutionUsed VMware Workstation to create stable, uniform platform formanaging OS and application updates
• Completed complex legacy migration project on more than 500 machines in 18 months
• Avoided $40 million capital spend by deploying proprietary application on existing hardware
• Enabled smooth transition of systems in merger and acquisition environment
“There’s no doubt that this is one of the best ways to continue using legacy PC-based software within new Windows operating systems.”
Mark JohnsonSenior Systems Analyst
Fleet Bank
27Copyright © 2006 VMware, Inc. All rights reserved.
Disaster Recovery, Light-years Ahead
The ChallengeJersey Financial Services Commission had identified shortcomings in its disaster-recovery methods and needed to find a new solution that could provide 24x7x360 availability.
The VMware SolutionVMware ESX Server put the company’s business-continuity solution light-years ahead of the traditional disaster-recovery methods and enabled the complete replication of its production environment on a single machine.
• Achieved 12:1 server consolidation ratio
• Enabled robust, cost-effective disaster recovery that offers real-time data replication
• Increased scalability without increased hardware
• Improved testing before patch and application deployment
“Since we began using VMware technology, we’ve been looking to expand our usage of it. The ability to boost high-specification server use from 1 to more than 25 percent represents a strong business case for virtual infrastructure. Our choice of VMware has been validated time and again.”
Shaun RobertsDeputy Director, Head of ICT
Jersey Financial Services
28Copyright © 2006 VMware, Inc. All rights reserved.
Assessment Key to Achieving Maximum Results
The ChallengeEvery new application that came in The Mechanics Bank required its own $6000 server. The bank needed a way to streamline its IT environment and create an effective disaster-recovery system while cutting costs.
The VMware SolutionVMware Virtual Infrastructure Methodology, Virtualization Assessment, ESX Server, VirtualCenter, and VMotion enabled The Mechanics Bank to contain costs by repurposing hardware and streamlining testing and development.
• Identified hardware that could be repurposed after migration to virtual infrastructure
• Established clear metrics for project success
• Demonstrated business and technical benefits of virtual infrastructure
• Enabled building of test and development environment without need for 100 new servers
“The virtualization assessment helped us identify how to achieve maximum results. The consultants’ expertise provided a full-blown assessment we couldn’t have done alone. It was like a health check; it showed us where we are, where we want to be, and how to get there.”
Richard LewisVP of IT
The Mechanics Bank
29Copyright © 2006 VMware, Inc. All rights reserved.
Risk Management in Transition
The ChallengeReplace 27,000 NT and W2K trader Workstations with XP-based systems
The VMware SolutionWindows NT apps running in VMware Workstation
• Saved millions of dollars when reduced costs by 40-50%
• Migration planning, testing and deployment on Windows XP
• Manage risk in transition phase
• Cost savings and reduction in deployment time for 28,000 Workstations
“VMware enables us to solve a variety of challenging IT issues in a quick, cost-effective manner…We’re using VMware Workstation to manage risk in transition – it’s running on each financial adviser’s desktop.”
John McKinleyChief Technology Officer
Merrill Lynch