STORMWATERMANAGEMENTFACILITY
C-2C-1
R100
GRACE & MERCY ENDURES, LLC
C-1
EDAN LLC
OFFIC
E
280'
R35'
30'
25'
R35'
129.1'
64.3'
30'
25'
25'
25'
50'
100'SIGN
NEW BI-LEVEL BUILDING A FIRST LEVEL F.F.E.=1013.00'BASEMENT F.F.E.=1002.33' 44,000 S.F.
TRACT "A"
TRACT "B"
TAX PARCEL ID: 16 002 02 008
TAX PARCEL ID: 16 062 02 005
BU
ILDIN
G B
BU
ILDIN
G C
BU
ILDIN
G D
BU
ILDIN
G E
BUILDING F
NEW GATE
BUILDING G
30'
30'
230'
180'
90'
20'60'
110'
200'
50'
25'
25'
NEW GATE
NEW GATE
NEW FENCE (TYP.)
NEW FENCE (TYP.)
TPA
REVISIONS
For The FirmTravis Pruitt & Associates, Inc.
NO
. DATE D
ES
CR
IPTIO
N B
Y
0 1 2 3 4 5 6
Fax: (770)416-6759w
ww
.travispruitt.com
4317 Park Drive, Suite 400
Norcross, G
eorgia 30093Phone: (770)416-7511
TravisPruittA
ssociates, Inc.
FN: 165-D-083JN: 1-19-0271
SCALE: 1"= 40'
5636 & 5672 RED
AN
ROA
D
DATE: 10/08/2019
CN:190271CP3
W:\2019\190271\Engineering\CAD\Drawings\190271CP4.dwg, concept plan, adohrn, Oct. 31, 19-9:58:16 AM, 1:1
Contact Person: A
USTIN
DO
HRN
TAX PARCEL ID:16 062 02 005; 16 002 02 008
BUILDING SETBACK LINES:
&
TRACT "A"
SITE ZONING:
SITE AREA:
LSV:
REFERENCE PLATS:
BUILDING SQUARE FOOTAGE:
BUILDING A (FIRST LEVEL)BUILDING A (BASEMENT)BUILDING BBUILDING CBUILDING DBUILDING EBUILDING FBUILDING G
BUILDINGAREA (SQ. FT.)
TOTAL81,250 SF
22,00022,0008,3006,8005,3002,0001,20013,650
TOTAL AREA: 0.96 ACRESIMPERVIOUS AREA: 0.67 ACRES PERVIOUS AREA: 0.29 ACRES
TRACT "B"TOTAL AREA: 5.57 ACRESIMPERVIOUS AREA: 2.98 ACRESPERVIOUS AREA: 2.59 ACRES
TRACT "A"
TRACT "B"
FRONT YARD : 0 TO 20 FEET
REAR YARD : 10 FEETSIDE YARD : 0 FEET
FRONT YARD : 60 FEET
REAR YARD : 30 FEETSIDE YARD : 20 FEET
PARKING SUMMARY TRACT "B"DESCRIPTIONREQ. MIN*ALLOW. MAX**PROVIDEDREGULAR PARKING:9-9ADA ACCESSIBLE PARKING:1-1TOTAL PARKING SPACES:101610*ONE SPACE PER 8,000 SF**ONE SPACE PER 5,000 SF
TRACT "A": (HIDDEN HILLS OVERLAY)
TRACT "B": C-1; R-100 (CASE #: Z-18-22137)
TRACT "A"
TRACT "B"
PARKING SUMMARY:
MAXIMUMPROVIDED
N/A -80%N/A
46.5% -80%53.5%
OPEN SPACE REQUIREMENTS:
MINIMUMPROVIDED
TRACT "A"TRACT "B"
N/A 20.0%46.5% 20.0%
FAR REQUIREMENTS:
MAXIMUMPROVIDED
TRACT "A"TRACT "B"
N/A 2.00*0.33 -
*THE MAXIMUM ALLOWABLE FAR OF A BUILDING OR DEVELOPMENT IN TIER 2 SHALLBE INCREASED TO A FAR NOT TO EXCEED A TOTAL OF TWO (2.0) IN EXCHANGE FORONE (1) OR MORE OF THE ADDITIONAL AMENITIES PROVIDED BELOW:1. INCREASE FAR BY 0.50 IF PUBLICLY ACCESSIBLE OPEN SPACE IS INCREASED TO 25%,WHILE PROVIDING CONNECTIVITY2. INCREASE FAR BY 1.00 IF PUBLICLY ACCESSIBLE OPEN SPACE IS INCREASED TO 30%,WHILE PROVIDING CONNECTIVITY