Master Plan
-
Upload
mrkhac-nguyen -
Category
Documents
-
view
29 -
download
4
Transcript of Master Plan
1
2
3
4
5
8
7
6
9
10
11
afe
db
future extention
mÆt b»ng tæng thÓmaster plan A3: 1/750
1
4a390 m2
2623 m2
13
14
4b
4a1
kho thµnh phÈm
nhµ nÐn khÝ më réng
nhµ ph¸t ®iÖn më réng
kho vËt liÖu cån
15
master planmÆt b»ng tæng thÓ
item no 00:
tæng thÓmaster PLAN
fax :tel :
fax : 04 5143095
notes :
(phase 3)
tel : 04 5142418
drawing :
add : 5, lang ha st.-ba dinh dis.-ha noi city
drawing no
status
scale
10-2011
jahwa vina factory
n
1. building a (phase 1)
2. building b (phase 2)
3. building c (phase 3)nhµ c (giai ®o¹n 3)
4. bike parking (120 bikes) (phase 1)
5. car parking (phase 1)
6. guard house & gate (phase 1)
7. water receivor tank & pump room (phase 1)
8. electric rm. & transformer station (phase 1)
9. garden
10. container loading (phase 2)
note
11. compressor & generator room (phase 1)
12. septic tank (phase 1)
4a. bike parking (700 bikes) (phase 2)
13. canteen (expansion)nhµ ¨n (më réng)
14. garbage storage (phase 2)
15. sports groundss©n thÓ thao
16
16. bike parking (300 bikes) (phase 3)nhµ ®Ó xe m¸y (300 chç) (giai ®o¹n 3)
sept
ic t
ank
(new
)
septic tank (existing)
football
volleyball
15
1
2
3
4
5
8
7
6
9
10
11
afe
db
future extention
mÆt b»ng s©n ®êngroad plan A3: 1/750
1
4a390 m2
2623 m2
13
14
4b
4a1
kho thµnh phÈm
nhµ nÐn khÝ më réng
nhµ ph¸t ®iÖn më réng
kho vËt liÖu cån
15
road planmÆt b»ng s©n ®êng
item no 00:
tæng thÓmaster PLAN
fax :tel :
fax : 04 5143095
notes :
(phase 3)
tel : 04 5142418
drawing :
add : 5, lang ha st.-ba dinh dis.-ha noi city
drawing no
status
scale
10-2011
jahwa vina factory
n
1. building a (phase 1)
2. building b (phase 2)
3. building c (phase 3)nhµ c (giai ®o¹n 3)
4. bike parking (120 bikes) (phase 1)
5. car parking (phase 1)
6. guard house & gate (phase 1)
7. water receivor tank & pump room (phase 1)
8. electric rm. & transformer station (phase 1)
9. garden
10. container loading (phase 2)
note
11. compressor & generator room (phase 1)
12. septic tank (phase 1)
4a. bike parking (700 bikes) (phase 2)
13. canteen (expansion)nhµ ¨n (më réng)
14. garbage storage (phase 2)
15. sports groundss©n thÓ thao
16. bike parking (300 bikes) (phase 3)nhµ ®Ó xe m¸y (300 chç) (giai ®o¹n 3)
sept
ic t
ank
(new
)
septic tank (existing)
football
volleyball
15
asphal road
c«ng tr×nh ®· x©y dùng
têng ch¾n ®Êt btctrc concrete retaining wall
®êng aslphal lµm míi
building as build
aslphal road (new)
vØa hÌ lµm míiside walk (new)
cÇu thangstair
cÇu thangstair
®êng bª t«ng lµm míiconcrete road (new)
16
asphal road
ROAD TYPICAL SECTIONMÆT C¾T §¦êNG §IÓN H×NH
item no 00:
tæng thÓmaster PLAN
fax :tel :
fax : 04 5143095
notes :
(phase 3)
tel : 04 5142418
drawing :
add : 5, lang ha st.-ba dinh dis.-ha noi city
drawing no
status
scale
10-2011
jahwa vina factory
- nilon c¸ch níc
- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT
- c¸t san ph¼ng dµy 50
concrete gr20 thickness 150mm- bª t«ng m¸c 200 dµy 150mm
WATER RESISTANCE VINYL SHEET
SAND 50MM THK.
COMPACTED STONE 40X60, 200MM THK.
- ®Êt san nÒn ®Çm chÆt k=0.95
COMPACTED SOIL K=0.95
atphalt concrete thickness 50mm- bª t«ng at-phan dµy 50mm
mÆt c¾t ®êng aspalt aspalt road section A3: none
1
- nilon c¸ch níc
- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT
- c¸t san ph¼ng dµy 50
concrete gr20 thickness 150mm- bª t«ng m¸c 200 dµy 150mm
WATER RESISTANCE VINYL SHEET
SAND 50MM THK.
COMPACTED STONE 40X60, 200MM THK.
- ®Êt san nÒn ®Çm chÆt k=0.95
COMPACTED SOIL K=0.95
atphalt concrete thickness 50mm- ®êng bª t«ng at-phan dµy 50mm
- nilon c¸ch níc
- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT
- c¸t san ph¼ng dµy 50
concrete gr20 thickness 150mm WITH NONE SLIP GROOVE- bª t«ng m¸c 200 dµy 150mm KHÝA R·NH CHèNG TR¦îT
WATER RESISTANCE VINYL SHEET
SAND 50MM THK.
COMPACTED STONE 40X60, 200MM THK.
- ®Êt san nÒn ®Çm chÆt k=0.95
COMPACTED SOIL K=0.95
R·NH CHèNG TR¦îT RéNG 50 S¢U 15 C¸CH NHAU 300
NONE SLIP GROOVE 50 WIDE 15 DEEP @=300
mÆt c¾t 1-1section 1-1 A3: none
1
mÆt c¾t 2-2section 2-2 A3: none
1
- nilon c¸ch níc
- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT
- c¸t san ph¼ng dµy 50
WATER RESISTANCE VINYL SHEET
SAND 50MM THK.
COMPACTED STONE 40X60, 200MM THK.
- ®Êt san nÒn ®Çm chÆt k=0.95
COMPACTED SOIL K=0.95
grasscá
CHI TIÕT §¦êNG DèCSLOPE DETAIL A3: none
1
grasscá
- nilon c¸ch níc
- ®¸ cÊp phèi 40x60 dµy 200 §ÇM CHÆT
- c¸t san ph¼ng dµy 50
concrete gr20 thickness 150mm- bª t«ng m¸c 200 dµy 150mm
WATER RESISTANCE VINYL SHEET
SAND 50MM THK.
COMPACTED STONE 40X60, 200MM THK.
- ®Êt san nÒn ®Çm chÆt k=0.95
COMPACTED SOIL K=0.95
mÆt c¾t ®êng bª t«ngconcrete road section A3: none
1
concrete gr20 thickness 150mm WITH NONE SLIP GROOVE- bª t«ng m¸c 200 dµy 150mm KHÝA R·NH CHèNG TR¦îT
SLOPE DETAIL
DETAIL
item no 00:
tæng thÓmaster PLAN
fax :tel :
fax : 04 5143095
notes :
(phase 3)
tel : 04 5142418
drawing :
add : 5, lang ha st.-ba dinh dis.-ha noi city
drawing no
status
scale
10-2011
jahwa vina factory
curb 150x280Bã VØA 150x280
curb 150x280®Êt t«n nÒn ®Çm chÆt
building cxëng c
l¸t g¹ch btxm 300 x 300
brick concrete 300 x 300
®Êt san nÒn ®Çm chÆt
c¸t ®en ®Çm chÆt dµy 100mmcompacted soil
compacted sand thk=100mm
l¸t g¹ch btxm 300 x 300
brick concrete 300 x 300
®Êt san nÒn ®Çm chÆt
c¸t ®en ®Çm chÆt dµy 100mmcompacted soil
compacted sand thk=100mm
mÆt c¾t 1-1section 1-1 A3: none
1
chi tiÕt têng ch¾n ®Êtrc concrete retaining wall A3: none
1
DETAIL
item no 00:
tæng thÓmaster PLAN
fax :tel :
fax : 04 5143095
notes :
owner:
project:
(phase 3)
tel : 04 5142418
drawing :
add : 5, lang ha st.-ba dinh dis.-ha noi city
drawing no
status
scale
10-2011
jahwa vina factory
R·NH CHèNG TR¦îT RéNG 50 S¢U 15 C¸CH NHAU 300
NONE SLIP GROOVE 50 WIDE 15 DEEP @=300
CHI TIÕT §¦êNG DèCSLOPE DETAIL A3: none
1
mÆt c¾t 1-1section 1-1
1S