TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004...

8
www.pttplc.com PTT Public Company Limited ฝรญ. Present_QC_2546.ppt Page 33 / 30 30/08/2004 3. Why focus on monitor power management rather than computer power management? TCI recommends enabling only the monitors' power management features that turn off the monitor or place it in standby mode after the computer has been idle for a period of time. TCI also recommends manually turning off computers and monitors during extended periods of non-use, such as nights and weekends. This approach captures almost 80 percent of the potential energy savings. www.pttplc.com PTT Public Company Limited ฝรญ. Present_QC_2546.ppt Page 34 / 30 30/08/2004 The Pennsylvania State University ©2004

Transcript of TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004...

Page 1: TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004 เปรียบเทียบข อมูลก อน / หลังการแก

www.pttplc.com PTT Public Company Limited ฝรญ.Present_QC_2546.ppt Page 33 / 30 30/08/2004

3. Why focus on monitor power management rather than computer power management?

TCI recommends enabling only the monitors' power managementfeatures that turn off the monitor or place it in standby mode after the computer has been idle for a period of time. TCI also recommends manually turning off computers and monitors during extended periods of non-use, such as nights and weekends. This approach captures almost 80 percent of the potential energy savings.

www.pttplc.com PTT Public Company Limited ฝรญ.Present_QC_2546.ppt Page 34 / 30 30/08/2004

The Pennsylvania State University ©2004

Page 2: TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004 เปรียบเทียบข อมูลก อน / หลังการแก

PC power consumptions

Test Equip’t PC consumption @ normal operation

Power consumption during STAND BY mode

Evaluation Team

multimeter

Separate convention out let

CRT & PC

28/11/03

Page 3: TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004 เปรียบเทียบข อมูลก อน / หลังการแก

www.pttplc.com PTT Public Company Limited ฝรญ.Present_QC_2546.ppt Page 37 / 30 30/08/2004

เปรียบเทียบขอมูลกอน / หลังการแกปญหา

Step Amp Volt Watt ใชไฟลดลง

1.normal operation 0.43 220 94.6

2.turn off monitor 0.18 220 39.6 58 %

3.turn off hard disks 0.06 220 13.2 86 %

4.system standby 0.06 220 13.2 86 %

5.Hibernate 0.06 220 13.2 86 %

ประหยัดพลังงานต้ังแต 58 – 86 %

การใชกระแส ไฟฟาลดลง

เปรียบเทียบขอมูลกระแสไฟฟากอน / หลังการใชโปรแกรม Power management

เปรียบเทียบกอนติดต้ังโปรแกรมหลังติดต้ัง (ปดจอภาพ)(ปด Harddisk)(Standby)(ไมใชข้ันตอนน้ี)

Page 4: TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004 เปรียบเทียบข อมูลก อน / หลังการแก
Page 5: TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004 เปรียบเทียบข อมูลก อน / หลังการแก

Topics for environmentally conscious organizations

• Cooling management• Capacity management• Demand management,• Data center consolidation• Enterprise architecture• Standardization• Virtualization.

DC Related project

• PTT group Data Center Consolidate– Main site consolidate– DR site consolidate

• PTT Data Center Cooling efficiency improvement – Dark room DC– Hot & Cool isle isolation– Seal cable hole

• Data Center Fire Protection replacement– Water mist

• Server consolidate– SAP server consolidate– Windows server consolidate– SQL server consolidate

• Unify Communication• HW purchasing Policy• Etc.

Page 6: TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004 เปรียบเทียบข อมูลก อน / หลังการแก

Virtualized Server project

• Project 1 : PTT Windows consolidate – HQ servers ratio 41:6– DR servers ratio 10:1

• Project 2 : ICT web hosting service• Project 3 : PTTEP Windows consolidate

– HQ servers ratio 33:6

• Project 4 : PTT SQL server consolidate (On going)• Project 5 : PTT SAP interface consolidate (next

year)

Saving from Project 1(PTT)

• Power consumption 530,000 บ/ป• Rack space 3.24 ลบ./ป • Physical server cost saving 13.5 ลบ.• Productivity from SA

Page 7: TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004 เปรียบเทียบข อมูลก อน / หลังการแก

Benefits from Project 2 (ICT)

• Reduce time to production avg. 3 months/proj.

• Fast system failover recovery than previous avg. 4 hrs./call

• Fast resource allocation than previous (on the fly)

Benefit from Project 3 (PTTEP)

• Reduce electrical shortage problem• Reduce cooling problem• Reduce insufficient room space• Reduce system administration complexity• Reduce legacy server

Page 8: TCI recommends enabling only the monitors' power ...Present_QC_2546.ppt Page 37 / 30 30/08/2004 เปรียบเทียบข อมูลก อน / หลังการแก

Benefit from Project 4(SQL)

• Time to migrate SQL2000(End of support SQL2000)

• Reduce number of SQL (High cost of SQL)

Benefit from Project 5(SAP int.)

• Readiness for SAP & interface system on DR site

• Reduce time to recovery during DR• Improvement for BCP