London Convention Guidelines for Assessment of Dredged Material PIANC-Dredged Material

42
London Convention Guidelines for Assessment of Dredged Material PIANC-Dredged Material Management Guidance Documents [email protected]

description

London Convention Guidelines for Assessment of Dredged Material PIANC-Dredged Material Management Guidance Documents [email protected]. - PowerPoint PPT Presentation

Transcript of London Convention Guidelines for Assessment of Dredged Material PIANC-Dredged Material

Page 1: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

London Convention Guidelines for Assessment of Dredged Material

PIANC-Dredged MaterialManagement Guidance Documents

[email protected]

Page 2: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Specific Guidelines forAssessment of Dredged Material

Introduction

Dredging is essential to maintain navigation in ports, harbours, marinas and inland waterways; for the development of port facilities; for flooding mitigation; and for removal of sediments from structures, basins and water intakes. Dredged material worldwide is, by nature, similar to undisturbed sediments in inland and coastal waters. A smaller proportion of dredged material, however, is contaminated by human activity.

Page 3: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Evaluation of Need forDredging and Disposal

CAPITAL DREDGING - for navigation, to enlarge or deepen existing channel and port areas or to create new ones

MAINTENANCE DREDGING - to ensure that channels, berths or construction works, etc., are maintained at their designed dimensions; and

CLEAN UP DREDGING - deliberate removal of contaminated material for human health and environmental protection purposes.

Page 4: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

The schematic provides a clear indication of the stages in the application of this guidance where important decisions should be made.Components are:1. Dredged material characterization2. Waste prevention audit and evaluation of disposal options3. Is material acceptable4. Identify and characterize dump-site5. Determine potential impacts and prepare impact hypothesis(es)6. Issue permit7. Implement project and monitor compliance8. Field monitoring and assessment (monitoring)

Page 5: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Dre

dged

Mat

eria

l Ass

essm

ent F

ram

ewor

k

DETE

RM

INE

PO

TEN

TIA

L

IMP

AC

TS A

ND

PR

EP

AR

EIM

PA

CT

HY

PO

THE

S(I/

E)S

IDEN

TIFY

AN

D C

HA

RA

CTE

RIZ

E

DIS

PO

SA

L S

ITE

IS M

ATE

RIA

L

AC

CE

PTA

BLE

?

BEN

EFI

CIA

L U

SE

PO

SS

IBLE

?

FIELD

MO

NIT

OR

ING

& A

SS

ES

SM

EN

T

IMP

LEM

EN

T P

RO

JEC

T &

MO

NIT

OR

CO

MP

LIA

NC

E

DRE

DG

ED

MA

TER

IAL

CH

AR

AC

TER

IZA

TIO

N

ISSU

E P

ER

MIT

?

CAN

MA

TER

IAL

BE

MA

DE

A

CC

EP

TAB

LE?

SO

UR

CE

CO

NTR

OL

OTH

ER

BE

NE

FIC

IAL

US

E

NEE

D F

OR

DR

ED

GIN

G

NO

NO

NO

NO

YE

S

YE

S

YE

S

Repr

esen

tatio

n of

the

Juris

dict

iona

l Bou

ndar

y of

the

Con

vent

ion

YE

S

Page 6: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

DREDGED MATERIALCHARACTERIZATION SOURCE

CONTROL

NEED FOR DREDGING

Page 7: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

IS MATERIAL ACCEPTABLE?

BENEFICIAL USEPOSSIBLE?

CAN MATERIAL BE MADE

ACCEPTABLE?

OTHER

BENEFICIALUSE

NO

YES

NO

YES

NO

YES

Page 8: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

IDENTIFY AND CHARACTERIZE DISPOSAL SITE

DETERMINE POTENTIAL IMPACTS AND PREPARE IMPACT HYPOTHES(UE)S

NO

Page 9: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

ISSUEPERMIT? NO

YES

Page 10: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

IMPLEMENT PROJECT & MONITOR COMPLIANCE

FIELD MONITORING & ASSESSMENT

YES

Page 11: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

For dredged material, the goal of waste management should be to identify and control the sources of contamination.

SOURCE CONTROL STRATEGY1. The continuing need for dredging;2. The hazards posed by contaminants and the relative contributions of the individual sources to these hazards;3. Existing source control programmes and other regulations or legal requirements;4. Technical and economic feasibility;5. The evaluation of the effectiveness of measures taken; and6. Consequences of not implementing contaminant reduction.

Waste Prevention Audit

Page 12: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Reduce or control impacts to a level that will not constitute unacceptable risks

• Treatment

• Disposal management techniques

• Methods of containing dredged material in a stable manner

• The practical availability of other means of disposal should be considered in the light of a comparative risk assessment involving both dumping and the alternatives

Management Options

Page 13: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Physical characterization• The basic physical characteristics required are the amount of material

Exemptions from detailed characterization• Dredged material is excavated from a site away from existing and historical sources of appreciable pollution, so as to provide reasonable assurance that the• dredged material has not been contaminated, or• dredged material is composed predominantly of sand, gravel and/or rock, or• dredged material is composed of previously undisturbed geological materials.

Dredged Material Characterization

Page 14: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Available information

• Geochemical characteristic

•Contaminant routes /sources

Chemical Characterization

Page 15: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Biological tests should incorporate:

• Acute toxicity

• Chronic toxicity and sub-lethal effects

• The potential for bioaccumulation

• The potential for tainting

at and in the vicinity of the disposal site.

Biological Characterization

Page 16: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Chemical and/or biological screening resulting in:- Wastes containing specified substances, or causing biological responses, exceeding the relevant upper level

shall not be dumped, unless made acceptable.

- Wastes which contain specified substances, or which cause biological responses, below the relevant lower levels should be considered to be of little environmental concern.

- Wastes, which contain specified substances, or which cause biological responses, below the upper level but above the lower level require more detailed assessment before their suitability for dumping can be determined.

Action List

Page 17: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Site Selection Considerations:• Physical, chemical and biological characteristics of the water-column and the seabed

• Location of amenities, values and other uses of the sea in the area under consideration

• Assessment of the constituent fluxes associated with dumping in relation to existing fluxes of substances in the marine environment

• Economic and operational feasibility

Dump-Site Selection

Page 18: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• The shoreline and bathing beaches• Areas of beauty or significant cultural or historical importance• Areas of special scientific or biological importance, such as sanctuaries• Fishing areas• Spawning, nursery and recruitment areas• Migration routes• Seasonal and critical habitats• Shipping lanes• Military exclusion zones• Engineering uses of the seafloor

Important Amenities, Biological Features and Uses of the Sea

Page 19: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Size of the dump-site

• Site capacity

• Evaluation of potential impacts

• Contaminant mobility

Site Selection Consideration

Page 20: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Impact hypothesis

• Integrate waste characteristics / site information

• Comprehensive assessment

• Emphasis on biological effects / habitat modification

• Cumulative impacts

Assessment of Potential Effects

Page 21: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Compliance monitoring,Field monitoring•Modify or terminate the field-monitoring programme

•Modify or revoke the permit

•Redefine or close the dump-site

•Modify the assessment basis

Monitoring

Page 22: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• The types, amounts and sources of materials to be dumped

• The location of the dump-site(s)

• The method of dumping

• Monitoring and reporting requirements

Permit and Permit Conditions

Page 23: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Assessment framework (LC)

• Material characterization

• Sustainable relocation

International NavigationAssociation PIANC

Dredged Material Management Guide(Supplement to Bulletin no. 96, 1987

Page 24: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Management options

• Contamination source control

• Management strategy

• Relevant background literature

Page 25: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Aquatic (LC guides)

• Land-based confined disposal- Contaminant release mechanisms- Processes- Pathways- Isolation- Surplus water treatment

Disposal

Page 26: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Implementation guidelines

• Monitoring (physical and environmental)

• Evaluation

• Optimization

Confined Disposal Site Management

Page 27: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Pretreatment

• Biological

• Chemical

• Thermal

• Immobilization

Treatment

Page 28: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Beneficial or adverse

• Long- or short-term

• Direct or indirect

• Reversible or irreversible

• Local or strategic

• Independent or cumulative

Impact Assessment

Page 29: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Specification of baseline conditions

• Port operational monitoring

Monitoring

Page 30: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

International NavigationAssociation

PIANC

Management of AquaticDisposal of Dredged Material

(Working Group 1 - 1998)

Page 31: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

1. Introduction2. Management framework3. Dredged material and site characterization

Outline

• Survey and sampling methods• Dredged material characterization

- Physical- Chemical- Ecotoxicological- Biological

Page 32: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Outline (cont.)

• Characterization of disposal site- Physical- Chemical- Biological- Functional uses of receiving area

Page 33: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Outline (cont.)

• Effects of disposal- Physical processes- Physical effects on ecology- Chemical and ecotoxicological- Functional uses / amenities

Page 34: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Outline (cont.)

• International, regional and National environmental controls- General approaches- Marine and estuarine disposal- Inland waterways disposal

Page 35: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Planning and engineering for aquatic disposal- Regulatory decision framework- Technical decision framework- Project decision framework

Page 36: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• Operational aspects of aquatic disposal- Operations plan- Monitoring requirements

Page 37: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• References

• Annexes- Description of physical properties of dredged material- Metals in sediments- List of international agreements, protocols and guidelines- Beneficial uses of dredged material in the aquatic environment- Mitigation measures- Consideration in design of monitoring plans

Page 38: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Managing ContaminatedDredged Material

• Defining CDM

• Risks

• Chemical characteristics and sources

Page 39: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Identifying, Assessing, andSelecting Options

• Planning CDM projects

• State-of-the-art technologies

• PIANC technical position

• Documenting results with case studies

Page 40: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Dredging: The Environmental Facts

Where to Find What You Need to Know

• Dredging a vital process

• Dredging for sustainable development

• Dredging must be safe and sound

Page 41: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

Sources of Information

• CEDA

• IADC

• WODA

• PIANC

• IAPH

• WEDA

• EDA

Page 42: London Convention Guidelines  for Assessment of  Dredged Material PIANC-Dredged Material

• CEDA

• IAPH

• WEDA

• EDA