Click to edit Master title styleClick to edit Master title style
Presented by:
Ashley Summers
August 31, 2017
Denver
Regional
Aerial
Photography
Project 2018

Click to edit Master title styleClick to edit Master title styleAgenda
• Welcome and Introductions
• Quick Recap
• Project Specifications
• Project Deliverables
• Update on Supplemental Imagery
• Update on Project Boundary/Resolution Extents
• Timeline
• Communications
• Next Steps
• Sanborn – Radiometry Workshop
If on the webinar,
use chat to ask ?s
If in the room,
please use mics!

Click to edit Master title styleClick to edit Master title styleQuick Recap
• Started DRAPP 2018 planning March
• Steering Committee met March-May
• Requirements survey April
• Kick off meeting Mid-May
• Prelim quotes sent Late-May
• Prelim quote sent (supplemental) June
• DRCOG collected commitments June-present
• Present *mostly* final project specs Today!
• Radiometry workshop (Sanborn) Today!

Click to edit Master title styleClick to edit Master title styleDecisions thus far
• Renewing contracts with 2016 vendors:
• Sanborn – Acquisition and processing
• Harris – DAT (quality control) and WMS
• In April, we voted to:
• Open the spring flight window earlier (Feb not Mar)
• Keep the summer flight window open later (to July)
• Drop the SID deliverable (now only TIFF and JPG)
• In August, we voted to:
• Change flight direction spec to allow for vendor discretion
• Consolidate WMS offerings with Harris

Click to edit Master title styleClick to edit Master title style2018 Project Specifications
• 4-band orthoimagery
• 3 inch, 6 inch, 12 inch resolutions
• Feb/Mar/Apr and June/July flight windows (metro and mountains, respectively)
• Strict sun angle requirements to reduce shadows
• Strict overlap and sidelaprequirements to reduce building lean
• Snow-free and leaf-off
• Adheres to ASPRS positional accuracy guidelines
• Independent quality control performed on every tile

Click to edit Master title styleClick to edit Master title style2018 Project Deliverables
• Tiled imagery on hard drive
• 3 projection options
• 2 format options
• Streaming services (WMS/WMTS)
• Interim imagery (2018)
• Final imagery (2018)
• Historical imagery (2002-2016)
• Associated files
• Metadata, tile indices, DEM
• Extras
• Planimetric feature update
• Supplemental imagery service

Click to edit Master title styleClick to edit Master title styleResponses on Supplemental Imagery
• Partners received quotes in mid-June that compared:• Resolution
• Flight timing
• Estimated delivery dates
• Cost
• Coverage
• Positional accuracy
• QAQC Procedures
• Deliverables
• Trial availability
• Access to historical imagery
• Licensing
• Support for derivatives (e.g. planimetrics)
Options:
• NearMap service
• Hexagon tiles/service
• Google tiles/service
Results:
• Google had the most
interest.
• Not enough interest in any
option to fund it.

Click to edit Master title styleClick to edit Master title styleProject Boundary/Resolution Extents
• Increase in 3-inch area in all
directions
• No Weld County or Fort Lupton
participation
3-inch (orange) = 1321 sqmi
6-inch (green) = 1389 sqmi
12-inch (blue) = 3319 sqmi
2016
2018

Click to edit Master title styleClick to edit Master title style3-inch Resolution Expansion Funding
1. CDOT
2. Denver Water
3. Adams County
4. Broomfield
5. Denver
6. Douglas County
7. Arvada
8. Aurora
9. Bennett
10. Brighton
11. Castle Rock
12. Centennial
13. Commerce City
14. Erie
15. Federal Heights
16. Frederick
17. Glendale
18. Golden
19. Greenwood Village
20. Lafayette
21. Littleton
22. Louisville
23. Northglenn
24. Superior
25. Westminster
26. Wheat Ridge
27. North Table Mountain
New 3-inch partner
15/27 = 56% of 3-inch funders are new to the resolution upgrade
27/50 = 54% of project partners will get 3-inch

Click to edit Master title styleClick to edit Master title styleTimeline
• Letters of Intent September – November 17
• Vendor contracts September – December 17
• Aesthetics survey Fall 17
• Front Range flight window & partner invoicing (#1) March 18
• Mountain flight window June 18
• Pilot review & Interim WMS July 18
• Processing & QAQC Fall 18
• Deliveries & partner invoicing (#2) Dec 18
Note that default invoicing is noted above. You can customize the timing.

Click to edit Master title styleClick to edit Master title styleCommunications
• Meetings (est. at major milestones):
• Kickoff – May 2017 ✓
• Update (specs) – August 2017 ✓
• Update (spring flights) – April 2018
• Update (summer flights) – August 2018
• Wrap up – March 2019
• Most project communication will come to you via email and will include:
• Letters of Intent – September 2017
• Invoices – March 2018 and December 2018 (or at your request)
• Flight status – multiple throughout spring and summer 2018
• WMS credentials – summer 2018 and winter 2019
• Custom order information – spring 2018
• Polls – as needed

Click to edit Master title styleClick to edit Master title styleNext Steps
• Letters of Intent
• DRCOG sends text with dollar amount
• You print on your letterhead
• Sign and return!
• Aesthetics survey (Sanborn)
• Determine our collective preferences for color, tone, sharpness,
contrast etc.
• Future of DRAPP and Planimetrics – brainstorming meeting
• License Agreements
• If you have one from 2014 or 2016, it’s still good for 2018.
Watch for emails!

Click to edit Master title styleClick to edit Master title styleLicensing Reminders
• License covers all current and past DRAPP imagery that you are using.
• Term begins as soon as the license is signed and continues as long as you are using a DRAPP imagery dataset. Letter of Intent solidifies commitment for the current project and specifies funding contribution (not the license agreement).
• Latest/current imagery:• Can be used for your internal business needs
• Can be served up as a basemap in your webmaps
• Can be provided to a contractor that is officially working for you and has signed an agreement stating they will only use the imagery for your project.
• Can NOT be given away (DRCOG’s resellers sell the tiles and WMS)
• Past imagery:• All of the above except tiles can be given away (to anyone including your
contractors) with no written agreement
• You may never sell the imagery because DRCOG does via our resellers.

Click to edit Master title styleClick to edit Master title style
QUESTIONS?
Email me at [email protected]

Click to edit Master title styleClick to edit Master title style
RADIOMETRY WORKSHOP
Sanborn presents: