Kalabagh Dam Project

15
KALABAGH DAM Project Nasrat Nisar (MBA 4 th )

Transcript of Kalabagh Dam Project

Page 1: Kalabagh Dam Project

KALABAGH DAM Project

Nasrat Nisar (MBA 4th)

Page 2: Kalabagh Dam Project

Out Lines Introduction Current Status Annual Benefit Water Demand Sindh Apprehension KPK Apprehension

Page 3: Kalabagh Dam Project

KALABAGH DAM LAYOUT

Page 4: Kalabagh Dam Project

Introduction Location Kalabagh, Miawali, Punjab

Dam Type Earth Core Rock Fill

Dam Height 925 ft. Reduced To 915 ft.

Power 3600 MW

Storage 6.1 MAF

Cost Estimation Rs 250 Billion

Sponsor Federal Govt & World Bank

Execution Ministry Of Water & Power

Page 5: Kalabagh Dam Project

KALABAGH DAM PROJECT(Current Status)

Feasibility Report 1984

PC-I submitted (1989) Approval pending

Project Planning Studies Completed

Completion Time 6 Years

Payback Period 9 To 10 Years

Page 6: Kalabagh Dam Project

KALABAGH DAM PROJECTANNUAL BENEFITS

1.Irrigation Water Supplies@ Rs. 2054/AF

6.1 x 2054 = Rs. 12.53 Billion

2 Power Benefits @ Rs. 4.00/Unit

11.736 x 4 = Rs. 46.944 Billion

3 Flood Control 1.50 Billion

Total Rs. 60.97 Billion

Page 7: Kalabagh Dam Project

7

WATER DEMAND IN PAKISTAN POPULATION 2005 141 million

2025 220 million URBAN POPULATION 2005 35%

2025 60%

TOTAL AREA 196 Million ACRESCULTIVABLE 77 MACULTIVATED 54.5 MAREMAINING 22.5 MA Needs Add. Water

To increase the crop yield requires additional water. Net Crop Water Requirement 2003-4 77.4 MAF

2010-11 89 MAF 2024-25 114.64 MAF

Domestic Demand 2005 ≈ 4.0 MAF

2025 ≈ 10.5MAF

Page 8: Kalabagh Dam Project
Page 9: Kalabagh Dam Project

KALABAGH DAM PROJECT APPREHENSIONS OF KPK

Apprehensions Factual Position DRAINAGE OF MARDAN, PABBI AND SWABI

WILL BE ADVERSELY AFFECTED CONSERVATION LEVEL OF KALABAGH DAM IS 915 FT WHICH IS LOWER THAN THE LOWEST GROUND LEVEL OF MARDAN, PABBI AND SWABI SCARP AREAS

Page 10: Kalabagh Dam Project

DRAINAGE LEVELS

910

930

950

970

990

1010

150 140 130 120 110 100 90 80

SWABICHARSADDA

PABBI

NOWSHERA

MARDAN

RESERVOIR RETENATION EL. 915

DISTANCE U/S DAM SITE IN MILES

LEVE

L IN

FEE

T

955 960

940

970

1000

Page 11: Kalabagh Dam Project

KALABAGH DAM PROJECT APPREHENSIONS OF KPK

Apprehensions Factual Position

LARGE POPULATION WOULD BE DISPLACED RESETTLEMENT PLAN WOULD ENSURE PROPER COMPENSATION TO THE AFFECTEES

PUNJAB NWFP TOTALNO. OF AFFECTEES 78,000 42,000 120,000LAND AFFECTED (Acres) 24,500 3,000 27,500

Page 12: Kalabagh Dam Project

KALABAGH DAM PROJECT APPREHENSIONS OF SINDH

APPREHENSIONS FACTUAL POSITION• Royalty from Kalabagh would go to

Punjab although the Project would be Federally Funded

• It is a Constitutional Matter.

SINDH WOULD BE CONVERTED INTO A DESERT

AFTER MANGLA & TARBELA DAMS, SINDH CANAL WITHDRAWALS INCREASED FROM 37.20 MAF TO 44.47 MAF

CANAL WITHDRAWALS FOR SINDH WOULD FURTHER INCREASE BY 2 MAF AFTER KALABAGH

Page 13: Kalabagh Dam Project

13

WARSAK DAMNowshe

ra

Lahore

A F G

H A

N I

S T A

N

Rivi

CHASHMA

BARRAGE

MANGLA DAM

JAMMU AND KASHMIR

(DISPUTED TERRITORY)

Sringar

Jammu

ISLAMABAD

Skardu

GilgitChitral

AttockPeshawar

Rawalpindi

Kalabagh

Dera Ismail Khan

Gujranwala

Faisalabad I N D

I A

Jheium

River

River

Chenab

River

Soan River

Indus River

Indu

s Rive

r

LOCATION MAP DAMS

TARBELA DAM

BASHA DAM

KALABAGH DAM TARBELA DAM

Page 14: Kalabagh Dam Project

CONCLUSION

Page 15: Kalabagh Dam Project

THANK YOU