EP3 Model - Management Principle for OPERATIONAL EXCELLENCE
-
Upload
thanik-nithiphanthawong -
Category
Business
-
view
79 -
download
3
Transcript of EP3 Model - Management Principle for OPERATIONAL EXCELLENCE
Engineering Planning Purchasing Production
Management Principle for Operational Excellence
Engineering Planning Purchasing Production
The due date for each function is determined by delivery date, total tasks and processing times.
Management Principle for Operational Excellence
Due Date
Engr
Due Date
Plan
Due Date
Purc
Due Date
Prod
Delivery Date XX/XX/XX
Engineering Planning Purchasing Production
Resources are allocated according to the due dates. Functions with low capacity will slow down the
line and eventually become “bottleneck”.
LOW
MEDIUM
HIGH
CAPACITY LEVEL
LOW
MEDIUM
HIGH
CAPACITY LEVEL
LOW
MEDIUM
HIGH
CAPACITY LEVEL
LOW
MEDIUM
HIGH
CAPACITY LEVEL
Management Principle for Operational Excellence
Engineering Planning Purchasing Production
Engineering shall continue to support other functions even when the design is already done
because issues may arise later.
Sample Issue: Parts don’t fit
together
Sample Issue: Clarification of Material and
Quantity Needed
Released Data: Drawings
Documents
Sample Issue: Material is no
longer available
Management Principle for Operational Excellence
Engineering Planning Purchasing Production
• Required resources are set in order for all the functions to satisfy their due dates and ultimately meet the delivery date by balancing the line.
• Resources may be reduced along with processing times for an increase in profit.
• Insufficient resources will impact both on time delivery and quality of products.
Management Principle for Operational Excellence