3
NDICECONTENTS
Energia hdricaHydropower ...................................8
Energia elica
Wind power ..................................12
Bioenergia
Bio energy ....................................24
Energia solar
Solar power ..................................38
Energia geotrmica
Geothermal energy ......................46
Energia das ondasWave power .................................50
8/2/2019 Energias Renov PT 2007
4/60
4
We are currently at a turning point given the need to respond
to the challenge of climate change and the need to reduce the
dependence on fossil fuels.
However this challenge creates many opportunities: more in-
vestigation and technological development, more innovative
investment and more jobs.
We may well be at the edge of a new technological revolutionwith an equivalent importance to what occurred in Informa-
tion and Communication Technologies.
There are many variables in the equation. The creation of inte-
grated, transparent and competitive markets. A new philoso-
phy for grid management. Achieving an efficient response to
energy storage. The commitment to renewable energies.
Portugal has, over the last two years, approved a comprehen-
sive series of measures to promote renewable energies. En-ergy policy development derives from the governments polit-
ical will, expressed in Resolution 169/2005 of October 2005.
The National Energy Strategy established various objectives,
namely the creation of a stable, transparent organisational
framework for the sector, permitting an unprecedented ex-
pansion of investment in renewable energies. The strategy
implementation is transforming Portugal in a benchmark operatorin terms of wind power development.
Vivemos um momento de mudana devido necessidade de res-
ponder ao desafio criado pelas alteraes climticas e pela neces-
sidade de reduzir a dependncia de combustveis fsseis.
Mas este desafio cria muitas oportunidades: mais investigao e
desenvolvimento tecnolgico, mais investimento inovador e mais
empregos.
Poderemos estar beira de uma revoluo tecnolgica com umaimportncia semelhante ocorrida nas Tecnologias da Informa-
o e da Comunicao.
H muitos aspectos em equao. A criao de mercados integra-
dos, transparentes e concorrenciais. Uma nova filosofia da gesto
de redes. Capacidade em criar uma resposta eficiente ao proble-
ma do armazenamento. A aposta nas energias renovveis.
Portugal aprovou nos ltimos dois anos um conjunto ambicioso de
medidas para promoo das energias renovveis. O desenvolvi-mento da poltica energtica traduz a viso do Governo, expressa
na Resoluo de Conselho de Ministros de Outubro de 2005.
A Estratgia Nacional para a Energia, estabeleceu vrios objecti-
vos, nomeadamente a criao de um quadro organizativo estvel
e transparente para o sector, e permitiu uma expanso sem pre-
cedentes do investimento em Energias Renovveis. O desenvol-
vimento desta estratgia est a tornar Portugal numa refernciaa nvel da energia elica. Tal sucede no momento em que Por-
8/2/2019 Energias Renov PT 2007
5/60
5
Manuel PinhoMinistro da Economia e da InovaoMinister of Economy and Inovation
This development happens in the moment when Portugal is
assuming the Presidency of the European Union and when
energy is one of the priorities in the European agenda. We will
not miss the opportunity to impact such an important issue.
Commitment to renewable energies, as a relevant means of lim-
iting the economys carbon intensity and as a significant contri-
bution to the diversification and sustainability of the energy sec-tor, is particularly based on the development of hydro and wind
power, biomass, promotion of biofuels and solar power.
Pursuant to the framework of Directive 2001/77/CE of 27 Sep-
tember 2001, on the promotion of electricity generated from
renewable energy sources, Portugal undertook to achieve a
target of 39% by 2010. At the end of March 2007, Portugal
had 7092 MW of installed capacity for electricity generation
from renewable energy sources.Electricity generation from renewable energy sources is par-
ticularly concentrated in northern Portugal, in the districts of
Bragana, Viana do Castelo, Viseu, Coimbra, Vila Real and
Braga. Excluding major hydroelectric projects, the principal
districts in terms of installed rated power are: Viseu, Coim-
bra, Lisbon, Vila Real, Castelo Branco, Santarm, Braga and
Guarda, whose installed rated power accounted for 74% oftotal renewable energy in March 2007.
tugal assume a Presidncia do Conselho da UE e em que a
questo da energia uma das prioridades da agenda europeia.
No vamos falhar a oportunidade de deixar uma marca nesta
questo to importante para a Europa.
A aposta nas Energias Renovveis visa limitar a intensidade car-
bnica da economia e contribuir para a diversificao e sustenta-
bilidade do sector energtico. Assenta, em especial, no desenvol-vimento das energias hdrica e elica, na biomassa, no incentivo
aos biocombustveis e na energia solar.
No quadro da Directiva 2001/77/CE, de 27 de Setembro de 2001,
relativa promoo de electricidade produzida a partir de fontes
de energias renovveis (FER), Portugal assumiu o compromisso
de, at 2010, atingir uma meta de 39 por cento. No final de Maro
de 2007, Portugal tinha 7092 MW de capacidade instalada para
produo de energia elctrica a partir de fontes de energia reno-vveis. A produo de energia elctrica de origem renovvel est
concentrada no Norte do pas, principalmente nos distritos de
Bragana, Viana do Castelo, Viseu, Coimbra, Vila Real e Braga.
Excluindo a grande hdrica, os principais distritos em termos de
potncia instalada so Viseu, Coimbra, Lisboa, Vila Real, Castelo
Branco, Santarm, Braga e Guarda, correspondendo a potncia
instalada destes oito distritos, em Maro de 2007, a 74 por centodo total renovvel. Em 2005, Portugal, foi o pas da Unio Europeia
8/2/2019 Energias Renov PT 2007
6/60
6
Portugal was the European Union country with the highest
growth in wind power generating capacity in 2005. A total of
36 new wind farms came into service in 2006, comprising a
60% growth in installed rated power.
Given the strategic importance of the commitment to renew-
able energies, the government, in 2007, defined new commit-
ments for 2010:
45% of all electricity consumption to be from renewable
energy sources;
biofuels used in the transport sector to account for 10%of road fuel consumption;
5 - 10% of coal used in power stations to be replaced by
biomass or wastes.
New objectives for various renewable energy sources were,
accordingly, defined:
Wind Power: To increase installed capacity by 1950 MW,by the year 2012, to total 5100 MW (600 MW of which
comprising equipment upgrades) and investment in a
technological cluster associated with wind power;
Hydropower: Reinforcement of the rated power of current
hydroelectric infrastructures, to achieve 5575 MW of installed
capacity in 2010 (575 MW more than previously forecast) and
achieving a 70% rate of exploitation of national hydroelectric
generating capacity potential in the medium term; Biomass: Attribution of a further 100 MW, totalling 250
MW in electricity generating capacity by 2010, promoting
linkage with forestry resources and fire-fighting policy;
Solar: Construction of the biggest worldwide photovoltaic
power station in Moura and association with micro-
generation and solar hot water policies and goals;
que mais cresceu na capacidade de produo de energia elica,
e em 2006 entraram em funcionamento 36 novos parques eli-
cos, o que significou um crescimento de 60 por cento da potncia
instalada. Dada a importncia estratgica da aposta nas energias
renovveis, o Governo definiu, em 2007, compromissos mais am-
biciosos para 2010:
45 por cento de toda a electricidade consumida ser de
base renovvel;
os biocombustveis utilizados nos transportes devero
atingir 10% do consumo dos combustveis rodovirios; cinco a dez por cento do carvo utilizado nas centrais
elctricas ser substitudo por biomassa ou resduos.
Neste sentido, foram estabelecidos novos objectivos para as v-
rias fontes de energia renovvel:
Energia Elica: Aumentar em 1950 MW a capacidade instala-
da, at 2012, perfazendo um total de 5100 MW (em que 600MW sero por upgrade do equipamento), e investimento
num cluster tecnolgico associado energia elica;
Energia hdrica: Reforo de potncia em infra-estruturas hi-
droelctricas existentes, de forma a atingir 5575 MW de ca-
pacidade instalada em 2010 (mais 575 MW que o previsto an-
teriormente) e atingir a prazo 70 por cento do aproveitamento
do potencial hdrico nacional;
Biomassa: Atribuio de mais 100 MW de capacidade paraproduo elctrica at 2010, para um total de 250 MW, pro-
movendo uma articulao com o recurso florestal e com a
poltica de combate ao risco de incndios;
Solar: Construo da maior central fotovoltaica do mundo
central de Moura e ligao com as polticas e metas de
microgerao e gua quente solar;
6
8/2/2019 Energias Renov PT 2007
7/60
7
Wave Power: Creation of a pilot zone with a total potential
operating capacity of up to 250 MW for the technological
development of new prototypes at their industrial and pre-
commercial stages;
Biofuels: To achieve a target of 10% of biofuels to be in-
corporated in road fuels by 2010 (bringing the European
Unions objective forward by 10 years) and promoting na-
tional agricultural strands for biofuels;
Biogas: A target of 100 MW of installed rated power in
units for anaerobic waste processing; Microgeneration: To promote the installation of 50 000
systems, by 2010, encouraging the installation of solar hot
water in buildings.
Renewable energies are a driving force behind economic,
social and technological development and lie at the founda-
tion of the promotion of important investments, job creationand regional development. Reference should be made to
the development of technological and research clusters; the
promotion of national agricultural strands, creation of water
impounding infrastructures and flood control; policies coor-
dination to reduce the risk of fires; increasing the useful life
of landfills.
To provide better information on national policy guidelines for
the renewables sector, aimed at providing information on theprincipal policies and measures in the renewable area, we
considered that it would be useful to publish a compilation of
some of the most emblematic projects already implemented
or in progress, contributing to the development of electricity
generation from renewable energy sources, in Portugal.
Ondas: Criao de uma zona piloto com potencial de explo-
rao total at 250 MW para desenvolvimento tecnolgico de
novos prottipos em fase industrial e pr-comercial;
Biocombustveis: Atingir em 2010 a meta de 10 por cento de
biocombustveis a incorporar nos combustveis (antecipando
em dez anos o objectivo da Unio Europeia) e promover filei-
ras agrcolas nacionais para biocombustveis;
Biogs: Meta de 100 MW de potncia instalada em unidades
de tratamento anaerbico de resduos;
Microgerao: Promover a instalao de 50 000 sistemas at2010, com incentivo instalao de gua quente solar nos
edifcios.
As energias renovveis constituem um motor de desenvolvi-
mento econmico, social e tecnolgico. Esto na base da pro-
moo de importantes investimentos, da criao de emprego
e de desenvolvimento regional, sendo de realar o desenvol-vimento de clusters tecnolgicos e de investigao; a promo-
o de fileiras agrcolas nacionais; a criao de infra-estruturas
para reservas de gua e controlo de cheias; a introduo de
polticas concertadas para a reduo de risco de incndios; o
aumento da vida til dos aterros.
Para melhor ilustrar as linhas estratgicas da poltica nacional
para o sector das renovveis e com o objectivo de promover
a divulgao das principais polticas e medidas na rea, con-siderou-se til reunir nesta edio um conjunto de projectos,
eventualmente os mais emblemticos, uns j realizados e ou-
tros a realizar, que iro contribuir para o desenvolvimento da
produo de energia elctrica a partir de fontes de energia re-
novveis no nosso pas.
7
8/2/2019 Energias Renov PT 2007
8/60
8
Portugal is one of the European Union countries with the
highest exploitable hydropower potential. It is also one of the
countries with the lowest hydro capacity growth over the last
30 years, still having around 54% of exploitable potential.
Hydropower is clearly a priority and one of national energy
policys principal commitments, with the objective of exceeding
an installed rated power of 7000 MW by 2020.
To achieve this objective and close the gap with such bench-
mark operators as Austria and Sweden, a framework of objec-
tives providing for the following measures, was established:
by 2010, preparation of a National Strategic Plan for invest-
ments in hydro projects, committed to optimising the poten-
tial of currently existing infrastructures, exceeding 5000 MW
of installed rated power by doubling the Alqueva dams
generating capacity im Guadiana river and bringing forward
rated power increases in Picote and Bemposta in Douro river;
by 2015, to achieve 6250 MW in hydro capacity, comprisingnew structuring projects for the sector and country, with a
strong commitment to hydroelectric reversible infrastruc-
tures with pumping capacity, to complement wind power
resources;
by 2020, to finalise the implementation of the National
Strategic Plan and achieve 7000 MW of installed capacity,
achieving the objective of exploiting around 70% of na-tional hydro potential.
Portugal um dos pases da Unio Europeia com maior poten-
cial hdrico por explorar. tambm um dos pases que menos
cresceu em capacidade hdrica nos ltimos 30 anos, tendo
hoje ainda cerca de 54 por cento do potencial por aproveitar.
A energia hdrica claramente uma prioridade e uma das prin-
cipais apostas da poltica energtica nacional, com o objecti-
vo de superar os 7000 MW de potncia instalada em 2020.
Para isso, tendo em vista uma aproximao a pases de refe-
rncia como a ustria e a Sucia, foi estabelecido um quadro
de objectivos que prev as seguintes medidas:
at 2010, elaborar um Plano Estratgico Nacional para
investimentos em aproveitamentos hdricos e apostar na
optimizao do potencial das infra-estruturas j existen-
tes, superar os 5000 MW de potncia instalada atravs da
duplicao do Alqueva e da antecipao dos reforos de
potncia de Picote e Bemposta;
at 2015, atingir 6250 MW de capacidade hdrica, con-cretizando novos projectos estruturantes para o sector
e para o pas, com uma aposta forte em infra-estruturas
hidroelctricas com bombagem, para assegurar a com-
plementaridade com os recursos elicos;
at 2020, concluir a implementao do Plano Estratgico
Nacional e alcanar os 7000 MW de capacidade instalada,
atingindo o objectivo de explorao de cerca de 70 porcento do potencial hdrico nacional.
ENERGIA HDRICAHYDROPOWER
8/2/2019 Energias Renov PT 2007
9/60
9
EMPREENDIMENTO HIDROELCTRICODE VENDA NOVA II CENTRAL DE FRADES
A Central Hidroelctrica da EDP Energias de Portugal, de-
signada por Empreendimento de Venda Nova II, situa-se na
regio noroeste do territrio continental portugus, no conce-
lho de Vieira do Minho, distrito de Braga, e parte integrante
do Centro de Produo do Cvado-Lima.
Esta Central permite um maior aproveitamento, em bomba-
gem, dos exceden-
tes de produo de
energia elctrica dascentrais trmicas e
elicas em horas de
baixo consumo e a
disponibilizao, por
turbinamento, de
mais energia e po-
tncia nas horas emque os consumos au-
mentam.
A concepo deste
projecto atendeu s
condies locais e
evoluo do diagra-
ma de consumos e
do sistema electro-
VENDA NOVA II (FRADES)HYDROELECTRIC POWER STATION
The EDP Energias de Portugal hydroelectric power station
known as Venda Nova II, in the northeast region of mainland
Portugal, in the municipal district of Vieira do Minho, district
of Braga is a part of the Cvado-Lima generating system.
This power station efficiently uses the surplus electricity from
the thermal and wind power stations by pumping at off-peak
times and produces
more energy and
rated power at peaktimes using its turbo-
generators.
This project was de-
signed on the basis
of local conditions
and the evolution
of the consumptionchart and national
electricity generating
system, leading to
the adopting of a
reversible scherme
permitting either to
turbine water from
the Venda Nova to
Localizao da Central de FradesLocation of Frades Power Station
8/2/2019 Energias Renov PT 2007
10/60
10
produtor nacionais,
as quais levaram
adopo de um
esquema revers-
vel que permite
turbinar a gua da
albufeira de Venda
Nova para a albu-
feira de Salamonde
e, alternadamente,a sua bombagem
no sentido inverso.
A Central, locali-
zada em posio
intermdia do tra-
ado do circuito
hidrulico e a uma
profundidade de
cerca de 350 me-
tros, constitu-
da por duas cavernas ligadas entre si por duas galerias. Na
caverna principal encontram-se dois grupos de geradores
reversveis iguais, de eixo vertical, constitudos por turbinas-
-bombas do tipo Francis e respectivos alternadores-motores.
the Salamonde reser-
voir or reverse pumping
operation.
The power station, lo-
cated halfway along
the hydraulic circuit
and at a depth of
around 350 metres,
comprises two caverns
interconnected by twogalleries. The principal
cavern houses two re-
versible vertical gene-
rating units, compri-
sing Francis turbines-
-pumps and respective
alternators-motors.Interior da central
Interior of power station
8/2/2019 Energias Renov PT 2007
11/60
11
Caractersticas da central
Potncia instalada 192 MW
Produo elctrica 220 GWh/ano
Entrada em funcionamento Agosto 2005
Characteristics of power station
Installed rated power 192 MW
Electricity generation 220 GWh per year
Operation start-up August 2005
Vista exterior da centralOutside view of power station
The adjacent cavern houses the two three phase transformers.
The principal access to the power station zone comprises a
tunnel with an 8 metre high transversal section, a total length
of around 1.5 kilometres and an incline of 11%.
The hydraulic circuit, in tunnel format, is around 4.5 kilometres
long with a diameter of 6.3 metres, inside the granite massif
of the left hand bank of the River Rabago, between the Venda
Nova and Salamonde reservoirs, permitting the exploitation
of the hydraulic circuits
and infrastructures alreadycreated by the works car-
ried out on the former Vila
Nova / Venda Nova.
Na caverna anexa ficam instalados os dois transformadores
do grupo trifsicos. O acesso principal zona da central
realizado atravs de um tnel com uma seco transversal de
8 metros de altura, uma extenso total de cerca de 1,5 km e
uma inclinao de 11 por cento.
O circuito hidrulico, em tnel, tem cerca de 4,5 km de ex-
tenso e 6,3 metros de dimetro, desenvolve-se no interior
do macio grantico da margem esquerda do rio Rabago,
entre as albufeiras de
Venda Nova e Sala-monde, permitindo o
aproveitamento das
condies hidrulicas
e de infra-estruturas
j criadas pelas obras
do antigo Aproveita-
mento Hidroelctrico
de Vila Nova / Venda
Nova.
8/2/2019 Energias Renov PT 2007
12/60
12
ENERGIA ELICAWIND POWER
8/2/2019 Energias Renov PT 2007
13/60
13
Em Portugal, devido sua situao geogrfica e geomorfolo-
gia, apenas nas montanhas a velocidade e a regularidade dovento susceptvel de aproveitamento energtico.
A maior parte dos locais com essas caractersticas situa-se
a norte do rio Tejo e, a sul, junto Costa Vicentina e Ponta
de Sagres. Presentemente est em curso o levantamento do
potencial de energia elica offshore ao longo da costa portu-
guesa.
A base de dados do potencial elico do vento em Portugal
EOLOS2.0 apresenta as caractersticas fsicas e energti-
cas do escoamento atmosfrico num conjunto de 57 locais.
Em Portugal Continental, foi desenvolvida pelo INETI-DER. O
software VENTOS utilizado para simulao computacional
do comportamento do escoamento do vento sobre solos
complexos com ou sem arborizao foi desenvolvido pela
FEUP, em colaborao com o Instituto de Engenharia Mec-
nica e Gesto Industrial, o INESC (Porto) e o Research Centrefor Wind Energy and Atmospheric Flows (RCWEAF). Ambas
so ferramentas importantes para a avaliao do potencial
energtico da energia do vento em Portugal.
Com o objectivo de intensificar e diversificar o aproveitamento
das FER para a produo de electricidade, com especial enfo-
que na energia elica, em 2005, Portugal reviu os objectivos
estabelecidos em 2003 e decidiu aumentar em 1950 MW ameta da capacidade instalada, para 5100 MW, em 2012 (com
Owing to Portugals geographical and geomorphologic loca-
tion, it is only in the mountains that the speed and regularityof the wind enables it to be exploited for energy purposes.
Most of the locations with the above characteristics are to
be found north of the River Tagus (Tejo) and south along the
Costa Vicentina and Ponta de Sagres. A survey on offshore
wind power potential along the Portuguese coast is currently
being prepared.
The database on wind power potential in Portugal EOLOS2.0
provides information on the physical and energy characteris-
tics of the atmospheric flow in 57 locations, on mainland Por-
tugal. The database was developed by INETI-DER. The VEN-
TOS software used for computational simulation purposes
of the behaviour of wind flow on complex terrains, whether or
not arborised, was developed by FEUP, in collaboration with
the Institute of Mechanical Engineering and Industrial Manage-
ment, INESC (Porto) and the Research Centre for Wind Energyand Atmospheric Flows (RCWEAF). Both are important tools
for the assessment of wind power potential in Portugal.With
the objective of intensifying and diversifying the exploitation
of renewable energy sources for electricity generation pur-
poses, particularly focusing on wind power, in 2005, Portu-
gal reviewed the objectives established in 2003 and decided
to increase its installed capacity target by 1950 MW to 5100MW, in 2012 (with an increase of 600 MW in equipment up-
8/2/2019 Energias Renov PT 2007
14/60
14
grades), while, at the same time, creating a technological and
industrial cluster associated with wind power.
This objective will represent a contribution of 20% to con-
sumption requirements at the end of the decade.
Generation in 2006, was more than 2120 equivalent hours perMW.The installed rated power at the end of March 2007 was
1808 MW, divided up over 143 farms, with a total number
of 1019 wind turbines over the whole of mainland territory,
with 52% of the installed rated power in farms with a rated
power of 25 MW or less. Average investment was EUR 1.18
million / MW.
A tender was issued for attributing up to 1800 MVA in rated
power and the creation of an industrial cluster associated with
the wind sector, with an investment of around EUR 1700 mil-
lion, the creation of around 1500 jobs and formation of a EUR
35 million fund for innovation in the renewable energies area.
The districts of Viseu, Coimbra, Lisbon, Castelo Branco, Vila
Real, Santarm, Leiria and Braga have the highest installed
rated power (March 2007) and districts with the greatest re-
sources, in 2006, were Bragana, Coimbra, Porto, Vila Real,Viana do Castelo, Guarda, Castelo Branco and Aveiro.
At the current rate of coming into service of new wind farms,
2000 MW of rated wind power, shall be in service on the na-
tional electricity system in 1st half 2007.
um acrscimo em 600 MW por upgrade do equipamento),
promovendo simultaneamente a criao de um cluster tec-
nolgico e de investimento associados energia elica.
Este objectivo representar uma contribuio de 20 por cento
para a satisfao do consumo no final desta dcada.A produo, em 2006, foi superior a 2120 horas equivalen-
tes por MW. A potncia instalada no final de Maro de 2007
situava-se em 1808 MW, distribuda por 143 parques, com
um total de 1019 aerogeradores ao longo de todo o territrio
continental, sendo que 52 por cento da potncia instalada se
situa em parques com potncia igual ou inferior a 25 MW. O
investimento mdio foi 1,18 milhes de euros/MW.
Foi lanado um concurso para atribuio at 1800 MVA de
potncia e a criao de um cluster industrial ligado ao sec-
tor elico, com um investimento de cerca de 1700 milhes
de euros, a criao de cerca de 1500 postos de trabalho e
a constituio de um fundo de 35 milhes de euros para a
inovao na rea das energias renovveis.
Os distritos de Viseu, Coimbra, Lisboa, Castelo Branco, Vila
Real, Santarm, Leiria e Braga so os de maior potncia ins-talada (Maro de 2007) e os distritos com maior recurso, em
2006, foram Bragana, Coimbra, Porto, Vila Real, Viana do
Castelo, Guarda, Castelo Branco e Aveiro.
Com o ritmo actual de entrada em funcionamento de novos par-
ques elicos, devero atingir-se os 2000 MW de potncia eli-
ca no sistema elctrico nacional durante o primeiro semestre de
2007.
8/2/2019 Energias Renov PT 2007
15/60
15
Data de arranque do projecto Setembro de 2004
Data de concluso do projecto Maio de 2007
Nmero de aerogeradores 64
Entrada em funcionamento Dezembro de 2005
Potncia instalada 146 MW
Produo expectvel 335 GWh/ano
Valor do investimento 150 milhes de euros
Caractersticas do projecto
Project start date September 2004
Project completion date May 2007
Number of wind turbines 64
Operational in December 2005
Rated power capacity 146 MW
Forecast generating capacity 335 GWh per year
Amount of investment EUR 150 million
Characteristics of project
PINHAL INTERIORWIND FARM
This wind farm is located in central Portugal in the region
known as Pinhal Interior. The project encompasses the dis-
tricts of Oleiros parishes of lvaro, Oleiros, Sobral, Mostei-
ro, Isna, Estreito and Sarnadas de S. Simo; Proena-a-Nova
PARQUE ELICODO PINHAL INTERIOR
O Parque Elico localiza-se na zona centro do pas na regio
denominada Pinhal Interior. O projecto abrange os conce-
lhos de Oleiros (freguesias de lvaro, Oleiros, Sobral, Mos-
teiro, Isna, Estreito e Sarnadas de S. Simo), Proena-a-Nova
Vista de uma das seces do Parque Elico do Pinhal InteriorView of one of the sections of the Pinhal Interior Wind Farm
8/2/2019 Energias Renov PT 2007
16/60
16
(freguesias de Proena-a-Nova e Sobreira Formosa), Sert
(freguesias de Ermida, Figueiredo e Troviscal) e o concelho
de Vila Velha de Rdo (freguesias de Vila Velha de Rodo e
Fratel), compreendendo sete reas de implantao.Constitui, ainda, um dos pilares fundamentais do Projecto
Elico da Beira Interior (Caramulo, Pinhal Interior, Gardunha,
Trancoso, Mosqueiros), em desenvolvimento pela GENERG,
abrangendo as regies da Beira Alta e Beira Baixa que, no seu
conjunto, envolver 12 concelhos e representar um Investi-
mento de 450 milhes de euros.
Este projecto elico um dos maiores do pas, com forte im-
pacte econmico nos quatro concelhos abrangidos.
- parishes of Proena-a-Nova and Sobreira Formosa; Sert
- parishes of Ermida, Figueiredo and Troviscal; and the muni-
cipal district of Vila Velha de Rdo parishes of Vila Velha de
Rodo and Fratel comprising 7 areas.This continues to be one of the fundamental pillars of the Bei-
ra Interior Wind Project (Caramulo, Pinhal Interior, Gardunha,
Trancoso, Mosqueiros). It is being developed by GENERG, and
encompasses the Beira Alta and Beira Baixa regions, which,
as a whole, will involve 12 municipal districts and comprise an
investment of EUR 450 million.
This wind project is one of the biggest in Portugal, with a ma-
jor economic impact on the four municipal districts involved.
8/2/2019 Energias Renov PT 2007
17/60
17
ALTO MINHO I WIND FARM
Still under construction, this wind farm owned by the Em-
preendimentos Elicos do Vale do Minho, S.A., company
is located in northern Portugal and encompasses the mu-
nicipal districts of Melgao, Mono, Paredes de Coura and
Valena.
Aerogeradores ENERCON de 2 MW
Capacidade instalada 240 MW
Nmero de aerogeradores 120
Investimento 360 M
Wind turbines ENERCON (2 MW)
Installed capacity 240 MW
Number of wind turbines 120
Investment EUR 360 million
Caractersticas do projecto Characteristics of project
PARQUE ELICO DO ALTO MINHO I
Ainda em fase de construo, este Parque Elico da empresa
Empreendimentos Elicos do Vale do Minho, S.A. localiza-se
na zona norte do pas e abrange os concelhos de Melgao,
Mono, Paredes de Coura e Valena.
Construo do macio de fundao da torreConstruct of foundations of tower
8/2/2019 Energias Renov PT 2007
18/60
18
PARQUE ELICO DE ARGA
Localizado em Caminha, o Parque Elico de Arga, da empresa
Empreendimentos Elicos do Vale do Minho, entrou em fun-
cionamento em Abril de 2006.
ARGA WIND FARM
Located in Caminha, the Arga wind farm, owned by the Em-
preendimentos Elicos do Vale do Minho company, came
into service in April 2006.
Nmero de aerogeradores 12
Caractersticas do aerogerador Vestas 3 MW
Potncia instalada 36 MW
Produo expectvel 71,6 GWh / ano
Entrada em funcionamento 2006
Investimento 39 M
Number of wind turbines 12
Characteristics of wind turbine Vestas 3 MW
Installed rated power 36 MW
Forecast generating capacity 71.6 GWh per year
Operational in 2006
Investment EUR 39 million
Caractersticas do projecto Characteristics of project
8/2/2019 Energias Renov PT 2007
19/60
19
CANDEEIROS WIND FARM
The Candeeiros wind farm, owned by the Companhia das
Energias Renovveis Serra de Candeeiros, Lda is located in
central Portugal, in the Alcobaa/Rio Maior region.
Nmero de aerogeradores 37
Caractersticas do aerogerador Vestas 3 MW
Potncia instalada 111 MW
Produo expectvel 294,15 GWh / ano
Entrada em funcionamento
1 Fase em 2005; 2 Fase
em 2006
Number of wind turbines 37
Characteristics of wind turbine Vestas 3 MW
Installed rated power 111 MW
Forecast generating capacity 294.15 GWh per year
Operational in
1st Stage in 2005; 2nd Stage
in 2006
PARQUE ELICO DE CANDEEIROS
O Empreendimento Elico de Candeeiros, da Companhia das
Energias Renovveis da Serra de Candeeiros, Lda encontra-se
localizado na zona centro do pas, na regio de Alcobaa/Rio
Maior.
Caractersticas do projecto Characteristics of project
8/2/2019 Energias Renov PT 2007
20/60
20
WIND INDUSTRIAL CLUSTER
Pursuant to the policy of wind power
capacity expansion (allocation of
rights up to 1800 MVA), Portugal, in
2006, issued a tender with a twofoldobjective: to use wind power to lever-
age the creation of an industrial sec-
tor and improve the efficiency of wind
power exploitation.
The creation of this wind cluster is an
instrument of a sustainable regional
development policy instrument, owing to
its importance in terms of the creation
of new sources of economic growth
and environmental conservation and
improvement.
The Agrupamento Elicas de Portu-
gal, responsible for implementing
this project, comprises a technological complex, leading the
development of wind turbines and four wind generation pro-moters having experience in the management of the wind
business.
Considered as being the most structuring project on the Por-
CLUSTER INDUSTRIAL ELICO
No quadro da expanso da capacidade elica (atri-
buio de direitos at 1800 MVA), Portugal lanou,
em 2006, um concurso com um duplo objectivo:
utilizar a energia elica para alavancar a criao deum sector industrial e explorar de forma mais efi-
ciente o recurso elico.
A criao deste cluster elico constitui um ins-
trumento de poltica de desenvolvimento regional
sustentvel, dada a sua importncia na criao de
novas fontes de crescimento econmico e na pre-
servao e melhoria do ambiente.
O Agrupamento Elicas de Portugal, constitudo
por um plo tecnolgico lder no desenvolvimen-
to de aerogeradores e por
quatro promotores eli-
cos com experincia na
gesto do negcio elico,
o responsvel pela implementao
deste projecto.Considerado como o mais estrutu-
rante, na ltima dcada, para o teci-
do industrial portugus, o cluster
Distribuio geogrfica do clusterGeographical distribution of the cluster
8/2/2019 Energias Renov PT 2007
21/60
21
tuguese industrial scene,
over the last decade, the
cluster represents invest-ment of EUR 1700 million,
of which an amount of EUR
161 million has been invest-
ed in the industrial sector
and EUR 1470 million in the
wind farms.
The new industrial cluster involves:
the creation of 29 companies
the development of an industrial complex comprising 5
manufacturing plants in Viana do Castelo, for the full pro-
duction of state-of-the-art wind turbines:
- ensuring the supply of all goods and services necessary
for the turnkey installation of wind farms;
- creation of 7 new and expansion of 12 industrial units
totaliza um investimento
de 1700 milhes de eu-
ros, dos quais 161 mi-lhes investidos na parte
industrial e 1470 milhes
de euros destinados aos
parques elicos.
O novo cluster industrial compreende:
criao de 29 empresas
desenvolvimento de um plo industrial de cinco fbricas,
em Viana do Castelo, para produo integral de aerogera-
dores de ltima gerao:
- assegurando o fornecimento de todos os bens e servi-
os necessrios instalao de parques elicos cha-
ve-na-mo;
- criando sete unidades industriais novas e ampliando 12
Vista geral do projectoGeneral view of project
8/2/2019 Energias Renov PT 2007
22/60
22
At final de 2008 estarooperacionais as outras fbricas
The other manufacturing plants willbe operational by end 2008
aposta na I&D e na transferncia de tecnologia, com a
criao de:
- Centro de Formao Profissional em Viana do Castelo- Centro de I&D e parcerias com universidades nacionais
- Um fundo de 35 milhes de euros para a inovao
criao de 48 novos parques elicos repartidos harmonio-
samente pelo pas;
distribuio de riqueza em zonas rurais (receitas dos mu-
nicpios e rendas dos proprietrios dos terrenos);
produo de mais de 2700 GWh de electricidade limpa- evitar a emisso de um milho de toneladas de CO2
por ano.
Impacto Econmico
Emprego
- Criao de 1800 novos postos de trabalho directos em
regies desfavorecidas do pas e criao de cerca de
5500 empregos indirectos anuais nos seis primeiros
anos.
Valor Acrescentado
- VAB do cluster em ano cruzeiro 116 milhes de euros
por ano
- VAB dos parques elicos 170 milhes de euros por ano
commitment to R&D and technology transfer, with the
creation of:
- a Professional Training Centre in Viana do Castelo- a R&D centre and partnerships with Portuguese univer-
sities
- A EUR 35 million innovation fund
creation of 48 new wind farms spread out over the whole
of the country;
wealth distribution in rural zones (revenues for municipali-
ties and rents for landowners); generation of more than 2700 GWh of clean electricity
- avoiding the emission of 1 million tonnes of CO2 per
year.
Economic Impact
Employment
- Creation of 1800 new direct jobs in less developed re-
gions in Portugal and around 5500 indirect jobs annually
in the first 6 years.
Added Value
- GVA of cluster in cruise year EUR 116 million per year
- GVA of wind farms EUR 170 million per year
8/2/2019 Energias Renov PT 2007
23/60
23
Efeito sobre a balana comercial
- Aumento das exportaes: mais de 60 por cento da pro-
duo ser exportada (200 milhes de euros por ano apartir de 2010)
- Reduo das importaes de componentes elicos: in-
corporao nacional passar dos actuais 20 por cento
para praticamente 100 por cento
- Reduo das importaes de matrias-primas: mais de
100 milhes de euros anuais
- Reduo da necessidade de compra de licenas de emis-so: mais de 1 milho de toneladas de CO2 evitadas
Em Novembro de 2007 estar operacional a fbrica de ps
de rotor.
Effect on Trade Balance
- Increased exports: more than 60% of production will be
exported (EUR 200 million per year starting 2010)- Reduction in imports of wind components: national in-
corporation will increase from the current level of 20% to
practically 100%
- Reduction of imports of raw materials: more than EUR
100 million per year
- Reduction of need to purchase emission licences: more
than 1 million tonnes of CO2 avoided.
The rotor blades manufacturing plant will be operational in
November 2007.
TorresTowers
8/2/2019 Energias Renov PT 2007
24/60
24
A aposta nas energias renovveis para a produo de electri-
cidade visa satisfazer, em 2010, 45 por cento do consumo de
electricidade do pas, sendo cinco por cento o contributo da
biomassa florestal.
A energia, um importante factor de crescimento da econo-mia portuguesa, constitui um desafio para o desenvolvimento
sustentvel do pas. O desenvolvimento dos recursos ener-
gticos endgenos representa um elevado potencial para a
inovao e um contributo importante para a concretizao da
Estratgia Nacional para a Energia e do Plano Tecnolgico.
A Biomassa florestal constitui uma das prioridades, dado
o seu impacto na revitalizao e dinamizao da actividade
econmica da fileira florestal, bem como na minimizao dos
riscos de incndio.
O lanamento do concurso para 15 novas centrais a biomassa
florestal representa um adicional de 100 MW e um investi-
mento total estimado em 225 milhes de euros.
Foram privilegiadas duas tipologias de centrais:
At 12 MW, permitindo economias de escala na produo
de energia elctrica e garantindo um maior raio de recolha
de Biomassa Florestal;
At 6 MW, permitindo o desenvolvimento de unidades
locais de pequena dimenso numa ptica de desenvolvi-
mento local.
The commitment to renewable energies for electricity
generation aims to meet 45% of the countrys electric-
ity requirements by 2010, 5% of which from forestry bio-
mass.
Energy, as an important growth factor for the Portugueseeconomy, represents a challenge for the countrys sus-
tainable development. The development of endogenous
energy resources represents major potential for innova-
tion and an important contribution to achieving the Na-
tional Energy Strategy and Technological Plan.
Forestry biomass is one of the priorities, given its impact
on revitalising and boosting economic activity in the forestry
strand, in addition to minimising fire risks.
The issue of a tender for 15 new forestry biomass power
stations represents an additional 100 MW and a total esti-
mated investment of EUR 225 million.
Preference has been given to two types of power station:
Up to 12 MW, permitting economies of scale in elec-tricity generation and ensuring a larger forestry bio-
mass collection area;
Up to 6 MW, permitting the development of small local
development units.
BIOENERGIABIO ENERGY
8/2/2019 Energias Renov PT 2007
25/60
25
A localizao das futuras centrais foi pr-seleccionada tendo
em conta a disponibilidade de Biomassa Florestal e o risco
estrutural de incndio. As novas Centrais a Biomassa possibi-
litaro a retirada de 1 milho de toneladas de resduos das flo-
restas nacionais e a criao de novas dinmicas de inovaona gesto e explorao florestal.
O aproveitamento da Biomassa Florestal para fins energti-
cos encarado no s como uma oportunidade de negcio e
de criao de emprego em zonas rurais, como um dos ins-
trumentos de luta contra os incndios, atravs da limpeza das
florestas. Actualmente, existem em Portugal trs centrais ter-
moelctricas ligadas rede elctrica que utilizam a Biomassa
Florestal como principal combustvel - a central da EDP, em
The location of the future power stations was pre-selected
taking into account the availability of forestry biomass and
structural fire risk. The new biomass power stations will make
it possible to extract 1 million tonnes of wastes from national
forests and create new dynamics of innovation in terms offorestry management and exploitation.
The exploitation of forestry biomass for energy purposes is
considered not only as a business opportunity and for its cre-
ation of employment in rural zones, but also as a fire-fighting
instrument in the form of forest clearing operations.
Portugal currently has two thermoelectric power stations
connected to the national grid, using forestry biomass as
their principal fuel - the EDP power station, in Mortgua
8/2/2019 Energias Renov PT 2007
26/60
26
Mortgua, e a Centroliva, em Vila Velha de Rdo e nove cen-
trais de cogerao instaladas nas indstrias do sector flores-
tal, que fazem aproveitamento de biomassa para produo de
calor, como a Portucel, Amorim Revestimentos, Stora Celbi,
Soporcel, SIAF e Companhia de Celulose do Caima.
O objectivo atingir em 2010 uma meta de 250 MW de ener-gia elctrica produzida atravs da biomassa.
and Centroliva, in Vila Velha de Rdo and nine cogenera-
tion power plants installed in forestry sector industries, such
as Portucel, Amorim Revestimentos, Stora Celbi, Soporcel,
SIAF and Companhia de Celulose do Caima which exploit
biomass for heat production.
The objective is to achieve a target of 250 MW of electricitygenerated from biomass in 2010.
8/2/2019 Energias Renov PT 2007
27/60
27
Em termos ambientais, a reduo da emisso de dixido de
carbono (C02) em 700 mil toneladas possibilitar a convergn-
cia para as metas definidas no Protocolo de Kyoto.
Os biocombustveis constituem um vector de diversificao
no abastecimento de combustveis aos transportes, sector
em se registam as mais elevadas taxas de crescimento deconsumo energtico.
Em Portugal, a dependncia energtica do sector transportador
relativamente ao petrleo acentuada, sendo responsvel por
42 por cento do consumo da totalidade do petrleo importado.
A substituio de mais de 300 milhes de litros de combus-
tveis at 2010 que corresponde a uma incorporao de dez
por cento nos combustveis rodovirios, antecipando em dez
anos o objectivo da UE, potencia a criao de unidades indus-triais e o desenvolvimento da agricultura energtica.
O Governo fixou em 205 mil toneladas a quantidade de bio-
combustveis a isentar de ISP (Imposto sobre os Produtos
Petrolferos) em 2007. Destas, 4 973 toneladas tm origem
em produo agrcola nacional. No entanto, esse valor deve
subir para 405 mil toneladas at 2010 atendendo ao aumento
previsto para a percentagem de incorporao. As medidas deiseno fiscal (ISP) visam fomentar a utilizao dos biocom-
bustveis nos transportes para reduzir a dependncia ener-
gtica portuguesa e dar cumprimento directiva comunitria
que estabelece, at 2020, a substituio de 10 por cento dos
combustveis convencionais usados nos transportes por com-
bustveis alternativos. Os pequenos produtores dedicados be-
neficiaro de iseno total de ISP at ao limite mximo global de
40 mil toneladas/ano.
In environmental terms, the reduction in the emission of
carbon dioxide (C02) by 700 thousand tonnes will make it
possible to converge with the targets defined in the Kyoto
protocol.
Biofuels representan area of diversification in the supply of
fuel to the transport sector which has recorded the highestgrowth rates in terms of energy consumption.
In Portugal, the transport sectors energy dependency on oil,
which is responsible for 42% of total imported oil consump-
tion, is very high.
The replacement of more than 300 million litres of fuel by
2010, comprising the incorporation of 10% in road fuels,
bringing the EUs objective forward by 10 years, promotes
the creation of industrial plants and development of energy-based agriculture.
The government set the quantity of biofuels to be exempt-
ed from ISP (tax on oil products) at 205 thousand tonnes in
2007. Of this amount, 4 973 tonnes derive from national ag-
ricultural production. However, this figure should rise to 405
thousand tonnes by 2010 in light of the forecast increase of
the incorporation percentage. The fiscal exemptions (ISP)have been designed to promote the use of biofuels in the
transport sector, to reduce Portuguese energy dependency
and comply with the Community directive establishing the
replacement of 10 per cent of conventional fuels used in
the transport sector, by alternative fuels by 2020. Small
dedicated producers are entitled to total exemption from
ISP up to a maximum global amount of 40 thousand tonnes
per year.
8/2/2019 Energias Renov PT 2007
28/60
28
BIOMASSA FLORESTALCentral termoelctrica do Rdo
A central termoelctrica a biomassa florestal residual, pro-priedade da EDP Produo Bioelctrica, S.A., fica situada
em Vila Velha do Rdo e permite levar electricidade a 70 mil
pessoas.
A biomassa a consumir pela central fornecida pelas empre-
sas silvcolas e florestais da regio e representa um volume
de negcio avaliado em cerca de quatro milhes de euros,
contribuindo para a limpeza da floresta.
As 160 mil toneladas de biomassa consumidas por ano re-
presentaro cerca de 4 milhes de euros, canalizados para as
empresas do sector silvcola e florestal da regio.
A converso da biomassa florestal em electricidade reali-
zada atravs da combusto em leito fluidizado borbulhante,
sendo a energia elctrica gerada por um turbo-grupo a vapor
constitudo por turbina de condensao e alternador trifsi-
co.
FOREST BIOMASSRdo thermoelectric power station
The forestry waste biomass thermoelectric power stationowned by EDP Produo Bioelctrica, S.A., is located in
Vila Velha do Rdo and supplies energy to 70 thousand per-
sons.
The biomass to be used by the power station is supplied by
regional silviculture companies and represents a turnover of
around EUR 4 million, while also contributing towards forest
clearing operations.
The 160 000 tonnes of biomass consumed per year will rep-
resent around EUR 4 million, channelled to silviculture and
forestry companies in the region.
Forestry biomass is converted to electricity through the (bub-
bling) bubble fluidised bed combustion process in which the
electricity is generated by a steam turbine unit comprising a
condensation turbine and a three phase alternator.
Recepo da biomassa
Delivery of biomass
8/2/2019 Energias Renov PT 2007
29/60
29
Centraltermoelctrica
do Rdo
Rdothermoelectricpower station
Caractersticas da central termoelctrica
Potncia instalada 14,4 MVA
Energia produzida 80 GWh/ano
Tecnologia da combusto Leito fluidizado borbulhante
Combustvel Resduos florestais
Consumo de biomassa 160 000 t/ano
Investimento 30 M
Entrada em funcionamento 2007
Characteristics of thermoelectric power station
Installed rated power 14.4 MVA
Generating capacity 80 GWh per year
Combustion technology Bubble fluidised bed combustion
Fuel Forestry wastes
Biomass consumption 160 000 tonnes per year
Investment EUR 30 million
Operational in 2007
8/2/2019 Energias Renov PT 2007
30/60
30
Central termoelctrica a biomassa florestal
residual de Mortgua
A funcionar desde 1999, este centro electroprodutor da EDP
Produo Bioelctrica, S. A. correspondeu a um investimen-
to inicial de 25 milhes de euros.
A compra de biomassa para alimentar a central representa
para o sector silvcola da regio uma oportunidade de negcio
e simultaneamente promove a limpeza florestal contribuindo
para minimizao do risco de incndio. Como combustvel deregulao e arranque utilizado o gs natural. Com uma dis-
ponibilidade superior a 89 por cento, vendeu 57,6 GWh de
electricidade rede, em 2006. O consumo de biomassa nesse
ano ascendeu a 109 mil toneladas, sendo 96,4 por cento bio-
massa florestal residual (casca de pinheiro e de eucalipto).
A compra de biomassa representou cerca de 2,7 milhes de
euros, canalizados para o sector silvcola da regio.
Partculas 100
Dixido de enxofre (SO2) 300
Dixido de azoto (NO2) 340
Monxido de carbono (CO) 200
Power Station Emission Values (mg/Nm3)
Particles 100
Sulphur dioxide (SO2) 300
Nitrogen dioxide (NO2) 340
Carbon monoxide (CO) 200
Valores de emisso na Central (mg/Nm3)
Mortgua forestry waste biomass
thermoelectric power station
In operation since 1999, this EDP Produo Bioelctrica, S.
A. power station represented an initial investment of EUR 25
million.
The purchase of biomass to fuel the power station represents
a business opportunity for the silviculture sector in the region
while also promoting forest clearing operations, helping to
minimise fire risks. Natural gas is used as a regulating andstart-up fuel. With an availability of more than 89%, it sold
57,6 GWh of electricity to the grid, in 2006.
The amount of biomass consumption in the said year was
109 000 tonnes, of which 96.4% was waste forestry biomass
(pine and eucalyptus bark).
Biomass purchases represented around EUR 2.7 million,
channelled to the silviculture sector in the region.
8/2/2019 Energias Renov PT 2007
31/60
31
Potncia instalada 9 MW (10 MVA)
Tenso de gerao 60 kV
Produo anual a plena carga 67 GWh
Consumo de biomassa com 30%humidade
Consumo horrio a plena carga 8,7 t/h
Consumo anual de biomassa 109 000 tPoder calorfico inferior (PCI) 13 800 kJ/kg
Capacidade do parque de combustvel 55 000 m3
Caractersticas do vapor sobreaquecido
Presso 42 bar
Temperatura 420 C
Caudal 40 t/h
Consumo de gua 60 m3/h
Caractersticas da central termoelctrica
Installed rated power 9 MW (10 MVA)
Generating voltage 60 kV
Annual generation at full load 67 GWh
Consumption of biomass with 30% humidity
Hourly consumption at full load 8.7 t/h
Annual consumption of biomass 109 000 tLower heating value 13 800 kJ/kg
Capacity of fuel storage site 55 000 m3
Characteristics of superheated steam
Pressure 42 bar
Temperature 420 C
Flow 40 t/h
Water consumption 60 m3/h
Characteristics of thermoelectric power station
8/2/2019 Energias Renov PT 2007
32/60
32
BIODIESELFbrica de biodiesel da Iberol
A Iberol-Sociedade Ibrica de Oleaginosas S.A., situada em
Alhandra, no concelho de Vila Franca de Xira, possui duas uni-
dades de produo de biodiesel. Uma construda pela empre-
sa CIMBRIA-SKET GmbH; a outra desenvolvida pela prpria
empresa.
A matria-prima utilizada provm principalmente de leos ve-
getais virgens extrados do girassol, palma, soja e colza.
Tambm os leos alimentares usados (OAU) resultantes da
fritura dos alimentos podem ser valorizados como matria-pri-
ma para a produo de biodiesel evitando-se o seu lanamen-
to na rede de saneamento bsico. A promoo da actividade
BIODIESELIberol biodiesel plant
Iberol-Sociedade Ibrica de Oleaginosas S.A., located in Al-
handra, in the municipal district of Vila Franca de Xira, has
two biodiesel generating units.
One was built by the company CIMBRIA-SKET GmbH and
the other was developed by the company itself.
The raw material used mainly derives from virgin vegetable
oils extracted from sunflowers, palm, soya and colza oil.
Used cooking oils deriving from food frying may be valor-
ised as raw material for the production of biodiesel avoid-
ing their discharge into the basic sanitation network. The
promotion of the commercial activity for collecting and sell-
Vista geral da IberolGeneral view of Iberol
8/2/2019 Energias Renov PT 2007
33/60
33
comercial de recolha e venda deste resduo (OAU) constitui
uma oportunidade de negcio, com receitas interessantes
para as autarquias ou agentes econmicos.
O laboratrio da fbrica de biodiesel realiza o controle de qua-
lidade da matria-prima e dos produtos fabricados de modoa garantir o cumprimento das normas EN14224 e da British
Standard, BS 2621.
A produo contnua, e a fbrica labora 24 horas por dia,
entregando o total da produo industria refinadora para in-
corporao nos combustveis rodovirios.
ing these wastes represents a business opportunity, with
interesting levels of revenues for municipalities or econom-
ic operators.
The biodiesel plants laboratory controls the quality of the
raw material and manufactured products to guaranteecompliance with standard EN14224 and British Standard,
BS 2621.
Production is continuous and the plant operates 24 hours a
day delivering the full amount of its production to the refin-
ing industry to be incorporated in road fuels.
8/2/2019 Energias Renov PT 2007
34/60
34
Capacidade instalada 120 000t/ano
Tecnologia Transesterificao de cidos gordos
Matria-primaleos de soja, colza, girassol
palma e OAU
Produo 100 000 t/ano
Investimento 58 M
Incio de actividade 2006
Novos postos de trabalho 85
Energia Consumo/h
Vapor (12 bar) 4400 kg
Electricidade 420 kWh
Ar comprimido (7bar) 150 Nm3
Consumo de energia na produo de biodiesel
Caractersticas do projecto
Installed capacity 120 000 tonnes per year
Technology Transterification of fatty acids
Raw materialSoya, colza, sunflower, palm oils and
used frying oils
Production 100 000 tonnes per year
Investment EUR 58 million
Operational in 2006
New Jobs 85
Energy Consumption/h
Steam (12 bar) 4400 kg
Electricity 420 kWh
Compresses Air (7bar) 150 Nm3
Energy consumption in biodiesel production
Characteristics of project
Laboratrio de qumica da fbricaPlants chemistry laboratory
8/2/2019 Energias Renov PT 2007
35/60
35
Fbrica de Biodiesel da Prio Biocombustveis
A Prio Biocombustveis SA, umaempresa do Grupo Martifer,
vai iniciar a produo de biodiesel em Portugal numa Fbrica
localizada no Terminal de Granis Lquidos do Porto de Aveiro,
na Gafanha da Nazar.
Dedicada a transformao de oleaginosas, utiliza como mat-
rias-primas principais a colza e o girassol.
Prio Biocombustveis Biodiesel Plant
The Prio Biocombustveis SA, a company of Martifer
Group, will star thebiodiesel production in a plant located
in Bult Liquids Terminal of Aveiros Port, in Gafanha da
Nazar.
Raw materials: Rapeseed, soybean, sunflower and palm
oil.
8/2/2019 Energias Renov PT 2007
36/60
36
Capacidade instalada 100 000 ton/ano de biodiesel
Tecnologia LURGI
Matria-primaleo de Soja, colza,
girassol e palma
Investimento 30 milhes de euros
Incio de actividade 1 Agosto 2007
Novos postos de trabalho 30
Energia Consumo
Vapor 4500 kg/hElectricidade 300 kW/h
Ar comprimido 70 Nm3/h
Consumo de energia na produo de biodiesel
Caractersticas do projecto
Capacity 100 000 ton/year of biodiesel
Technology LURGI
Raw materialsRapeseed, soybean, sunflower and
palm oil
Investment 58 M
Opening date 1st August 2007
Employment created 30 job posts
Energy Consumption
Steam 4500 kg/hElectricity 300 kW/h
Compressed air 70 Nm3/h
Energy consumption in biodiesel production
Projects characteristics
8/2/2019 Energias Renov PT 2007
37/60
37
BIOGS - APROVEITAMENTO POR COMBUSTOE SISTEMAS HBRIDOS COM CLULASDE COMBUSTVEL DE HIDROGNIO
A AGNI/EGF, prope-se realizar em Portugal, at 2009, um in-
vestimento numa fbrica e Centro de Investigao e Desen-
volvimento em tecnologias de hidrognio.
A EGF S.A. empresa nacional responsvel pela implementa-o deste projecto, ir converter e implementar os sistemas
hbridos, integrando as pilhas de combustvel de hidrognio
em todos os aterros sanitrios onde se encontram instalados
os sistemas tradicionais para o aproveitamento energtico do
biogs, bem como nas novas centrais de valorizao orgnica
em construo e explorao, tendo em vista a melhoria da
eficincia energtica associada ao biogs. possvel maximizar o aproveitamento do biogs captado,
atravs da utilizao de pilhas de combustvel de hidrognio.
Estas constituem um sistema alternativo utilizao do bio-
gs nos motores de combusto interna, ou, em
conjunto com estes, numa soluo designada
por sistema hbrido.
O investimento, a realizar de forma faseada, en-
volver, na totalidade, cerca de 60 milhes de
euros e a criao de 220 postos de trabalho, at
2013.
BIOGAS - COMBUSTION AND HYBRIDSYSTEMS USING HYDROGEN FUEL CELLS
AGNI/EGF, has undertaken to invest in a plant and research
and development centre for hydrogen technologies in Portu-
gal, by 2009.
EGF S.A. a national company responsible for the implemen-
tation of this project will convert and implement the hybridsystems, integrating the hydrogen fuel cells in all landfills
containing traditional systems for the energy exploitation of
biogas, in addition to the new organic enhancement power
stations being built and operated with the aim of improving
the energy efficiency associated with biogas.
It is possible to maximise the exploitation of biogas capture,
through the use of hydrogen fuel cells. These comprise analternative system to the use of biogas in internal combus-
tion engines in conjunction with them in a solution known as
Hybrid Systems.
The investment, which will be staged, will total
around EUR 60 million and create 220 jobs by
2013.
Sistema de aproveitamento energtico do biogsdo aterro sanitrio do BarlaventoBiogas plant from Barlavento landfill
8/2/2019 Energias Renov PT 2007
38/60
38
Portugal um dos pases da
Europa com maior disponi-
bilidade de radiao solar.
A insolao em Portugal
Continental (nmero de
horas de sol descoberto
acima do horizonte) um
elemento climtico muito
importante que varia entreas 1800 e as 3100 horas de
Sol por ano. A quantidade total de radiao global varia entre
140 e 170 kcal/cm2.
Existe um vasto potencial de aplicao do solar trmico, avalia-
do em cerca de 2,8 milhes de metros quadrados de colecto-
res. A energia solar trmica para aquecimento de gua a baixa
temperatura vantajosa, quer do ponto de vista energtico,
quer ambiental, representando um contributo significativo para
a reduo das emisses de Gases com Efeito de Estufa (GEE).
Outros benefcios referem-se criao de postos de trabalho
associados dinamizao e evoluo do mercado.
O pas, devido s suas condies climticas, possui tambm
excelentes condies para a converso fotovoltaica, com n-
dices de produo entre os 1000 e os 1500 kWh por ano por
kWp instalado.
Portugal is one of the Eu-
ropean countries with the
highest levels of solar ra-
diation.
Sunshine in mainland Por-
tugal (number of sunlight
hours above the horizon)
varies between 1800 and
3100 hours per year andis a very important clima-
tic element. Total global radiation varies between 140 and 170
kcal/cm2.
There is vast potential for the application of thermal solar pow-
er, assessed at around 2.8 million m2 of panels. Thermal solar
power for low temperature water heating is advantageous,
both from an energy and environmental viewpoint, represent-
ing a significant contribution to reducing greenhouse gases.
Other benefits include the creation of jobs associated with
market promotion and evolution.
Owing to its climate, Portugal also enjoys excellent conditions
for photovoltaic conversion, with generating indices of be-
tween 1000 and 1500 kWh per year, for each installed kWp.
ENERGIA SOLARSOLAR POWER
8/2/2019 Energias Renov PT 2007
39/60
39
CENTRAL SOLAR TRMICA DE TAVIRA
A central solar trmica em fase de construo na Capelinha,
perto da cidade de Tavira, destina-se produo de electrici-
dade a partir da produo de vapor turbinado.
A empresa T-ESTP, S.A., especialmente constituda para a
conduo deste projecto conta com a participao da EDP,
da ROLEAR Lda. e da Cmara Municipal de Tavira e com a
colaborao do INETI (Ministrio da Economia e Inovao) e
da Universidade do Algarve.
Os colectores do tipo CLFR (Compact Linear Fresnel Reflec-tor) sero produzidos em Portugal, numa unidade industrial
criada para o efeito, tendo em vista a expanso da produo
para outros projectos dentro e fora de Portugal.
A central ocupar uma rea de dez hectares para a instalao de
83 mil metros quadrados de espelhos.
A produo de electricidade a partir da energia solar pode
realizar-se com diversos tipos de tecnologia, sendo comum a
todos eles o aquecimento de um fluido (gua, vapor, ar, etc.)
com o qual se pode gerar movimento capaz de accionar um
gerador elctrico. A tecnologia CFLR desenvolvida pela em-
presa australiana Solar Heat and Power, Pty (SHP) uma
combinao, em alguns aspectos, da tecnologia das centrais
de torre e das centrais do tipo cilindro parablico.
TAVIRA THERMAL SOLAR POWER STATION
This thermal solar power station, under construction in
Capelinha, near the city of Tavira, will generate electricity
through the use of steam turbines.
The company T-ESTP, S.A., which was especially formed to
manage this project enjoys the participation of EDP, ROLEAR
Lda. and the Municipality of Tavira and the collaboration of
INETI (Ministry of the Economy and Innovation) and University
of the Algarve.
Panels of the CLFR - Compact Linear Fresnel Reflector type,will be manufactured in Portugal, in an industrial unit created
for the purpose in question, with a view to expanding produc-
tion to other projects inside and outside Portugal.
The power station will cover an area of 10 hectares, with the
installation of 83 000 m2 of mirrors.
Electricity generation from solar power can use diverse types
of technology, with a common factor being the heating of a
working fluid (water, steam, air, etc.) capable of activating an
electric generator.
CFLR technology developed by the Australian company Solar
Heat and Power, Pty (SHP) is, in several aspects, a combi-
nation of the technology used in solar power towers and
parabolic cylinder type power plants.
8/2/2019 Energias Renov PT 2007
40/60
40
Caractersticas do projecto
Turbogerador 6,6 MWe
Potncia pico 6,5 MWe
Potncia nominal 5,2 MWe
Nmero de horas de funcionamento 2442
Energia produzida 12 GWh/ano
rea de colectores 83 000 m2
rea de ocupao do solo 100 000 m2
Consumo de fluido (gua desmineralizada) 1 a 2 m3/dia
Consumo de gua para arrefecimento 130 m3/dia
Data de entrada em funcionamento Outubro de 2008
Investimento 19 M
Characteristics of project
Turbogenerator 6.6 MWe
Peak rated power 6.5 MWe
Nominal rated power 5.2 MWe
Number of hours of operation 2442
Electricity generation 12 GWh per year
Area of panels 83 000 m2
Area of ground occupancy 100 000 m2
Consumption of fluid (de-mineralised water) 1 a 2 m3/day
Consumption of cooling water 130 m3/day
Operational in Outober 2008
Investment EUR 19
million
Central solar trmica de TaviraTavira thermal solar power station
8/2/2019 Energias Renov PT 2007
41/60
41
CENTRAL FOTOVOLTAICA DE SERPA
Situada na freguesia de Brinches, concelho de Serpa (distritode Beja), a central fotovoltaica de Serpa ocupa uma rea de
60 hectares numa das zonas de Portugal onde se verificam
os valores mais elevados da radiao solar e onde, tambm,
existe capacidade na rede elctrica para um projecto desta
dimenso. A electricidade produzida anualmente pela central
suficiente para alimentar oito mil habitaes e quintas na
regio.So parceiros neste projecto a GE Energy Financial Services
(investidor), a Power Light Corporation (projecto e construo)
e a Catavento, S.A. (promotor e gestor de activos).
A utilizao do Po-
werLight PowerTra-
cker System, que
acompanha o movi-
mento aparente dosol aumenta a efi-
cincia do sistema
permitindo que mais
de 200 kWp sejam
comandados por
um nico conjunto
motor/actuador comapenas 0,5 kW de
potncia.
SERPA PHOTOVOLTAIC POWER STATION
Located in the district of Beja, in the municipal district of Ser-pa, parish of Brinches, the Serpa photovoltaic power station
occupies an area of 60 hectares in one of the zones in Portu-
gal with the highest levels of solar radiation and in which the
electricity grid has the capacity to accommodate a project of
this size.
The power stations annual electricity generation is sufficient
to supply 8 000 homes and farms in the region.GE Energy Financial Services (Investor), Power Light Corpora-
tion (Project and Construction) and Catavento, S.A. (Promoter
and Asset Manager) are parties to this project.
The use of the Pow-
erLight PowerTracker
System, accompa-
nying the apparent
movement of thesun, increases the
systems efficiency
by permitting more
than 200 kWp to be
controlled by a sin-
gle motor/actuator
with a rated powerof only 0.5 kW.
8/2/2019 Energias Renov PT 2007
42/60
42
Nmero de painis fotovoltaicos52 000 (Sanyo, Sharp,
SunPower e Suntech)
rea de implantao da central 60 ha
rea da superfcie fotovoltaica 34 ha
Potncia instalada 11 MWp
Produo anual de energia
elctrica> 18 GWh
Sistema de seguimento solar PowerLight PowerTracker
Investimento total 62 M
Entrada em funcionamento Janeiro de 2007
Especificaes da central fotovoltaica de Serpa
Number of photovoltaic panels52 000 (Sanyo, Sharp,
SunPower and Suntech)
Area occupied by power station 60 hectares
Photovoltaic surface area 34 hectares
Installed rated power 11 MWp
Annual electricity generation > 18 GWh
Solar tracking system PowerLight PowerTracker
Total investment EUR 62 million
Operational in January 2007
Specifications of Serpa photovoltaic power station
8/2/2019 Energias Renov PT 2007
43/60
43
CENTRAL FOTOVOLTAICA DE MOURA
A Central Solar Fotovoltaica de Moura, a instalar na Freguesia daAmareleja, Concelho de Moura, ser a maior central fotovoltaica
do mundo. Est tambm prevista a construo e explorao de
uma fbrica de painis solares pela empresa BP Solar, a instalar no
complexo industrial do Tecnopolo de Moura, onde sero produzi-
dos os painis fotovoltaicos necessrios Central. Futuramente,
a sua produo ser dirigida para o mercado internacional.
Nmero de painis fotovoltaicos 376 632
rea de implantao da central 130 ha
Potncia instalada 62 MWp
Produo anual de energia elctrica 88 GWh
Transformadores de potncia 22
Inversores 214
Co2 evitado 60 000 t/ano
Investimento 250 M
Especificaes da Central Fotovoltaica de Moura
Number of photovoltaic panels 376 632
Area occupied by power station 130 ha
Installed rated power 62 MWp
Annual electricity generation 88 GWh
Power transformers 22
Inverters 214
CO2 avoided 60 000 t per year
Investment EUR 250 million
Specifications of Moura Photovoltaic Power Station
MOURA PHOTOVOLTAIC POWER STATION
The Moura Photovoltaic Solar Power station, to be installedin the parish of Amareleja, in the municipal district of Moura,
will be the worlds biggest. The construction and operation of
a solar panel manufacturing plant by the company BP Solar,
to be installed on the Tecnopolo de Moura industrial estate,
which will be producing the photovoltaic panels necessary for
the power station, is also planned. Its future production will
be targeted at the international market.
8/2/2019 Energias Renov PT 2007
44/60
44
INTEGRAO DE SISTEMASDE APROVEITAMENTO
DA ENERGIA SOLAR EDIFCIOS
A nova legislao sobre edifcios que decorre da transposio
da Directiva 2002/91/CE compreende o Regulamento dos Sis-
temas Energticos e de Climatizao dos Edifcios (RSECE) e
o Regulamento das Caractersticas de Comportamento Tr-
mico dos Edifcios (RCCTE) e cerca de 40 por cento mais
exigente em termos de eficincia energtica que os regula-mentos anteriores. Esta legislao obriga instalao de pai-
nis solares nos novos edifcios, tornando assim possvel a
diminuio efectiva do consumo de energia neste sector.
O Edifcio Solar XXI, situado no Campus do INETI, um exem-
plo de integrao de sistemas solares passivos (solar trmico
e fotovoltaico) e activos (arquitectura bioclimtica).
INTEGRATION OF SOLAR POWER SYSTEMSIN BUILDINGS
New legislation on buildings deriving from the transposition
of Directive 2002/91/CE, encompasses RSECE (Regulation
on Energy and Acclimatisation Systems in Buildings) and RC-
CTE (Regulation on the Thermal Performance of Buildings) is
around 40% more demanding in terms of energy efficiency
than the former regulations. This legislation make it manda-
tory to install solar panels on new buildings, therefore makingit possible to effectively reduce energy consumption in this
sector.
The Edifcio Solar XXI, located on INETIs campus is an ex-
ample of the integration of passive (thermal solar and photo-
voltaic) and active (bioclimatic architecture) solar systems.
Vista geral e parque deestacionamento com um sistemafotovoltaico de 6kWpGeneral view and car park with
a 6 kWp photovoltaic system
CopyrightINETI/DER
8/2/2019 Energias Renov PT 2007
45/60
45
SISTEMA FOTOVOLTAICO
rea de painis 96 m2
Potncia instalada 12 kWp
Energia produzida 12 MWh/ano
CO2 evitado 8 t
EDIFCIO
rea edificada 1500 m2 (3 pisos)
Tipologia Servios
Edifcio Solar XXI
PHOTOVOLTAIC SYSTEM
Area of panels 96 m2
Installed rated power 12 kWp
Electricity generation 12 MWh per year
CO2 Avoided 8 t
BUILDING
Built area 1500 m2 (3 floors)
Type of building Services
Edifcio Solar XXI
EDIFCIO SOLAR XXI
Um edifcio energeticamente eficiente em Portugal
O Edifcio Solar XXI um projecto do INETI (Departamento de
Energias Renovveis) com apoio do PRIME. Tem como objec-
tivo principal a criao de um edifcio que possa constituir um
ex-libris da eficincia energtica em edifcios e da utilizao
das energias renovveis.
Este projecto associa uma estratgia de optimizao da en-
volvente utilizao de sistemas solares,
activos e passivos, destacando-se a integra-
o de sistemas fotovoltaicos nas fachadas
com aproveitamento trmico e um siste-
ma de arrefecimento passivo pelo solo, de
modo a garantir que condies de conforto
trmico no edifcio sejam asseguradas, re-
duzindo ou anulando quaisquer consumos
energticos para esse efeito.
EDIFCIO SOLAR XXI
An Energy Efficient Building in Portugal
The Edifcio Solar XXI, is a INETI (Renewable Energies De-
partment) project with the support of PRIME. Its principal ob-
jective is to design and build a prime example of an energy
efficient building and use of renewable energies.
This project associates an environmental optimisation strat-
egy with the use of active and passive solar systems particu-
larly including the integration
of photovoltaic systems on
the facades to exploit thermal
benefits and a passive cooling
system using the ground to
ensure thermal comfort inside
the building, reducing or elimi-
nating any energy consump-
tion for the said purpose.
ENERGIA GEOTRMICA
8/2/2019 Energias Renov PT 2007
46/60
46
O tipo de utilizao da energia contida nos fluidos geotrmi-
cos depende do caudal disponvel, da temperatura e da qua-
lidade da gua. O caudal disponvel e a temperatura determi-
nam as dimenses da central geotrmica, sendo o tipo de
aplicao geotrmica condicionada pela temperatura.
Os recursos geotrmicos de baixa entalpia, presentes em
Portugal, no territrio continental, prestam-se geralmente
utilizao directa do calor, por meio de permutadores ou de
bombas de calor, para aquecimentos domsticos, industriais
e agrcolas (como estufas). Os recursos de alta entalpia dos
Aores devem-se sua localizao geo-estrutural, junto da
Crista Mdio Atlntica, na confluncia de trs placas tectni-
cas (americana, africana e euroasitica), que proporciona umaintensa actividade vulcnica, com mais de trs dezenas de
erupes vulcnicas histricas registadas, bem como outras
manifestaes superficiais evidenciveis da enorme quanti-
dade de energia endgena existente no subsolo em muitos
locais do arquiplago.
Em termos scio-econmicos o aproveitamento desta fonte
de energia renovvel fomenta a criao de emprego local e
promove o fortalecimento da economia regional, potenciando
simultneamente o desenvolvimento de competncias tcni-
cas. O decisivo empenho da Regio Autnoma dos Aores
relativamente questo das energias renovveis, em particu-
lar da geotermia, no mix energtico, veio a provar-se como
certo, podendo considerar-se hoje uma aposta ganha, face ao
aprovisionamento energtico endgeno da ilha de S. Miguel.
The type of use of energy contained in geothermal fluids de-
pends upon the available flow, water temperature and qual-
ity.
Available flow and temperature determine the size of the geo-
thermal power station whose type of geothermal applica-
tion is conditioned by the temperature.
Low enthalpy geothermal resources, present in mainland Por-
tugal, are generally suitable for the direct use of heat, using
heat exchangers or heat pumps, for domestic, industrial and
agricultural (such as greenhouses) heating. High enthalpy re-
sources existing in the Azores derive from their geostructural
location, next to the Mid Atlantic Ridge, at the confluence of
three tectonic plates American, African and Eurasian, gener-ating intense volcanic activity, with more than thirty recorded
volcanic eruptions, in addition to other surface manifestations
evidenced by the enormous amount of endogenous subterra-
nean energy existing in many locations on the archipelago.
In socioeconomic terms, the exploitation of this source of
renewable energy helps to create local employment and
strengthens the regional economy, while also promoting the
development of technical expertise.
The decisive commitment of the Autonomous Region of the
Azores contribution to renewable, particularly geothermal en-
ergies, in terms of the energy mix, has been shown to be cor-
rect and successful in light of the energy supply on the island
of S. Miguel.
ENERGIA GEOTRMICAGEOTHERMAL ENERGY
8/2/2019 Energias Renov PT 2007
47/60
47
Vista Geral da Centralda Ribeira Grande
General View of RibeiraGrande Power Station
CENTRAIS GEOTERMOELCTRICASDO ARQUIPLAGO DOS AORES
A SOGEO - Sociedade Geotrmica dos Aores, S.A. a em-
presa concessionria da explorao dos recursos geotrmi-
cos do Campo Geotrmico da Ribeira Grande, localizado na
vertente norte do vulco do Fogo, prximo da cidade da Ribei-
ra Grande, na ilha de S. Miguel (Aores).
O recurso geotrmico existente no Campo Geotrmico da
GEOTHERMAL ELECTRIC POWER STATIONSIN THE ARCHIPELAGO OF THE AZORES
SOGEO - Sociedade Geotrmica dos Azores, S.A. is the con-
cessionaire for the exploitation of geothermal resources in the
Ribeira Grande Geothermal Field, located on the northern side
of the Fogo volcano, close to the city of Ribeira Grande, on the
island of S. Miguel (Azores). The geothermal resources exist-
ing in the Ribeira Grande Geothermal Field are currently be-
8/2/2019 Energias Renov PT 2007
48/60
48
Especificaes Ribeira Grande Pico Vermelho Total
Capacidade instalada 13 MW 10 MW 23 MW
Grupos turbogeradores (2 x 2,5 + 2 x 4) 10
Produo elctrica anual 82,5 GWh/ano 78,5 GWh/ano 161 GWh/ano
Entrada em
funcionamento1994 2006
Investimento 34,4 M
Centrais geotrmicas de S. Miguel - Aores
Central geotrmica do Pico VermelhoPico Vermelho geothermal power station
Ribeira Grande actualmente explorado em duas centrais
geotrmicas de produo de energia elctrica: a Central
Geotrmica da Ribeira Grande e a nova Central Geotrmica do
Pico Vermelho que conjuntamente asseguram 44 por cento
do total da energia produzida em So Miguel.Ambas as centrais geotrmicas possuem tecnologia binria,
funcionando segundo o ciclo de Rankine, aproveitando o ca-
lor contido na fase lquida e de vapor do fluido geotrmico
para vaporizao de um fluido de trabalho.
No sector do Pico Vermelho do Campo Geotrmico da Ribei-
ra Grande, no ano de 2005, iniciou-se a construo da nova
central do Pico Vermelho, com o objectivo de reforar a capa-
cidade de gerao a partir da fonte geotrmica na ilha de S.
Miguel.
8/2/2019 Energias Renov PT 2007
49/60
49
Specifications Ribeira Grande Pico Vermelho Total
Installed capacity 13 MW 10 MW 23 MW
Turbogenerators (2 x 2.5 + 2 x 4) 10
Annual electricity generation 82.5 GWh per year 78.5 GWh per year 161 GWh per year
Operational in 1994 2006
Investment EUR 34.4 million
Geothermal power stations in S. Miguel - Azores
Vista parcial da Central da Ribeira GrandePart view of Ribeira Grande Power Station
ing exploited by two geothermal power stations: the Ribeira
Grande Geothermal Power Station and the new Pico Vermelho
Geothermal Power Station which together account for 44% of
total power generation in S. Miguel.
Both geothermal power stations use Rankine cycle binarytechnology, exploiting the heat contained in the liquid and
vapour phase of the geothermal fluid to vaporise a working
fluid.
Work started in the Pico Vermelho sector of the Ribeira Grande
Geothermal Field in 2005 on the construction of the new Pico
Vermelho power station with the objective of reinforcing the
generating capacity from geothermal sources on the island
of S. Miguel.
ENERGIA DAS ONDAS
8/2/2019 Energias Renov PT 2007
50/60
50
Portugal tem uma posio de liderana mundial e de prestgio
no que se refere a conhecimentos tcnico-cientficos sobre
a energia das ondas, aps mais de 20 anos de investigaodesenvolvida pelo IST (Instituto Superior Tcnico) e INETI (Ins-
tituto Nacional de Engenharia, Tecnologia e Inovao).
Com a preparao de uma zona martima para a instalao de
projectos-piloto visa-se o desenvolvimento de novas tecno-
logias, que possibilitem, simultaneamente, o aproveitamento
deste potencial energtico e a criao de um cluster indus-
trial ligado energia das ondas.
Portugal tem uma costa extensa, uma ondulao de excelen-tes caractersticas com densidade de energia bastante eleva-
da e uma batimetria adequada.
O recurso bastante estvel e previsvel, com relativa imuni-
dade aos efeitos climatricos locais e uma variao horria ou
circundiria pequena. Existem modelos Wind/Wave calibrados
e servios de previso do estado do mar, especialmente para
apoio navegao, bastante desenvolvidos. Tendo em contaa extenso da nossa costa e as condies que possibilitam a
viabilidade de instalao de futuros parques offshore resulta
um potencial de utilizao estimado em mais de 250 km.
Portugal enjoys a leading, prestigious worldwide position in
matters associated with its technical-scientific knowledge of
wave power, following more than 20 years research by IST(Higher Technical Institute) and INETI (National Engineering,
Technology and Innovation Institute).
With the preparation of a maritime zone for the installation of
pilot projects, the aim is to develop new technologies, permit-
ting, at the same time, the exploitation of this energy potential
and the creation of an industrial cluster associated with wave
power.
Portugal has a long coastline, undulation with excellent char-acteristics and a reasonably high energy density and a suit-
able bathymetry..
This resource is reasonably stable and predictable and is rel-
atively immune from local climate effects and small hourly
changes.
There are calibrated wind/wave models and highly developed
services for predicting sea conditions, particularly in supportof shipping.
The length of our coastline and the conditions permitting the
feasibility of the installation of future offshore installations
ENERGIA DAS ONDASWAVE POWER
8/2/2019 Energias Renov PT 2007
51/60
51
O potencial de produo de energia elctrica a partir da ener-
gia das ondas na costa atlntica portuguesa foi estimado ad-
mitindo um recurso de 30 kW por km de costa e que uma per-centagem mdia de 15 por cento da energia incidente pode
ser convertida em energia elctrica.
Ondas com amplitudes grandes (> 2 m) e longos perodos (7
a 10 s) tm energias superiores a 40~50 kW/m.
Estima-se em 10 TWh por ano o potencial de produo de
energia elctrica associado quela extenso, sobre os 50 m
de profundidade. Para os mesmos 250 km, utilizando o valor
de 20 MW de potncia instalada por quilmetro, a potnciainstalada poder ascender a 5 GW.
A rede elctrica na faixa litoral de Portugal, onde a densidade
populacional mais elevada e onde se verificam os maiores
consumos de energia elctrica, oferece as condies neces-
srias interligao.
O desenvolvimento da energia das ondas encerra uma opor-
tunidade de desenvolvimento para vrios sectores da activi-dade econmica e cientfica, permitindo antever a criao de
sete mil novos postos de trabalho directos e um mercado na-
cional no valor 5 mil milhes de euros.
create a potential feasibility estimate of more than 250 km.
Electricity generating potential from wave power on Portu-
gals Atlantic coast has been estimated, on the basis of a re-source of 30 MW per kilometre of coastline and an average
percentage of 15% of the incident energy being converted to
electricity.
Waves with large amplitudes (> 2 m) and long periods (7 - 10
s) have energy of more than 40-50 kW/m.
Electricity generating potential associated with the said extent
at a depth of 50 m has been estimated at 10 TWh per year.
For the same 250 km, using a value of