  • SOCIALIST REPUBLIC OF VIET NAM

    ELECTRICITY OF VIET NAM

    PECC4 POWER ENGINEERING CONSULTING COMPANY 4SO990012O

    RP287Project No.: 14 - 02 VOL. 4

    TUY HOA - NHA TRANG 220kV TRANSMISSION LINE

    FEASIBILITY STUDY REPORT

    RESETTLEMENT ACTION PLAN (RAP)(FIRST REVISION)

    Khanh Hoa Province - 2005

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

  • SOCIALIST REPUBLIC OF VIET NAM

    ELECTRICITY OF VIET NAM

    PECC4 POWER ENGINEERING CONSULTING COMPANY 4ISO 900 2

    PROJECT: 14 - 02

    TUY HOA - NHA TRANG 220kV TRANSMISSION LINE

    FEASIBILITY STUDY REPORT

    RESETTLEMENT ACTION PLAN (RAP)(FIRST REVISION)

    Head of Department : Nguyen Kim Dong

    Head of Project Design: Le Hoang Thuong -

    Khanh Hoa Province, 2005

    FOR AND ON BEHALF OF

    POWER ENGINEERING CONSULTING COMPANY 4

    DEN HUU TAP

    DEPUTY DIRECTOR |

  • Tuy Hoa - Nha Trang 220kV transmission line Feasibility Study

    The staffs participating in RAP establishment including of:

    No. Full name Content prepared Signature

    In charge of presiding RAP1 Tran Van Luyen enestablishment i2 Mai Thi Hop Establishing RAP

    Resettlement Action Plan

  • Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study

    CONTENTS

    ABREVIATION 4

    SUMMARY 5

    1. Policy framework 5

    2. Project impacts 5

    3. Resetlement policy 6

    4. Public consultation 6

    5. Grievance 7

    6. Management organization 7

    7. Implemetation schedule 7

    8. Cost estimate 8

    9. Information dissemination 8

    CHAPTER 1: GENERAL INTRODUCTION 9

    1.1 The basis of the report 9

    1.2 Objectives 9

    1.3 Validity of RAP implementation 10

    1.4 Description of the project 10

    1.4.1 Characteristic of the project 10

    1.4.2 Project impacts 13

    1.5 Project impacts minimizing measures 13

    1.6 Implementation cost estimate 14

    CHAPTER 2: IMPLEMENTATION ORGANIZATION AND LEGAL 15

    FRAMEWORK FOR COMPENSA TIONAND RESETTLEMENT

    2. 1. Institutional arrangements 15

    2.2. Organizational'responsibility 15

    2.3. Staffing organization and responsibilities 20

    2.4 Legal framework 21

    CHAPTER 3: ENTITLEMENT POLICY 26

    Resettlement Action Plan 1

  • Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study

    3.1 Definition of PAP and limitation to eligibility 26

    3.2 Resettlement and compensation principles 26

    3.3 Eligibility to get compensation entitlements 27

    3.4 Entilement policy 28

    3.5 Inpacted categories 31

    CHAPTER 4: SOCIO-ECONOMIC SITUATION OFPROJECTAREA 33

    AND THE PROJECT IMPACTS

    4.1 Survey work, inventory of project impacts 33

    4.2 The socio-economic condition of project area 33

    4.2.1 Phu Yen Province 33

    4.2.2 Khanh Hoa Province 34

    4.3 Project impacts 34

    CHAPTER 5: PULICPARTICIPATIONAND CONSULTATION 36

    5.1 Objectives of information campaign and consultation program 36

    5.2 Consultation and inform to people 36

    5.3 Information dissemination and PAPs'consultation 37

    CHAPTER 6. COMPLAINTSAND GRIEVANCE 40

    CHAPTER 7: SUPERVISIONAND MONITORING 42

    7.1 Internal supervision 42

    7.2 Independent supervision 42

    CHAPTER 8: IMPLEMENTATION ORGANIZATION FOR 44

    COMPENSA TIONAND RESETTLEMENT PLAN

    8.1 Measures for the project implementation 44

    8.1.1 Announcement to PAPs 44

    8.1.2 Compensation and Resettlement deadlines 44

    8.2 RAP implementation process 44

    8.3 RAP implementation schedule 46

    Resettlement Action Plan 2

  • Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study

    CHAPTER 9: COSTS AND BUDGET 47

    9.1 Budget 47

    9.2 Compensation price determination 47

    9.2.1 Land 47

    9.2.2 Impacted trees and crops 47

    9.3 Compensation cost estimate 48

    9.3.1 Cost for RAP establishment 48

    9.3.2 Compensation cost 49

    9.3.3 Management cost 49

    9.3.4 Supervision cost 49

    9.3.5 Reserved cost 49

    9.3.6 Total compensation cost for project 49

    CHAPTER 10: CONCLUSIONAND PROPOSALS 50

    10.1 Conclusion 50

    10.1 Proposals 50

    APPENDICES 51

    Appendix 1: Entitlement Matrix 52

    Appendix 2: Table of compensation quantity for Quy Nhon - Tuy Hoa 220kV T/L 59

    Appendix 3: Inventory of Project Affected People 62

    Appendix 4: Entitlements of Project Affected People 75

    Appendix 5: Socio-Economic Household Data Sheet of Project Affected People 87

    Appendix 6: Minutes of public consultation 96

    Resettlement Action Plan 3

  • Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study

    ABREVIATION

    - RAP Resettlement Plan

    - PAPs Project Affected Persons

    - WB World Bank

    - PC People's Committee

    - EVN Electricity of Vietnam

    - LC Land Clearance

    - PMB Project Management Board

    - PECC4 Power Engineering Consulting Company 4

    - ER Environmental Resource

    -GC General Company

    - VND Viet Nam Dong

    - SC Safe Corridor

    - ROW Right-Of-Way

    - CPPMB Central Power Projects Management Board

    Resettlement Action Plan 4

  • l

    Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study

    SUMMARY

    Pursuant to the Government policy, the power energy develops in advance of

    other sectors to serve as the engine for development with purposes of rich people,

    strong country and an equitable, democratic and civilized society. In order to

    strengthen the capacity of supplying power source, a vitual infrastructure, Electricity

    of Vietnam (EVN) has established the project "Transmission, distribution and

    overcoming natural disasters" (3034-VN) financed by World Bank (WB). One of its

    component is "Tuy Hoa - Nha Trang 220kV transmission line" project with total route

    length of 131,528m going through the territory of Phu Hoa and Tuy Hoa districts, Phu

    Yen Province; Van Ninh and Ninh Hoa districts, Nha Trang City of Khanh Hoa

    Province.

    Tuy Hoa - Nha Trang 220kV transmission line project is constructed in line

    with Quy Nhon - Tuy Hoa 220kV transmission line and 220kV Tuy Hoa Substation

    projects targeting to combine the local 110kV, 220kV power grid, to receive energy

    source from power source of Ha Song Ba hydropower project, etc.. .into power grid

    and to upgrade the reliability in supplying power, the quality of power energy of the

    local power grid.

    1. Policy framework

    The plan on project compensation and resettlement is established based on Decree

    197/2004/ND-CP dated December 3rd, 2004 of the Government regarding the

    compensation, resettlement support when the State takes back the land; Decree

    198/2004fND-CP dated November 16th,2004 of the Govermment regarding the method

    to determine the land price and the price framework of land kinds; Decree

    181/2004/ND-CP of the Government regarding the implementation of Land Law, etc...

    and guideline on RAP establishment of WB (the policy framework of unvoluntary

    resettlement OD 4.30). According to this policy, PAPs are people, households, entities

    with or without juridical personality for their assets on project impacted land and

    inventoried before the cut-off-date (September 9th, 2004) are entitled to compensation

    and resettlement.

    2. Project impacts

    The project causes impacts to the followings:

    Resettlement Action Plan 5

  • Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study

    - Perpetual land acquisition at tower foundation positions, ect. (the

    perpetual acquisition area of 47,345m2).

    - Causing damage to trees, crops and other assets at tower foundation

    positions and within ROW.

    - Temporary land acquisition under project construction

    Results of project data collection show that there are 135 households whose houses

    and structures are impacted within the safe corridor of the line route, whereas:

    + No household loses over 25% area of agricultural land

    + No affect to cultural relics area, preservation area, pagoda and sensitive areas

    + No ethnic minority household among impacted households.

    During public consultation process, impacted households were agreed to select the

    compensation procedure on land and assets in cash.

    3. Compensation policy

    The cut-off-date is September 96, 2004. The price for making compensation on land,

    assets and crops is based on the compensation unit price of Phu Yen and Khanh Hoa

    Provinces.

    All impacted households are entitled according to the policy framework and Vietnam

    Decrees such as displacement support, support for production stabilization, etc... Up

    till now, the survey result and damage inventory shows that no remarkable impacts to

    people, the community and the public assets. As a result, it is unnecessary to have

    economical recovery measures.

    4. Public consultation

    PAPs consultation to get feedback comments will restrict the contradictions and delay

    when implementing the project. The resettlement plan will be implemented following

    to the reference c