Application of DRM-Trefftz and DRM-MFS to Transient Heat ...
Chief Guest Shri S.K.Mohanty, DRM ... - East Coast...
Transcript of Chief Guest Shri S.K.Mohanty, DRM ... - East Coast...
Chief Guest Shri S.K.Mohanty, DRM
at the flag hoisting ceremony at KUR, ECoRly Chief Guest inspecting the parade contingent
A cultural show
A Cultural show March past by the NCC contingent
A cultural show Pyramid show by NCC students
EAST COAST RAILWAY
KHURDA ROAD DIVISION
* DIVISIONAL RAILWAY MANAGER’S
66TH INDEPENDENCE DAY–2012 MESSAGE
President and other members of ECoRWWO, Khurda Road, all the officers
and staff, Representatives of the recognized unions, Members of media, Children,
Ladies and Gentlemen, it gives me immense pleasure to address you all on the
occasion of 66th Independence day. I extend my greetings to you and your family
members.
On this day, let us pay homage to all our leaders who made huge personal
sacrifices to secure freedom for our country. Their sacrifices continue to inspire
generations, as we all unite and rededicate ourselves to make India a vibrant and
progressive nation.
Indian railway has played a pivotal role in the process of social integration
and economic development of free India. East Coast Railway with 5064 Track Km
has emerged over the years as one of the blue chip zones of Indian Railways,
contributing significantly to the development of the country. (Khurda Road
division has a total Track Km. of 1957 (38.6% of total).)
It is a matter of pride for the Division that for its spectacular performance in
2011, it was selected for eight shields including Overall Efficiency Shield
handedover by our General Manager during the Railway Week celebrations in
April, 2012. I am glad to inform you that the first seven months of the year 2012
has seen the division touch greater heights in the field of freight loading and
earnings, passenger earnings, passenger amenities and staff welfare activities. I am
sure we will be able to achieve all the targets set for us with hard work,
determination and a sense of co-operation.
It is indeed a great pleasure to note that freight loading of 42.23 Million
Tonnes has been achieved during January to July 2012, compared to 34.51 Million
Tonnes for the corresponding period of previous year, registering an increase of
22.64%.
The originating freight earnings is ` 2606 crores for the first seven months
of the current year, compared to ` 2008 crores during the corresponding period of
last year, registering a growth of 30%.
The number of passengers carried showed an increase of 5.4% from 25.37
million passengers during this period of last year to 26.74 million passengers in the
current year.
Similarly, the passenger earning registered a growth of 10% from `
253.48 crores during January to July of previous year to ` 278.47 crores in the
current year.
The total earnings during the current year upto July is ` 2921 crores
(Approx.), as against ` 2267 crores during the corresponding period of last year,
showing an improvement of ` 654 crores (i.e.28.8%).
I am happy to inform you that Khurda Road division has, in the
process, surpassed the targets set by headquarters in the fields of originating
loading and earnings in the first four months of the financial year 2012-13.
During this year many passenger amenities have been provided at various
stations:-
Khurda Road station yard remodelling and RRI was commissioned in
June, with two additional platforms and simultaneous reception and
despatch facilities towards Puri. The third line has also been
commissioned between Retang and Khurda Road along with this.
Unreserved Ticketing System[UTS] have been installed at Naranpur,
Ghantikal Nidhipur, Sadashibpur, Radhakishorepur, Salagaon, Charbatia,
Naraj Marthapur, Gurudijhatia, Harichandanpur and Budhapank stations.
UTS is yet to be commissioned at remaining 9 stations ; Sukinda Road,
Baghuapal, Tomka, Tangiriapal, Sagadapata, Chilikdara, Nilkantheswar,
Sitabinji and Basantpur.
The waiting halls at Balugoan, Hindol Road, Ghantikal Nidhipur, Naraj Marthapur, Kaluparaghat, Kendujhargarh, Raghunathpur, Dhenkanal and Angul stations have been improved.
Additional FOBs have been provided at Kaipadar Road, Raghunathpur and Hindol Road stations.
Additional RDSO design platform shelter was provided at 5 stations. The old AC sheets have been replaced with Colour coated galvalume sheets of PF No. 2 &3 at Bhubaneswar. Similarly, the works of improvement to circulating area, raising of platform Nos. 1, 4 & 5 from rail level to high level and extension of platform shelter of PF no. 2 & 3 at Jajpur Keonjhar Road have been completed.
The circulating area of 5 stations (Manjuri Road, Balugaon, Jagannathpur, Kendujhargarh and Sompeta) has been improved.
The Rail level / Mid level PF surface (at PF No.2&3) at Palasa and (PF
No.2&3) at Khurda Road has been raised to high level and extended to
accommodate longer length trains.
The damaged and outdated roof of PF shelters at Brahmapur, Cuttack,
Khurda Road stations has been replaced with galvalume sheet roofing.
Kota stone flooring of PF No.1, 1A & PF No. 2&3 at Palasa station was
completed after raising of Platform. Similarly heavy duty mosaic PF
surfacing was done on PF No.4&5 at Khurda Road station for entire
length of Platform.
Coach summary Boards have been provided at Balugaon, Jajpur
Keonjhar Road and Bhadrak Stations and Coach Indication Boards have
been provided at Bhubaneswar Station.
Touch Screen KIOSK has been provided at Bhubaneswar & Brahmapur stations and Auto announcement system has been provided at Bhadrak.
Keeping in view the cleanliness of environment and passenger hygiene,
the Controlled Discharge Toilet System (CDTS) of all Rajdhani Exp.
coaches & Duronto Exp. coaches has been made functional.
(A) The following trains have been newly introduced :
22201/22202 (PUI-SDAH-PUI Tri Weekly Duranto Exp.) w.e.f
14.02.2012.
22877/22878 (Puri-Digha-Puri Weekly superfast Exp.) w.e.f 22.02.2012.
22603/22604 (Kharagpur-Villupuram-Kharagpur Weekly superfast Exp.)
w.e.f 20.02.2012.
22874/22873 (Visakhapatnam-Digha-Visakhapatnam Weekly superfast
Exp.) w.e.f 23.02.2012.
22851/22852 (Santragachi-Mangalore-Santragachi Weekly superfast
Exp.) w.e.f 25.02.2012.
22817/22818 (Howrah-Mysore-Howrah Weekly superfast Exp.) w.e.f
24.02.2012.
22849/22850 (Shalimar-Secunderabad-Shalimar Weekly superfast Exp.)
w.e.f 24.02.2012.
22606/22607 (Villupuarm-Purulia-Villupuram) w.e.f 21.04.2012.
22825/22826 (Shalimar-Chennai-Shalimar weekly superfast exp.) w.e.f
03.7.2012.
22871/22872 (Bhubaneswar-Tirupaty-Bhubaneswar weekly superfast
Exp.) w.e.f. 14.7.2012.
22883/22884 (Puri-Yeswantpur-Puri Weekly Garibrath exp.) w.e.f
20.7.2012.
22859/22860 (Puri-Chennai-Puri Weekly Superfast exp.) w.e.f
22.7.2012.
18497/18438 (Bhubaneswar-Bhawanipatna-Bhubaneswar link exp.) w.e.f
11.8.2012.
(B) The following trains have been extended :
18416/18415 (Puri-Banspani Exp.) has been extended from
BANSAPANI To BARBIL and further the same rake is now going to
Chakradharpur as a separate train.
18417/18418 (Bhubaneswar-Jharsuguda exp.) has been extended from
Jharsuguda to Rourkela.
12892/12891 (Bhubaneswar-Baripada Exp.) has been similarly extended
from BARIPADA to BANGRI POSI.
(c) The following trains have been given new stoppage :
Haldia-Chennai-Haldia weekly superfast Exp. has been provided
Commercial stoppage at Bhubaneswar.
Falaknuma Express has been provided commercial stoppage at Jajpur
Keonjhar Road station.
ANGL-PUI-ANGUL passenger has been provided commercial stoppage
at Kanas Road flag station and
Prasanti express has been provided commercial stoppage at Sompeta
station.
Various Welfare and other Activities undertaken on Khurda Road
Division:
44 employment assistance cases have been processed and employment
granted to the wards of the deceased railway employees.
Accident Free Service Award in favour of 281 eligible employees
pending since 2006 have been paid by conducting a special drive.
Digitization of Service Records of all the employees of KUR division has
been undertaken and is in progress.
Out of 2591 nos. of Pre-2006 Pension Retirement cases received, more
than 80% cases have been certified and PPOs issued. Rest of the cases
are under process and will be completed by 30th September, 2012.
Provident Fund has been fully Computerised and Provident Fund Ledgers
are printed electronically.
Mechanised Cleaning with intensive anti fly and anti mosquito measures
have been organised on the division.
Direct Building Maintenance of 783 staff quarters has been completed.
A New Parcel office has been constructed at Bhubaneswar station to
meet the additional inward and outward traffic requirement.
Automatic signaling system has been commissioned in between
Mancheswar to Bhubaneswar (BBS) on 22.04.2012.
18Nos of manned and un-manned level crossings have been standardized
by provision of standard check rail, repairing to road surface, provision
of caution indicators for increased safety of road users.
Two Limited Height Subways were constructed by eliminating two UM
LCs thereby increasing safety by reducing potential of accidents at level
crossings.
Total 20 bridges have been rebuilt / strengthened during the above
period.
The existing speed of 15 Kmph on first loop lines of CTC-PRDP section
was raised to 30Kmph during the year.
18 units of Type-II & 6 units of Type-IIII quarters have been constructed
at different stations of the division.
Construction of 32 bedded running room at Talcher has been completed.
I am thankful to East Cost Railway Shramik Congress, East Coast Railway
Shramik Union, SC/ST Association, OBC Association, Promotee Officer’s
Association and Officers Association for extending their wholehearted support in day-
to-day functioning of the Division in a peaceful and efficient manner. I am also
thankful to members of ECoRWWO, Khurda Road for rendering their valuable
services to railway staff & their families and local public through various welfare
activities in the field of Education, Adult Literacy, Art, Music & Dance.
On this auspicious occasion, I appeal to all railway men and women to
rededicate themselves to work with sense of responsibility, discipline and integrity,
and with a spirit of cooperation. We must focus all our efforts towards achieving the
goal of providing better services to our customers in a safe and efficient manner and
thereby contribute to the development of our country.
JAI HIND !