TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE BARBARA DRIVE DRAINAGE PROJECT UPDATE APRIL 28, 2016 Presented by David Pulido, P.E., TCI Project Manager Location: Family Center of the Blessed Sacrament Church 600 Oblate

Transcript of TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... ·...

Page 1: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

TRANSPORTATION & CAPITAL IMPROVEMENTS

(TCI)

BARBARA DRIVEBARBARA DRIVEDRAINAGE PROJECT UPDATE

APRIL 28, 2016,

Presented by David Pulido, P.E., TCI Project Manager

–1

y j gLocation: Family Center of the Blessed Sacrament Church

600 Oblate

Page 2: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Agenda

TCI Introductions

Barbara Drive Project Update P j t I f ti Project Information Planned Improvements Project Progress Project Schedule/TCI Contact information

Public Comments and Questions

–2 2

Page 3: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

TCI Introductions

City Council District 1Councilman Roberto Trevino

TCI Management TeamTCI Management TeamArt Reinhardt, P.E. – TCI Assistant DirectorDavid Pulido, P.E. – Project Manager Katy Otto, P.E. – Project Engineer y , j gPeter Rodriguez – Capital Projects Officer

Design Consultant – Civil Engineering ConsultantsDesign Consultant Civil Engineering ConsultantsMelissa Byler, P.E. – Design Project ManagerKristina Saenz, P.E. – Design Engineer

–3 3

Page 4: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Project Information

G l d fl d h b d lGoal: Reduce flooding in the Barbara Dr. area and along McCullough Ave

Scope: Construct an open channel to convey the 100-yr flood condition

Project Limits: 200th block of Barbara Drive/300th block of Shannon Lee between McCullough and Skipper Drive

–4 4

Page 5: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Planned Improvements

Construct approx. 1,700 feet open channelo Varying width – 150 feet widest width at flow lineo Earthen with rock riprap o Trapezoidal shapeo 3:1 side slopes (typical)o 3:1 side slopes (typical)o Concrete pilot channel

–5 5

Page 6: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Planned Improvements

–6 6

Page 7: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Planned Improvements

Basin road re-alignment Landscaping with varying width green spaces

Sid lk d ADA li ( i i id lk Sidewalks and ADA compliant ramps (existing sidewalks near the edge of pavement will be removed)

Utility adjustments/improvementsy p

–7 7

Page 8: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Planned Improvements

–8 8

Preliminary (40%) Design

Page 9: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Planned Improvements

–9 9

Final (70%) Design

Page 10: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Planned Improvements

–10

Landscaping Plan10

Page 11: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Planned Improvements

Received Input from: • Coordination with Council Office

Ci i i• Citizen committee• Individual resident correspondence/coordination

–11 11

Page 12: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Planned Improvements

Public sensitive features: • Lot maintenance & “No Trespassing” signs• Sidewalk lighting included as additive alternate• Sidewalk lighting – included as additive-alternate • Removal of trees in decline • No vegetation to obscure sight lines • No benches or parking areas within green space• New curb to help address the McCullough flooding issue

–12 12

Page 13: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Planned Improvements

L d i / id lk

–13

Landscaping/sidewalks

13

Page 14: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Project Progress

• TCI Real Estate has acquired all properties

• Last structure demolition has begun

• C l t d th 70% D i Mil t 95% D i i d• Completed the 70% Design Milestone; 95% Design is underway

–14 14

Page 15: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Project Progress

• Design will conclude in September 2016

• Permitting process underway

• Continue public notificationContinue public notification

• Begin relocations of non-joint bid utilities

–15 15

Page 16: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Project Progress

• Bid project p j

• Begin construction; currently scheduled for January 2017; approximate 12 month duration; will hold public meeting priorapproximate 12 month duration; will hold public meeting prior

• Maintenance F f h l b k fl li S W From top of channel bank to flow line – Storm Water Maintenance

From top of channel bank to curb/roadway – Storm Water or p yParks, depending on final improvements

• FEMA Process – LOMR

–16 16

FEMA Process – LOMR

Page 17: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Project Schedule/Contact InformationInformation

BarbaraBarbara Drive Drainage Drive Drainage ScheduleSchedule

Estimated design completion September 2016g p p

Estimated construction start January 2017

Estimated construction December 2017completion*

Estimated construction duration*

* h i i

12 months

* Weather permitting

For information in regards to the project during the Design Phase: Please contact: Peter Rodriguez – TCI Capital Projects Officer at 210.207.8154P t R d i @ t [email protected]

If you would like to be added to an e-mail list for project updates or future meetingt pl r fill t th i i h t d h k th p r i i

–17 17

announcements, please ensure you fill out the sign-in sheet and check the permission block.

Page 18: TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI)files.ctctcdn.com/5c921684301/0f78f62d-6951-48bc... · TRANSPORTATION & CAPITAL IMPROVEMENTS (TCI) BARBARA DRIVE DRAINAGE PROJECT UPDATE

Questions or Comments

TCI Thanks You for Your Attendance