Master Plan
-
Upload
st-thomas-epsicopal-parish-school -
Category
Documents
-
view
214 -
download
0
description
Transcript of Master Plan
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
NEW SPORTS FIELD
KENDALL DRIVE
RE
D R
OA
D
NEW PICNIC AREA SHADE STRUCTURES AND
PERVIOUS SURFACE
NEW PERIMETER FENCE
RECREATION /OVERFLOW PARKING
52-72 CARS
NATURE WALKDONOR WALK
NEW PERIMETER WALL AND PLANTING
PLAYGROUND SHADE STRUCTURES
EXPANDED OPEN PLAYFOR YOUNG CHILDREN
EXPANDED RECTORY PORCH
NEW PERIMETER WALLAND PLANTING
NEW WALK
NEW PERIMETER FENCEAND PLANTING
NEW PERIMETER FENCE AND GATES
PARKING 132 CARS
REMOVEABLE FENCING FOR EVENT OVERFLOW
PARKING
ENHANCE UNDERSTORY PLANTING WITH NATIVE
HAMMOCK
ENHANCEDCOURTYARD
PLANTING
ADDITIONAL PLANTING
ENHANCED ENTRY PLANTING AREA AND SIGNAGE
ENHANCED PLANTINGS AND PAVINGS TO CREATE MORE OUTDOOR CLASSROOMS
OPPORTUNITIES
RAISED PLANTING BEDS FOR STUDENT LEARNING
WETLANDS FOR STUDENT LEARNING
ENHANCED BUTTERFLY GARDEN AREA
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
NEW PLAY FIELD: The construction of a new grass playfi eld to the east of the Old Rectory. The construction of a wall along the east and south property lines and planting in front of the wall. Re-paving and re-confi guration of the existing parking and walkway to connect the fi eld to the School.
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
EAST SIDE OF THE NEW FIELD: The new perimeter wall at this location will be a solid masonry wall with columns and caps and a stucco fi nish. There will be shrubs and trees along the entire face at this location.
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
SOUTH-EAST END OF THE NEW FIELD: The new perimeter wall at this location will be a concrete panel wall with stone texture on the panels and columns, and will be planted with vines to cover. There will also be shrubs and trees along the entire face at this location.
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
RENOVATED CHURCH ENTRY: New landscaping at the church entry circle and corner of the property. Renovation of existing sign to increase visibility. The addition of an alumi-num fence and gates with stone clad columns, to secure the church and Chapel.
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
NEW WALKWAY: The construction of a new walkway to allow for a safe pedestrian connection between the re-confi gured parking area to the school, church and playfi elds. The addition of more canopy treees in the parking area to provide more shade for the walkway and for the parking lot.
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
KENDALL DRIVE PERIMETER FENCE AND ENTRY GATES: New aluminium fence and stone faced columns along the perimeter of Kendall Drive. New custom gates and sig-nage for the primary entrance to the parking area. A small guard house at the main entry for security. New landscaping along the fenceline.
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
KENDALL DRIVE PERIMETER FENCE AND ENTRY GATES: New aluminium fence and stone faced columns along the perimeter of Kendall Drive. New custom gates and sig-nage for the primary entrance to the parking area. A small guard house at the main entry for security. New landscaping along the fenceline.
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
RED ROAD PERIMETER FENCE AND NEW OUTDOOR EATING AREA: New aluminium fence and stone faced columns along the perimeter of Red Road and around to connect to the new wall at Banyan Drive. New surfacing, furniture and Shade Structures for the Outdoor Eating area.
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
PLAYGROUND WALL AND SHADE STRUCTURE: The new perimeter wall will be planted with a dense vine to soften it’s appearance. New shade structures will be installed over the playground.
S T. T H O M A S E P I S C O PA L PA R I S H - M A S T E R P L A N V I S I O N C U R T I S + R O G E R S D E S I G N S T U D I O , I N C . D E C E M B E R 2 0 0 9
NATURE WALK AND POTENTIAL DONOR AREA: The area between the playground and the overfl ow parking will host a native plant walkway towards the new play fi eld. This area can also host donor requests for memorial benches and trees.