RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION

9
Maypray G. Guimbarda Phase 1, Blk 53, Lot 9 & 11, Cyber Ville SunTrust Gen. Trias Cavite, Philippines Contact Number: Mobile (+639107074299) Tel (+63464241481) E-mail: [email protected] & [email protected] _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ CERTIFIED COATING INSPECTOR: SSPC - The Society for Protective Coating. PCI - Certified Protective Coating Inspector Level II ID number: 27909 Start: Feb 19, 2009 up to Due Date: Dec 13, 2013 OBJECTIVE AND GOAL : To work in company with an effective environment conductive for person success, intellectual growth and career advancement and to achieve a position that would offer job satisfaction and channels for application of knowledge gain. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ WORK EXPERIENCE : COMPANY: SAMSUNG ENGINEERING. (EPC - Contractor ) PROJECT: SAUDI ARAMCO - NGL PLANT AND GOSP - 7 (CO2) - Carbon Dioxide Capture and Injection Facilities Hawiyah & Uthmaniyah Kingdom of Saudi Arabia CLIENT - PMT: SAUDI ARAMCO (Managing Contractor) POSITION: QC COATING/PAINTING and INSULATION INSPECTOR DURATION: (July 18, 2012 up to Present) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ COMPANY: RECINCO N.V (PUF Insulation Tank - Contractor ) And CB&I (EPC Tank - Contractor ) PROJECT: CRYOGENIC REFRIGERATED 6 LPG STORAGE TANK PUF Insulation of Double Walls Tank (NGL) Natural Gas Liquids (GASCO Train 4 th IGD Integrated Gas Development) Al Ruwais Industrial City Abu Dhabi U.A.E CLIENT - PMC: WORLEYPARSONS Resources & Energy. (Project Management Consultant)

description

I ‘am Certified Coating Inspector for SSPC Level 2 of PCI - Protective Coating Inspector American Standards Equivalent of NACE 2, CSWIP-BGAS 2 and FROSIO 3, and have Experience for all Insulation Works Likes: Cryogenic Insulation Cold Box Equipment, Tank for Polyurethane Foam Insulation of Double Walls, Tank Insulation External Wall and Thermal Insulation for Piping and Mechanical Equipment"

Transcript of RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION

MMaayypprraayy GG.. GGuuiimmbbaarrddaa Phase – 1, Blk 53, Lot 9 & 11, Cyber Ville SunTrust Gen. Trias Cavite, Philippines Contact Number: Mobile (+639107074299) Tel (+63464241481) E-mail: [email protected] & [email protected]

___________________________________________________________________________________________ CERTIFIED COATING INSPECTOR:

SSPC - The Society for Protective Coating.

PCI - Certified Protective Coating Inspector Level II ID number: 27909 Start: Feb 19, 2009 up to Due Date: Dec 13, 2013 OBJECTIVE AND GOAL: To work in company with an effective environment conductive for person success, intellectual growth and career advancement and to achieve a position that would offer job satisfaction and channels for application of knowledge gain.

___________________________________________________________________________________________ WORK EXPERIENCE:

COMPANY: SAMSUNG ENGINEERING.

(EPC - Contractor)

PROJECT: SAUDI ARAMCO - NGL PLANT AND GOSP - 7 (CO2) - Carbon Dioxide Capture and Injection Facilities

Hawiyah & Uthmaniyah – Kingdom of Saudi Arabia CLIENT - PMT: SAUDI ARAMCO

(Managing Contractor) POSITION: QC COATING/PAINTING and INSULATION – INSPECTOR DURATION: (July 18, 2012 up to Present)

__________________________________________________________________________________________ COMPANY: RECINCO N.V (PUF Insulation Tank - Contractor)

And CB&I (EPC Tank - Contractor)

PROJECT: CRYOGENIC REFRIGERATED 6 LPG STORAGE TANK

PUF Insulation of Double Walls Tank (NGL) – Natural Gas Liquids

(GASCO Train 4th IGD – Integrated Gas Development) Al Ruwais Industrial City – Abu Dhabi U.A.E

CLIENT - PMC: WORLEYPARSONS Resources & Energy.

(Project Management Consultant)

POSITION: QC INSPECTOR & SUPERVISOR PAINTING and INSULATION

DURATION: (September 2, 2011 up to May 12, 2012)

__________________________________________________________________________________________ COMPANY: JGC - CORPORATION.

(EPC Contractor) PROJECT: (NCP) National Chevron Phillips-North Plot

(CHEVRON PHILIPS & SAUDI POLYMER LLC.)

Kingdom of Saudi Arabia. Jubail Industrial 1

CLIENT - PMT: WORLEYPARSONS Resources & Energy. (Managing Contractor)

POSITION: QC PAINTING and INSULATION - INSPECTOR DURATION: (April 28, 2010 up to April 30, 2011)

___________________________________________________________________________________________ COMPANY: CCC - CONSOLIDATED CONTRACTOR INTL.COMPANY.

(Sub-Contractor) PROJECT: (PGTL) Pearl Gas to Liquid

(Qatar Petroleum and Shell Company LTD.)

Qatar Ras-laffan Industrial City

CLIENT - EPC/EPCM: JGC - CORPORATION & KBR - INTERNATIONAL

(Joint Venture)

POSITION: QC PAINTING and INSULATION - INSPECTOR DURATION: (July 14, 2008 up to December 2, 2009)

___________________________________________________________________________________________ Local COMPANY: JOTUN S’PORE PTE. LTD PHILIPPINES. 846 West Service Road. Km.18 South Super Highway Paranaque City, Metro Manila 1714

PROJECT: Marine Coating and Industrial Coating.

(Supplier) POSITION: QA/QC INSPECTOR DURATION: (May 25, 2007 up to June 4, 2008)

___________________________________________________________________________________________

Duties and Responsibility for Inspection:

The Quality Control Inspector tasks that includes:

Coating Inspection:

Carry-out Tank’s Inspection of Surface Preparation & Painting Work’s.

Witnessing and carrying out the checks accompanied with pre-application,

application e.g. Surface preparation, climatic conditions, materials preparation, after application checks, marking areas of defects and assurance of repair compliance, validity of equipment and materials storing conditions…etc.

Experience for Inspection of FBE, 3LPE and 3LPP in Vendor Manufacturer Pipe and

for Pipeline Coating, Field Joint Coating, and Heat shrink Sleeve, Visco-Elastic Coating System Wrapping for Underground.

Study of client’s specification and developing (or approving already prepared)

technical procedure according to the standards and requirements specified, attending the pre-job conference and the periodical meetings.

Experience of all Coating Inspection Instruments / Gages and Test kits in level of

using (as inspector) that includes: Climatic Conditions gages and measurements. DFT Magnetic / Ultrasonic Gages and measurements. Surface visible cleanliness comparators. Surface profile gages. Surface Contaminations Test Instruments, Surface Temperature Thermometers, Pinholes, Holiday and Discontinuity Testers of Dry applied Coats. Adhesion Testers of Dry applied Coats.

Conversant To Most of the International Codes Required Standard (Aramco

Engineering Standard, BSI, ASTM, ISO, SSPC and NACE). Certify reports prepared by the applicator, and reporting to the client. Preliminary Design and Check all the Painting and protective Coating Systems.

Method of Application included: Spraying (Air, Airless and Plural Component Spray Systems), Field and Shop Application.

Witnessing and approving pre-job evaluation / after completion final acceptance

tests.

Preparing the daily work schedule and the weekly work plan, that includes man power, equipment, materials, and working hours, liaison affiliated parties e.g. subcontractors, suppliers, construction etc

Assessment of the Q/A system of applicator(s) regarding coating job in concern

(documentation, personnel CV’s, Calibration certificates, Maintenance reports, Materials validity certificates, Chemical analysis certificates…etc.

Carrying out failure Analysis assessment for old coating systems, recording and reporting coating Failure Analysis according to the standardized report form (Defect

size, distribution, pattern, and shape), advising of a repair system and procedure.

Generate Daily, Weekly and Monthly Reports On The quality Status of All the Activities with Their Scheduler for Completion. Types of Coating include: Wide

range of Generic types of Liquid Paints (External, Internal), Pipelines Coating. Insulation Inspection:

Inspection of Storage Tank’s for Cold Insulation like (Propylene Tank and

Propane, Butane)

Carry out inspection for PUF Insulation like’s Straight, Comprise and Volume, Density and also Thickness for Insulation Product.

Perform Inspection for “PULL OF TEST” of First Layer of PUF Insulation for

Tanks Walls and Bottom Plate.

Carry-out Inspection of Cryogenic or Perlite Filling for Double wall Tank and for Cold Box Equipment.

Inspection for Hot Insulation of Tank’s Like (Tailing Tower Tank & Acoustic

Tank with Internal Insulation for Bottom.)

Study of specification and developing (or approving already prepared) technical procedure according to the standards and requirements specified, attending the pre-job conference and the periodical meetings.

Review the P&ID Drawing Piping for Temperature in Insulation of the thermal Hot and Cold Insulation.

Carry-out of Inspection in the Equipment for Insulation- (Boiler, HRSG –

Heat Recovery of Steam Generator’s. And Reactor Vessel & Column Vessel, Exchanger Equipment, Directors Drum & Tank, Cold box.)

Checking the material for Insulation and the Equipment using to the thermal Hot and Cold insulation.

Surveillance the gab fault of Insulation in stagger line. Measuring the

standards of length of band or belt inside and outside and Alignment of Insulation/Cladding Weather Jacketing.

Monitoring the constructions of the work and Surveillance the materials

for insulation.

Review the RFI of Request for Inspection and also the attach document paper. And base into the ITP or QCTP for Quality Control Test Plan requirements.

Surveillance the contractor work's if the procedures are been follows in specification.

Inspection for Flange and Valve (Hot and Cold Insulation Box.)

__________________________________________________________________________________________ TRAINING AND CERTIFICATION SEMINARS ATTENDED: SSPC – The Society for Protective Coating. (Training and Certification) Location: State of Qatar

PCI - Protective Coating Inspector. HEMPEL PAINT MANUFACTURE COMPANY. (Training and Certification) Location: State of Qatar

For training to the coating in substrate. Learn to the mixing and thinning for paint. Train for applied paint in surface preparation. Lesson for strip coat. Resolution for paint defaults. Checking the temperature of paint in the painting store. Solution for mixing and ratio in paint.

JUTON PAINT MANUFACTURE COMPANY. (Training and Certification)

Location: Philippines

Training for Corrosion and Protective Coatings in Theory and Application.

___________________________________________________________________________________________ Personal Data: Date of Birth: May 20, 1985 Nationality: Filipino Place of Birth: Maco, Davao Martial Status: Married Passport Number: EB5803335 (Expiration: June 29, 2017) Degree Holder: B.Sc. Computer Engineering (2002 – 2007)

I hereby that testify that the above information are true and correct to the best of my knowledge and belief.

Respectfully Yours:

Maypray G.Guimbarda