    Energia hdricaHydropower ...................................8

    Energia elica

    Wind power ..................................12

    Bioenergia

    Bio energy ....................................24

    Energia solar

    Solar power ..................................38

    Energia geotrmica

    Geothermal energy ......................46

    Energia das ondasWave power .................................50

  • 8/2/2019 Energias Renov PT 2007

    4/60

    4

    We are currently at a turning point given the need to respond

    to the challenge of climate change and the need to reduce the

    dependence on fossil fuels.

    However this challenge creates many opportunities: more in-

    vestigation and technological development, more innovative

    investment and more jobs.

    We may well be at the edge of a new technological revolutionwith an equivalent importance to what occurred in Informa-

    tion and Communication Technologies.

    There are many variables in the equation. The creation of inte-

    grated, transparent and competitive markets. A new philoso-

    phy for grid management. Achieving an efficient response to

    energy storage. The commitment to renewable energies.

    Portugal has, over the last two years, approved a comprehen-

    sive series of measures to promote renewable energies. En-ergy policy development derives from the governments polit-

    ical will, expressed in Resolution 169/2005 of October 2005.

    The National Energy Strategy established various objectives,

    namely the creation of a stable, transparent organisational

    framework for the sector, permitting an unprecedented ex-

    pansion of investment in renewable energies. The strategy

    implementation is transforming Portugal in a benchmark operatorin terms of wind power development.

    Vivemos um momento de mudana devido necessidade de res-

    ponder ao desafio criado pelas alteraes climticas e pela neces-

    sidade de reduzir a dependncia de combustveis fsseis.

    Mas este desafio cria muitas oportunidades: mais investigao e

    desenvolvimento tecnolgico, mais investimento inovador e mais

    empregos.

    Poderemos estar beira de uma revoluo tecnolgica com umaimportncia semelhante ocorrida nas Tecnologias da Informa-

    o e da Comunicao.

    H muitos aspectos em equao. A criao de mercados integra-

    dos, transparentes e concorrenciais. Uma nova filosofia da gesto

    de redes. Capacidade em criar uma resposta eficiente ao proble-

    ma do armazenamento. A aposta nas energias renovveis.

    Portugal aprovou nos ltimos dois anos um conjunto ambicioso de

    medidas para promoo das energias renovveis. O desenvolvi-mento da poltica energtica traduz a viso do Governo, expressa

    na Resoluo de Conselho de Ministros de Outubro de 2005.

    A Estratgia Nacional para a Energia, estabeleceu vrios objecti-

    vos, nomeadamente a criao de um quadro organizativo estvel

    e transparente para o sector, e permitiu uma expanso sem pre-

    cedentes do investimento em Energias Renovveis. O desenvol-

    vimento desta estratgia est a tornar Portugal numa refernciaa nvel da energia elica. Tal sucede no momento em que Por-

  • 8/2/2019 Energias Renov PT 2007

    5/60

    5

    Manuel PinhoMinistro da Economia e da InovaoMinister of Economy and Inovation

    This development happens in the moment when Portugal is

    assuming the Presidency of the European Union and when

    energy is one of the priorities in the European agenda. We will

    not miss the opportunity to impact such an important issue.

    Commitment to renewable energies, as a relevant means of lim-

    iting the economys carbon intensity and as a significant contri-

    bution to the diversification and sustainability of the energy sec-tor, is particularly based on the development of hydro and wind

    power, biomass, promotion of biofuels and solar power.

    Pursuant to the framework of Directive 2001/77/CE of 27 Sep-

    tember 2001, on the promotion of electricity generated from

    renewable energy sources, Portugal undertook to achieve a

    target of 39% by 2010. At the end of March 2007, Portugal

    had 7092 MW of installed capacity for electricity generation

    from renewable energy sources.Electricity generation from renewable energy sources is par-

    ticularly concentrated in northern Portugal, in the districts of

    Bragana, Viana do Castelo, Viseu, Coimbra, Vila Real and

    Braga. Excluding major hydroelectric projects, the principal

    districts in terms of installed rated power are: Viseu, Coim-

    bra, Lisbon, Vila Real, Castelo Branco, Santarm, Braga and

    Guarda, whose installed rated power accounted for 74% oftotal renewable energy in March 2007.

    tugal assume a Presidncia do Conselho da UE e em que a

    questo da energia uma das prioridades da agenda europeia.

    No vamos falhar a oportunidade de deixar uma marca nesta

    questo to importante para a Europa.

    A aposta nas Energias Renovveis visa limitar a intensidade car-

    bnica da economia e contribuir para a diversificao e sustenta-

    bilidade do sector energtico. Assenta, em especial, no desenvol-vimento das energias hdrica e elica, na biomassa, no incentivo

    aos biocombustveis e na energia solar.

    No quadro da Directiva 2001/77/CE, de 27 de Setembro de 2001,

    relativa promoo de electricidade produzida a partir de fontes

    de energias renovveis (FER), Portugal assumiu o compromisso

    de, at 2010, atingir uma meta de 39 por cento. No final de Maro

    de 2007, Portugal tinha 7092 MW de capacidade instalada para

    produo de energia elctrica a partir de fontes de energia reno-vveis. A produo de energia elctrica de origem renovvel est

    concentrada no Norte do pas, principalmente nos distritos de

    Bragana, Viana do Castelo, Viseu, Coimbra, Vila Real e Braga.

    Excluindo a grande hdrica, os principais distritos em termos de

    potncia instalada so Viseu, Coimbra, Lisboa, Vila Real, Castelo

    Branco, Santarm, Braga e Guarda, correspondendo a potncia

    instalada destes oito distritos, em Maro de 2007, a 74 por centodo total renovvel. Em 2005, Portugal, foi o pas da Unio Europeia

  • 8/2/2019 Energias Renov PT 2007

    6/60

    6

    Portugal was the European Union country with the highest

    growth in wind power generating capacity in 2005. A total of

    36 new wind farms came into service in 2006, comprising a

    60% growth in installed rated power.

    Given the strategic importance of the commitment to renew-

    able energies, the government, in 2007, defined new commit-

    ments for 2010:

    45% of all electricity consumption to be from renewable

    energy sources;

    biofuels used in the transport sector to account for 10%of road fuel consumption;

    5 - 10% of coal used in power stations to be replaced by

    biomass or wastes.

    New objectives for various renewable energy sources were,

    accordingly, defined:

    Wind Power: To increase installed capacity by 1950 MW,by the year 2012, to total 5100 MW (600 MW of which

    comprising equipment upgrades) and investment in a

    technological cluster associated with wind power;

    Hydropower: Reinforcement of the rated power of current

    hydroelectric infrastructures, to achieve 5575 MW of installed

    capacity in 2010 (575 MW more than previously forecast) and

    achieving a 70% rate of exploitation of national hydroelectric

    generating capacity potential in the medium term; Biomass: Attribution of a further 100 MW, totalling 250

    MW in electricity generating capacity by 2010, promoting

    linkage with forestry resources and fire-fighting policy;

    Solar: Construction of the biggest worldwide photovoltaic

    power station in Moura and association with micro-

    generation and solar hot water policies and goals;

    que mais cresceu na capacidade de produo de energia elica,

    e em 2006 entraram em funcionamento 36 novos parques eli-

    cos, o que significou um crescimento de 60 por cento da potncia

    instalada. Dada a importncia estratgica da aposta nas energias

    renovveis, o Governo definiu, em 2007, compromissos mais am-

    biciosos para 2010:

    45 por cento de toda a electricidade consumida ser de

    base renovvel;

    os biocombustveis utilizados nos transportes devero

    atingir 10% do consumo dos combustveis rodovirios; cinco a dez por cento do carvo utilizado nas centrais

    elctricas ser substitudo por biomassa ou resduos.

    Neste sentido, foram estabelecidos novos objectivos para as v-

    rias fontes de energia renovvel:

    Energia Elica: Aumentar em 1950 MW a capacidade instala-

    da, at 2012, perfazendo um total de 5100 MW (em que 600MW sero por upgrade do equipamento), e investimento

    num cluster tecnolgico associado energia elica;

    Energia hdrica: Reforo de potncia em infra-estruturas hi-

    droelctricas existentes, de forma a atingir 5575 MW de ca-

    pacidade instalada em 2010 (mais 575 MW que o previsto an-

    teriormente) e atingir a prazo 70 por cento do aproveitamento

    do potencial hdrico nacional;

    Biomassa: Atribuio de mais 100 MW de capacidade paraproduo elctrica at 2010, para um total de 250 MW, pro-

    movendo uma articulao com o recurso florestal e com a

    poltica de combate ao risco de incndios;

    Solar: Construo da maior central fotovoltaica do mundo

    central de Moura e ligao com as polticas e metas de

    microgerao e gua quente solar;

    6

  • 8/2/2019 Energias Renov PT 2007

    7/60

    7

    Wave Power: Creation of a pilot zone with a total potential

    operating capacity of up to 250 MW for the technological

    development of new prototypes at their industrial and pre-

    commercial stages;

    Biofuels: To achieve a target of 10% of biofuels to be in-

    corporated in road fuels by 2010 (bringing the European

    Unions objective forward by 10 years) and promoting na-

    tional agricultural strands for biofuels;

    Biogas: A target of 100 MW of installed rated power in

    units for anaerobic waste processing; Microgeneration: To promote the installation of 50 000

    systems, by 2010, encouraging the installation of solar hot

    water in buildings.

    Renewable energies are a driving force behind economic,

    social and technological development and lie at the founda-

    tion of the promotion of important investments, job creationand regional development. Reference should be made to

    the development of technological and research clusters; the

    promotion of national agricultural strands, creation of water

    impounding infrastructures and flood control; policies coor-

    dination to reduce the risk of fires; increasing the useful life

    of landfills.

    To provide better information on national policy guidelines for

    the renewables sector, aimed at providing information on theprincipal policies and measures in the renewable area, we

    considered that it would be useful to publish a compilation of

    some of the most emblematic projects already implemented

    or in progress, contributing to the development of electricity

    generation from renewable energy sources, in Portugal.

    Ondas: Criao de uma zona piloto com potencial de explo-

    rao total at 250 MW para desenvolvimento tecnolgico de

    novos prottipos em fase industrial e pr-comercial;

    Biocombustveis: Atingir em 2010 a meta de 10 por cento de

    biocombustveis a incorporar nos combustveis (antecipando

    em dez anos o objectivo da Unio Europeia) e promover filei-

    ras agrcolas nacionais para biocombustveis;

    Biogs: Meta de 100 MW de potncia instalada em unidades

    de tratamento anaerbico de resduos;

    Microgerao: Promover a instalao de 50 000 sistemas at2010, com incentivo instalao de gua quente solar nos

    edifcios.

    As energias renovveis constituem um motor de desenvolvi-

    mento econmico, social e tecnolgico. Esto na base da pro-

    moo de importantes investimentos, da criao de emprego

    e de desenvolvimento regional, sendo de realar o desenvol-vimento de clusters tecnolgicos e de investigao; a promo-

    o de fileiras agrcolas nacionais; a criao de infra-estruturas

    para reservas de gua e controlo de cheias; a introduo de

    polticas concertadas para a reduo de risco de incndios; o

    aumento da vida til dos aterros.

    Para melhor ilustrar as linhas estratgicas da poltica nacional

    para o sector das renovveis e com o objectivo de promover

    a divulgao das principais polticas e medidas na rea, con-siderou-se til reunir nesta edio um conjunto de projectos,

    eventualmente os mais emblemticos, uns j realizados e ou-

    tros a realizar, que iro contribuir para o desenvolvimento da

    produo de energia elctrica a partir de fontes de energia re-

    novveis no nosso pas.

    7

  • 8/2/2019 Energias Renov PT 2007

    8/60

    8

    Portugal is one of the European Union countries with the

    highest exploitable hydropower potential. It is also one of the

    countries with the lowest hydro capacity growth over the last

    30 years, still having around 54% of exploitable potential.

    Hydropower is clearly a priority and one of national energy

    policys principal commitments, with the objective of exceeding

    an installed rated power of 7000 MW by 2020.

    To achieve this objective and close the gap with such bench-

    mark operators as Austria and Sweden, a framework of objec-

    tives providing for the following measures, was established:

    by 2010, preparation of a National Strategic Plan for invest-

    ments in hydro projects, committed to optimising the poten-

    tial of currently existing infrastructures, exceeding 5000 MW

    of installed rated power by doubling the Alqueva dams

    generating capacity im Guadiana river and bringing forward

    rated power increases in Picote and Bemposta in Douro river;

    by 2015, to achieve 6250 MW in hydro capacity, comprisingnew structuring projects for the sector and country, with a

    strong commitment to hydroelectric reversible infrastruc-

    tures with pumping capacity, to complement wind power

    resources;

    by 2020, to finalise the implementation of the National

    Strategic Plan and achieve 7000 MW of installed capacity,

    achieving the objective of exploiting around 70% of na-tional hydro potential.

    Portugal um dos pases da Unio Europeia com maior poten-

    cial hdrico por explorar. tambm um dos pases que menos

    cresceu em capacidade hdrica nos ltimos 30 anos, tendo

    hoje ainda cerca de 54 por cento do potencial por aproveitar.

    A energia hdrica claramente uma prioridade e uma das prin-

    cipais apostas da poltica energtica nacional, com o objecti-

    vo de superar os 7000 MW de potncia instalada em 2020.

    Para isso, tendo em vista uma aproximao a pases de refe-

    rncia como a ustria e a Sucia, foi estabelecido um quadro

    de objectivos que prev as seguintes medidas:

    at 2010, elaborar um Plano Estratgico Nacional para

    investimentos em aproveitamentos hdricos e apostar na

    optimizao do potencial das infra-estruturas j existen-

    tes, superar os 5000 MW de potncia instalada atravs da

    duplicao do Alqueva e da antecipao dos reforos de

    potncia de Picote e Bemposta;

    at 2015, atingir 6250 MW de capacidade hdrica, con-cretizando novos projectos estruturantes para o sector

    e para o pas, com uma aposta forte em infra-estruturas

    hidroelctricas com bombagem, para assegurar a com-

    plementaridade com os recursos elicos;

    at 2020, concluir a implementao do Plano Estratgico

    Nacional e alcanar os 7000 MW de capacidade instalada,

    atingindo o objectivo de explorao de cerca de 70 porcento do potencial hdrico nacional.

    ENERGIA HDRICAHYDROPOWER

  • 8/2/2019 Energias Renov PT 2007

    9/60

    9

    EMPREENDIMENTO HIDROELCTRICODE VENDA NOVA II CENTRAL DE FRADES

    A Central Hidroelctrica da EDP Energias de Portugal, de-

    signada por Empreendimento de Venda Nova II, situa-se na

    regio noroeste do territrio continental portugus, no conce-

    lho de Vieira do Minho, distrito de Braga, e parte integrante

    do Centro de Produo do Cvado-Lima.

    Esta Central permite um maior aproveitamento, em bomba-

    gem, dos exceden-

    tes de produo de

    energia elctrica dascentrais trmicas e

    elicas em horas de

    baixo consumo e a

    disponibilizao, por

    turbinamento, de

    mais energia e po-

    tncia nas horas emque os consumos au-

    mentam.

    A concepo deste

    projecto atendeu s

    condies locais e

    evoluo do diagra-

    ma de consumos e

    do sistema electro-

    VENDA NOVA II (FRADES)HYDROELECTRIC POWER STATION

    The EDP Energias de Portugal hydroelectric power station

    known as Venda Nova II, in the northeast region of mainland

    Portugal, in the municipal district of Vieira do Minho, district

    of Braga is a part of the Cvado-Lima generating system.

    This power station efficiently uses the surplus electricity from

    the thermal and wind power stations by pumping at off-peak

    times and produces

    more energy and

    rated power at peaktimes using its turbo-

    generators.

    This project was de-

    signed on the basis

    of local conditions

    and the evolution

    of the consumptionchart and national

    electricity generating

    system, leading to

    the adopting of a

    reversible scherme

    permitting either to

    turbine water from

    the Venda Nova to

    Localizao da Central de FradesLocation of Frades Power Station

  • 8/2/2019 Energias Renov PT 2007

    10/60

    10

    produtor nacionais,

    as quais levaram

    adopo de um

    esquema revers-

    vel que permite

    turbinar a gua da

    albufeira de Venda

    Nova para a albu-

    feira de Salamonde

    e, alternadamente,a sua bombagem

    no sentido inverso.

    A Central, locali-

    zada em posio

    intermdia do tra-

    ado do circuito

    hidrulico e a uma

    profundidade de

    cerca de 350 me-

    tros, constitu-

    da por duas cavernas ligadas entre si por duas galerias. Na

    caverna principal encontram-se dois grupos de geradores

    reversveis iguais, de eixo vertical, constitudos por turbinas-

    -bombas do tipo Francis e respectivos alternadores-motores.

    the Salamonde reser-

    voir or reverse pumping

    operation.

    The power station, lo-

    cated halfway along

    the hydraulic circuit

    and at a depth of

    around 350 metres,

    comprises two caverns

    interconnected by twogalleries. The principal

    cavern houses two re-

    versible vertical gene-

    rating units, compri-

    sing Francis turbines-

    -pumps and respective

    alternators-motors.Interior da central

    Interior of power station

  • 8/2/2019 Energias Renov PT 2007

    11/60

    11

    Caractersticas da central

    Potncia instalada 192 MW

    Produo elctrica 220 GWh/ano

    Entrada em funcionamento Agosto 2005

    Characteristics of power station

    Installed rated power 192 MW

    Electricity generation 220 GWh per year

    Operation start-up August 2005

    Vista exterior da centralOutside view of power station

    The adjacent cavern houses the two three phase transformers.

    The principal access to the power station zone comprises a

    tunnel with an 8 metre high transversal section, a total length

    of around 1.5 kilometres and an incline of 11%.

    The hydraulic circuit, in tunnel format, is around 4.5 kilometres

    long with a diameter of 6.3 metres, inside the granite massif

    of the left hand bank of the River Rabago, between the Venda

    Nova and Salamonde reservoirs, permitting the exploitation

    of the hydraulic circuits

    and infrastructures alreadycreated by the works car-

    ried out on the former Vila

    Nova / Venda Nova.

    Na caverna anexa ficam instalados os dois transformadores

    do grupo trifsicos. O acesso principal zona da central

    realizado atravs de um tnel com uma seco transversal de

    8 metros de altura, uma extenso total de cerca de 1,5 km e

    uma inclinao de 11 por cento.

    O circuito hidrulico, em tnel, tem cerca de 4,5 km de ex-

    tenso e 6,3 metros de dimetro, desenvolve-se no interior

    do macio grantico da margem esquerda do rio Rabago,

    entre as albufeiras de

    Venda Nova e Sala-monde, permitindo o

    aproveitamento das

    condies hidrulicas

    e de infra-estruturas

    j criadas pelas obras

    do antigo Aproveita-

    mento Hidroelctrico

    de Vila Nova / Venda

    Nova.

  • 8/2/2019 Energias Renov PT 2007

    12/60

    12

    ENERGIA ELICAWIND POWER

  • 8/2/2019 Energias Renov PT 2007

    13/60

    13

    Em Portugal, devido sua situao geogrfica e geomorfolo-

    gia, apenas nas montanhas a velocidade e a regularidade dovento susceptvel de aproveitamento energtico.

    A maior parte dos locais com essas caractersticas situa-se

    a norte do rio Tejo e, a sul, junto Costa Vicentina e Ponta

    de Sagres. Presentemente est em curso o levantamento do

    potencial de energia elica offshore ao longo da costa portu-

    guesa.

    A base de dados do potencial elico do vento em Portugal

    EOLOS2.0 apresenta as caractersticas fsicas e energti-

    cas do escoamento atmosfrico num conjunto de 57 locais.

    Em Portugal Continental, foi desenvolvida pelo INETI-DER. O

    software VENTOS utilizado para simulao computacional

    do comportamento do escoamento do vento sobre solos

    complexos com ou sem arborizao foi desenvolvido pela

    FEUP, em colaborao com o Instituto de Engenharia Mec-

    nica e Gesto Industrial, o INESC (Porto) e o Research Centrefor Wind Energy and Atmospheric Flows (RCWEAF). Ambas

    so ferramentas importantes para a avaliao do potencial

    energtico da energia do vento em Portugal.

    Com o objectivo de intensificar e diversificar o aproveitamento

    das FER para a produo de electricidade, com especial enfo-

    que na energia elica, em 2005, Portugal reviu os objectivos

    estabelecidos em 2003 e decidiu aumentar em 1950 MW ameta da capacidade instalada, para 5100 MW, em 2012 (com

    Owing to Portugals geographical and geomorphologic loca-

    tion, it is only in the mountains that the speed and regularityof the wind enables it to be exploited for energy purposes.

    Most of the locations with the above characteristics are to

    be found north of the River Tagus (Tejo) and south along the

    Costa Vicentina and Ponta de Sagres. A survey on offshore

    wind power potential along the Portuguese coast is currently

    being prepared.

    The database on wind power potential in Portugal EOLOS2.0

    provides information on the physical and energy characteris-

    tics of the atmospheric flow in 57 locations, on mainland Por-

    tugal. The database was developed by INETI-DER. The VEN-

    TOS software used for computational simulation purposes

    of the behaviour of wind flow on complex terrains, whether or

    not arborised, was developed by FEUP, in collaboration with

    the Institute of Mechanical Engineering and Industrial Manage-

    ment, INESC (Porto) and the Research Centre for Wind Energyand Atmospheric Flows (RCWEAF). Both are important tools

    for the assessment of wind power potential in Portugal.With

    the objective of intensifying and diversifying the exploitation

    of renewable energy sources for electricity generation pur-

    poses, particularly focusing on wind power, in 2005, Portu-

    gal reviewed the objectives established in 2003 and decided

    to increase its installed capacity target by 1950 MW to 5100MW, in 2012 (with an increase of 600 MW in equipment up-

  • 8/2/2019 Energias Renov PT 2007

    14/60

    14

    grades), while, at the same time, creating a technological and

    industrial cluster associated with wind power.

    This objective will represent a contribution of 20% to con-

    sumption requirements at the end of the decade.

    Generation in 2006, was more than 2120 equivalent hours perMW.The installed rated power at the end of March 2007 was

    1808 MW, divided up over 143 farms, with a total number

    of 1019 wind turbines over the whole of mainland territory,

    with 52% of the installed rated power in farms with a rated

    power of 25 MW or less. Average investment was EUR 1.18

    million / MW.

    A tender was issued for attributing up to 1800 MVA in rated

    power and the creation of an industrial cluster associated with

    the wind sector, with an investment of around EUR 1700 mil-

    lion, the creation of around 1500 jobs and formation of a EUR

    35 million fund for innovation in the renewable energies area.

    The districts of Viseu, Coimbra, Lisbon, Castelo Branco, Vila

    Real, Santarm, Leiria and Braga have the highest installed

    rated power (March 2007) and districts with the greatest re-

    sources, in 2006, were Bragana, Coimbra, Porto, Vila Real,Viana do Castelo, Guarda, Castelo Branco and Aveiro.

    At the current rate of coming into service of new wind farms,

    2000 MW of rated wind power, shall be in service on the na-

    tional electricity system in 1st half 2007.

    um acrscimo em 600 MW por upgrade do equipamento),

    promovendo simultaneamente a criao de um cluster tec-

    nolgico e de investimento associados energia elica.

    Este objectivo representar uma contribuio de 20 por cento

    para a satisfao do consumo no final desta dcada.A produo, em 2006, foi superior a 2120 horas equivalen-

    tes por MW. A potncia instalada no final de Maro de 2007

    situava-se em 1808 MW, distribuda por 143 parques, com

    um total de 1019 aerogeradores ao longo de todo o territrio

    continental, sendo que 52 por cento da potncia instalada se

    situa em parques com potncia igual ou inferior a 25 MW. O

    investimento mdio foi 1,18 milhes de euros/MW.

    Foi lanado um concurso para atribuio at 1800 MVA de

    potncia e a criao de um cluster industrial ligado ao sec-

    tor elico, com um investimento de cerca de 1700 milhes

    de euros, a criao de cerca de 1500 postos de trabalho e

    a constituio de um fundo de 35 milhes de euros para a

    inovao na rea das energias renovveis.

    Os distritos de Viseu, Coimbra, Lisboa, Castelo Branco, Vila

    Real, Santarm, Leiria e Braga so os de maior potncia ins-talada (Maro de 2007) e os distritos com maior recurso, em

    2006, foram Bragana, Coimbra, Porto, Vila Real, Viana do

    Castelo, Guarda, Castelo Branco e Aveiro.

    Com o ritmo actual de entrada em funcionamento de novos par-

    ques elicos, devero atingir-se os 2000 MW de potncia eli-

    ca no sistema elctrico nacional durante o primeiro semestre de

    2007.

  • 8/2/2019 Energias Renov PT 2007

    15/60

    15

    Data de arranque do projecto Setembro de 2004

    Data de concluso do projecto Maio de 2007

    Nmero de aerogeradores 64

    Entrada em funcionamento Dezembro de 2005

    Potncia instalada 146 MW

    Produo expectvel 335 GWh/ano

    Valor do investimento 150 milhes de euros

    Caractersticas do projecto

    Project start date September 2004

    Project completion date May 2007

    Number of wind turbines 64

    Operational in December 2005

    Rated power capacity 146 MW

    Forecast generating capacity 335 GWh per year

    Amount of investment EUR 150 million

    Characteristics of project

    PINHAL INTERIORWIND FARM

    This wind farm is located in central Portugal in the region

    known as Pinhal Interior. The project encompasses the dis-

    tricts of Oleiros parishes of lvaro, Oleiros, Sobral, Mostei-

    ro, Isna, Estreito and Sarnadas de S. Simo; Proena-a-Nova

    PARQUE ELICODO PINHAL INTERIOR

    O Parque Elico localiza-se na zona centro do pas na regio

    denominada Pinhal Interior. O projecto abrange os conce-

    lhos de Oleiros (freguesias de lvaro, Oleiros, Sobral, Mos-

    teiro, Isna, Estreito e Sarnadas de S. Simo), Proena-a-Nova

    Vista de uma das seces do Parque Elico do Pinhal InteriorView of one of the sections of the Pinhal Interior Wind Farm

  • 8/2/2019 Energias Renov PT 2007

    16/60

    16

    (freguesias de Proena-a-Nova e Sobreira Formosa), Sert

    (freguesias de Ermida, Figueiredo e Troviscal) e o concelho

    de Vila Velha de Rdo (freguesias de Vila Velha de Rodo e

    Fratel), compreendendo sete reas de implantao.Constitui, ainda, um dos pilares fundamentais do Projecto

    Elico da Beira Interior (Caramulo, Pinhal Interior, Gardunha,

    Trancoso, Mosqueiros), em desenvolvimento pela GENERG,

    abrangendo as regies da Beira Alta e Beira Baixa que, no seu

    conjunto, envolver 12 concelhos e representar um Investi-

    mento de 450 milhes de euros.

    Este projecto elico um dos maiores do pas, com forte im-

    pacte econmico nos quatro concelhos abrangidos.

    - parishes of Proena-a-Nova and Sobreira Formosa; Sert

    - parishes of Ermida, Figueiredo and Troviscal; and the muni-

    cipal district of Vila Velha de Rdo parishes of Vila Velha de

    Rodo and Fratel comprising 7 areas.This continues to be one of the fundamental pillars of the Bei-

    ra Interior Wind Project (Caramulo, Pinhal Interior, Gardunha,

    Trancoso, Mosqueiros). It is being developed by GENERG, and

    encompasses the Beira Alta and Beira Baixa regions, which,

    as a whole, will involve 12 municipal districts and comprise an

    investment of EUR 450 million.

    This wind project is one of the biggest in Portugal, with a ma-

    jor economic impact on the four municipal districts involved.

  • 8/2/2019 Energias Renov PT 2007

    17/60

    17

    ALTO MINHO I WIND FARM

    Still under construction, this wind farm owned by the Em-

    preendimentos Elicos do Vale do Minho, S.A., company

    is located in northern Portugal and encompasses the mu-

    nicipal districts of Melgao, Mono, Paredes de Coura and

    Valena.

    Aerogeradores ENERCON de 2 MW

    Capacidade instalada 240 MW

    Nmero de aerogeradores 120

    Investimento 360 M

    Wind turbines ENERCON (2 MW)

    Installed capacity 240 MW

    Number of wind turbines 120

    Investment EUR 360 million

    Caractersticas do projecto Characteristics of project

    PARQUE ELICO DO ALTO MINHO I

    Ainda em fase de construo, este Parque Elico da empresa

    Empreendimentos Elicos do Vale do Minho, S.A. localiza-se

    na zona norte do pas e abrange os concelhos de Melgao,

    Mono, Paredes de Coura e Valena.

    Construo do macio de fundao da torreConstruct of foundations of tower

  • 8/2/2019 Energias Renov PT 2007

    18/60

    18

    PARQUE ELICO DE ARGA

    Localizado em Caminha, o Parque Elico de Arga, da empresa

    Empreendimentos Elicos do Vale do Minho, entrou em fun-

    cionamento em Abril de 2006.

    ARGA WIND FARM

    Located in Caminha, the Arga wind farm, owned by the Em-

    preendimentos Elicos do Vale do Minho company, came

    into service in April 2006.

    Nmero de aerogeradores 12

    Caractersticas do aerogerador Vestas 3 MW

    Potncia instalada 36 MW

    Produo expectvel 71,6 GWh / ano

    Entrada em funcionamento 2006

    Investimento 39 M

    Number of wind turbines 12

    Characteristics of wind turbine Vestas 3 MW

    Installed rated power 36 MW

    Forecast generating capacity 71.6 GWh per year

    Operational in 2006

    Investment EUR 39 million

    Caractersticas do projecto Characteristics of project

  • 8/2/2019 Energias Renov PT 2007

    19/60

    19

    CANDEEIROS WIND FARM

    The Candeeiros wind farm, owned by the Companhia das

    Energias Renovveis Serra de Candeeiros, Lda is located in

    central Portugal, in the Alcobaa/Rio Maior region.

    Nmero de aerogeradores 37

    Caractersticas do aerogerador Vestas 3 MW

    Potncia instalada 111 MW

    Produo expectvel 294,15 GWh / ano

    Entrada em funcionamento

    1 Fase em 2005; 2 Fase

    em 2006

    Number of wind turbines 37

    Characteristics of wind turbine Vestas 3 MW

    Installed rated power 111 MW

    Forecast generating capacity 294.15 GWh per year

    Operational in

    1st Stage in 2005; 2nd Stage

    in 2006

    PARQUE ELICO DE CANDEEIROS

    O Empreendimento Elico de Candeeiros, da Companhia das

    Energias Renovveis da Serra de Candeeiros, Lda encontra-se

    localizado na zona centro do pas, na regio de Alcobaa/Rio

    Maior.

    Caractersticas do projecto Characteristics of project

  • 8/2/2019 Energias Renov PT 2007

    20/60

    20

    WIND INDUSTRIAL CLUSTER

    Pursuant to the policy of wind power

    capacity expansion (allocation of

    rights up to 1800 MVA), Portugal, in

    2006, issued a tender with a twofoldobjective: to use wind power to lever-

    age the creation of an industrial sec-

    tor and improve the efficiency of wind

    power exploitation.

    The creation of this wind cluster is an

    instrument of a sustainable regional

    development policy instrument, owing to

    its importance in terms of the creation

    of new sources of economic growth

    and environmental conservation and

    improvement.

    The Agrupamento Elicas de Portu-

    gal, responsible for implementing

    this project, comprises a technological complex, leading the

    development of wind turbines and four wind generation pro-moters having experience in the management of the wind

    business.

    Considered as being the most structuring project on the Por-

    CLUSTER INDUSTRIAL ELICO

    No quadro da expanso da capacidade elica (atri-

    buio de direitos at 1800 MVA), Portugal lanou,

    em 2006, um concurso com um duplo objectivo:

    utilizar a energia elica para alavancar a criao deum sector industrial e explorar de forma mais efi-

    ciente o recurso elico.

    A criao deste cluster elico constitui um ins-

    trumento de poltica de desenvolvimento regional

    sustentvel, dada a sua importncia na criao de

    novas fontes de crescimento econmico e na pre-

    servao e melhoria do ambiente.

    O Agrupamento Elicas de Portugal, constitudo

    por um plo tecnolgico lder no desenvolvimen-

    to de aerogeradores e por

    quatro promotores eli-

    cos com experincia na

    gesto do negcio elico,

    o responsvel pela implementao

    deste projecto.Considerado como o mais estrutu-

    rante, na ltima dcada, para o teci-

    do industrial portugus, o cluster

    Distribuio geogrfica do clusterGeographical distribution of the cluster

  • 8/2/2019 Energias Renov PT 2007

    21/60

    21

    tuguese industrial scene,

    over the last decade, the

    cluster represents invest-ment of EUR 1700 million,

    of which an amount of EUR

    161 million has been invest-

    ed in the industrial sector

    and EUR 1470 million in the

    wind farms.

    The new industrial cluster involves:

    the creation of 29 companies

    the development of an industrial complex comprising 5

    manufacturing plants in Viana do Castelo, for the full pro-

    duction of state-of-the-art wind turbines:

    - ensuring the supply of all goods and services necessary

    for the turnkey installation of wind farms;

    - creation of 7 new and expansion of 12 industrial units

    totaliza um investimento

    de 1700 milhes de eu-

    ros, dos quais 161 mi-lhes investidos na parte

    industrial e 1470 milhes

    de euros destinados aos

    parques elicos.

    O novo cluster industrial compreende:

    criao de 29 empresas

    desenvolvimento de um plo industrial de cinco fbricas,

    em Viana do Castelo, para produo integral de aerogera-

    dores de ltima gerao:

    - assegurando o fornecimento de todos os bens e servi-

    os necessrios instalao de parques elicos cha-

    ve-na-mo;

    - criando sete unidades industriais novas e ampliando 12

    Vista geral do projectoGeneral view of project

  • 8/2/2019 Energias Renov PT 2007

    22/60

    22

    At final de 2008 estarooperacionais as outras fbricas

    The other manufacturing plants willbe operational by end 2008

    aposta na I&D e na transferncia de tecnologia, com a

    criao de:

    - Centro de Formao Profissional em Viana do Castelo- Centro de I&D e parcerias com universidades nacionais

    - Um fundo de 35 milhes de euros para a inovao

    criao de 48 novos parques elicos repartidos harmonio-

    samente pelo pas;

    distribuio de riqueza em zonas rurais (receitas dos mu-

    nicpios e rendas dos proprietrios dos terrenos);

    produo de mais de 2700 GWh de electricidade limpa- evitar a emisso de um milho de toneladas de CO2

    por ano.

    Impacto Econmico

    Emprego

    - Criao de 1800 novos postos de trabalho directos em

    regies desfavorecidas do pas e criao de cerca de

    5500 empregos indirectos anuais nos seis primeiros

    anos.

    Valor Acrescentado

    - VAB do cluster em ano cruzeiro 116 milhes de euros

    por ano

    - VAB dos parques elicos 170 milhes de euros por ano

    commitment to R&D and technology transfer, with the

    creation of:

    - a Professional Training Centre in Viana do Castelo- a R&D centre and partnerships with Portuguese univer-

    sities

    - A EUR 35 million innovation fund

    creation of 48 new wind farms spread out over the whole

    of the country;

    wealth distribution in rural zones (revenues for municipali-

    ties and rents for landowners); generation of more than 2700 GWh of clean electricity

    - avoiding the emission of 1 million tonnes of CO2 per

    year.

    Economic Impact

    Employment

    - Creation of 1800 new direct jobs in less developed re-

    gions in Portugal and around 5500 indirect jobs annually

    in the first 6 years.

    Added Value

    - GVA of cluster in cruise year EUR 116 million per year

    - GVA of wind farms EUR 170 million per year

  • 8/2/2019 Energias Renov PT 2007

    23/60

    23

    Efeito sobre a balana comercial

    - Aumento das exportaes: mais de 60 por cento da pro-

    duo ser exportada (200 milhes de euros por ano apartir de 2010)

    - Reduo das importaes de componentes elicos: in-

    corporao nacional passar dos actuais 20 por cento

    para praticamente 100 por cento

    - Reduo das importaes de matrias-primas: mais de

    100 milhes de euros anuais

    - Reduo da necessidade de compra de licenas de emis-so: mais de 1 milho de toneladas de CO2 evitadas

    Em Novembro de 2007 estar operacional a fbrica de ps

    de rotor.

    Effect on Trade Balance

    - Increased exports: more than 60% of production will be

    exported (EUR 200 million per year starting 2010)- Reduction in imports of wind components: national in-

    corporation will increase from the current level of 20% to

    practically 100%

    - Reduction of imports of raw materials: more than EUR

    100 million per year

    - Reduction of need to purchase emission licences: more

    than 1 million tonnes of CO2 avoided.

    The rotor blades manufacturing plant will be operational in

    November 2007.

    TorresTowers

  • 8/2/2019 Energias Renov PT 2007

    24/60

    24

    A aposta nas energias renovveis para a produo de electri-

    cidade visa satisfazer, em 2010, 45 por cento do consumo de

    electricidade do pas, sendo cinco por cento o contributo da

    biomassa florestal.

    A energia, um importante factor de crescimento da econo-mia portuguesa, constitui um desafio para o desenvolvimento

    sustentvel do pas. O desenvolvimento dos recursos ener-

    gticos endgenos representa um elevado potencial para a

    inovao e um contributo importante para a concretizao da

    Estratgia Nacional para a Energia e do Plano Tecnolgico.

    A Biomassa florestal constitui uma das prioridades, dado

    o seu impacto na revitalizao e dinamizao da actividade

    econmica da fileira florestal, bem como na minimizao dos

    riscos de incndio.

    O lanamento do concurso para 15 novas centrais a biomassa

    florestal representa um adicional de 100 MW e um investi-

    mento total estimado em 225 milhes de euros.

    Foram privilegiadas duas tipologias de centrais:

    At 12 MW, permitindo economias de escala na produo

    de energia elctrica e garantindo um maior raio de recolha

    de Biomassa Florestal;

    At 6 MW, permitindo o desenvolvimento de unidades

    locais de pequena dimenso numa ptica de desenvolvi-

    mento local.

    The commitment to renewable energies for electricity

    generation aims to meet 45% of the countrys electric-

    ity requirements by 2010, 5% of which from forestry bio-

    mass.

    Energy, as an important growth factor for the Portugueseeconomy, represents a challenge for the countrys sus-

    tainable development. The development of endogenous

    energy resources represents major potential for innova-

    tion and an important contribution to achieving the Na-

    tional Energy Strategy and Technological Plan.

    Forestry biomass is one of the priorities, given its impact

    on revitalising and boosting economic activity in the forestry

    strand, in addition to minimising fire risks.

    The issue of a tender for 15 new forestry biomass power

    stations represents an additional 100 MW and a total esti-

    mated investment of EUR 225 million.

    Preference has been given to two types of power station:

    Up to 12 MW, permitting economies of scale in elec-tricity generation and ensuring a larger forestry bio-

    mass collection area;

    Up to 6 MW, permitting the development of small local

    development units.

    BIOENERGIABIO ENERGY

  • 8/2/2019 Energias Renov PT 2007

    25/60

    25

    A localizao das futuras centrais foi pr-seleccionada tendo

    em conta a disponibilidade de Biomassa Florestal e o risco

    estrutural de incndio. As novas Centrais a Biomassa possibi-

    litaro a retirada de 1 milho de toneladas de resduos das flo-

    restas nacionais e a criao de novas dinmicas de inovaona gesto e explorao florestal.

    O aproveitamento da Biomassa Florestal para fins energti-

    cos encarado no s como uma oportunidade de negcio e

    de criao de emprego em zonas rurais, como um dos ins-

    trumentos de luta contra os incndios, atravs da limpeza das

    florestas. Actualmente, existem em Portugal trs centrais ter-

    moelctricas ligadas rede elctrica que utilizam a Biomassa

    Florestal como principal combustvel - a central da EDP, em

    The location of the future power stations was pre-selected

    taking into account the availability of forestry biomass and

    structural fire risk. The new biomass power stations will make

    it possible to extract 1 million tonnes of wastes from national

    forests and create new dynamics of innovation in terms offorestry management and exploitation.

    The exploitation of forestry biomass for energy purposes is

    considered not only as a business opportunity and for its cre-

    ation of employment in rural zones, but also as a fire-fighting

    instrument in the form of forest clearing operations.

    Portugal currently has two thermoelectric power stations

    connected to the national grid, using forestry biomass as

    their principal fuel - the EDP power station, in Mortgua

  • 8/2/2019 Energias Renov PT 2007

    26/60

    26

    Mortgua, e a Centroliva, em Vila Velha de Rdo e nove cen-

    trais de cogerao instaladas nas indstrias do sector flores-

    tal, que fazem aproveitamento de biomassa para produo de

    calor, como a Portucel, Amorim Revestimentos, Stora Celbi,

    Soporcel, SIAF e Companhia de Celulose do Caima.

    O objectivo atingir em 2010 uma meta de 250 MW de ener-gia elctrica produzida atravs da biomassa.

    and Centroliva, in Vila Velha de Rdo and nine cogenera-

    tion power plants installed in forestry sector industries, such

    as Portucel, Amorim Revestimentos, Stora Celbi, Soporcel,

    SIAF and Companhia de Celulose do Caima which exploit

    biomass for heat production.

    The objective is to achieve a target of 250 MW of electricitygenerated from biomass in 2010.

  • 8/2/2019 Energias Renov PT 2007

    27/60

    27

    Em termos ambientais, a reduo da emisso de dixido de

    carbono (C02) em 700 mil toneladas possibilitar a convergn-

    cia para as metas definidas no Protocolo de Kyoto.

    Os biocombustveis constituem um vector de diversificao

    no abastecimento de combustveis aos transportes, sector

    em se registam as mais elevadas taxas de crescimento deconsumo energtico.

    Em Portugal, a dependncia energtica do sector transportador

    relativamente ao petrleo acentuada, sendo responsvel por

    42 por cento do consumo da totalidade do petrleo importado.

    A substituio de mais de 300 milhes de litros de combus-

    tveis at 2010 que corresponde a uma incorporao de dez

    por cento nos combustveis rodovirios, antecipando em dez

    anos o objectivo da UE, potencia a criao de unidades indus-triais e o desenvolvimento da agricultura energtica.

    O Governo fixou em 205 mil toneladas a quantidade de bio-

    combustveis a isentar de ISP (Imposto sobre os Produtos

    Petrolferos) em 2007. Destas, 4 973 toneladas tm origem

    em produo agrcola nacional. No entanto, esse valor deve

    subir para 405 mil toneladas at 2010 atendendo ao aumento

    previsto para a percentagem de incorporao. As medidas deiseno fiscal (ISP) visam fomentar a utilizao dos biocom-

    bustveis nos transportes para reduzir a dependncia ener-

    gtica portuguesa e dar cumprimento directiva comunitria

    que estabelece, at 2020, a substituio de 10 por cento dos

    combustveis convencionais usados nos transportes por com-

    bustveis alternativos. Os pequenos produtores dedicados be-

    neficiaro de iseno total de ISP at ao limite mximo global de

    40 mil toneladas/ano.

    In environmental terms, the reduction in the emission of

    carbon dioxide (C02) by 700 thousand tonnes will make it

    possible to converge with the targets defined in the Kyoto

    protocol.

    Biofuels representan area of diversification in the supply of

    fuel to the transport sector which has recorded the highestgrowth rates in terms of energy consumption.

    In Portugal, the transport sectors energy dependency on oil,

    which is responsible for 42% of total imported oil consump-

    tion, is very high.

    The replacement of more than 300 million litres of fuel by

    2010, comprising the incorporation of 10% in road fuels,

    bringing the EUs objective forward by 10 years, promotes

    the creation of industrial plants and development of energy-based agriculture.

    The government set the quantity of biofuels to be exempt-

    ed from ISP (tax on oil products) at 205 thousand tonnes in

    2007. Of this amount, 4 973 tonnes derive from national ag-

    ricultural production. However, this figure should rise to 405

    thousand tonnes by 2010 in light of the forecast increase of

    the incorporation percentage. The fiscal exemptions (ISP)have been designed to promote the use of biofuels in the

    transport sector, to reduce Portuguese energy dependency

    and comply with the Community directive establishing the

    replacement of 10 per cent of conventional fuels used in

    the transport sector, by alternative fuels by 2020. Small

    dedicated producers are entitled to total exemption from

    ISP up to a maximum global amount of 40 thousand tonnes

    per year.

  • 8/2/2019 Energias Renov PT 2007

    28/60

    28

    BIOMASSA FLORESTALCentral termoelctrica do Rdo

    A central termoelctrica a biomassa florestal residual, pro-priedade da EDP Produo Bioelctrica, S.A., fica situada

    em Vila Velha do Rdo e permite levar electricidade a 70 mil

    pessoas.

    A biomassa a consumir pela central fornecida pelas empre-

    sas silvcolas e florestais da regio e representa um volume

    de negcio avaliado em cerca de quatro milhes de euros,

    contribuindo para a limpeza da floresta.

    As 160 mil toneladas de biomassa consumidas por ano re-

    presentaro cerca de 4 milhes de euros, canalizados para as

    empresas do sector silvcola e florestal da regio.

    A converso da biomassa florestal em electricidade reali-

    zada atravs da combusto em leito fluidizado borbulhante,

    sendo a energia elctrica gerada por um turbo-grupo a vapor

    constitudo por turbina de condensao e alternador trifsi-

    co.

    FOREST BIOMASSRdo thermoelectric power station

    The forestry waste biomass thermoelectric power stationowned by EDP Produo Bioelctrica, S.A., is located in

    Vila Velha do Rdo and supplies energy to 70 thousand per-

    sons.

    The biomass to be used by the power station is supplied by

    regional silviculture companies and represents a turnover of

    around EUR 4 million, while also contributing towards forest

    clearing operations.

    The 160 000 tonnes of biomass consumed per year will rep-

    resent around EUR 4 million, channelled to silviculture and

    forestry companies in the region.

    Forestry biomass is converted to electricity through the (bub-

    bling) bubble fluidised bed combustion process in which the

    electricity is generated by a steam turbine unit comprising a

    condensation turbine and a three phase alternator.

    Recepo da biomassa

    Delivery of biomass

  • 8/2/2019 Energias Renov PT 2007

    29/60

    29

    Centraltermoelctrica

    do Rdo

    Rdothermoelectricpower station

    Caractersticas da central termoelctrica

    Potncia instalada 14,4 MVA

    Energia produzida 80 GWh/ano

    Tecnologia da combusto Leito fluidizado borbulhante

    Combustvel Resduos florestais

    Consumo de biomassa 160 000 t/ano

    Investimento 30 M

    Entrada em funcionamento 2007

    Characteristics of thermoelectric power station

    Installed rated power 14.4 MVA

    Generating capacity 80 GWh per year

    Combustion technology Bubble fluidised bed combustion

    Fuel Forestry wastes

    Biomass consumption 160 000 tonnes per year

    Investment EUR 30 million

    Operational in 2007

  • 8/2/2019 Energias Renov PT 2007

    30/60

    30

    Central termoelctrica a biomassa florestal

    residual de Mortgua

    A funcionar desde 1999, este centro electroprodutor da EDP

    Produo Bioelctrica, S. A. correspondeu a um investimen-

    to inicial de 25 milhes de euros.

    A compra de biomassa para alimentar a central representa

    para o sector silvcola da regio uma oportunidade de negcio

    e simultaneamente promove a limpeza florestal contribuindo

    para minimizao do risco de incndio. Como combustvel deregulao e arranque utilizado o gs natural. Com uma dis-

    ponibilidade superior a 89 por cento, vendeu 57,6 GWh de

    electricidade rede, em 2006. O consumo de biomassa nesse

    ano ascendeu a 109 mil toneladas, sendo 96,4 por cento bio-

    massa florestal residual (casca de pinheiro e de eucalipto).

    A compra de biomassa representou cerca de 2,7 milhes de

    euros, canalizados para o sector silvcola da regio.

    Partculas 100

    Dixido de enxofre (SO2) 300

    Dixido de azoto (NO2) 340

    Monxido de carbono (CO) 200

    Power Station Emission Values (mg/Nm3)

    Particles 100

    Sulphur dioxide (SO2) 300

    Nitrogen dioxide (NO2) 340

    Carbon monoxide (CO) 200

    Valores de emisso na Central (mg/Nm3)

    Mortgua forestry waste biomass

    thermoelectric power station

    In operation since 1999, this EDP Produo Bioelctrica, S.

    A. power station represented an initial investment of EUR 25

    million.

    The purchase of biomass to fuel the power station represents

    a business opportunity for the silviculture sector in the region

    while also promoting forest clearing operations, helping to

    minimise fire risks. Natural gas is used as a regulating andstart-up fuel. With an availability of more than 89%, it sold

    57,6 GWh of electricity to the grid, in 2006.

    The amount of biomass consumption in the said year was

    109 000 tonnes, of which 96.4% was waste forestry biomass

    (pine and eucalyptus bark).

    Biomass purchases represented around EUR 2.7 million,

    channelled to the silviculture sector in the region.

  • 8/2/2019 Energias Renov PT 2007

    31/60

    31

    Potncia instalada 9 MW (10 MVA)

    Tenso de gerao 60 kV

    Produo anual a plena carga 67 GWh

    Consumo de biomassa com 30%humidade

    Consumo horrio a plena carga 8,7 t/h

    Consumo anual de biomassa 109 000 tPoder calorfico inferior (PCI) 13 800 kJ/kg

    Capacidade do parque de combustvel 55 000 m3

    Caractersticas do vapor sobreaquecido

    Presso 42 bar

    Temperatura 420 C

    Caudal 40 t/h

    Consumo de gua 60 m3/h

    Caractersticas da central termoelctrica

    Installed rated power 9 MW (10 MVA)

    Generating voltage 60 kV

    Annual generation at full load 67 GWh

    Consumption of biomass with 30% humidity

    Hourly consumption at full load 8.7 t/h

    Annual consumption of biomass 109 000 tLower heating value 13 800 kJ/kg

    Capacity of fuel storage site 55 000 m3

    Characteristics of superheated steam

    Pressure 42 bar

    Temperature 420 C

    Flow 40 t/h

    Water consumption 60 m3/h

    Characteristics of thermoelectric power station

  • 8/2/2019 Energias Renov PT 2007

    32/60

    32

    BIODIESELFbrica de biodiesel da Iberol

    A Iberol-Sociedade Ibrica de Oleaginosas S.A., situada em

    Alhandra, no concelho de Vila Franca de Xira, possui duas uni-

    dades de produo de biodiesel. Uma construda pela empre-

    sa CIMBRIA-SKET GmbH; a outra desenvolvida pela prpria

    empresa.

    A matria-prima utilizada provm principalmente de leos ve-

    getais virgens extrados do girassol, palma, soja e colza.

    Tambm os leos alimentares usados (OAU) resultantes da

    fritura dos alimentos podem ser valorizados como matria-pri-

    ma para a produo de biodiesel evitando-se o seu lanamen-

    to na rede de saneamento bsico. A promoo da actividade

    BIODIESELIberol biodiesel plant

    Iberol-Sociedade Ibrica de Oleaginosas S.A., located in Al-

    handra, in the municipal district of Vila Franca de Xira, has

    two biodiesel generating units.

    One was built by the company CIMBRIA-SKET GmbH and

    the other was developed by the company itself.

    The raw material used mainly derives from virgin vegetable

    oils extracted from sunflowers, palm, soya and colza oil.

    Used cooking oils deriving from food frying may be valor-

    ised as raw material for the production of biodiesel avoid-

    ing their discharge into the basic sanitation network. The

    promotion of the commercial activity for collecting and sell-

    Vista geral da IberolGeneral view of Iberol

  • 8/2/2019 Energias Renov PT 2007

    33/60

    33

    comercial de recolha e venda deste resduo (OAU) constitui

    uma oportunidade de negcio, com receitas interessantes

    para as autarquias ou agentes econmicos.

    O laboratrio da fbrica de biodiesel realiza o controle de qua-

    lidade da matria-prima e dos produtos fabricados de modoa garantir o cumprimento das normas EN14224 e da British

    Standard, BS 2621.

    A produo contnua, e a fbrica labora 24 horas por dia,

    entregando o total da produo industria refinadora para in-

    corporao nos combustveis rodovirios.

    ing these wastes represents a business opportunity, with

    interesting levels of revenues for municipalities or econom-

    ic operators.

    The biodiesel plants laboratory controls the quality of the

    raw material and manufactured products to guaranteecompliance with standard EN14224 and British Standard,

    BS 2621.

    Production is continuous and the plant operates 24 hours a

    day delivering the full amount of its production to the refin-

    ing industry to be incorporated in road fuels.

  • 8/2/2019 Energias Renov PT 2007

    34/60

    34

    Capacidade instalada 120 000t/ano

    Tecnologia Transesterificao de cidos gordos

    Matria-primaleos de soja, colza, girassol

    palma e OAU

    Produo 100 000 t/ano

    Investimento 58 M

    Incio de actividade 2006

    Novos postos de trabalho 85

    Energia Consumo/h

    Vapor (12 bar) 4400 kg

    Electricidade 420 kWh

    Ar comprimido (7bar) 150 Nm3

    Consumo de energia na produo de biodiesel

    Caractersticas do projecto

    Installed capacity 120 000 tonnes per year

    Technology Transterification of fatty acids

    Raw materialSoya, colza, sunflower, palm oils and

    used frying oils

    Production 100 000 tonnes per year

    Investment EUR 58 million

    Operational in 2006

    New Jobs 85

    Energy Consumption/h

    Steam (12 bar) 4400 kg

    Electricity 420 kWh

    Compresses Air (7bar) 150 Nm3

    Energy consumption in biodiesel production

    Characteristics of project

    Laboratrio de qumica da fbricaPlants chemistry laboratory

  • 8/2/2019 Energias Renov PT 2007

    35/60

    35

    Fbrica de Biodiesel da Prio Biocombustveis

    A Prio Biocombustveis SA, umaempresa do Grupo Martifer,

    vai iniciar a produo de biodiesel em Portugal numa Fbrica

    localizada no Terminal de Granis Lquidos do Porto de Aveiro,

    na Gafanha da Nazar.

    Dedicada a transformao de oleaginosas, utiliza como mat-

    rias-primas principais a colza e o girassol.

    Prio Biocombustveis Biodiesel Plant

    The Prio Biocombustveis SA, a company of Martifer

    Group, will star thebiodiesel production in a plant located

    in Bult Liquids Terminal of Aveiros Port, in Gafanha da

    Nazar.

    Raw materials: Rapeseed, soybean, sunflower and palm

    oil.

  • 8/2/2019 Energias Renov PT 2007

    36/60

    36

    Capacidade instalada 100 000 ton/ano de biodiesel

    Tecnologia LURGI

    Matria-primaleo de Soja, colza,

    girassol e palma

    Investimento 30 milhes de euros

    Incio de actividade 1 Agosto 2007

    Novos postos de trabalho 30

    Energia Consumo

    Vapor 4500 kg/hElectricidade 300 kW/h

    Ar comprimido 70 Nm3/h

    Consumo de energia na produo de biodiesel

    Caractersticas do projecto

    Capacity 100 000 ton/year of biodiesel

    Technology LURGI

    Raw materialsRapeseed, soybean, sunflower and

    palm oil

    Investment 58 M

    Opening date 1st August 2007

    Employment created 30 job posts

    Energy Consumption

    Steam 4500 kg/hElectricity 300 kW/h

    Compressed air 70 Nm3/h

    Energy consumption in biodiesel production

    Projects characteristics

  • 8/2/2019 Energias Renov PT 2007

    37/60

    37

    BIOGS - APROVEITAMENTO POR COMBUSTOE SISTEMAS HBRIDOS COM CLULASDE COMBUSTVEL DE HIDROGNIO

    A AGNI/EGF, prope-se realizar em Portugal, at 2009, um in-

    vestimento numa fbrica e Centro de Investigao e Desen-

    volvimento em tecnologias de hidrognio.

    A EGF S.A. empresa nacional responsvel pela implementa-o deste projecto, ir converter e implementar os sistemas

    hbridos, integrando as pilhas de combustvel de hidrognio

    em todos os aterros sanitrios onde se encontram instalados

    os sistemas tradicionais para o aproveitamento energtico do

    biogs, bem como nas novas centrais de valorizao orgnica

    em construo e explorao, tendo em vista a melhoria da

    eficincia energtica associada ao biogs. possvel maximizar o aproveitamento do biogs captado,

    atravs da utilizao de pilhas de combustvel de hidrognio.

    Estas constituem um sistema alternativo utilizao do bio-

    gs nos motores de combusto interna, ou, em

    conjunto com estes, numa soluo designada

    por sistema hbrido.

    O investimento, a realizar de forma faseada, en-

    volver, na totalidade, cerca de 60 milhes de

    euros e a criao de 220 postos de trabalho, at

    2013.

    BIOGAS - COMBUSTION AND HYBRIDSYSTEMS USING HYDROGEN FUEL CELLS

    AGNI/EGF, has undertaken to invest in a plant and research

    and development centre for hydrogen technologies in Portu-

    gal, by 2009.

    EGF S.A. a national company responsible for the implemen-

    tation of this project will convert and implement the hybridsystems, integrating the hydrogen fuel cells in all landfills

    containing traditional systems for the energy exploitation of

    biogas, in addition to the new organic enhancement power

    stations being built and operated with the aim of improving

    the energy efficiency associated with biogas.

    It is possible to maximise the exploitation of biogas capture,

    through the use of hydrogen fuel cells. These comprise analternative system to the use of biogas in internal combus-

    tion engines in conjunction with them in a solution known as

    Hybrid Systems.

    The investment, which will be staged, will total

    around EUR 60 million and create 220 jobs by

    2013.

    Sistema de aproveitamento energtico do biogsdo aterro sanitrio do BarlaventoBiogas plant from Barlavento landfill

  • 8/2/2019 Energias Renov PT 2007

    38/60

    38

    Portugal um dos pases da

    Europa com maior disponi-

    bilidade de radiao solar.

    A insolao em Portugal

    Continental (nmero de

    horas de sol descoberto

    acima do horizonte) um

    elemento climtico muito

    importante que varia entreas 1800 e as 3100 horas de

    Sol por ano. A quantidade total de radiao global varia entre

    140 e 170 kcal/cm2.

    Existe um vasto potencial de aplicao do solar trmico, avalia-

    do em cerca de 2,8 milhes de metros quadrados de colecto-

    res. A energia solar trmica para aquecimento de gua a baixa

    temperatura vantajosa, quer do ponto de vista energtico,

    quer ambiental, representando um contributo significativo para

    a reduo das emisses de Gases com Efeito de Estufa (GEE).

    Outros benefcios referem-se criao de postos de trabalho

    associados dinamizao e evoluo do mercado.

    O pas, devido s suas condies climticas, possui tambm

    excelentes condies para a converso fotovoltaica, com n-

    dices de produo entre os 1000 e os 1500 kWh por ano por

    kWp instalado.

    Portugal is one of the Eu-

    ropean countries with the

    highest levels of solar ra-

    diation.

    Sunshine in mainland Por-

    tugal (number of sunlight

    hours above the horizon)

    varies between 1800 and

    3100 hours per year andis a very important clima-

    tic element. Total global radiation varies between 140 and 170

    kcal/cm2.

    There is vast potential for the application of thermal solar pow-

    er, assessed at around 2.8 million m2 of panels. Thermal solar

    power for low temperature water heating is advantageous,

    both from an energy and environmental viewpoint, represent-

    ing a significant contribution to reducing greenhouse gases.

    Other benefits include the creation of jobs associated with

    market promotion and evolution.

    Owing to its climate, Portugal also enjoys excellent conditions

    for photovoltaic conversion, with generating indices of be-

    tween 1000 and 1500 kWh per year, for each installed kWp.

    ENERGIA SOLARSOLAR POWER

  • 8/2/2019 Energias Renov PT 2007

    39/60

    39

    CENTRAL SOLAR TRMICA DE TAVIRA

    A central solar trmica em fase de construo na Capelinha,

    perto da cidade de Tavira, destina-se produo de electrici-

    dade a partir da produo de vapor turbinado.

    A empresa T-ESTP, S.A., especialmente constituda para a

    conduo deste projecto conta com a participao da EDP,

    da ROLEAR Lda. e da Cmara Municipal de Tavira e com a

    colaborao do INETI (Ministrio da Economia e Inovao) e

    da Universidade do Algarve.

    Os colectores do tipo CLFR (Compact Linear Fresnel Reflec-tor) sero produzidos em Portugal, numa unidade industrial

    criada para o efeito, tendo em vista a expanso da produo

    para outros projectos dentro e fora de Portugal.

    A central ocupar uma rea de dez hectares para a instalao de

    83 mil metros quadrados de espelhos.

    A produo de electricidade a partir da energia solar pode

    realizar-se com diversos tipos de tecnologia, sendo comum a

    todos eles o aquecimento de um fluido (gua, vapor, ar, etc.)

    com o qual se pode gerar movimento capaz de accionar um

    gerador elctrico. A tecnologia CFLR desenvolvida pela em-

    presa australiana Solar Heat and Power, Pty (SHP) uma

    combinao, em alguns aspectos, da tecnologia das centrais

    de torre e das centrais do tipo cilindro parablico.

    TAVIRA THERMAL SOLAR POWER STATION

    This thermal solar power station, under construction in

    Capelinha, near the city of Tavira, will generate electricity

    through the use of steam turbines.

    The company T-ESTP, S.A., which was especially formed to

    manage this project enjoys the participation of EDP, ROLEAR

    Lda. and the Municipality of Tavira and the collaboration of

    INETI (Ministry of the Economy and Innovation) and University

    of the Algarve.

    Panels of the CLFR - Compact Linear Fresnel Reflector type,will be manufactured in Portugal, in an industrial unit created

    for the purpose in question, with a view to expanding produc-

    tion to other projects inside and outside Portugal.

    The power station will cover an area of 10 hectares, with the

    installation of 83 000 m2 of mirrors.

    Electricity generation from solar power can use diverse types

    of technology, with a common factor being the heating of a

    working fluid (water, steam, air, etc.) capable of activating an

    electric generator.

    CFLR technology developed by the Australian company Solar

    Heat and Power, Pty (SHP) is, in several aspects, a combi-

    nation of the technology used in solar power towers and

    parabolic cylinder type power plants.

  • 8/2/2019 Energias Renov PT 2007

    40/60

    40

    Caractersticas do projecto

    Turbogerador 6,6 MWe

    Potncia pico 6,5 MWe

    Potncia nominal 5,2 MWe

    Nmero de horas de funcionamento 2442

    Energia produzida 12 GWh/ano

    rea de colectores 83 000 m2

    rea de ocupao do solo 100 000 m2

    Consumo de fluido (gua desmineralizada) 1 a 2 m3/dia

    Consumo de gua para arrefecimento 130 m3/dia

    Data de entrada em funcionamento Outubro de 2008

    Investimento 19 M

    Characteristics of project

    Turbogenerator 6.6 MWe

    Peak rated power 6.5 MWe

    Nominal rated power 5.2 MWe

    Number of hours of operation 2442

    Electricity generation 12 GWh per year

    Area of panels 83 000 m2

    Area of ground occupancy 100 000 m2

    Consumption of fluid (de-mineralised water) 1 a 2 m3/day

    Consumption of cooling water 130 m3/day

    Operational in Outober 2008

    Investment EUR 19

    million

    Central solar trmica de TaviraTavira thermal solar power station

  • 8/2/2019 Energias Renov PT 2007

    41/60

    41

    CENTRAL FOTOVOLTAICA DE SERPA

    Situada na freguesia de Brinches, concelho de Serpa (distritode Beja), a central fotovoltaica de Serpa ocupa uma rea de

    60 hectares numa das zonas de Portugal onde se verificam

    os valores mais elevados da radiao solar e onde, tambm,

    existe capacidade na rede elctrica para um projecto desta

    dimenso. A electricidade produzida anualmente pela central

    suficiente para alimentar oito mil habitaes e quintas na

    regio.So parceiros neste projecto a GE Energy Financial Services

    (investidor), a Power Light Corporation (projecto e construo)

    e a Catavento, S.A. (promotor e gestor de activos).

    A utilizao do Po-

    werLight PowerTra-

    cker System, que

    acompanha o movi-

    mento aparente dosol aumenta a efi-

    cincia do sistema

    permitindo que mais

    de 200 kWp sejam

    comandados por

    um nico conjunto

    motor/actuador comapenas 0,5 kW de

    potncia.

    SERPA PHOTOVOLTAIC POWER STATION

    Located in the district of Beja, in the municipal district of Ser-pa, parish of Brinches, the Serpa photovoltaic power station

    occupies an area of 60 hectares in one of the zones in Portu-

    gal with the highest levels of solar radiation and in which the

    electricity grid has the capacity to accommodate a project of

    this size.

    The power stations annual electricity generation is sufficient

    to supply 8 000 homes and farms in the region.GE Energy Financial Services (Investor), Power Light Corpora-

    tion (Project and Construction) and Catavento, S.A. (Promoter

    and Asset Manager) are parties to this project.

    The use of the Pow-

    erLight PowerTracker

    System, accompa-

    nying the apparent

    movement of thesun, increases the

    systems efficiency

    by permitting more

    than 200 kWp to be

    controlled by a sin-

    gle motor/actuator

    with a rated powerof only 0.5 kW.

  • 8/2/2019 Energias Renov PT 2007

    42/60

    42

    Nmero de painis fotovoltaicos52 000 (Sanyo, Sharp,

    SunPower e Suntech)

    rea de implantao da central 60 ha

    rea da superfcie fotovoltaica 34 ha

    Potncia instalada 11 MWp

    Produo anual de energia

    elctrica> 18 GWh

    Sistema de seguimento solar PowerLight PowerTracker

    Investimento total 62 M

    Entrada em funcionamento Janeiro de 2007

    Especificaes da central fotovoltaica de Serpa

    Number of photovoltaic panels52 000 (Sanyo, Sharp,

    SunPower and Suntech)

    Area occupied by power station 60 hectares

    Photovoltaic surface area 34 hectares

    Installed rated power 11 MWp

    Annual electricity generation > 18 GWh

    Solar tracking system PowerLight PowerTracker

    Total investment EUR 62 million

    Operational in January 2007

    Specifications of Serpa photovoltaic power station

  • 8/2/2019 Energias Renov PT 2007

    43/60

    43

    CENTRAL FOTOVOLTAICA DE MOURA

    A Central Solar Fotovoltaica de Moura, a instalar na Freguesia daAmareleja, Concelho de Moura, ser a maior central fotovoltaica

    do mundo. Est tambm prevista a construo e explorao de

    uma fbrica de painis solares pela empresa BP Solar, a instalar no

    complexo industrial do Tecnopolo de Moura, onde sero produzi-

    dos os painis fotovoltaicos necessrios Central. Futuramente,

    a sua produo ser dirigida para o mercado internacional.

    Nmero de painis fotovoltaicos 376 632

    rea de implantao da central 130 ha

    Potncia instalada 62 MWp

    Produo anual de energia elctrica 88 GWh

    Transformadores de potncia 22

    Inversores 214

    Co2 evitado 60 000 t/ano

    Investimento 250 M

    Especificaes da Central Fotovoltaica de Moura

    Number of photovoltaic panels 376 632

    Area occupied by power station 130 ha

    Installed rated power 62 MWp

    Annual electricity generation 88 GWh

    Power transformers 22

    Inverters 214

    CO2 avoided 60 000 t per year

    Investment EUR 250 million

    Specifications of Moura Photovoltaic Power Station

    MOURA PHOTOVOLTAIC POWER STATION

    The Moura Photovoltaic Solar Power station, to be installedin the parish of Amareleja, in the municipal district of Moura,

    will be the worlds biggest. The construction and operation of

    a solar panel manufacturing plant by the company BP Solar,

    to be installed on the Tecnopolo de Moura industrial estate,

    which will be producing the photovoltaic panels necessary for

    the power station, is also planned. Its future production will

    be targeted at the international market.

  • 8/2/2019 Energias Renov PT 2007

    44/60

    44

    INTEGRAO DE SISTEMASDE APROVEITAMENTO

    DA ENERGIA SOLAR EDIFCIOS

    A nova legislao sobre edifcios que decorre da transposio

    da Directiva 2002/91/CE compreende o Regulamento dos Sis-

    temas Energticos e de Climatizao dos Edifcios (RSECE) e

    o Regulamento das Caractersticas de Comportamento Tr-

    mico dos Edifcios (RCCTE) e cerca de 40 por cento mais

    exigente em termos de eficincia energtica que os regula-mentos anteriores. Esta legislao obriga instalao de pai-

    nis solares nos novos edifcios, tornando assim possvel a

    diminuio efectiva do consumo de energia neste sector.

    O Edifcio Solar XXI, situado no Campus do INETI, um exem-

    plo de integrao de sistemas solares passivos (solar trmico

    e fotovoltaico) e activos (arquitectura bioclimtica).

    INTEGRATION OF SOLAR POWER SYSTEMSIN BUILDINGS

    New legislation on buildings deriving from the transposition

    of Directive 2002/91/CE, encompasses RSECE (Regulation

    on Energy and Acclimatisation Systems in Buildings) and RC-

    CTE (Regulation on the Thermal Performance of Buildings) is

    around 40% more demanding in terms of energy efficiency

    than the former regulations. This legislation make it manda-

    tory to install solar panels on new buildings, therefore makingit possible to effectively reduce energy consumption in this

    sector.

    The Edifcio Solar XXI, located on INETIs campus is an ex-

    ample of the integration of passive (thermal solar and photo-

    voltaic) and active (bioclimatic architecture) solar systems.

    Vista geral e parque deestacionamento com um sistemafotovoltaico de 6kWpGeneral view and car park with

    a 6 kWp photovoltaic system

    CopyrightINETI/DER

  • 8/2/2019 Energias Renov PT 2007

    45/60

    45

    SISTEMA FOTOVOLTAICO

    rea de painis 96 m2

    Potncia instalada 12 kWp

    Energia produzida 12 MWh/ano

    CO2 evitado 8 t

    EDIFCIO

    rea edificada 1500 m2 (3 pisos)

    Tipologia Servios

    Edifcio Solar XXI

    PHOTOVOLTAIC SYSTEM

    Area of panels 96 m2

    Installed rated power 12 kWp

    Electricity generation 12 MWh per year

    CO2 Avoided 8 t

    BUILDING

    Built area 1500 m2 (3 floors)

    Type of building Services

    Edifcio Solar XXI

    EDIFCIO SOLAR XXI

    Um edifcio energeticamente eficiente em Portugal

    O Edifcio Solar XXI um projecto do INETI (Departamento de

    Energias Renovveis) com apoio do PRIME. Tem como objec-

    tivo principal a criao de um edifcio que possa constituir um

    ex-libris da eficincia energtica em edifcios e da utilizao

    das energias renovveis.

    Este projecto associa uma estratgia de optimizao da en-

    volvente utilizao de sistemas solares,

    activos e passivos, destacando-se a integra-

    o de sistemas fotovoltaicos nas fachadas

    com aproveitamento trmico e um siste-

    ma de arrefecimento passivo pelo solo, de

    modo a garantir que condies de conforto

    trmico no edifcio sejam asseguradas, re-

    duzindo ou anulando quaisquer consumos

    energticos para esse efeito.

    EDIFCIO SOLAR XXI

    An Energy Efficient Building in Portugal

    The Edifcio Solar XXI, is a INETI (Renewable Energies De-

    partment) project with the support of PRIME. Its principal ob-

    jective is to design and build a prime example of an energy

    efficient building and use of renewable energies.

    This project associates an environmental optimisation strat-

    egy with the use of active and passive solar systems particu-

    larly including the integration

    of photovoltaic systems on

    the facades to exploit thermal

    benefits and a passive cooling

    system using the ground to

    ensure thermal comfort inside

    the building, reducing or elimi-

    nating any energy consump-

    tion for the said purpose.

    ENERGIA GEOTRMICA

  • 8/2/2019 Energias Renov PT 2007

    46/60

    46

    O tipo de utilizao da energia contida nos fluidos geotrmi-

    cos depende do caudal disponvel, da temperatura e da qua-

    lidade da gua. O caudal disponvel e a temperatura determi-

    nam as dimenses da central geotrmica, sendo o tipo de

    aplicao geotrmica condicionada pela temperatura.

    Os recursos geotrmicos de baixa entalpia, presentes em

    Portugal, no territrio continental, prestam-se geralmente

    utilizao directa do calor, por meio de permutadores ou de

    bombas de calor, para aquecimentos domsticos, industriais

    e agrcolas (como estufas). Os recursos de alta entalpia dos

    Aores devem-se sua localizao geo-estrutural, junto da

    Crista Mdio Atlntica, na confluncia de trs placas tectni-

    cas (americana, africana e euroasitica), que proporciona umaintensa actividade vulcnica, com mais de trs dezenas de

    erupes vulcnicas histricas registadas, bem como outras

    manifestaes superficiais evidenciveis da enorme quanti-

    dade de energia endgena existente no subsolo em muitos

    locais do arquiplago.

    Em termos scio-econmicos o aproveitamento desta fonte

    de energia renovvel fomenta a criao de emprego local e

    promove o fortalecimento da economia regional, potenciando

    simultneamente o desenvolvimento de competncias tcni-

    cas. O decisivo empenho da Regio Autnoma dos Aores

    relativamente questo das energias renovveis, em particu-

    lar da geotermia, no mix energtico, veio a provar-se como

    certo, podendo considerar-se hoje uma aposta ganha, face ao

    aprovisionamento energtico endgeno da ilha de S. Miguel.

    The type of use of energy contained in geothermal fluids de-

    pends upon the available flow, water temperature and qual-

    ity.

    Available flow and temperature determine the size of the geo-

    thermal power station whose type of geothermal applica-

    tion is conditioned by the temperature.

    Low enthalpy geothermal resources, present in mainland Por-

    tugal, are generally suitable for the direct use of heat, using

    heat exchangers or heat pumps, for domestic, industrial and

    agricultural (such as greenhouses) heating. High enthalpy re-

    sources existing in the Azores derive from their geostructural

    location, next to the Mid Atlantic Ridge, at the confluence of

    three tectonic plates American, African and Eurasian, gener-ating intense volcanic activity, with more than thirty recorded

    volcanic eruptions, in addition to other surface manifestations

    evidenced by the enormous amount of endogenous subterra-

    nean energy existing in many locations on the archipelago.

    In socioeconomic terms, the exploitation of this source of

    renewable energy helps to create local employment and

    strengthens the regional economy, while also promoting the

    development of technical expertise.

    The decisive commitment of the Autonomous Region of the

    Azores contribution to renewable, particularly geothermal en-

    ergies, in terms of the energy mix, has been shown to be cor-

    rect and successful in light of the energy supply on the island

    of S. Miguel.

    ENERGIA GEOTRMICAGEOTHERMAL ENERGY

  • 8/2/2019 Energias Renov PT 2007

    47/60

    47

    Vista Geral da Centralda Ribeira Grande

    General View of RibeiraGrande Power Station

    CENTRAIS GEOTERMOELCTRICASDO ARQUIPLAGO DOS AORES

    A SOGEO - Sociedade Geotrmica dos Aores, S.A. a em-

    presa concessionria da explorao dos recursos geotrmi-

    cos do Campo Geotrmico da Ribeira Grande, localizado na

    vertente norte do vulco do Fogo, prximo da cidade da Ribei-

    ra Grande, na ilha de S. Miguel (Aores).

    O recurso geotrmico existente no Campo Geotrmico da

    GEOTHERMAL ELECTRIC POWER STATIONSIN THE ARCHIPELAGO OF THE AZORES

    SOGEO - Sociedade Geotrmica dos Azores, S.A. is the con-

    cessionaire for the exploitation of geothermal resources in the

    Ribeira Grande Geothermal Field, located on the northern side

    of the Fogo volcano, close to the city of Ribeira Grande, on the

    island of S. Miguel (Azores). The geothermal resources exist-

    ing in the Ribeira Grande Geothermal Field are currently be-

  • 8/2/2019 Energias Renov PT 2007

    48/60

    48

    Especificaes Ribeira Grande Pico Vermelho Total

    Capacidade instalada 13 MW 10 MW 23 MW

    Grupos turbogeradores (2 x 2,5 + 2 x 4) 10

    Produo elctrica anual 82,5 GWh/ano 78,5 GWh/ano 161 GWh/ano

    Entrada em

    funcionamento1994 2006

    Investimento 34,4 M

    Centrais geotrmicas de S. Miguel - Aores

    Central geotrmica do Pico VermelhoPico Vermelho geothermal power station

    Ribeira Grande actualmente explorado em duas centrais

    geotrmicas de produo de energia elctrica: a Central

    Geotrmica da Ribeira Grande e a nova Central Geotrmica do

    Pico Vermelho que conjuntamente asseguram 44 por cento

    do total da energia produzida em So Miguel.Ambas as centrais geotrmicas possuem tecnologia binria,

    funcionando segundo o ciclo de Rankine, aproveitando o ca-

    lor contido na fase lquida e de vapor do fluido geotrmico

    para vaporizao de um fluido de trabalho.

    No sector do Pico Vermelho do Campo Geotrmico da Ribei-

    ra Grande, no ano de 2005, iniciou-se a construo da nova

    central do Pico Vermelho, com o objectivo de reforar a capa-

    cidade de gerao a partir da fonte geotrmica na ilha de S.

    Miguel.

  • 8/2/2019 Energias Renov PT 2007

    49/60

    49

    Specifications Ribeira Grande Pico Vermelho Total

    Installed capacity 13 MW 10 MW 23 MW

    Turbogenerators (2 x 2.5 + 2 x 4) 10

    Annual electricity generation 82.5 GWh per year 78.5 GWh per year 161 GWh per year

    Operational in 1994 2006

    Investment EUR 34.4 million

    Geothermal power stations in S. Miguel - Azores

    Vista parcial da Central da Ribeira GrandePart view of Ribeira Grande Power Station

    ing exploited by two geothermal power stations: the Ribeira

    Grande Geothermal Power Station and the new Pico Vermelho

    Geothermal Power Station which together account for 44% of

    total power generation in S. Miguel.

    Both geothermal power stations use Rankine cycle binarytechnology, exploiting the heat contained in the liquid and

    vapour phase of the geothermal fluid to vaporise a working

    fluid.

    Work started in the Pico Vermelho sector of the Ribeira Grande

    Geothermal Field in 2005 on the construction of the new Pico

    Vermelho power station with the objective of reinforcing the

    generating capacity from geothermal sources on the island

    of S. Miguel.

    ENERGIA DAS ONDAS

  • 8/2/2019 Energias Renov PT 2007

    50/60

    50

    Portugal tem uma posio de liderana mundial e de prestgio

    no que se refere a conhecimentos tcnico-cientficos sobre

    a energia das ondas, aps mais de 20 anos de investigaodesenvolvida pelo IST (Instituto Superior Tcnico) e INETI (Ins-

    tituto Nacional de Engenharia, Tecnologia e Inovao).

    Com a preparao de uma zona martima para a instalao de

    projectos-piloto visa-se o desenvolvimento de novas tecno-

    logias, que possibilitem, simultaneamente, o aproveitamento

    deste potencial energtico e a criao de um cluster indus-

    trial ligado energia das ondas.

    Portugal tem uma costa extensa, uma ondulao de excelen-tes caractersticas com densidade de energia bastante eleva-

    da e uma batimetria adequada.

    O recurso bastante estvel e previsvel, com relativa imuni-

    dade aos efeitos climatricos locais e uma variao horria ou

    circundiria pequena. Existem modelos Wind/Wave calibrados

    e servios de previso do estado do mar, especialmente para

    apoio navegao, bastante desenvolvidos. Tendo em contaa extenso da nossa costa e as condies que possibilitam a

    viabilidade de instalao de futuros parques offshore resulta

    um potencial de utilizao estimado em mais de 250 km.

    Portugal enjoys a leading, prestigious worldwide position in

    matters associated with its technical-scientific knowledge of

    wave power, following more than 20 years research by IST(Higher Technical Institute) and INETI (National Engineering,

    Technology and Innovation Institute).

    With the preparation of a maritime zone for the installation of

    pilot projects, the aim is to develop new technologies, permit-

    ting, at the same time, the exploitation of this energy potential

    and the creation of an industrial cluster associated with wave

    power.

    Portugal has a long coastline, undulation with excellent char-acteristics and a reasonably high energy density and a suit-

    able bathymetry..

    This resource is reasonably stable and predictable and is rel-

    atively immune from local climate effects and small hourly

    changes.

    There are calibrated wind/wave models and highly developed

    services for predicting sea conditions, particularly in supportof shipping.

    The length of our coastline and the conditions permitting the

    feasibility of the installation of future offshore installations

    ENERGIA DAS ONDASWAVE POWER

  • 8/2/2019 Energias Renov PT 2007

    51/60

    51

    O potencial de produo de energia elctrica a partir da ener-

    gia das ondas na costa atlntica portuguesa foi estimado ad-

    mitindo um recurso de 30 kW por km de costa e que uma per-centagem mdia de 15 por cento da energia incidente pode

    ser convertida em energia elctrica.

    Ondas com amplitudes grandes (> 2 m) e longos perodos (7

    a 10 s) tm energias superiores a 40~50 kW/m.

    Estima-se em 10 TWh por ano o potencial de produo de

    energia elctrica associado quela extenso, sobre os 50 m

    de profundidade. Para os mesmos 250 km, utilizando o valor

    de 20 MW de potncia instalada por quilmetro, a potnciainstalada poder ascender a 5 GW.

    A rede elctrica na faixa litoral de Portugal, onde a densidade

    populacional mais elevada e onde se verificam os maiores

    consumos de energia elctrica, oferece as condies neces-

    srias interligao.

    O desenvolvimento da energia das ondas encerra uma opor-

    tunidade de desenvolvimento para vrios sectores da activi-dade econmica e cientfica, permitindo antever a criao de

    sete mil novos postos de trabalho directos e um mercado na-

    cional no valor 5 mil milhes de euros.

    create a potential feasibility estimate of more than 250 km.

    Electricity generating potential from wave power on Portu-

    gals Atlantic coast has been estimated, on the basis of a re-source of 30 MW per kilometre of coastline and an average

    percentage of 15% of the incident energy being converted to

    electricity.

    Waves with large amplitudes (> 2 m) and long periods (7 - 10

    s) have energy of more than 40-50 kW/m.

    Electricity generating potential associated with the said extent

    at a depth of 50 m has been estimated at 10 TWh per year.

    For the same 250 km, using a value of