Master Plan

5
1 2 3 4 5 8 7 6 9 10 11 a f e d b future extention PW EQJ W¤QJ WK master plan A3: 1/750 1 4a 390 m2 2623 m2 13 14 4b 4a1 NKR WKQK SK¢P QK QªQ NK· PÅ UÃQJ QK SKW L°Q PÅ UÃQJ NKR Y¥W OL°X F¿Q 15 master plan PW EQJ W¤QJ WK item no 00: W¤QJ WK master PLAN fax : tel : fax : 04 5143095 notes : (phase 3) tel : 04 5142418 drawing : add : 5, lang ha st.-ba dinh dis.-ha noi city drawing no status scale 10-2011 jahwa vina factory n 1. building a (phase 1) 2. building b (phase 2) 3. building c (phase 3) QK~ F JLDL }RQ 4. bike parking (120 bikes) (phase 1) 5. car parking (phase 1) 6. guard house & gate (phase 1) 7. water receivor tank & pump room (phase 1) 8. electric rm. & transformer station (phase 1) 9. garden 10. container loading (phase 2) note 11. compressor & generator room (phase 1) 12. septic tank (phase 1) 4a. bike parking (700 bikes) (phase 2) 13. canteen (expansion) QK~ wQ P© U§QJ 14. garbage storage (phase 2) 15. sports grounds VxQ WK WKDR 16 16. bike parking (300 bikes) (phase 3) QK~ } [H P\ FK¥ JLDL }RQ septic tank (new) septic tank (existing) football volleyball 15

Transcript of Master Plan

Page 1: Master Plan

1

2

3

4

5

8

7

6

9

10

11

afe

db

future extention

mÆt b»ng tæng thÓmaster plan A3: 1/750

1

4a390 m2

2623 m2

13

14

4b

4a1

kho thµnh phÈm

nhµ nÐn khÝ më réng

nhµ ph¸t ®iÖn më réng

kho vËt liÖu cån

15

master planmÆt b»ng tæng thÓ

item no 00:

tæng thÓmaster PLAN

fax :tel :

fax : 04 5143095

notes :

(phase 3)

tel : 04 5142418

drawing :

add : 5, lang ha st.-ba dinh dis.-ha noi city

drawing no

status

scale

10-2011

jahwa vina factory

n

1. building a (phase 1)

2. building b (phase 2)

3. building c (phase 3)nhµ c (giai ®o¹n 3)

4. bike parking (120 bikes) (phase 1)

5. car parking (phase 1)

6. guard house & gate (phase 1)

7. water receivor tank & pump room (phase 1)

8. electric rm. & transformer station (phase 1)

9. garden

10. container loading (phase 2)

note

11. compressor & generator room (phase 1)

12. septic tank (phase 1)

4a. bike parking (700 bikes) (phase 2)

13. canteen (expansion)nhµ ¨n (më réng)

14. garbage storage (phase 2)

15. sports groundss©n thÓ thao

16

16. bike parking (300 bikes) (phase 3)nhµ ®Ó xe m¸y (300 chç) (giai ®o¹n 3)

sept

ic t

ank

(new

)

septic tank (existing)

football

volleyball

15

Page 2: Master Plan

1

2

3

4

5

8

7

6

9

10

11

afe

db

future extention

mÆt b»ng s©n ®­êngroad plan A3: 1/750

1

4a390 m2

2623 m2

13

14

4b

4a1

kho thµnh phÈm

nhµ nÐn khÝ më réng

nhµ ph¸t ®iÖn më réng

kho vËt liÖu cån

15

road planmÆt b»ng s©n ®­êng

item no 00:

tæng thÓmaster PLAN

fax :tel :

fax : 04 5143095

notes :

(phase 3)

tel : 04 5142418

drawing :

add : 5, lang ha st.-ba dinh dis.-ha noi city

drawing no

status

scale

10-2011

jahwa vina factory

n

1. building a (phase 1)

2. building b (phase 2)

3. building c (phase 3)nhµ c (giai ®o¹n 3)

4. bike parking (120 bikes) (phase 1)

5. car parking (phase 1)

6. guard house & gate (phase 1)

7. water receivor tank & pump room (phase 1)

8. electric rm. & transformer station (phase 1)

9. garden

10. container loading (phase 2)

note

11. compressor & generator room (phase 1)

12. septic tank (phase 1)

4a. bike parking (700 bikes) (phase 2)

13. canteen (expansion)nhµ ¨n (më réng)

14. garbage storage (phase 2)

15. sports groundss©n thÓ thao

16. bike parking (300 bikes) (phase 3)nhµ ®Ó xe m¸y (300 chç) (giai ®o¹n 3)

sept

ic t

ank

(new

)

septic tank (existing)

football

volleyball

15

asphal road

c«ng tr×nh ®· x©y dùng

t­êng ch¾n ®Êt btctrc concrete retaining wall

®­êng aslphal lµm míi

building as build

aslphal road (new)

vØa hÌ lµm míiside walk (new)

cÇu thangstair

cÇu thangstair

®­êng bª t«ng lµm míiconcrete road (new)

16

asphal road

Page 3: Master Plan

ROAD TYPICAL SECTIONMÆT C¾T §¦êNG §IÓN H×NH

item no 00:

tæng thÓmaster PLAN

fax :tel :

fax : 04 5143095

notes :

(phase 3)

tel : 04 5142418

drawing :

add : 5, lang ha st.-ba dinh dis.-ha noi city

drawing no

status

scale

10-2011

jahwa vina factory

- nilon c¸ch n­íc

- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT

- c¸t san ph¼ng dµy 50

concrete gr20 thickness 150mm- bª t«ng m¸c 200 dµy 150mm

WATER RESISTANCE VINYL SHEET

SAND 50MM THK.

COMPACTED STONE 40X60, 200MM THK.

- ®Êt san nÒn ®Çm chÆt k=0.95

COMPACTED SOIL K=0.95

atphalt concrete thickness 50mm- bª t«ng at-phan dµy 50mm

mÆt c¾t ®­êng aspalt aspalt road section A3: none

1

- nilon c¸ch n­íc

- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT

- c¸t san ph¼ng dµy 50

concrete gr20 thickness 150mm- bª t«ng m¸c 200 dµy 150mm

WATER RESISTANCE VINYL SHEET

SAND 50MM THK.

COMPACTED STONE 40X60, 200MM THK.

- ®Êt san nÒn ®Çm chÆt k=0.95

COMPACTED SOIL K=0.95

atphalt concrete thickness 50mm- ®­êng bª t«ng at-phan dµy 50mm

- nilon c¸ch n­íc

- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT

- c¸t san ph¼ng dµy 50

concrete gr20 thickness 150mm WITH NONE SLIP GROOVE- bª t«ng m¸c 200 dµy 150mm KHÝA R·NH CHèNG TR¦îT

WATER RESISTANCE VINYL SHEET

SAND 50MM THK.

COMPACTED STONE 40X60, 200MM THK.

- ®Êt san nÒn ®Çm chÆt k=0.95

COMPACTED SOIL K=0.95

R·NH CHèNG TR¦îT RéNG 50 S¢U 15 C¸CH NHAU 300

NONE SLIP GROOVE 50 WIDE 15 DEEP @=300

mÆt c¾t 1-1section 1-1 A3: none

1

mÆt c¾t 2-2section 2-2 A3: none

1

- nilon c¸ch n­íc

- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT

- c¸t san ph¼ng dµy 50

WATER RESISTANCE VINYL SHEET

SAND 50MM THK.

COMPACTED STONE 40X60, 200MM THK.

- ®Êt san nÒn ®Çm chÆt k=0.95

COMPACTED SOIL K=0.95

grasscá

CHI TIÕT §¦êNG DèCSLOPE DETAIL A3: none

1

grasscá

- nilon c¸ch n­íc

- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT

- c¸t san ph¼ng dµy 50

concrete gr20 thickness 150mm- bª t«ng m¸c 200 dµy 150mm

WATER RESISTANCE VINYL SHEET

SAND 50MM THK.

COMPACTED STONE 40X60, 200MM THK.

- ®Êt san nÒn ®Çm chÆt k=0.95

COMPACTED SOIL K=0.95

mÆt c¾t ®­êng bª t«ngconcrete road section A3: none

1

concrete gr20 thickness 150mm WITH NONE SLIP GROOVE- bª t«ng m¸c 200 dµy 150mm KHÝA R·NH CHèNG TR¦îT

SLOPE DETAIL

Page 4: Master Plan

DETAIL

item no 00:

tæng thÓmaster PLAN

fax :tel :

fax : 04 5143095

notes :

(phase 3)

tel : 04 5142418

drawing :

add : 5, lang ha st.-ba dinh dis.-ha noi city

drawing no

status

scale

10-2011

jahwa vina factory

curb 150x280Bã VØA 150x280

curb 150x280®Êt t«n nÒn ®Çm chÆt

building cx­ëng c

l¸t g¹ch btxm 300 x 300

brick concrete 300 x 300

®Êt san nÒn ®Çm chÆt

c¸t ®en ®Çm chÆt dµy 100mmcompacted soil

compacted sand thk=100mm

l¸t g¹ch btxm 300 x 300

brick concrete 300 x 300

®Êt san nÒn ®Çm chÆt

c¸t ®en ®Çm chÆt dµy 100mmcompacted soil

compacted sand thk=100mm

mÆt c¾t 1-1section 1-1 A3: none

1

Page 5: Master Plan

chi tiÕt t­êng ch¾n ®Êtrc concrete retaining wall A3: none

1

DETAIL

item no 00:

tæng thÓmaster PLAN

fax :tel :

fax : 04 5143095

notes :

owner:

project:

(phase 3)

tel : 04 5142418

drawing :

add : 5, lang ha st.-ba dinh dis.-ha noi city

drawing no

status

scale

10-2011

jahwa vina factory

R·NH CHèNG TR¦îT RéNG 50 S¢U 15 C¸CH NHAU 300

NONE SLIP GROOVE 50 WIDE 15 DEEP @=300

CHI TIÕT §¦êNG DèCSLOPE DETAIL A3: none

1

mÆt c¾t 1-1section 1-1

1S