TS1311 Instruction Sheet

24
Page 1 of 24 Instruction Sheet C685 5-2005 Installation and Operation of a TS1311 Control (Kit 541-1221 for Transfer Switches with Line-to-Neutral Sensing) This Instruction Sheet describes the installation and operation of a TS1311 control on a transfer switch with line-to-neutral sensing. This control is to be used in utility-to-genset applications only. The following parts are included in this kit. Part Description Qty TS1311 Control (Includes a gasket and two retaining clips) 1 6 Pin Connector 1 8 Pin Connector 1 9 Pin Connector 1 Quick Reference Card 1 This instruction sheet covers the following topics: Topic Page Control Installation 1 Optional Equipment 5 Control Panel 7 Pushbutton Operation 8 Control Functions 9 System Settings 9 Time Delays 10 Using the Integrated Exerciser 11 Exercising With or Without Load 12 Testing With or Without Load 13 Sensor Settings 14 Modifying the Control Panel Configuration 15 Troubleshooting 19 Read these instructions completely and become fa- miliar with safety warnings, cautions, and proce- dures before starting the installation. WARNING Incorrect installation, service, or parts replacement can result in severe personal injury, death, and/or equipment damage. Ser- vice personnel must be trained and experi- enced to perform electrical and mechanical component installations. CONTROL INSTALLATION WARNING The transfer switch presents a shock hazard that can cause severe personal injury or death. Before beginning installation, remove all sources of AC power. If a generator set provides emergency power, move the gen- erator set operation selector switch to Stop, dis- connect AC line power, disconnect the battery charger from its AC power source, and discon- nect the starting battery (negative [-] lead first). 1. Remove all sources of power from the transfer switch in the following order. a. Move the operation selector switch on the generator set to Stop. CAUTION Always disconnect a battery charger from its AC source before discon- necting the battery cables. Otherwise, dis- connecting the cables can result in voltage spikes high enough to damage the DC con- trol circuits. b. If there is an external battery charger, dis- connect the battery charger from its AC power source. WARNING Ignition of explosive battery gases can cause severe personal injury. Do not smoke or cause any spark, arc, or flame while servicing batteries. WARNING Accidental starting of the gen- set can cause severe personal injury or death due to electrocution or contact with moving parts. Disconnect the starting bat- tery cables, before performing service. Bat-

description

TS1311 Instruction Sheet

Transcript of TS1311 Instruction Sheet

  • Page 1 of 24

    Instruction SheetC685 5-2005

    Installation and Operation of a TS1311 Control(Kit 5411221 for Transfer Switches with Line-to-Neutral Sensing)This Instruction Sheet describes the installationand operation of a TS1311 control on a transferswitch with line-to-neutral sensing. This control isto be used in utility-to-genset applications only.

    The following parts are included in this kit.

    Part Description QtyTS1311 Control (Includes a gasket andtwo retaining clips)

    1

    6 Pin Connector 18 Pin Connector 19 Pin Connector 1Quick Reference Card 1

    This instruction sheet covers the following topics:

    Topic PageControl Installation 1Optional Equipment 5Control Panel 7Pushbutton Operation 8Control Functions 9

    System Settings 9Time Delays 10Using the Integrated Exerciser 11Exercising With or Without Load 12Testing With or Without Load 13Sensor Settings 14

    Modifying the Control PanelConfiguration

    15

    Troubleshooting 19

    Read these instructions completely and become fa-miliar with safety warnings, cautions, and proce-dures before starting the installation.

    WARNING Incorrect installation, service, orparts replacement can result in severe personalinjury, death, and/or equipment damage. Ser-vice personnel must be trained and experi-enced to perform electrical and mechanicalcomponent installations.

    CONTROL INSTALLATIONWARNING The transfer switch presents a

    shock hazard that can cause severe personalinjury or death. Before beginning installation,remove all sources of AC power. If a generatorset provides emergency power, move the gen-erator set operation selector switch to Stop, dis-connect AC line power, disconnect the batterycharger from its AC power source, and discon-nect the starting battery (negative [] lead first).

    1. Remove all sources of power from the transferswitch in the following order.

    a. Move the operation selector switch on thegenerator set to Stop.CAUTION Always disconnect a battery

    charger from its AC source before discon-necting the battery cables. Otherwise, dis-connecting the cables can result in voltagespikes high enough to damage the DC con-trol circuits.

    b. If there is an external battery charger, dis-connect the battery charger from its ACpower source.

    WARNING Ignition of explosive batterygases can cause severe personal injury. Donot smoke or cause any spark, arc, or flamewhile servicing batteries.

    WARNING Accidental starting of the gen-set can cause severe personal injury ordeath due to electrocution or contact withmoving parts. Disconnect the starting bat-tery cables, before performing service. Bat-

  • Page 2 of 24C685

    teries emit hydrogen, a highly explosivegas. Thoroughly ventilate the batterycompartment before removing batterycables. Remove the negative () cable (s)first to reduce the risk of arcing.

    c. Disconnect the genset starting battery(negative [] lead first).WARNING If the cabinet must be opened

    for any reason, remove AC power to the au-tomatic transfer switch. If the instructionsrequire otherwise, use extreme caution dueto the danger of shock hazard.

    d. Remove AC power to the automatic transferswitch.

    2. Open the transfer switch door.

    3. Select a location on the front of the door tomount the control. Make sure no componentson either side of the door that are near the areawhere the control will be mounted.

    4. Mark the area that needs to be cut out (see Fig-ure 1).

    DIMENSIONS ARE IN MILLIMETERS

    P4 P5

    P3

    FIGURE 1. CONTROL INSTALLATION

    CAUTION Installation debris can cause equip-ment failure and damage. Use extreme care tokeep drill chips and filings out of the relays,contacts, and other parts of the automatictransfer switch when cutting a hole in the cabi-net door for mounting the control. Make sure nocomponents are near the area that will be cutout.

    1. Cover the transfer switch to prevent acci-dental entry of metal chips.

    5. Cut a hole in the cabinet door for the control.

    6. Insert the control in the hole. Make sure thecontrol gasket is installed between the controland the cabinet door.

    7. Use the two retaining clips to secure the controlto the transfer switch door. The clips areinstalled on the sides of the control (see Figure6).

    WIRINGWARNING AC voltages and currents present

    an electrical shock hazard that can cause se-vere personal injury or death. Only trained andexperienced personnel are to perform the fol-lowing procedures.Figure 2 is an example of a wiring diagram for a typi-cal transfer switch installation using the TS1311control. It includes wiring information for optionalequipment (external exerciser and a battery char-ger) that are not required for a basic installation. Italso shows wiring information for the followingpieces of equipment that are not included in this kit.

    Seven fuse blocks (FM1, FM2, FM3, FM4, FS1,FS2, and FB)

    Four relay coils (K1 thru K4) A transfer switch

    Four transfer switch auxiliary contacts (ASW1,ASW2, BSW1, and BSW2)

    Use the wiring listed in Figure 2. Install the wiringfrom the component to the appropriate pin(s) on theappropriate connector. Refer to Table 1 for informa-tion on connector pins. When the wiring is com-plete, install the connectors on the control.

    1. Install wiring to make the connections from thedevices (fuses, relay coils, auxiliary contacts,etc.) to the controls P3 (6-pin) connector, P5(9-pin) connector, and P4 (8-pin) connector, asshown in Figure 2.

    2. Install wiring for any optional equipment. Wir-ing for an external clock and battery charger isshown in Figure 2. Wiring for a Manual RestoreSwitch is shown on page 6.

  • Page 3 of 24C685

    FIG

    URE

    2. T

    S131

    1 CO

    NTRO

    L W

    IRIN

    G D

    IAG

    RAM

    EXA

    MPL

    E

    SW

    ITC

    H C

    ON

    TR

    OL T

    ER

    MIN

    ALS

  • Page 4 of 24C685

    TABLE 1. CONTROL PANEL CONNECTIONS

    CONNECTOR PIN # FUNCTION TYPE COMMENTSP3 1 N Generator

    3 L1 Generator5 N Utility Voltage Sensor 75 480 Volts AC7 L3 Utility

    Voltage SensorInputs 75480 Volts AC

    9 L2 Utility11 L1 Utility

    P4 1 Functional Earth Ground Common for remote inputs2 Remote Override Connect to P4-1 to activate3 Remote Test Connect to P4-1 to activate4 External Exerciser Clock Connect to P4-1 to activate5 Transfer Inhibit Inputs Connect to P4-1 to activate6 Retransfer Inhibit

    In utsConnect to P4-1 to activate

    7 Connected to Utility(Normal)Connect to P4-1 to activate whenconnected to utility power

    8 Connected to Genset(Emergency)Connect to P4-1 to activate whenconnected to the genset

    P5 1 Open Normal (Utility) Grounded internally to energize opennormal K4 relay2 Close Normal (Utility) Grounded internally to energize closenormal K2 relay3 Open Emergency (Genset) Grounded internally to energize openemergency K1 relay4 Close Emergency(Genset) Outputs

    Grounded internally to energize closeemergency K3 relay

    5 Elevator Pretransfer Grounded internally to energizeelevator pretransfer relay

    6 Genset Start Relay Internal dry contact closes(de-energizes) to start the genset and7 Genset Start Relay

    (de energizes) to start the genset andis held open (energized) to stop thegenset

    8 Ground Input () Battery 8 35 volts DC9 B+ Input

    BatteryConnections 835 volts DC

    NOTE: L3 Utility is not available on 2 pole transfer switches

  • Page 5 of 24C685

    OPTIONAL EQUIPMENTOptional equipment that is available on transferswitches with a TS1311 control include the follow-ing: External Exerciser

    2 ampere or 12/15 ampere battery charger

    Manual Restore Key Switch

    External Exerciser OptionAn External Exerciser kit (5411215) can be pur-chased. The exercise clock includes:

    A 7 day, 24 hour clock Up to 28 programs that can be used to start and

    stop exercise periods Automatic changeover for summer/winter (Day-

    light Savings) time A 3 volt lithium battery backup (non-replaceable)Wiring for the external exerciser is shown in Figure2.

    If installed, the integrated exercise function of thecontrol must be disabled in order to use the externalexerciser. Therefore, the controls external exerciseon/off function must be set to On. See Modifyingthe Control Panel Configuration, starting on page15 for information on setting the external exerciseron/off function.

    ENDBRACKET

    ENDBRACKET

    EXERCISE CLOCK

    TERMINALRAIL

    NUT ANDFLAT WASHER

    0369

    12 15 18 21 24

    1 2 3 4 5 6 711:30AM

    Auto03 01 04Off

    FIGURE 3. EXERCISE CLOCK ASSEMBLY

    Battery Charger OptionsTwo battery chargers are available for installationon transfer switches. One battery charger is ratedfor 2 amperes at 12 or 24 VDC. The other batterycharger is rated for 15 amperes at 12 VDC or 12 am-peres at 24 VDC.The available 2 amp battery charger kits are:

    300602609 120 VAC300602610 208 VAC300602611 240 VAC300602612 277 VAC300602613 380 VAC300602614 416 VAC300602615 480 VAC300602616 600 VAC

    The available 15/12 amp battery charger kits are:300587813 120, 208, 240 VAC300587814 277 VAC300587815 380 VAC300587816 416 VAC300587817 480 VAC300587818 600 VAC

    Wiring for a battery charger is shown in Figure 2.

    2-AMP CHARGER 15-AMP (12 VOLT), 12-AMP(24 VOLT) CHARGER

    FIGURE 4. BATTERY CHARGERS

  • Page 6 of 24C685

    Manual Restore Option

    When installed, the optional Manual Restore keyswitch (kit 5411216) is located on the front panelbelow the Control Panel (see Figure 5).When the switch is set to Retransfer Inhibit, theload remains connected to Source 2 after a transfer.When the switch is set to Force Retransfer to Util-ity, the load is transferred back to Utility power.

    A manual restore input is set up by connecting a dry(voltage free) contact between P4-2 on the back ofthe control panel and Retransfer Inhibit and Com-mon of a terminal block (TB1-7 and TB1-8 in Figure6). Closing the contact enables the feature andopening the contact disables it.NOTE: The terminal block is not included in this

    kit.

    CONTROLPANEL

    MANUAL RESTOREKEY SWITCH

    FIGURE 5. MANUAL RESTORE KEY SWITCH

    RETRANSFER INHIBITCOMMON

    GENSET STARTREMOTE TESTTRANSFER INHIBIT

    TB1

    GNDGENSET STARTB+

    1

    2

    3456

    78

    FIGURE 6. CONNECTIONS FOR MANUAL RESTORE INPUT

  • Page 7 of 24C685

    CONTROL PANEL

    The control panel (see Figure 7) includes controlfunction LEDs, ATS status LEDs, and three mem-brane pushbuttons.

    Control Function LEDs

    The control panel includes eight LEDs that displaycodes that indicate various control functions thatcan be configured. The first five LEDs display thefunction code and the last three LEDs display thevalue code for the displayed function. For informa-tion on configuring these functions, see page 15.

    With the exception of the first LED (Test), normallythese LEDs are off and are only lit when in Configu-ration Mode. The Test LED is also used to notify theuser of test periods.

    ATS Status LEDs

    The control panel includes six LEDs that provideAutomatic Transfer Switch (ATS) status informa-tion.

    Utility Power Available This green LED is litwhen the utility power source has acceptable outputvoltage.

    Genset Power Available This amber LED is litwhen the genset power source has acceptable out-put voltage and frequency.

    Both power source LEDs can be lit simultaneously.

    Utility Power Connected This green LED is litwhen utility power is supplying power to the load.

    This LED flashes once per second if there is a fail-ure to connect to or disconnect from utility power,when commanded. The control makes five at-tempts (there is ten seconds between each at-tempt) to connect to or disconnect from utility powerbefore it flashes the failure.

    Genset Power Connected This amber LED is litwhen the genset is supplying power to the load.

    This LED flashes once per second if there is a fail-ure to connect to or disconnect from the genset,when commanded. The control makes five at-tempts (there is ten seconds between each at-tempt) to connect to or disconnect from the gensetbefore it flashes the failure.

    Test Override Set Exercise

    Exercise

    Test

    Control operation could be delayed by external source.

    FUNCTIONINDICATOR

    LEDS

    VALUEINDICATOR

    LEDS

    THIS LED IS LIT WHEN THE EXTERNALEXERCISE FUNCTION IS SELECTED THIS LED IS LIT

    WHEN THEEXTERNAL

    EXERCISE VALUEIS SET TO ON

    EXERCISE LEDSET EXERCISEPUSHBUTTON

    OVERRIDEPUSHBUTTON

    TESTPUSHBUTTON

    UTILITYPOWER

    AVAILABLE

    UTILITYPOWER

    CONNECTED

    GENSETPOWER

    AVAILABLE

    GENSETPOWER

    CONNECTED

    FIGURE 7. CONTROL PANEL

  • Page 8 of 24C685

    Test This amber LED is lit when there is an activetest period. This LED flashes twice per secondwhen the Test pushbutton is pressed to set or can-cel a test period.Exercise This amber LED lights when repeat ex-ercise periods have been set. This LED flashestwice per second when the Set Exercise pushbuttonis pressed to set or cancel an exercise. This LEDflashes once per second during an active exerciseperiod.

    PUSHBUTTON OPERATION

    The following describes operation of the threepushbuttons located on the control panel.

    Test PushbuttonThe Test pushbutton is used to: Start a genset test, with or without load. The

    Test LED flashes and stays on if the Testpushbutton is pressed and held for two sec-onds.

    Terminate a genset test. The Test LEDflashes for two seconds and goes out if theTest pushbutton is momentarily pressed.

    The Test pushbutton is also used in the Configura-tion Mode to step through the function codes (seepage 15).Override Pushbutton

    The Override pushbutton is used to:

    Terminate the following system time delays: Time Delay Engine Start (TDES) Time Delay Normal to Emergency (TDNE) Time Delay Emergency to Normal (TDEN)

    Bypass the TDNE timer and transfer the loadimmediately during an active Transfer Inhibitinput.

    Bypass the TDEN timer and retransfer theload immediately during an active RetransferInhibit input.

    Stop the Utility Power Connected LED fromflashing as a result of a failure to connect toor disconnect from the utility when command-ed.

    Stop the Genset Power Connected LEDfrom flashing as a result of a failure to con-nect to or disconnect from the genset whencommanded.

    Cancel an active exercise period.

    The Program Transition (TDPT), Elevator signal(TDEL), and Engine Cool Down (TDEC) time de-lays are not affected by pressing this pushbutton.

    The Override pushbutton is also used in the Config-uration Mode to step through the value codes (seeModifying the Control Panel Configuration, start-ing on page 15).Set Exercise Pushbutton

    This pushbutton is only used with the integrated ex-erciser and only functions if the External Exercisefunction is disabled (set to Off).The Set Exercise pushbutton is used to:

    Set a delayed repeat exercise period whenthe pushbutton is pressed and held for fiveseconds.

    Start an immediate exercise period (that alsorepeats) if the pushbutton is pressed momen-tarily within ten seconds of starting thedelayed exercise period.

    Cancel a repeatable exercise period if thepushbutton is pressed and held for five sec-onds.

  • Page 9 of 24C685

    CONTROL FUNCTIONSThe control includes a series of functions with ad-justable settings. Settings for these functions arepreset at the factory. The default control settings areshown in Table 2.

    TABLE 2. DEFAULT FUNCTION SETTINGS

    Function FactorySettingSystem Nominal Voltage Table Table 2System Nominal Voltage 240 VACSystem Nominal Frequency 50 HzSystem Phase 3 PhaseExternal Exercise OffTDES (Time Delay EngineStart)

    3 Seconds

    TDNE (Time Delay Normal toEmergency)

    5 Seconds

    TDEN (Time Delay Emergencyto Normal)

    10 Minutes

    TDEC (Time Delay EngineCooldown)

    10 Minutes

    TDPT (Time DelayProgrammed Transition)

    0 Seconds

    TDEL (Time Delay ElevatorSignal)

    0 Seconds

    Test With or Without Load Without LoadExercise With or Without Load Without LoadUtility Undervoltage Pickup 90%Utility Undervoltage Dropout 85%Phase Check OffReturn to ProgrammedTransition

    Off

    Elevator Post Transfer Delay OffExercise Repeat Interval Every 7 Days

    Once the control has been installed, it will need tobe configured if your installation requires differentsettings from what is shown in Table 2. While the fol-lowing pages provide information on all of the func-

    tions that are available, only the system settingsmust be set to match your system specifications inorder for the control to operate the transfer switchwhen power is applied. You may wish to adjust addi-tional settings for better performance. Other set-tings may only need to be changed when exercisingor testing the unit with or without load.Descriptions of these functions are listed below.The functions are divided into six categories.

    System settings Time Delays Using the integrated exerciser Exercising with or without load Testing with or without load Sensor settings

    Information on how to configure the control in orderto adjust these settings in on page 15.

    SYSTEM SETTINGSBefore power is applied to the transfer switch, thefollowing system settings must be set on the con-trol.

    System Nominal VoltageEleven possible nominal voltages are available withthis control. The nominal voltages are divided intotwo tables. Voltage Table 1 includes 110, 115, 120,127, 139, and 220 VAC. Voltage Table 2 includes230, 240, 255, 277, and 347 VAC. The default set-tings are Voltage Table 2, and 240 VAC. To changethe nominal voltage, you must first configure thecontrol for the appropriate voltage table and thenconfigure it for the appropriate voltage value.

    System Nominal FrequencyThe control can be configured for either 50 or 60 Hz(default = 50 Hz).System PhaseThe control can be configured for either a singlephase or a three phase system (default = threephase).

  • Page 10 of 24C685

    TIME DELAYS

    A transfer switch control uses various time delays tobreak from one power source and reconnect toanother source. The control panel can be used toadjust these time delays.In the following descriptions of time delays, it is im-portant to remember that:

    When the transfer switch is connected toNormal, it is connected to the utility powersource.

    When the transfer switch is connected toEmergency, it is connected to the Gensetpower source.

    When the transfer switch is in the Neutralposition, it is not connected to either powersource.

    Time Delay Engine Start (TDES)This time delay prevents the generator from startingduring brief utility power interruptions. This timerstarts the instant the utility fails, as detected by theUndervoltage Sensor.

    When the control senses a utility failure, the controlstarts the Time Delay Engine Start (TDES) timer.This time delay is configurable for 0 (disabled), 0.5,1, 2, 3, 4, 6, or 10 seconds (default = 3 seconds).If utility power returns while the TDES timer is ac-tive, the timer is reset. When the timer expires, thecontrol de-energizes the start relay, closing the startcontact signalling the generator to start. The timeris not reset until utility power returns. If the Overridepushbutton is pressed or the Override input isgrounded while the TDES timer is active, the TDEStimer immediately expires.

    Time Delay Engine Cooldown (TDEC)This time delay allows the generator to cool down(under no load conditions) before the control turns itoff.

    The Time Delay Engine Cooldown (TDEC) startstiming when the load is retransferred to utility power.This time delay is configurable for 0 (disabled), 0.1,5, 10, 15, 20, 25 or 30 minutes (default = 10 min-utes).When the TDES expires, the stop signal is sent tothe generator and the timer is reset. Pressing the

    Override pushbutton or grounding the Override in-put has no effect on this time delay.

    Time Delay Normal to Emergency (TDNE)This time delay allows the generator to stabilize be-fore the load is applied.

    While connected to Normal, this time delay startsafter utility power fails and the generator becomesavailable (the amber Genset Power Available LEDis lit). This time delay also starts after the generatorbecomes available when a with load Test or Exer-cise period is activated.

    The time delay is configurable for 0 (disabled), 1, 2,3, 5, 30, 120, or 300 seconds (default = 5 seconds).If the generator fails any time during a TDNE, thecontrol resets the timer and restarts it once the gen-erator is again available.

    If the Override pushbutton is pressed or the Over-ride input is grounded while the TDNE timer is ac-tive, the TDNE timer immediately expires. TheTDNE timer will not begin if a Transfer Inhibit input isactive.

    Time Delay Emergency to Normal (TDEN)While connected to Emergency, this time delay al-lows utility power to stabilize before the retransfercommand is issued. This delay also allows the gen-erator to operate under load for a minimum amountof time before transferring back to utility power.

    This time delay starts with the transfer switch con-nected to the generator and after the utility be-comes available following an outage (The greenUtility Power Available LED is lit). This time delayalso starts when an active Test or Exercise period isended. After the delay, the transfer switch can re-transfer the load to the utility power source.

    The time delay is configurable for 0 (disabled), 0.1,5, 10, 15, 20, 25 or 30 minutes (default = 10 min-utes). If the utility fails any time during this timedelay, the control resets the timer and restarts itonce utility power becomes available. If the genera-tor fails at any time during this time delay, the timerexpires and the normal retransfer sequence takesplace.

    If the Override pushbutton is pressed or the Over-ride input is grounded while the TDEN timer is ac-tive, the TDEN timer immediately expires. TheTDEN timer will not begin if a Retransfer Inhibit inputis active.

  • Page 11 of 24C685

    Time Delay Programmed Transition(TDPT)This feature causes the transfer switch to pause inthe Neutral position for an adjustable period of timewhenever there is a transfer from one source toanother. The intentional delay allows the residualvoltage of an inductive load to sufficiently decay be-fore connecting it to another power source. Thisdelay prevents potentially damaging voltage andcurrent transients in the customers power system.If TDPT is set to zero, then the transfer switch trans-fers from one source to the other with no neutralposition delay.

    The control activates a Program Transition TimeDelay (TDPT) whenever the transfer switch has dis-connected from one source and is in the Neutralposition. The time delay is configurable for 0 (dis-abled), 0.5, 1, 2, 3, 4, 6 or 10 seconds (default = 0seconds). The control also detects if the transferswitch has disconnected from the first source be-fore connecting it to the second source.

    If there is a power source failure while the TDPT isactive, the control only transfers to the remainingactive power source. The control does not termi-nate the TDPT timer if either source fails while thetransfer switch is in the Neutral position.

    Time Delay Elevator (TDEL) Pre-TransferPrimarily used in elevator applications, this delaysets a time to wait for an elevator pre-transfer sig-nal. This signal allows the elevator to come to acomplete stop before the switch transfers.

    The elevator pre-transfer signal and associatedtime delay, is used to signal an elevator control sys-tem that there is an impending transfer or retransfer(i.e., the elevator is going to see a brief power fail-ure).

    This delay is disabled during an actual source fail-ure. If the timer is set for more than 0 seconds, thenthe control activates the elevator pre-transfer out-put and time delay prior to transferring the transferswitch between two live sources. If the control is in aTest or Exercise sequence, the control adds anadditional delay prior to activating the transfer andretransfer commands. After the TDNE (and/orTDEN) time delay expires, the control activates theElevator output and starts the TDEL timer.

    The output relay has two normally open and twonormally closed contacts, rated 10 amps at 600volts.

    When the timer expires, the control issues thetransfer (or retransfer) command. When the timer isinactive or expires, the control deactivates the relayoutput.

    The Elevator Pre-transfer Time Delay is configur-able for 0 (disabled), 1, 2, 3, 5, 30, 120, or 300 sec-onds (default = 0 seconds).Transfer Inhibit and Retransfer Inhibit do NOT affector delay the elevator pre-transfer delay while it is ac-tive.

    The Override pushbutton or Override input has noeffect on this time delay.

    The TS1311 control also includes a feature calledElevator Post Transfer Delay that keeps the eleva-tor output active for the same TDEL time period af-ter the transfer switch transfers. For more informa-tion, see Elevator Post Transfer Delay below.

    Elevator Post Transfer DelayThe Elevator Post Transfer Delay feature keeps theelevator output active for the same TDEL time peri-od after the transfer switch transfers. Instead of de-activating the elevator output when the pre-transfertime delay expires, the control keeps the output ac-tive and starts the TDEL timer again after it sensesthat the transfer switch has transferred. When theTDEL timer expires the second time, the control de-activates the elevator output. The Elevator PostTransfer Delay is configurable to be enabled (On) ordisabled (Off) (default = Off).

    USING THE INTEGRATED EXERCISERIf your installation includes an external exerciser, beaware that only one exerciser can operate at a time.The control panel must be configured for the type ofexerciser being used. This is done by setting the Ex-ternal Exerciser function On or Off. If the integratedexerciser is used, the External Exercise On/Offfunction must be disabled (set to Off). If an externalexerciser is used, the External Exercise On/Offfunction must be enabled (set to On). The ExternalExercise On/Off function of the control included inthis kit is is set to Off.Before an exercise can begin, the transfer switchmust be connected to utility power and utility powermust be available (the green Utility Power AvailableLED must be lit).

  • Page 12 of 24C685

    Exercise Repeat IntervalThe exercise period of the integrated exerciser is 20minutes and it repeats every 7, 14, 21, or 28 days(default = 7 days).Setting the Integrated Exercise Period

    1. Verify that the Exercise LED is off and the Ex-ternal Exercise function is disabled (set to Off,see Modifying the Control Panel Configura-tion, starting on page 15). If the External Exer-cise function is enabled, the integral exerciseris disabled.

    2. To set the exercise start time for a repeat exer-cise period, press and hold the Set Exercisepushbutton for 5 seconds. The Exercise LEDflashes at a rate of twice per second for 5 sec-onds and then stays on when the exercise peri-od is set. A delayed 20 minute exercise periodwill start in 12 hours. At that time, the ExerciseLED flashes at a rate of once per second duringthe entire exercise period. When the exerciseperiod is over, the Exercise LED quits flashingand remains on to signify that repeat exerciseperiods are enabled.

    3. To start an immediate exercise period andhave it repeat, momentarily press the Set Exer-cise pushbutton a second time within ten sec-onds of starting the delayed exercise period.Momentarily pressing and releasing the SetExercise pushbutton a second time starts animmediate 20 minute exercise period insteadof waiting for 12 hours. The Exercise LEDflashes at a rate of once per second during theentire exercise period. When the exercise peri-od is over, the Exercise LED stops flashing andremains on to signify that repeat exercise peri-ods are enabled.

    Canceling Repeat Exercise PeriodsWith the control panel Exercise LED on steady,press and hold the Set Exercise pushbutton for 5seconds. The Exercise LED flashes at a rate oftwice per second for 5 seconds and then goes out tosignify that repeat exercise periods are cancelled.

    Canceling An Active Exercise PeriodActive exercise periods can be canceled by press-ing the Override pushbutton on the control panel orby grounding the remote override input (P4-2) onthe back of the control panel.

    Power Source Failure During An ActiveExercise PeriodIf either power source fails during an active exerciseperiod, the control immediately terminates the exer-cise and proceeds with the automatic mode of op-eration.

    Power Loss BackupIf DC power is removed from the control panel, theexercise clock uses a replaceable lithium battery(part number 4161250) to back up the time setting.The battery is good for ten years and doesnt needto be serviced. The battery is attached to the timechip on the control board.

    If no exercise period is set, the Exercise LED is off(see Figure 7).

    EXERCISING WITH OR WITHOUT LOADThe control includes an exercise with or withoutload function (default = without load). When WithLoad is selected, the load is transferred to the gen-set during the exercise period. When WithoutLoad is selected, the generator set runs with noload for the duration of the exercise period.

    Exercise Without Load Sequence ofEvents

    1. When an exercise period becomes active, theExerciser LED flashes at a rate of once per sec-ond.

    2. The control signals the generator to start andrun for 20 minutes.

    3. After the exercise period has ended, the controlsignals the generator to stop.

    4. The Exercise LED stops flashing and remainson to signify that repeat exercise periods areset (unless there are no repeat exercise peri-ods). If there are no repeat exercise periods,the Exercise LED goes out.

    Exercise With Load Sequence of Events1. When an exercise period becomes active, the

    Exerciser LED flashes at a rate of once per sec-ond.

    2. The control signals the generator to start.

    3. When the generator output is acceptable, thecontrol transfers the load to the generator, fol-lowing the configuration set points.

  • Page 13 of 24C685

    4. After the exercise period has ended, the controlretransfers the load back to the utility, followingthe configured set points.

    5. Once the load is connected to utility power, thecontrol runs the genset unload for the durationof the cooldown timer (TDEC).

    6. After the TDEC timer expires, the control sig-nals the genset to stop.

    7. Unless the repeat exercise periods have beencanceled, the Exercise LED quits flashing andremains on to signify that repeat exercise peri-ods are set. If the exerciser is not set up to re-peat exercises, the Exercise LED goes out.

    TESTING WITH OR WITHOUT LOAD

    This feature allows a transfer switch operator to testthe transfer switch and generator power system.The test is configurable to be with load or withoutload. A test with load initiates a load transfer. A testwithout load just starts the generator and runs itwithout load.

    1. Verify that the transfer switch is set to test withor without load, as desired (see Modifying theControl Panel Configuration, starting on page15).

    2. To start a test, press and hold the Test Pushbut-ton for two seconds or ground the Remote Testinput.

    3. To end the test, momentarily press the Testpushbutton or remove the ground from the Re-mote Test input.

    NOTE: When ending a test with load, you canbypass the retransfer time delay(TDEN) and cause the immediate loadretransfer by pressing the Overridebutton. The generator stops after theengine cooldown time delay (TDEC).

    Test With Load Sequence of Events

    The following describes the sequence of events of atransfer switch during a test with load. In this exam-ple, TDPT is set to zero, the phase check sensor isdisabled, the Transfer Inhibit and Retransfer Inhibitinputs are inactive, and TDEL is set to zero.

    The utility must be acceptable during the entire testevent. Acceptability is determined by the active

    source sensor (undervoltage sensor). If, at anytime, the undervoltage sensor determines that theutility is not acceptable, the Test is terminated.

    Before a test can begin, the transfer switch must beconnected to the utility power source and utilitypower must be available.

    1. Verify that the transfer switch is set to test withload.

    2. Verify that the green Utility Power ConnectedLED on the control panel is lit.

    3. Verify that the green Utility Power AvailableLED on the control panel is lit.

    4. Press and hold the control panel Test pushbut-ton for two seconds or ground the Remote Testinput to initiate the Test. The Test LED flashestwo times per second for two seconds, ac-knowledging that the test was activated. Oncethe test period starts, the Test LED stays oncontinuously.

    5. The control simulates a utility power failure butthe Utility Power Available LED remains lit aslong as the utility is still available.

    6. The control starts the TDES timer. After the tim-er expires, the control de-energizes the startrelay, closing the start contact to signal the gen-erator to start.

    7. When the generator output is acceptable (theGenset Power Available LED is lit) the controlstarts the TDNE timer.

    8. After the TDNE timer expires, the transferswitch transfers to the genset (the GensetPower Connected LED is lit).

    9. The control continues to run the generator withthe transfer switch connected to the genset un-til the control panel Test pushbutton is momen-tarily pressed or the ground is removed fromthe Remote Test input.

    10. After this action, the control starts the TDENtimer. The Test LED flashes twice per secondfor two seconds to acknowledge the operationand then the Test LED goes out.

    11. After the TDEN timer expires, the transferswitch retransfers back to the utility (the UtilityPower Connected LED is lit).

  • Page 14 of 24C685

    12. Once the transfer switch is connected to utilitypower, the control starts the TDEC timer.

    13. After the timer expires, the control energizesthe start relay, opening the start contact to sig-nal the generator to stop.

    Test Without Load Sequence of Events

    The following describes the sequence of events of atransfer switch during a test without load. In this se-quence of events, the generator is started and runswithout load for the duration of the test.

    The utility must be acceptable during the entire testevent. Acceptability is determined by the activesource sensor (undervoltage sensor). If, at anytime, the undervoltage sensor determines that theutility is not acceptable, the Test is terminated.

    Before a test can begin, the transfer switch must beconnected to the utility and utility power must beavailable.

    1. Verify that the transfer switch is set to test with-out load.

    2. Verify that the green Utility Power ConnectedLED on the control panel is lit.

    3. Verify that the green Utility Power AvailableLED on the control panel is lit.

    4. Press and hold the control panel Test pushbut-ton for two seconds or ground the Remote Testinput. The Test LED flashes twice per secondfor two seconds acknowledging that the testwas activated. Once the test period starts, theTest LED stays on continuously.

    5. The control de-energizes the start relay, clos-ing the start contact to signal the generator tostart. When the genset starts and producespower, the amber Genset Power Available LEDlights.

    6. The control continues to run the generator with-out load until the control panel Test pushbuttonis momentarily pressed or the ground is re-moved from the Remote Test input.

    7. After the control panel Test pushbutton is mo-mentarily pressed or the ground is removed

    from the Remote Test input, the control flashesthe Test LED twice per second for two secondsto acknowledge the operation and then goesout.

    8. The control energizes the start relay, openingthe start contact to signal the generator to stop.

    SENSOR SETTINGSUtility Sensor

    The utility sensor monitors all phases of the utilityfor undervoltage conditions. Both the pickup anddropout set points are adjustable. The set points arelisted in Table 3. Refer to Modifying the ControlPanel Configuration section on page 16 for infor-mation on how to make adjustments.

    TABLE 3. UTILITY UNDERVOLTAGE SET POINTS

    Description Available Set PointsUndervoltage Pickup 95%Undervoltage Picku (% of Nominal) 90%

    90%

    Undervoltage Dropout 85%Undervoltage Dro out (% of Nominal) 80%

    70%

    NOTE: If the utility undervoltage pickup is set at90%, then the dropout has to be set lowerthan 90%.

    Figure 8 illustrates how the pickup and dropout set-tings work.

    VOLTS

    NominalSetpoint(240V)

    Pick-upSetting(216V)

    Drop-outSetting(194V)

    90% ofNominal

    85% ofNominal

    Example using Default Settingsfor Nominal Voltage of 240 VAC

    FIGURE 8. UNDERVOLTAGE SENSING

  • Page 15 of 24C685

    Generator Sensor

    The generator sensor is a single phase sensor thatmonitors undervoltage and underfrequency condi-tions. All the pickup and dropout settings are fixedand are not adjustable. The genset undervoltageand underfrequency set points are listed in Table 4.

    TABLE 4. GENSET UNDERVOLTAGE ANDUNDERFREQUENCY SET POINTS

    Description Set PointUndervoltage Pickup (% of Nominal) 90%Undervoltage Dropout (% of Nominal) 75%Underfrequency Pickup(% of Nominal) 90%Underfrequency Dropout(% of Nominal) 85%

    Phase Check Sensor

    The phase check sensor can be enabled (set to On)for applications that require a fast transfer of a loadbetween two live sources (both power source avail-able LEDs are lit). The phase check sensor deter-mines when the relative phase difference (less than25 degrees and approaching 0) and the frequencydifference (less than 1 Hz) of the two sources arewithin specified limits. When all conditions are met,a transfer is initiated. If enabled, the phase checksensor is activated after all time delays have ex-pired, just before the transfer switch transfers theload, and only when both sources are available.

    Return to Programmed Transition

    This feature can be used in conjunction with thephase check sensor. If, for some reason the twosources do not fall within the specified limits of thephase check sensor for a period of two minutes,then the control bypasses the phase check sensor,returns to the Programmed Transition sequence of

    operation, and transfers the load. If this feature isenabled, the programmed transition time delay(TDPT) should be set greater than zero. The actualsetting depends on your load.

    MODIFYING THE CONTROL PANELCONFIGURATION

    IntroductionThe control panel has a series of eight LEDs thatdisplay codes that indicate various control functionsthat can be configured. The first five LEDs displaythe function code and the last three LEDs displaythe value code for the displayed function (see Fig-ure 7). A listing of the control functions (includingthe function and value codes) is included in Table 5.For normal (automatic) operation, the control mustbe in Automatic Mode. With the exception of theTest LED, the function and value LEDs are not litduring automatic operation (Automatic Mode).The control must be in Configuration Mode tomodify the value code for the various control func-tions. Information on how to access ConfigurationMode and modify the control panel configuration isincluded on the following page.

    Accessing the Front Panel ConfigurationEditorWARNING AC power within the cabinet and the

    rear side of the cabinet door presents a shockhazard that can cause severe personal injury ordeath. Use extreme caution to avoid touchingelectrical contacts whenever the cabinet door isopen.

    The transfer switch must be installed correctly, withDC power (battery power) present, before any ad-justments to the configuration can be made. WhenDC power is present, either the Utility Power Con-nected LED or the Genset Power Connected LED islit. If neither LED is lit, open the transfer switch doorand place the transfer switch in the Normal or Emer-gency position.

  • Page 16 of 24C685

    AC power (utility or genset) may be present butdoesnt have to be present to configure the controlpanel.

    1. Open the transfer switch door.

    2. Configuration Mode is selected by movingthe small slide switch located on the back of thecontrol panel to the right (configuration mode)position. The switch is located near the bottomedge of the printed circuit board (see Figure 9).The switch is partially hidden to prevent acci-dental operation.

    NOTE: The Configuration Mode can be entered atany time, but once it is selected, all automat-ic operation is suspended.

    Modifying the ConfigurationCAUTION Incorrect settings can result in the

    transfer switch failing to operate correctly. Only

    authorized trained personnel should makechanges to the control function settings.Default settings are shown in bold italics in Table 5.To adjust settings,

    3. Slide the selector switch to the ConfigurationMode position. TDES is always the first func-tion shown when entering Configuration Mode.

    4. Press the Test pushbutton to scroll through thevarious control function codes displayed withthe first five LEDs (see Table 5). The black-filled circles indicate which LEDs are lit for thefunction and value codes listed.

    5. Once the desired function is selected, pressthe Override pushbutton to change the associ-ated value code displayed with the last threeLEDs.

    6. When configuration is completed, return theselector switch back to the Automatic Modeposition.

    SWITCH INAUTOMATIC MODE

    SWITCH INCONFIGURATION MODE

    FIGURE 9. NORMAL/CONFIGURATION MODE SELECTOR SWITCH

  • Page 17 of 24C685

    TABLE 5. ADJUSTABLE TRANSFER SWITCH FUNCTIONS FUNCTION FUNCTION CODE VALUE CODE VALUE (Default in bold italics)

    Not Available NA NA NATDES (Ti D l E i S )

    0 Seconds (Disabled)(Time Delay Engine Start)

    0.5 Second 1 Second 2 Seconds 3 Seconds 4 Seconds 6 Seconds 10 Seconds

    TDNE (Ti D l N l

    0 Seconds (Disabled)(Time Delay Normal toEmergency)

    1 SecondEmergency)

    2 Seconds 3 Seconds 5 Seconds 30 Seconds 120 Seconds 300 Seconds

    TDEN (Ti D l E

    0 Minutes (Disabled)(Time Delay Emergency toNormal)

    0.1 Minutes (For Testing)Normal)

    5 Minutes 10 Minutes 15 Minutes 20 Minutes 25 Minutes 30 Minutes

    TDEC (Ti D l E i

    0 Minutes (Disabled)(Time Delay EngineCooldown)

    0.1 Minutes (For Testing)Cooldown)

    5 Minutes 10 Minutes 15 Minutes 20 Minutes 25 Minutes 30 Minutes

    TDPT (Ti D l P

    0 Seconds (Disabled)(Time Delay ProgramTransition)

    0.5 SecondTransition)

    1 Second 2 Seconds 3 Seconds 4 Seconds 6 Seconds 10 Seconds

  • Page 18 of 24C685

    TABLE 5. ADJUSTABLE TRANSFER SWITCH FUNCTIONS (CONT.)FUNCTION VALUE (Default in bold italics)VALUE CODEFUNCTION CODE

    TDEL(Ti D l El Si l)

    0 Seconds (Disabled)(Time Delay Elevator Signal)

    1 Second 2 Seconds 3 Seconds 5 Seconds 30 Seconds 120 Seconds 300 Seconds

    Test With/Without Load Without Load With Load

    External Exercise On/Off Off On

    Exercise With/Without Load Without Load With Load

    System Nominal VoltageT bl S l i

    Table 1 y gTable Selection

    Table 2 System Nominal Voltage 110 230y g

    115 240 120 255 127 277 139 347 220 347

    System Nominal Frequency0/60 H

    60 Hzy q y50/60 Hz

    50 HzSingle Phase/Three Phase Three Phaseg

    Single PhaseUtility Undervoltage Pickup 90%y g

    95%Utility Undervoltage Dropout 90%y g

    85% 80% 70%

    Phase Check On/Off Off On

    Return to ProgrammedT i i O /Off

    OffgTransition On/Off

    OnElevator Post TransferD l O /Off

    OffDelay On/Off

    OnExercise Repeat Interval Every 7 Days

    Every 14 Days Every 21 Days Every 28 Days

    = THESE CONTROL FUNCTIONS ARE SET AT THE FACTORY AND SHOULD NOT REQUIRE ADJUSTING.

  • Page 19 of 24C685

    TROUBLESHOOTING

    The control panel contains six LED indicators thatprovide some information about the current controlstatus and may be helpful in troubleshooting thetransfer switch (see Figure 7). Descriptions of theseindicators are included in Table 6.

    WARNING Some automatic transfer switchservice procedures present hazards that can re-sult in severe personal injury or death. Only

    trained and experienced service personnel withknowledge of electricity and machinery hazardsshould perform service.

    Several of the steps listed on the following pages in-clude checking on the control panel settings. Tocheck the control settings, open the transfer switchdoor and slide the selector switch on the back on thecontrol panel to the Configuration Mode position. In-formation on configuring the control panel is in-cluded earlier in this Instruction Sheet.

    TABLE 6. CONTROL PANEL LED INDICATORS

    Indicator DefinitionUtility (Normal) PowerAvailable

    This indicator lights when the utility source voltage sensor has determined that Utilitypower is available and is within acceptable voltage limits.

    Utility (Normal) Connected 1. Lights constantly when the transfer switch is connected to the Utility.2. Blinks once per second when the transfer switch has failed to connect to or

    disconnect from the Utility when commanded.3. Is off when the transfer switch is not connected to the Utility.

    Genset (Emergency) PowerAvailable

    This indicator lights when the generator source voltage sensor has determined thatgenerator power is within acceptable voltage and frequency limits.

    Genset (Emergency)Connected

    1. Lights constantly when the transfer switch is connected to the Genset.2. Blinks once per second when the transfer switch has failed to connect to or

    disconnect from the Genset when commanded.3. Is off when the transfer switch is not connected to the Genset.

    Exercise The following describes the Exercise LED when an exercise is enabled.1. Lights constantly when integrated repeat exercise periods have been set.2. Blinks twice per second when the Set Exercise button is pressed and held to set

    or cancel an integrated exercise period.3. Blinks once per second when an integrated or external exercise period is active.4. Is off when no integrated repeat exercise periods are set.

    Test 1. This indicator blinks at two times per second rate during the two seconds that theTest button is pressed to acknowledge that a test has been activated or when theremote test input is grounded.

    2. The indicator lights constantly during the test and goes out once the test is termi-nated or normal power has failed.

    3. The indicator blinks at two times per second rate during the two seconds to ac-knowledge that the Test button has been pressed to cancel a Test. The light thengoes out.

  • Page 20 of 24C685

    Power Outage Occurs, But Generator SetDoes Not StartWARNING AC power within a transfer switch

    cabinet door presents a shock hazard that cancause severe personal injury or death. Whenev-er the cabinet door is open, use extreme cautionto avoid touching electrical contacts with body,tools, jewelry, clothes, hair, etc.

    1. Verify that the operation selector switch on thegenerator set control panel is set to the Remoteposition. Check for fault indicators on the gen-erator set control.

    WARNING Ignition of explosive batterygases can cause severe personal injury. Donot smoke or cause any spark or flamewhile servicing batteries.

    WARNING Ignition of fuel can cause se-vere personal injury or death by fire or ex-plosion. Do not permit any flame, cigarette,spark, pilot light, arcing equipment, or oth-er possible source of ignition near the fuelsystem.

    2. Start the generator set using its start-stop con-trols. If it does not crank, check the starting bat-teries. If it cranks but does not start, check thefuel supply. If the problem persists, call yourdealer or distributor.

    3. Run a Test to make sure the control is sendinga remote start signal to the generator set.

    Generator Set Starts During Normal PowerServiceWARNING AC power within a transfer switch

    cabinet door presents a shock hazard that cancause severe personal injury or death. Whenev-er the cabinet door is open, use extreme cautionto avoid touching electrical contacts with body,tools, jewelry, clothes, hair, etc.

    1. Verify that the operation selector switch on thegenerator set control panel is set to the Remoteposition.

    2. Check the Utility Power Available LED on thecontrol panel to see if it is lit.If the Utility Power Available LED is lit,a. Check the Active Exercise LED to see if it is

    in an exercise period.NOTE: If the exercise period occurs at an

    unexpected time or for an exces-sive duration, refer to the exerciserclock programming procedure orcall your dealer or distributor.

    b. Momentary voltage dips might cause volt-age sensors to initiate generator set start-ing. Check the utility undervoltage parame-ter settings on the control panel. Increasethe TDES setting.

    If the Utility Power Available LED is not lit,a. Check the control setting to verify that the

    system nominal voltage matches what islisted on the nameplate.

    b. Check the control setting to verify that thesystem frequency matches what is listed onthe nameplate.

    c. Check the control setting to verify that thesystem phase setting matches what is listedon the nameplate.

    d. Check the control setting to verify that theutility undervoltage dropout point is set low-er than the pickup set point.

    3. If the problem persists, call your dealer or dis-tributor.

  • Page 21 of 24C685

    Generator Set Does Not Exercise

    WARNING AC power within a transfer switchcabinet door presents a shock hazard that cancause severe personal injury or death. Whenev-er the cabinet door is open, use extreme cautionto avoid touching electrical contacts with body,tools, jewelry, clothes, hair, etc.

    1. Verify that the operation selector switch on thegenerator set control panel is set to the Remoteposition.

    2. If the optional external exerciser is installed,verify that the External Exercise function hasbeen set to On.

    3. Check the Exercise LED on the control panel tosee if it is lit.

    a. If the Exercise LED is not lit, no exercise pe-riod has been set. Refer to the exerciserprogramming procedure for information onsetting an exercise.

    b. If the Exercise LED is lit but not flashing, theexercise period has not yet started. Inte-grated exercisers do not display exercisestart and stop times. If the optional externalexerciser is enabled, check the exerciseclock to see when an exercise is scheduled.

    WARNING Ignition of explosive batterygases can cause severe personal injury. Donot smoke or cause any spark or flamewhile servicing batteries.

    WARNING Ignition of fuel can cause se-vere personal injury or death by fire or ex-plosion. Do not permit any flame, cigarette,spark, pilot light, arcing switch or equip-ment, or other possible source of ignitionnear the fuel system.

    4. Start the generator set using its start-stop con-trols. If it does not crank, check the starting bat-teries. If it cranks but does not start, check thefuel supply.

    5. If the problem persists, call your dealer or dis-tributor.

    After a Power Failure, the Generator SetStarts But Does Not Assume the Load

    WARNING AC power within a transfer switchcabinet door presents a shock hazard that cancause severe personal injury or death. Whenev-er the cabinet door is open, use extreme cautionto avoid touching electrical contacts with body,tools, jewelry, clothes, hair, etc.

    1. Check to see if the Genset Power AvailableLED on the control panel is lit.

    If the Genset Power Available LED is not lit,a. Check the output voltage of the power

    source by observing the voltmeter on thegenerator set.

    b. Check the control setting to verify that thesystem nominal voltage matches what islisted on the nameplate.

    c. Check the control setting to verify that thesystem frequency matches what is listed onthe nameplate.

    d. Check the control setting to verify that thesystem phase setting matches what is listedon the nameplate.

    If the Genset Power Available LED is lit,a. The transfer time delay may not have ex-

    pired. The TDNE can be set for up to 300seconds. If you do not wish to wait until thetime delay expires, press the Overridepushbutton.

    FUNCTION CODEFOR TDNE

    VALUECODE

    VALUE (Default inbold italics)

    0 Seconds (Disabled) 1 Second 2 Seconds 3 Seconds 5 Seconds 30 Seconds 120 Seconds 300 Seconds

    b. There may be an active transfer inhibit. If atransfer inhibit is enabled, the load transferwill not take place until the Override push-button on the control panel is pressed or thetransfer inhibit input is disabled.

    2. If the problem persists, call your dealer or dis-tributor.

  • Page 22 of 24C685

    After Power Returns, the Transfer SwitchDoes Not Return To Normal Position

    1. Check to see if the Utility Power Available LEDis lit.

    If the Utility Power Available LED is lit,

    a. The retransfer time delay period may nothave expired. The TDEN can be set for upto 30 minutes. If you do not wish to wait untilthe time delay expires, press the Overridepushbutton.

    FUNCTION CODEFOR TDEN

    VALUECODE

    VALUE (Default inbold italics)

    0 Minutes (Disabled) 0.1 Minutes 5 Minutes 10 Minutes 15 Minutes 20 Minutes 25 Minutes 30 Minutes

    b. There may be an active retransfer inhibit. Ifa retransfer inhibit is enabled, the loadtransfer will not take place until the Overridepushbutton on the control panel is pressed,the retransfer inhibit input is disabled, or thegenset fails.

    c. There may be an active TDEL. Wait until thetime delay has expired. The TDEL can beset for up to 300 seconds.

    FUNCTION CODEFOR TDEL

    VALUECODE

    VALUE (Default inbold italics)

    0 Seconds (Disabled) 1 Second 2 Seconds 3 Seconds 5 Seconds 30 Seconds 120 Seconds 300 Seconds

    d. A phase check may be enabled. When thephase check function is enabled, the utilitydoes not assume the load until both sourcesare within acceptable limits of the phasecheck sensor.

    If the Utility Power Available LED is not lit,

    a. Check the control setting to verify that theutility undervoltage dropout point is set low-er than the pickup set point.

    2. If the problem persists, call your dealer or dis-tributor.

    Generator Set Continues to Run AfterRetransfer of Load to Normal Power

    WARNING AC power within a transfer switchcabinet door presents a shock hazard that cancause severe personal injury or death. Whenev-er the cabinet door is open, use extreme cautionto avoid touching electrical contacts with body,tools, jewelry, clothes, hair, etc.

    1. The engine cooldown time delay may not haveexpired. The TDEC can be set for up to 30 min-utes.

    FUNCTION CODEFOR TDEC

    VALUECODE

    VALUE (Default inbold italics)

    0 Minutes (Disabled) 0.1 Minutes 5 Minutes 10 Minutes 15 Minutes 20 Minutes 25 Minutes 30 Minutes

    2. Stop the generator set with its Start/Stopswitch. Call your dealer or distributor.

  • Page 23 of 24C685

    System Does Not Test With LoadWARNING AC power within a transfer switch

    cabinet door presents a shock hazard that cancause severe personal injury or death. Whenev-er the cabinet door is open, use extreme cautionto avoid touching electrical contacts with body,tools, jewelry, clothes, hair, etc.

    1. Check the control setting to verify that the TestWith/Without Load function has been set toWith Load.

    2. If the control has been set to Test With Load,

    a. The transfer time delay may not have ex-pired. The TDNE can be set for up to 300seconds. If you do not wish to wait until thetime delay expires, press the Overridepushbutton.

    FUNCTION CODEFOR TDNE

    VALUECODE

    VALUE (Default inbold italics)

    0 Seconds (Disabled) 1 Second 2 Seconds 3 Seconds 5 Seconds 30 Seconds 120 Seconds 300 Seconds

    b. There may be an active transfer inhibit. If atransfer inhibit is enabled, the load transferwill not take place until the Override push-button on the control panel is pressed or thetransfer inhibit input is disabled.

    c. There may be an active TDEL. Wait until thetime delay has expired. The TDEL can beset for up to 300 seconds.

    FUNCTION CODEFOR TDEL

    VALUECODE

    VALUE (Default inbold italics)

    0 Seconds (Disabled) 1 Second 2 Seconds 3 Seconds 5 Seconds 30 Seconds 120 Seconds 300 Seconds

    d. A phase check may be enabled. When thephase check function is enabled, the gensetdoes not assume the load until both sourcesare within acceptable limits of the phasecheck sensor.

  • Page 24 of 24C685

    System Does Not Exercise With LoadWARNING AC power within a transfer switch

    cabinet door presents a shock hazard that cancause severe personal injury or death. Whenev-er the cabinet door is open, use extreme cautionto avoid touching electrical contacts with body,tools, jewelry, clothes, hair, etc.

    1. Check the control setting to verify that the Exer-cise With/Without Load function has been setto With Load.

    2. If the control has been set to Exercise WithLoad,a. The transfer time delay may not have ex-

    pired. The TDNE can be set for up to 300seconds. If you do not wish to wait until thetime delay expires, press the Overridepushbutton.

    FUNCTION CODEFOR TDNE

    VALUECODE

    VALUE (Default inbold italics)

    0 Seconds (Disabled) 1 Second 2 Seconds 3 Seconds 5 Seconds 30 Seconds 120 Seconds 300 Seconds

    b. There may be an active transfer inhibit. If atransfer inhibit is enabled, the load transferwill not take place until the Override push-button on the control panel is pressed or thetransfer inhibit input is disabled.

    c. There may be an active TDEL. Wait until thetime delay has expired. The TDEL can beset for up to 300 seconds.

    FUNCTION CODEFOR TDEL

    VALUECODE

    VALUE (Default inbold italics)

    0 Seconds (Disabled) 1 Second 2 Seconds 3 Seconds 5 Seconds 30 Seconds 120 Seconds 300 Seconds

    d. A phase check may be enabled. When thephase check function is enabled, the gensetdoes not assume the load until both sourcesare within acceptable limits of the phasecheck sensor.