46964240 History of Kalabagh Dam

download 46964240 History of Kalabagh Dam

of 13

Transcript of 46964240 History of Kalabagh Dam

  • 7/31/2019 46964240 History of Kalabagh Dam

    1/13

    Design in 1984.

    Total cost 3.46$ billion

  • 7/31/2019 46964240 History of Kalabagh Dam

    2/13

    Kalabagh Dam Project was designed in 1984,with the assistance of the United Nations

    Development Program; supervised by theWorld Bank, for the client Water and PowerDevelopment Authority of Pakistan.

    It was estimated to be US$ 3.46 Billion at June

    1987 level and was scheduled to be completedin 6 years.

  • 7/31/2019 46964240 History of Kalabagh Dam

    3/13

    Near Main Wali

    Famous for Nawb of Kala Bahg

  • 7/31/2019 46964240 History of Kalabagh Dam

    4/13

    Hydrology (Indus river at site)

    Area 110500 square meter

    Water storage capacity 7.9 MAF

    Maximum height above river bed 260 feet

  • 7/31/2019 46964240 History of Kalabagh Dam

    5/13

    Turbine frames types

    Installed capacity 2400-3600 MW

  • 7/31/2019 46964240 History of Kalabagh Dam

    6/13

    Providing additional storage to meet existingwater shortage.

    Control of high flood

    Irrigation to the river area in Sindh

  • 7/31/2019 46964240 History of Kalabagh Dam

    7/13

    Producing hydro power for growing demandof agricultural, industrial and domestic needs

    Producing employment for 30000 personsduring construction

  • 7/31/2019 46964240 History of Kalabagh Dam

    8/13

    Drainage of surrounding area of Mardan

    Area of Pabbi and Swabi plains would beaffected

    Large number of people would be displaced

  • 7/31/2019 46964240 History of Kalabagh Dam

    9/13

  • 7/31/2019 46964240 History of Kalabagh Dam

    10/13

  • 7/31/2019 46964240 History of Kalabagh Dam

    11/13

  • 7/31/2019 46964240 History of Kalabagh Dam

    12/13

    Physical Model of Dam

  • 7/31/2019 46964240 History of Kalabagh Dam

    13/13

    Current Picture of Kala Bagh