Superfast LeicestershireStakeholder Forum
11th March 2014
Matthew Kempson Jessica GrudgingsBroadband Project Manager Campaigns Officer
Agenda
• Welcome and Introductions• Previous actions – mobile phone coverage• BT commercial rollout• BT Contract update (including Deployment)• Communications and Demand Stimulation• Final 6% (e.g. DCMS Superfast Extension Programme)• Q&A
Commercial rollout• Will complete in June 2014.• From March 2014 – Melton Mowbray, Shepshed, Earl Shilton, Glenfield
BT Contract Update• Signed contract in late August 2013
• £16.9m to deliver SFBB (>24Mbps) to increase coverage from 75% to 92.3% - 50,000 premises (further 2,500 on “Slow NGA”)
• Infrastructure• Fibre to the Cabinet – 280 Cabinets• Small amount of FTTP – may change• Commitment to ensure 2Mbps min. to all premises (Satellite, BET)
• £1.1m of District funding to increase to 93.8% - 4,400 premises (Feb 2014). VfM for each District Council!
• District coverage breakdown….
Comm. prems with SFBB (BT,
VM) %
LCC contract
premswith
SFBB %
District funded prems
with SFBB %
Premises with No
SFBB %District
investment
Blaby DC 33213 80.8 6208 95.9 230 96.4 1470 3.6 £50,000
Charnwood BC 60885 82.7 8879 94.7 448 95.3 3453 4.7 £100,000
Harborough DC 21743 56.3 11628 86.5 1380 90.1 3836 9.9 £530,000
H&B BC 36284 73.6 9121 92.2 572 93.3 3289 6.7 £58,820
Melton BC 12962 55.2 5959 80.5 1440 86.7 3131 13.3 £360,000
NW Leics DC 33289 77.2 6883 93.2 299 93.9 2641 6.1 £54,000
O&W BC 22088 93.2 1227 98.3 0 98.3 397 1.7 0
Leicestershire 220464 75.3 49905 92.3 4369 93.8 18217 6.2 £1,152,820
Deployment
• Completed mobilisation – project team in place; BT, Openreach• Currently planning Phase 1 – on-site survey of BT infrastructure
• Condition of ducts, access to power, space in the existing Cabinet, new fibre Cabinet location.
• c.50 Cabinet locations under investigation – Mainly in HDC, CBC and MBC.• Expect to announce Phase 1 locations in July 2014 – revise map
• Deployment is currently on-track - summer 2014-spring 2016 – c.280 Cabinets• Strong partnership – Highways, Planners, Conservation Officers.
• Issues are likely to be ahead of us!• Fibre spine – rodding, trenching• Power in rural areas• Exchange Only cabinets – c.80. Will require network re-arrangement
• Will affect the coverage extent, location and timetable of the deployment.
Demand stimulation and communications
Who is working on the programme within the communications team?
• Holly‐Marie Draper – Campaign Manager • Jessica Grudgings – Campaign Officer• Rita Nathwani – Campaign Assistant• Dan Cooper – Media Officer
Things to share:
• Our focus• Demand stimulation• Branding• www.superfastleicestershire.org.uk
Our focus
• Trying to achieve at least 20% uptake per cabinet across Leicestershire.
• Stakeholder engagement – working with district and borough councils and voluntary organisations to ensure a consistent message.
• Expectation and reputation management – there will be problems with the roll out, trying to manage residents expectations.
Programme reputation
• Keeping residents informed that the programme is moving forward– Leicestershire Matters– Milestone news articles– Social media @leicscountyhall tweets– News and updates published on the site– District communication channels
Demand stimulation • Ensuring 20% + uptake• Three phases:
• Get ready/work happening/issues• It’s here• Have you got it yet?
– Based on local demographic– Localised approach – Local publications – Leaflets – Events – Shifting approach depending on channels and demographic
Example case studyGet ready/works happening/issues
– Understanding of population of XXXX village – research information
– Timely: manage expectation – ‘Get Ready’ article in news & parish magazine – Poster in village hall and village shop – Update of information on superfast website, village website and Leicestershire villages
– Speaking at local information event i.e. WI event
It’s here!
‐ Article in news and parish magazine ‐ Updates to superfast website, village website and Leicestershire villages
‐ Cabinet sticker/wrap ‐ Milestone press release and photo opportunity
Have you got it yet?
– 1‐3 months after launch – Article in news and parish magazine – Poster in village hall and village shop – Update of information on superfast website, village website and Leicestershire villages
Superfast Leicestershire branding
Superfast Leicestershire branding
• Vanilla approach • Target four key audiences:
– Families– Businesses– Rural communities/businesses– Older people
Superfast Leicestershire website
• Sent out to tender in January ‐ three prospective suppliers
• Due to go live in the next two weeks• All communications we issue will direct the public to the website.
• Interactive information hub:‐ residents can check maps of where they live to
see updates.‐ the website will try to answer any questions residents may have on its FAQ page.
Homepage – rotating banner 1
Homepage – rotating banner 4
Business users ‐ benefits
When and where – line checker
When and where – coming to your area (hover map)
When and where – expected coverage
Unavailable in your area ‐ final 6%
FAQs
Any questions?
Final 6%
• District Council funding
• DCMS Superfast Extension Programme
• Community-led schemes• Fibre• Wireless
• Diseworth RCBF
DCMS Superfast Extension Programme
• Government objective to deliver 95% superfast broadband by 2017• Allocations announced 25th February - £250m• £4.04m (largest in E. Mids) - £2.94m – County; £1.1m – City
• Requires local match - £2m LLEP (tbc); £2m LCC (tbc)• Allocation has not taken account of District investment
3 procurement options
1) Change control to existing contract – materiality issues - BT2) DCMS Framework (will need extension) – BT or Fujitsu3) New procurement (one-off, local framework; regional framework)
Superfast Extension Programme continued….
Key points• Application process – EOI, Funding Request• Funding is for the next Parliament but DCMS may bring forward• Timing is key – BDUK pipeline• Need to be confident of VfM
• FTTC - Expecting new BT technology – Fibre to the Remote Node (FTTN)
• Overlap existing deployment• Technical support
Community-led schemes
Fibre• Work with an existing alternative suppliers• Note suppliers require minimum requirements – community size etc.
Wireless• Interim solution – Generally not regarded as superfast broadband • 1) New project – e.g. Stathern using Public Sector Network• 2) Existing wireless coverage
• Not eligible for capital funding• Keen to support communities. Let us know
Diseworth
• Defra Rural Community Broadband Fund – previously promoted to you.
• Working with Disewired for c.2-3 years – Final 6%
• BT FTTC solution – long fibre spine required – 7km
• Submitted application – Expect to fail RCBF
• Lots of learning!
NEED TO ENGAGE WITH FINAL 6% COMMUNITIES DIRECTLY