V.S.Chandra

download V.S.Chandra

of 6

Transcript of V.S.Chandra

  • 8/6/2019 V.S.Chandra

    1/6

    V.S.Chandra.Mobile : +91 9916032642

    E mail : [email protected].

    Objective:I am looking for a challenging position in Data Warehousing, Data

    modeling, ETL architecting and process automation that will best utilize myexpertise and experience with a scope for good career growth.

    Summary of Experience:

    Total 3.2 years of experience in Software Industry, in which 2.2 years on Datastage and 1 year as Trainee (Java).

    Worked on Data Mart development and implementations of Data Warehousingprojectswhere Good knowledge in Client/ Server technologies.

    Extensively used ETL methodology for supporting Data Extraction,transformations and loading processing, in a corporate wide ETL Solution using

    Ascential DATASTAGE 7.5.2. (Data Stage Designer, Data Stage Director, Data

    Stage Manager, Data Stage Administrator).

    Experience in analysis, data conversion in Data warehouse design development,

    Implementations of Data warehousing projects.

    Running, Scheduling, resetting of ETL jobs & viewing their logs in Data stageDirector. And Deployment is done on ETL jobs using Data stage Manager.

    Working Experience:

    Working as ETL Consultant for UniSys IT Solutions,Bangalore from November2004 to tilldate.

    Worked as ETL developer for GMAX,Bangalore from October 2003 to October2004.

  • 8/6/2019 V.S.Chandra

    2/6

    Technical Skills:

    Languages: SQL & PL/SQL, C OS: MS Windows, MS DOS , UNIX Database: Oracle8i/ 9i, SQL server ETL Tool: Data stage 7.5.2

    Academic qualification

    Completed MCA from Andhra University in 2003.

    Project Summary:

    Project #1

    Title : Sales & Supply Chain Warehouse

    Client : Digital Sales Corporation, USA

    Designation : ETL Developer.

    Role : Team Member

    Description :

    Digital Sales Corporation put its transaction data online using an OLTP system.

    The transactions are captured at the point of sales, one row of transaction table is used

    for each purchased item. Digital sales Corp. has 100 stores in different regions of USA,

    with average of 1000 customers per store. Each customer averages 5 items per

    transaction. Thus, 500000 rows added to the digital sales database every day. Digital

    sales turn the data into decisions and launched a data warehouse project

    The transaction system and data warehouse are using Oracle 8i as RDBMS.

    DataStage is used to extract data from non store data that was stored in the flat files. The

    star schema model consists of Transaction Fact table with Dimensions namely Customer,

    Product, Store, Region and Time.

  • 8/6/2019 V.S.Chandra

    3/6

    Responsibilities:

    Involved in Data Acquisition Process to populate the Dimension

    Tables from different source systems like flat files (.txt, .CSV),

    Oracle 8i, SQL Server.

    Used the DS Designer to develop server jobs for extracting,

    cleansing, transforming, integrating, and loading data into Oracle

    Data warehouse.

    Used Hash files (for Lookups), Link Partitioner and Link Collector

    to improve performance of large scale sequential files in the server

    jobs

    Used the DS Director to validating, running, and monitoring the

    Server Jobs designed in DS Designer

    Worked with DS Manager for importing metadata to repository

    and exported the DataStage components based on other project

    demands, performed usage analysis to understand the dependency

    of the different DataStage components.

    Assisted to design Job Sequencer to automate the whole process of

    data loading.

    Environment: DataStage 7.5.1,Oracle 8i, DB2, Windows 2000 Server.

    Project #2

    Title : Aeron Life Insurance.

    Client : Aeron Life Insurance, Inc

    Designation : ETL Developer

    Role : Team Member

  • 8/6/2019 V.S.Chandra

    4/6

    Description :

    Customer, product, agents and transactions will organize the data according to

    the requirements of the organization. The main process that is performed is Extraction,

    Transformation and Loading. This system is used to perform Policy formulating, claim

    processing. The console application, which is part of this system, does the month end and

    the day end processes apart from performing regular database maintenance. The

    reporting tools provide on demand reports to business users who use the information to

    study service usage patterns, design more competitive, cost effective services, and

    improve customer service.

    Responsibilities:

    Used the Expression andAggregator transformations to summarize the volume

    of the Day/Month/Year.

    While developing jobs I used different stages like sequential file, hashed file,

    transform stage, ODBC stage, aggregator stage, sorter stage etc.

    Analyzing the log files and bugs verifying.

    Used the Data stage Designer to build complex jobs for extracting and

    transforming the data.

    Used the Data stage Director and its run time engine to create batches, clear

    status files, clear log files and schedule the jobs.

    Environment : Datastage 7.5.2, Oracle 9i, PL/SQL.

    Project #3Title : RAMADA INTERNATIONAL INTEGRATIONClient : Cendent Hotels

    Designation : ETL Developer (Datastage)

    Role : Team Member

    Description:

    Cendant Hotels is integrating data from Ramada group of hotels into its data warehouse

    for decision support purposes. As part of that source data from Ramada system needs to

    be loaded to existing Cendant Hotels data warehouse structure. Ramada data needs to be

  • 8/6/2019 V.S.Chandra

    5/6

    cleansed prior to data loading. As part of the effort daily currency feeds need to be

    maintained.

    Responsibilities:

    Understanding existing business model and customer requirements. Created Jobs between Source and Target using Ascential Data StageDesigner . Created and scheduled many sequential & concurrent batches to group the

    jobs to run at same time. Loaded data into target database from source database using Data StageDirector .

    Environment: DataStage 7.5.1,Oracle 8i, DB2, Windows 2000 Server.

    Project #4

    Title : Distributed Factory Management System (DFMS)Client : Ramson Industries Pvt Ltd.

    Designation : Developer

    Role : Team Member

    Description:

    This product has different modules like Production, Sales, Purchases, Marketing and Cash

    Management. In Sales module, Customer has to make enquiry for products, which are

    available in company, and then he/she has to send Enquiry form to company. And

    company will prepare quotation for required products. If Customers are accepts those

    quotation then they should send Sales order form with any modifications in previous

    corresponding enquiry form. That gives the finally wanted products with quantities.

    Company prepares the dispatch form and delivery those products. Lastly company should

    prepare Invoice for delivered products.

    Responsibilities:

    Involved in Sales module.

  • 8/6/2019 V.S.Chandra

    6/6

    Coding using Servlets, JDBC and Unit testing.