Shaik. Mujibur Rahiman Mob: +91 9848811861 Email : [email protected] Skype:m ujiburrahiman77 Around 20+ Years of experience in the field of Heavy Engineering items like Seaport Bulk material Handling Equipments, Hot Induction Pipe Bends inspection, Rotary Equipments’, Pressure Vessel inspection , Sampling Packages and Instrumentation , Oil and Gas, Petrochemicals related Equipments. Objective: A challenging growth oriented position in a progressive company, where my technical and analytical skills are utilized to improve operation and to contribute in organization success and becoming a competent in charge and build a promising carrier. Code Awareness: ASME Sec-II,ASME B31.1, ASME Sec-VIII,Div-1,ASME Sec-IX, ASME Sec-V, API 5L, API 598, API 6F,6D,AWS D1.1,API 1104, API 610, API 598. Academic Qualifications: B. Tech from Mechanical Engineering with First class (61.61%) from CBIT College ,Gandipeta, Hyderabad, affiliated to JNTU HYD(Part Time) . Diploma in Mechanical Engineering with Distinction (79.60%) from Vasavi Polytechnic, Banaganapalli. Professional Qualification: CSWIP 3.1 level II (Cert No:80745 Exp Dt:15/08/2018) ASNT Level II in PT , MT, UT & RT Computer Proficiency: M.S Office & AutoCad-2004, Solid modeling (Ver’2004) Experience Profile : Inspection professional in the fields of Oil and Gas, On-shore and Offshore, construction, cross-country pipeline, Coating, Power industry, Chemical Industry, petrochemical industry, Pharma, Mining. Material Handling (Coal, Ash& Husk) and Structural Items (Power, Cement, Material Handling& ESP): Material handling systems such as Stacker cum reclaimers and its parts like LT assembly, Boom Luffing assembly, Mast structure, Boom structure assembly, Counter weight assembly, Boom conveyor assembly, Bucket wheels, Tripper Conveyor assembly, Bucket wheels, Portal and Slew decks, Track Hoppers, Trusses, Trestles of conveyor and all types of pulleys Portal and Slew decks for BMH systems , Driver and Driven pulleys, Idlers, Jockey pulleys, All the bearings and rollers.

Transcript of SMR ciriculamvitae

Page 1: SMR ciriculamvitae

Shaik. Mujibur RahimanMob: +91 9848811861 Email : [email protected]:m ujiburrahiman77

Around 20+ Years of experience in the field of Heavy Engineering items like Seaport Bulk material Handling Equipments, Hot Induction Pipe Bends inspection, Rotary Equipments’, Pressure Vessel inspection , Sampling Packages and Instrumentation , Oil and Gas, Petrochemicals related Equipments.

Objective:A challenging growth oriented position in a progressive company, where my technical and analytical skills are utilized to improve operation and to contribute in organization success and becoming a competent in charge and build a promising carrier.

Code Awareness:ASME Sec-II,ASME B31.1, ASME Sec-VIII,Div-1,ASME Sec-IX, ASME Sec-V, API 5L, API 598, API 6F,6D,AWS D1.1,API 1104, API 610, API 598.

Academic Qualifications: B. Tech from Mechanical Engineering with First class (61.61%) from CBIT College ,Gandipeta, Hyderabad,

affiliated to JNTU HYD(Part Time) . Diploma in Mechanical Engineering with Distinction (79.60%) from Vasavi Polytechnic, Banaganapalli.

Professional Qualification: CSWIP 3.1 level II (Cert No:80745 Exp Dt:15/08/2018) ASNT Level II in PT , MT, UT & RT

Computer Proficiency: M.S Office & AutoCad-2004, Solid modeling (Ver’2004)

Experience Profile :Inspection professional in the fields of Oil and Gas, On-shore and Offshore, construction, cross-country pipeline, Coating, Power industry, Chemical Industry, petrochemical industry, Pharma, Mining.

Material Handling (Coal, Ash& Husk) and Structural Items (Power, Cement, Material Handling& ESP): Material handling systems such as Stacker cum reclaimers and its parts like LT assembly, Boom Luffing assembly, Mast structure, Boom structure assembly, Counter weight assembly, Boom conveyor assembly, Bucket wheels, Tripper Conveyor assembly, Bucket wheels, Portal and Slew decks, Track Hoppers, Trusses, Trestles of conveyor and all types of pulleys Portal and Slew decks for BMH systems , Driver and Driven pulleys, Idlers, Jockey pulleys, All the bearings and rollers.

Boiler Main structural Columns, Girders, Bunkers wall Panels, ESP Components, Bracings/Tie Beams, Track hoppers, Stacker and Reclaimers items such as mast, boom and counter weights, Cladding Plates, etc.

Ash handling parts like Conveyors, screen feeders, pulleys, rollers, screw conveyors, Rotary airlock valves, stringers, flap and diverging gates, Drag chain hopper, conveyor hoods etc.

Scope of Inspection:1. Inspection activity involves identification of Raw materials such as all the plates, forgings, with respect to the

drawings, specifications and it’s related testing in the event of no co relation. 2. Review and verify all the NDE and testing procedures required for manufacturing of the system.3. Review/Verification of Weld Maps, welding procedures (WPS, PQR, WPQR)4. Review and verify the qualification certificates of NDT and other Testing personnel.

Page 2: SMR ciriculamvitae

5. To verify the markings/ cutting of various Po’s numbers with respect to the drawings.6. Review/witness fit ups and sub-assemblies of the two wheel bogies, 4 wheel bogies, 6 wheel bogies , portal and

slew decks .7. Inspection of final welding and review of post welding heat treatment records before final machining 8. Witness geometrical dimensions and on machine dimensions before assembly.9. Witnessing sub assemblies before proceeding to the final protocol.10. Coordination with end user during final protocol inspection of the system.11. Portal and slew deck Gear back lash inspection 12. Torque checking of the motor bolts which was attached to the long travel assembly. 13. To verify/witness surface preparation and coating (Primer, Intermediate, Final coats).14. To verify the preservation and stuffing during transportation.

Pressure Vessels: Boilers, Heat Exchangers, Coolers, Deaerators, Economizers, Super heaters, Storage tanks, Heaters, Headers, Economizers, Air Jet Ejectors, Condensers, Columns, Skid mounting Equipment’s, Reactors, Piping, Air Filters, Drums, Towers, Spherical storage vessels, Reboilers, Fire fighting items sprinkler systems and Hydrant systems.

Scope of Inspection:1. Inspection of Raw material with respect to the drawings, specifications, project specifications.2. Review and verify all the procedures required for manufacturing.3. Verification of welding procedures (WPS, PQR, WPQR)4. Review and verify the qualification certificates of NDT and other Testing personnel.5. To verify the markings of various parts with respect to the drawings.6. To witness/review the forming/rolling’s like dished ends, cones, shells.7. Review/witness the Heat Treatment.8. Witness the fit-ups with respect to the part drawings/GA Drawings.9. Witness/ReviewofNon-Destructive Tests.10. Visual and dimensional checks stage/final.11. Witnessing the pressure tests.12. To verify/witness surface preparation and coating.13. To verify the preservation and stuffing.

Rotating Equipment’s: Blowers, Pumps, Pulverizes, Compressors, Agitators, Conveyors, Couplings, Turbines, wind mill rotors, kiln shell, Roller press, longitudinal Guide Assemblies, Rotary Airlock Valves, HVA equipments such as ACCU,AHU& FAHU’sScope of Inspection:1. Inspection of Raw material with respect to the drawings, specifications, project specifications.2. Review and verify all the procedures required for manufacturing.3. Verification of welding procedures (WPS, PQR, WPQR)4. Review and verify the qualification certificates of NDT and other Testing personnel.5. To verify the markings of various parts with respect to the drawings.6. Witness/review of the balancing of parts.7. Review/witness the Heat Treatment8. Visual and dimensional checks stage/final9. Witness the FAT/Mechanical Run Test/Performance Test10. To verify/witness surface preparation and coating.11. To verify the preservation and stuffing.

Valves:Butterfly valves, Ball Valves, Gate Valves, Needle Valves, Pinch Valves, Reducing Valves, Safety relief valves, Globe Valves, Plug Valves, Diaphragm Valves, Check Valves , flow meters, Dial gauges, Venturi meters, Metering Skids, Injection molding fittings, etc

Page 3: SMR ciriculamvitae

Scope of Inspection:1. Inspection of Raw material with respect to the drawings, specifications, project specifications.2. Review and verify all the procedures required for manufacturing.3. Verification of welding procedures (WPS, PQR, WPQR)4. Review and verify the qualification certificates of NDT and other Testing personnel.5. To verify the markings of various parts with respect to the drawings.6. Reviewing the stage assembly records.7. Final visual and Dimensional checks.8. Witnessing of the pressure tests like Body hydro, Seat hydro, Seat Pneumatic test.9. Witnessing the performance test.10. To verify/witness surface preparation and coating.11. To verify the preservation and stuffing.

Expediting: Pressure Vessels, Rotating Equipment’s, Control Valves, Structural, HVAC, and Static Equipments, Super Structures, Boiler structures, etc.

Scope of expediting: 1. Verification all the reference documents like PO, ITP, Drawings, and Project Specifications.2. Ensure all the required manufacture and test procedures/code & standards are available with respect to the

reference documents. 3. Verification of Material with respect to the drawings/ BOM.4. Non available materials follow up with vendor/sub vendor and same will ensure the availability for assembly

whenever required.5. The manufacturing schedules will be prepared with the help of manufacturing team and ensure meeting the

schedule.6. Day to day surveillance will be done and the status will be verified with respect to the manufacturing schedules.

If schedules are not meeting, the same will be discussed with manufacturing team and ensure to finish the with next day schedules.

7. To ensure and complete the items as per the PO delivery dates.

Over all Job Profile:1. Conversant with various types of welding process like SMAW, GTAW, SAW,GMAW & FCAW

2. Familiar with NDT methods like UT, RT, MT PT and VT

3. Preparation and review of WPS, PQR, WPQ’s, QAP/ITP.

4. Witnessing the procedure qualification, welder qualification test coupons and witnessed the

lab test as per the code/standards requirements.

5. Review/ Preparation of weld Map, Weld Logs with respect to the job requirements/project requirements.

6. Verification of Iso-metric drawings with respect to the P&ID

7. Verify the fabricated piping spools, pipe racks and its supports with respect to the Isometric drawings.

8. Test packs to be prepared/verified with respect to the P&ID/Project specification.

9. Witnessing of pressure test (Hydro/Pneumatic and commodity Test) according to piping class, their test limit and

required pressure as per codes/standards/project procedures

10. Inspection of Boiler main structures like columns, girders, beams, truss, bracings and BMH structures like trestles, stringers, hopers, etc.

11. Inspection of pressure vessels like L P, HP heaters, Surface condensers, Reactors (GLR’S), De Aerators of Both MS/SS.

Page 4: SMR ciriculamvitae

12. Conversant with post heat treatment process.13. Involvement in planning activities such as bar charts, activity reports, process sequence

Reports.

14. Inspection and assembly of cement plant items such as Klin shells, Clinker crusher,

Pulverizes, longitudinal guide assemblies, Flexible shafts, Roller press assemblies, Rotary air lock valves, screw

conveyors, Vibratory feeders and belt feeders. Inspection of pipe Fittings, bends (long radius and short radius)

Casting Gr 5, Gr 7 & 9, Casting for Pumps, Bearing casing& brackets.

15. Cladding plates Inspection including UT testing as per codes/standards/project specifications

16. Witnessing PMI (Positive Material Identification) of various materials.

17. Inspection of spring hangers, Belt conveyor components such as Rollers, Belt feeders,

Pulleys& ESP components.

18. Inspection of casting items like dip tube assemblies, hard facing items.

19. Inspection of heavy structural beams columns for petrochemical structural items

and boiler main structures bracings trusses, ESP’s structural items, Material

handling systems structural items,

20. Inspection of Fire fighting systems like yard hydrants and sprinklers system for MEP

Companies.

21. Installation and commissioning of DG sets of pump room for Hydrant and sprinklers systems.

22. Responsible for internal audits, issuing of NCR and closing of NCR through

proper documentation.

23. Inspection all kind of valves which are used in petrochemical line and their testing.

24. Witnessing of calibration for the items Venturi meters, Flow meters, Dial gauges etc.

25. Inspection of Material Handling equipments such as Stackers cum Reclaimers, Track hoppers and their individual

parts inspection and it’s assembly’s etc.

26. Project controls from the LOA stage to the finished stage

27. Conducting KOM and Engineering MOM and expediting works from desk and in the shop during manufacturing.

Experience Summary:

Sr No Employer Position Duration Department

1 Freelancer Inspector& Expeditor Feb 2015 Till date

2M/s ABF Engineering International Pvt LtdBangalore

Asst Manager From Dec 2013 Feb 2015

3

M/s Felguera Graus India Pvt Ltd,Visakhapatnam.“Bulk Material Handling Equipment EPC Company”Like Staker cum Reclaimers,Ship unloaders/Grabers.

Asst Manager May 2011 to June 2013 QA/QC

Page 5: SMR ciriculamvitae

4 M/s TUV-SUD South Asia Pvt Ltd, Hyderabad Asst Manager Aug 2010 to May’2011 Inspection

5 M/s Indian Inspection Service P Ltd, Hyderabad Sr Engineer April 2005 to Aug 2010 Inspection

6 M/s Turbovent Industries P Ltd, Hyderabad. Sr Engineer June 2003 to April 2005 QA/QC

7 M/s Ability Equipments P Ltd, Hyderabad. Engineer Dec 2000 to June 2003 QA/QC

8 M/s Hitech Engineers P Ltd, Ahammed Nagar, Engineer Sept 1997 to Nov 2000 QA/QC

Project No: 1Client : Navayuga Construction Pvt Ltd. Project : Krishnapatnam port Project (2 No,s Stackers cum Reclaimers) Role : Inspection/ Expidation/ExecutionDuration : Aug 2010 to Present Location of Work : Diamond Engineerg Groups ( Chennai)

Project No: 2Client : M/s Bothra Shipping Corporation. Project : Kakinada port Project (2 No,s Stackers cum Reclaimers,1 Tracke Hopper and 1 Wagon unloader) Role : Inspection/ Expediting/Execution/ FollowupDuration : Aug 2011 to Present Location of Work : Diamond Engineerg Groups ( Chennai)

Projects Handled:

Project No: 1Company : ECA (Grup of Bureau Veritas)Client : Iberdrola Ingeniería y Construcción Project : 181 RM CN LAGUNA VERDE ( 1st& 2 nd FASE)Role : Inspection/ Expidation EngineerDuration : Feb 2010 to Jul’2010 Location of Work : Hindupur ( A P)Material Specification : AS per Drawings& SpecsProject No: 2Company : Thermax Boiler& Utility DivisionClient : ESSAR POWER LTDProject : Pulverizer’s for Thermal Power PlantRole : Inspection/ Expidation EngineerDuration : Feb 2009 to April 2010Location of Work : Kitti Steel Ltd, Ghatkesar, Hyd.Material Specification : IS 2062 Gr BSize of Eqpt : 5MtrX10 Mtr of 200 Mesh sizeQuantity : 04 No’s

Project No: 3Company : IDEA AE&E Pvt Ltd ChennaiClient : Enterprise Product Operating LPProject : Enterprise Sherman Extension Pipe lineRole : Inspection EngineerDuration : Feb 2006 to Aug 2006

Page 6: SMR ciriculamvitae

Location of Work : WELSPUN GUJARAT STAHL ROHERN Ltd.HSAW PIPE Division , Anjar, Kutch ( DT), Gujarat. India

Material Specification : API 5L X 70, PSL 2Size of Pipes : 36”x14.10& 19.01 mmQuantity : 5000 No’s

Role& Responsibilities:Pipe Mill Division (HSAW): Process Inspection.

Inspection of plates, through NDT methods like UT (Thickness gauge), Monitoring of SAW Welding parameters, Previsual inspection, Interpretation RT film. Final visual Inspection of line pipes.

Witnessing of Fluoroscopy testing, Ultrasonic Testing, Magnetic Particle Testing and Dye Penetrate Testing & review AUT and hydro charts.

Responsible for conducting procedure qualification test and welder performance qualification test. Responsible for giving repair approval for weld repair. Welding visual inspection Working independently by following all company safety procedures and regulation. Project No: 4Company : IDEA AE&E Pvt Ltd ChennaiClient : Reliance Infrastructure LtdProject : Gas projecetRole : Inspection EngineerDuration : Mar 2005 to Jan 2006Location of Work : Hyderabad Cylinders P Ltd, Kottur, Hyd, INDIAMaterial Specification : IS 3196 Part I& IIISize of Cylinder : 17.5 KG, DomesticQuantity : 15000 No’s

Role& Responsibilities:Cylinder Plant (SAW): Process Inspection.

Which includes inspection of coils, filler material, flux, bungs, and valves before undergoing in to processPerformance and condition of machines

Verification of documents such as welding procedure specifications and calibration certificates of machines and measuring instruments

Monitoring and crosschecking of blanking , Deep drawing, on line welding process and dimensional checking Pre visual checking of cylinders before identification(punching) on the stay plates Monitoring of Heat treatment process Witnessing of Blasting , Galvanizing, painting process Witnessing of Pneumatic and hydrostatic testing Witnessing of final painting and stenciling operations Raising of NCR and its evaluation to eliminate Preparation of final documents and its verification before dispatch

Pressure Vessels-Heat Exchanger- Traps-Fan Coolers/Flare Stack

AVU Engg (P) Ltd., Hyderabad IndiaEnmax Engineers India (P) Ltd.,

Hyderabad India

NEIL Hyderabad IndiaEnfab Hyderabad IndiaSV Engineers Hyderabad IndiaHaritha Industries Hyderabad India

Page 7: SMR ciriculamvitae

ITC Ltd., Badrachalam IndiaGE GodavariReitzTurbo VentVoith TurboHemairBGK Engg

HyderabadHyderabadHyderabadHyderabadHyderabadTadha

IndiaIndiaIndiaIndiaIndiaIndia

Plates Coils, Structural -Packages-Miscellaneous

Sri Rama Hyderabad IndiaPennar Industries Hyderabad IndiaAVU Engg (P) Ltd., Hyderabad IndiaEnmax Engineers India (P) Ltd., Hyderabad India Kitti Steels Hyderabad IndiaAster Heavy Engg Hyderabad IndiaSiddartha Heavy Equipmemts Hyderabad IndiaHaritha IndustriesEnsthee Sunil HitechMetal Fab

HyderabadNagpurNagpurNagpur

India IndiaIndiaIndia

Pipes and Tubes (L.P., Condenser and Heat Exchanger Tubes)

AVU Engg (P) Ltd., Hyderabad IndiaEnmax Engineers India (P) Ltd.,GE Godavari

Hyderabad

Hyderabad

India

India

Fittings

AVU Engg (P) Ltd., Hyderabad IndiaEnmax Engineers India (P) Ltd.,GE Godavari

Hyderabad

Hyderabad

India

IndiaKitti Steels Hyderabad India

CastingsSimon Carves Nagpur India Thermax Hyderabad India Humboldt Hyderabad India

Shot and Sand Blasting – FBE- PE Bituminous- Silicone Alkyd- Zinc Silicate- Epoxy Mastic – High Temperature Coating System- Inorganic Zinc Primer- Fiberglass Reinforced Coatings- Epoxy/Polyurethane Coating System for Atmospheric Service for ; Tanks, Piping, Pipelines (and Associated Appurtenances & Fittings), Structures, Process Equipment; Internal and External, Onshore, Offshore, and/or Subsea)

Srirama Hyderabad IndiaTigaksha Metalic (P) Ltd Hyderabad India

Page 8: SMR ciriculamvitae

AVU Engg (P) Ltd., Hyderabad IndiaEnmax Engineers India (P) Ltd.,

Hyderabad India

NEIL Hyderabad IndiaEnfab Hyderabad IndiaSV Engineers Hyderabad IndiaHaritha Industries Hyderabad India ITC Ltd., Badrachalam IndiaEnsthee Sunil Hitech

NagpurNagpur

IndiaIndia

Valves, Actuators

SMRPEC Hyderabad IndiaAir Liquide Hyderabad IndiaAVU Engg (P) Ltd. FlowserveAdvance Valves

HyderabadBangaloreDelhi

IndiaIndiaIndia

Larsen & ToubroEmerson Process ManagementServon GlocaonMicrofinish valvesBDK ValvesHawa ValvesHydro Pnuematic Valves

Chennai & CoimbotoreChenni

ChenniHubliHubliHubliMumbai

IndiaIndia

IndiaIndiaIndiaIndiaIndia

Flanges/Forging

SMRPEC Hyderabad IndiaAir Liquide Hyderabad IndiaSrirama Hyderabad IndiaTigaksha Metalic (P) Ltd Hyderabad IndiaAVU Engg (P) Ltd., Hyderabad IndiaEnmax Engineers India (P) Ltd.,

Hyderabad India

NEIL Hyderabad IndiaEnfab Hyderabad IndiaSV Engineers Hyderabad IndiaHaritha Industries Hyderabad India

Expansion Joint / Bellows / Hoses

SMRPEC Hyderabad IndiaAir Liquide Hyderabad IndiaITC Ltd., Badrachalam India

X-Mas Three / Well head equipment

Page 9: SMR ciriculamvitae

Abu Dhabi Company for Onshore Oil Operations (ADCO)Through FMC Technologies

Coimbatore India

Pumps- Rotating Equipments-Gear Box

NEILEnfabBalaji aminesITC Ltd.,

HyderabadHyderabadHyderabadBadrachalam

IndiaIndiaIndiaIndia

For Zadco Through Flow serveModel No:4WX &3WX

Coimbatore India

Compressors

Malhan EnterprisesNeelgiri CompressorsAnuraj EqipmentsElgi

AhemadabadCoimbotoreHyderabadAhemadabad

IndiaIndiaIndiaIndia

Page 10: SMR ciriculamvitae

Personal Details:

Name : S Mujibur Rahiman

Father’s Name : Abdul shukur S

DOB : June 1st 1977

Marital Status : Married

Language Known : English, Telugu, Hindi

Nationality : Indian

Pass port Number : J1234365

Permanent Address : HNo:13-211, Kondapeta, Banaganapalle-518124 Kurnool (DT)

Current designation : Asst Manager QA/QC

Current CTC : 8.8 Lacs

Expected CTC : Negotiable

Notice Period : Immediate

Current Location : Hyderanad,IndiaIf require ready to relocate anywhere in india

Skype ID : mujiburrahiman77

Reason For change of Job : For better prospects

Place: Hyderabad (Mujibur Rahiman Shaik)

Date:

Page 11: SMR ciriculamvitae
Page 12: SMR ciriculamvitae
Page 13: SMR ciriculamvitae
Page 14: SMR ciriculamvitae
Page 15: SMR ciriculamvitae
Page 16: SMR ciriculamvitae
Page 17: SMR ciriculamvitae
Page 18: SMR ciriculamvitae
Page 19: SMR ciriculamvitae
Page 20: SMR ciriculamvitae
Page 21: SMR ciriculamvitae