CV- Vu Van Hoang-2017-QAQC

8
Page 1 of 8 CURRICULUM VITAE Candidate’s position : QAQC WELDING INSPECTOR PERSONAL INFORMATION Full name Gender Date of birth Nationality Marital status Position Mobile E-mail : VU VAN HOANG : Male : 05/06/1987 : Vietnam : Married : QA/QC Staff : (84) 934 405 686 : [email protected] EDUCATION UNIVERSITY/ DIPLOMA HA NOI UNIVERSITY OF TECHNOLOGY (Vietnam) Majors: Bachelor Mechanical Engineer, specialized in Welding Technology OTHER TRAINING COURSES 2012 : TWI Welding Inspector CSWIP 3.1 2013 : Tropical Basic Offshore Safety Induction And Emergency Training (T-BOSIET) 2015 : Attended CSWIP Radiographic Interpretation level 2 ( RI ) PERSONAL SKILL Microsoft Office application Fluent in English Auto Cad 2D Resolving problems Work effectively in a team or independence Creative and Dynamic and Enthusiasm WORK EXPERIENCES Duration Company Projects Respective position Description for main task Jul-2016 to present PetroViet Nam Technical Services Corporation (PTSC) - Ca Mau Gas processing plant. Piping mechanical inspector In charge of: - Monitor all Welding activities at site to comply with WPS, Project Specification, Standards ( AWS, ASME, API…) - Prepare and review reports (MRIR, Materical traceablity, weld Summary, NDT report… ) for Final documentation - Monitor installation piping

Transcript of CV- Vu Van Hoang-2017-QAQC

Page 1 of 8

CURRICULUM VITAE

Candidate’s position : QAQC WELDING INSPECTOR

PERSONAL INFORMATION

Full name

Gender

Date of birth

Nationality

Marital

status

Position

Mobile

E-mail

: VU VAN HOANG

: Male

: 05/06/1987

: Vietnam

: Married

: QA/QC Staff

: (84) 934 405 686

: [email protected]

EDUCATION

UNIVERSITY/ DIPLOMA

HA NOI UNIVERSITY OF TECHNOLOGY (Vietnam)

Majors: Bachelor Mechanical Engineer, specialized in Welding Technology

OTHER TRAINING COURSES

2012 : TWI Welding Inspector CSWIP 3.1

2013 : Tropical Basic Offshore Safety Induction And Emergency Training

(T-BOSIET)

2015 : Attended CSWIP Radiographic Interpretation level 2 ( RI )

PERSONAL SKILL

Microsoft Office application Fluent in English Auto Cad 2D Resolving problems Work effectively in a team or independence Creative and Dynamic and Enthusiasm

WORK EXPERIENCES

Duration Company Projects Respective

position Description for main task

Jul-2016 to

present

PetroViet Nam

Technical Services

Corporation (PTSC)

- Ca Mau Gas processing plant.

Piping mechanical inspector

In charge of: - Monitor all Welding activities at

site to comply with WPS, Project Specification, Standards ( AWS, ASME, API…)

- Prepare and review reports (MRIR, Materical traceablity, weld Summary, NDT report… ) for Final documentation

- Monitor installation piping

Page 2 of 8

- Review hydrostatic test document. - Line check prior of release for

hydrostatic test - Co-ordinate and send request for

inspection to Client - Witness valve leak test, flushing

and hydrostatic test of piping system - Monitor bolt tightening - Monitor Reinstatement.

Jul-2015 to Jul-2016

Petroleum Equipment

Assembly & Metal

Structure JSC (PVC-MS)

- STT-LQ project - Jacket and

Topside Topside : 1500 tons Jacket : 1000 tons

- Client Cuu

Long JOC

Welding inspector

Team leader

In charge of: - Manage & coordinate all welding

team members - Contact directly to Client to solve

problems during productive activities.

- Join with Quality Manager and Welding Engineer in qualification WPS, welder & welding operator

- Monitor all Welding activities at site to comply with WPS, Project Specification, Standards ( AWS, ASME, API…)

- Prepare all Welding report ( Fit Up, Visual, weld Summary ) for Final documentation

- May

2014 to Jul-2015

Petroleum Equipment

Assembly & Metal

Structure JSC (PVC-MS)

- Thai Binh Drilling Platform project

- Jacket and Topside

- Client PCOSB

Welding inspector

Team leader

In charge of: - Manage & coordinate all welding

team members - Contact directly to Client to solve

problems during productive activities.

- Join with Quality Manager and Welding Engineer in qualification WPS, welder & welding operator

- Monitor all Welding activities at site to comply with WPS, Project Specification, Standards ( ASME, API… )

- Prepare all Welding report ( Fit Up, Visual, Summary ) for Final documentation

May

2013 to May

Petroleum Equipment

Assembly &

- Diamond

Drilling

Welding

In charge of: - Manage & coordinate all welding

team members

Page 3 of 8

2014 Metal Structure JSC

(PVC-MS)

Platform project Topside : 2300 tons Jacket : 2000 tons Client PCVL

inspector Team leader

- Contact directly to Client to solve problems during productive activities.

- Join with Quality Manager and Welding Engineer in qualification WPS, welder & welding operator

- Monitor all Welding activities at site to comply with WPS, Project Specification, Standards ( ASME, API… )

- Prepare all Welding report ( Fit Up, Visual , Summary ) for Final documentation

Feb

2013 to

May

2013

Petroleum Equipment

Assembly & Metal

Structure JSC (PVC-MS)

- Diamond Drilling Platform project (PCVL)

Topside : 2300 tons - Jacket : 2000

tons

- Client PCVL

Welding Engineer

In charge of: - Monitor Welder Qualification Test

- Monitor Welding Procedure Qualification Test

- Prepare WPS structure and piping for Diamond project

Oct -2012 to

Feb-2013

Petroleum Equipment

Assembly & Metal

Structure JSC (PVC-MS)

- Thang Long- Dong Do Project

- Chemical skid and Pressure Vessel

- Client Lam Son JOC

Welding Inspector

In charge of: - Join with Quality Manager and

Welding Engineer in qualification WPS, welder & welding operator

- Monitor all Welding activities at site to comply with WPS , Project Specification, Standards ( ASME,API… )

- Check drawing and weld map.

Page 4 of 8

Sep-2011 to Oct - 2012

Petroleum Equipment

Assembly & Metal

Structure JSC (PVC-MS)

- TGT WHP H04 Topsides : 2000 tons

- HST H01 Modification

- Client HLHV JOC

Welding inspector for Piping

Team leader

In charge of: - Manage & coordinate all piping

team members - Contact directly to Client to solve

problems during productive activities.

- Join with Quality Manager and Welding Engineer in qualification WPS , welder & welding operator

- Monitor all Welding activities at site to comply with WPS , Project Specification, Standards ( ASME,API…)

- Prepare all Welding report ( Fit Up, Visual, Summary ) for Final documentation

Apr-2011 to

Sep-2011

Petroleum Equipment

Assembly & Metal

Structure JSC (PVC-MS)

- Bien Dong Project / Moc Tinh Topside : 3200 tons

- Client : Bien Dong JOC

Welding Supervisor for Piping

and Structure

In charge of: - Check drawing and weld map. - Prepare request, control welding

summary - Fit-up, visual and control before

welding, during welding and after welding

- Monitor all Welding activities at site

Jul-2010 to Apr-2011

Lilama 10 JSC

-Son La Hydropower

project - Client : Vietnam electricity (EVN)

Welding

supervisor

In charge of: - Check drawing and weld map. - Prepare request, control welding

summary - Fit-up, visual and control before

welding , during welding and after welding

- Monitor all Welding activities at site

Page 5 of 8