KALABAGH DAM Project
Nasrat Nisar (MBA 4th)
Out Lines Introduction Current Status Annual Benefit Water Demand Sindh Apprehension KPK Apprehension
KALABAGH DAM LAYOUT
Introduction Location Kalabagh, Miawali, Punjab
Dam Type Earth Core Rock Fill
Dam Height 925 ft. Reduced To 915 ft.
Power 3600 MW
Storage 6.1 MAF
Cost Estimation Rs 250 Billion
Sponsor Federal Govt & World Bank
Execution Ministry Of Water & Power
KALABAGH DAM PROJECT(Current Status)
Feasibility Report 1984
PC-I submitted (1989) Approval pending
Project Planning Studies Completed
Completion Time 6 Years
Payback Period 9 To 10 Years
KALABAGH DAM PROJECTANNUAL BENEFITS
1.Irrigation Water Supplies@ Rs. 2054/AF
6.1 x 2054 = Rs. 12.53 Billion
2 Power Benefits @ Rs. 4.00/Unit
11.736 x 4 = Rs. 46.944 Billion
3 Flood Control 1.50 Billion
Total Rs. 60.97 Billion
7
WATER DEMAND IN PAKISTAN POPULATION 2005 141 million
2025 220 million URBAN POPULATION 2005 35%
2025 60%
TOTAL AREA 196 Million ACRESCULTIVABLE 77 MACULTIVATED 54.5 MAREMAINING 22.5 MA Needs Add. Water
To increase the crop yield requires additional water. Net Crop Water Requirement 2003-4 77.4 MAF
2010-11 89 MAF 2024-25 114.64 MAF
Domestic Demand 2005 ≈ 4.0 MAF
2025 ≈ 10.5MAF
KALABAGH DAM PROJECT APPREHENSIONS OF KPK
Apprehensions Factual Position DRAINAGE OF MARDAN, PABBI AND SWABI
WILL BE ADVERSELY AFFECTED CONSERVATION LEVEL OF KALABAGH DAM IS 915 FT WHICH IS LOWER THAN THE LOWEST GROUND LEVEL OF MARDAN, PABBI AND SWABI SCARP AREAS
DRAINAGE LEVELS
910
930
950
970
990
1010
150 140 130 120 110 100 90 80
SWABICHARSADDA
PABBI
NOWSHERA
MARDAN
RESERVOIR RETENATION EL. 915
DISTANCE U/S DAM SITE IN MILES
LEVE
L IN
FEE
T
955 960
940
970
1000
KALABAGH DAM PROJECT APPREHENSIONS OF KPK
Apprehensions Factual Position
LARGE POPULATION WOULD BE DISPLACED RESETTLEMENT PLAN WOULD ENSURE PROPER COMPENSATION TO THE AFFECTEES
PUNJAB NWFP TOTALNO. OF AFFECTEES 78,000 42,000 120,000LAND AFFECTED (Acres) 24,500 3,000 27,500
KALABAGH DAM PROJECT APPREHENSIONS OF SINDH
APPREHENSIONS FACTUAL POSITION• Royalty from Kalabagh would go to
Punjab although the Project would be Federally Funded
• It is a Constitutional Matter.
SINDH WOULD BE CONVERTED INTO A DESERT
AFTER MANGLA & TARBELA DAMS, SINDH CANAL WITHDRAWALS INCREASED FROM 37.20 MAF TO 44.47 MAF
CANAL WITHDRAWALS FOR SINDH WOULD FURTHER INCREASE BY 2 MAF AFTER KALABAGH
13
WARSAK DAMNowshe
ra
Lahore
A F G
H A
N I
S T A
N
Rivi
CHASHMA
BARRAGE
MANGLA DAM
JAMMU AND KASHMIR
(DISPUTED TERRITORY)
Sringar
Jammu
ISLAMABAD
Skardu
GilgitChitral
AttockPeshawar
Rawalpindi
Kalabagh
Dera Ismail Khan
Gujranwala
Faisalabad I N D
I A
Jheium
River
River
Chenab
River
Soan River
Indus River
Indu
s Rive
r
LOCATION MAP DAMS
TARBELA DAM
BASHA DAM
KALABAGH DAM TARBELA DAM
CONCLUSION
THANK YOU