SOURCES OF WATER (Q) IN OUR RIVERS:
RAINFALL
SNOW MELTING
GLACIERS
SPRINGS
-
8/9/2019 Kalabagh Dam Presentation
5/27
LAND USE IN PAKISTAN
-
8/9/2019 Kalabagh Dam Presentation
6/27
WATER AVAILIBILITY IN PAKISTAN
-
8/9/2019 Kalabagh Dam Presentation
7/27
BACKGROUND
-
8/9/2019 Kalabagh Dam Presentation
8/27
EXISTING SURFACE STORAGES
I - IRRIGATION P- POWER W- WATER SUPPLY 1 MAF = 1.224 BCM
PROJECT RIVER HT. OF DAM LIVE STORAGE POWER
(MW)
PURPOSE
FT M MAF BCM
TARBELA (1976) INDUS 485 147.8 9.30 11.38 3478 I,P
MANGLA (1966) JHELUM 380 115.8 4.82 5.90 1000 I,P
CHASHMA (1971) INDUS - - 0.61 0.75 - I,P
WARSAK (1960) KABUL 250 76.2 0.04 0.05 240 I,P
BARAN DAM (1962) KURRAM 107 32.6 0.03 0.04 4 I,P
HUB (1983) HUB 151 46.0 0.76 0.93 - I,W
KHANPUR (1984) HARO 167 50.9 0.09 0.11 - I,W
TANDA (1965) KOHAT TOI 115 35.0 0.06 0.07 - I
RAWAL (1962) KURANG 114 34.7 0.04 0.05 - W
SIMLY DAM (1972) SOAN 215 65.5 0.02 0.02 - W
BKD KHAN (1900 ) PISHIN 35 10.7 0.04 0.05 - I
HAMAL LAKE - - - 0.08 0.09 - I
MANCHAR LAKE INDUS - - 0.75 0.92 - I
KINJHAR LAKE INDUS - - 0.32 0.39 - I,W
CHOTIARI LAKE INDUS - - 0.78 0.95 - I
TOTAL 17.74 21.90 4722
-
8/9/2019 Kalabagh Dam Presentation
9/27
RESERVOIR SEDIMENTATION (MAF)
-
8/9/2019 Kalabagh Dam Presentation
10/27
SURFACE STORAGE SITES INDUS RIVER & TRIBUTATIES
I.IRRIGATION R- RECONNAISSANCE STUDY COMPLETED FT. FEET
P-POWER F- FEASIBILITY STUDY COMPLETED M: METERS
PROJECT RIVER HT. OF DAM LIVE
STORAGE
POWER
(MW)
PURPOS
E
STATUS
FT M MAF BCM
YUGO SYHOK 540 164.5 4.82 5.90 1000 I,P R
SKARDU INDUS 755 230.1 15.52 18.99 4000 I,P R
KATZARA INDUS - 35.00 42.82 15000 R
BASHA INDUS 660 201.1 5.70 6.98 3360 I,P PF
KALABAG H INDUS 260 79.3 6.10 7.46 3600 I,P C
KALAM SWAT 450 137.1 0.26 0.32 110 I,P R
MIR KHANI CHITRAL 410 124.9 0.58 0.71 150 I,P R
KHAZANA PANJKORA 380 115.8 0.56 0.68 110 I,P R
MUNDA SWAT 700 213.2 0.67 0.82 740 I,P F
-
8/9/2019 Kalabagh Dam Presentation
11/27
LOCATION OF DAM SITES
-
8/9/2019 Kalabagh Dam Presentation
12/27
KALABAGH DAM
SALIENT FEATURES
GROSS STORAGE 7.9 MAF LIVE STORAGE 6.1 MAF RETENTION LEVEL 915 FT. CREST ELEVATION 940 FT.
MAX HEIGHT 260 FT. HYDRO POWER 2,400/ 3,600 MW NO. OF UNITS 8/12 ESTIMATED COST US $ 6.1 BILLION
-
8/9/2019 Kalabagh Dam Presentation
13/27
-
8/9/2019 Kalabagh Dam Presentation
14/27
PROBLEMS SHORT LIFE DUE TO HEAVY SEDIMENTATION
POWER HOUSES CLOSURE FOR 3 MONTHS DISPLACEMENT OF POPULATION (1,20,000)
PUNJAB 78,000
NWFP 42,000
SUBMERGENCE OF FERTILE LAND (27,500 ACRES)
PUNJAB: TOTAL 24,500 BARANI 21,000
IRRIGATED 2,900
NWFP: TOTAL 3,000 BARANI 2,900
IRRIGATED 100
DRAINAGE PROBLEMS OF PESHAWAR VALLEY
FLOODS IN KABUL RIVER
EFFECTS ON INDUS DELTA MANGROVE FORESTS.
ADVERSE EFFECTS ON RIVERINE AREA
-
8/9/2019 Kalabagh Dam Presentation
15/27
DRAINAGE LEVEL IN KABUL VALLEY WITH KALABAGH
-
8/9/2019 Kalabagh Dam Presentation
16/27
BASHA DAM
GROSS STORAGE 9.04 MAF
LIVE STORAGE 7.30 MAF HYDRO POWER 4,500 MW
HEIGHT OF DAM 913 FT.
TOTAL COST $ 6.5 BILLION
ELEVATION RESERVOIR ASL 3819 FT. AREA UNDER RESERVOIR 32,000 ACRES
-
8/9/2019 Kalabagh Dam Presentation
17/27
-
8/9/2019 Kalabagh Dam Presentation
18/27
PROBLEMS
DISPLACEMENT OF POPULATION 24,350
PERSONS IN 32 VILLAGES
SUBMERGENCE OF KKH 110 KM
LOSS OF AGRICULTURAL LAND 1,600 ACRES
COST OF RESETTLEMENT $ 200 M
-
8/9/2019 Kalabagh Dam Presentation
19/27
KATZARAH DAM
SALIENT FEATURES GROSS STORAGE 35 MAF
LIVE STORAGE ?
HYDRO POWER 15000 MW
HEIGHT 860 FT.
COST NOT WORKED-OUT
PRE-FEASIBILITY STUDIES IN PROGRESS
-
8/9/2019 Kalabagh Dam Presentation
20/27
-
8/9/2019 Kalabagh Dam Presentation
21/27
PROBLEMS
SUBMERGENCE OF LAND 80,000 ACRES
ROADS AFFECTED 40 KM
DISPLACED POPULATION 1,60,000 PERSONS
SKARDU AIRPORT WOULD BE SUBMERGED
POWER DISPERSAL VERY DIFFICULT
-
8/9/2019 Kalabagh Dam Presentation
22/27
AKHORI RESERVOIR
SALIENT FEATURES GROSS STORAGE 14 MAF
LIVE STORAGE 6 MAF
HEIGHT 418 FT. COST $ 5 BILLION
-
8/9/2019 Kalabagh Dam Presentation
23/27
-
8/9/2019 Kalabagh Dam Presentation
24/27
PROBLEMS
PERSONS DISPLACED 49,300 ROADS AFFECTED 97 KM
LAND SUBMERGENCE 59,200 ACRES
-
8/9/2019 Kalabagh Dam Presentation
25/27
PROVINCIAL VIEWS ON MEGA DAMS
-
8/9/2019 Kalabagh Dam Presentation
26/27
CONCLUSION
Water resources must be developed on prioritybasis
Feasibility study should be carried out of allpotential sites
The retention level of Kalabagh dam (915 ft) shouldbe further reduced to protect Peshawar valley fromwater-logging
Work on Basha dam, which is not controvercial,should be taken-up followed by Akhori andKatzarah
-
8/9/2019 Kalabagh Dam Presentation
27/27
Thanks for the attentionand interest