Dredged material treatment and disposal facilities

22
Heinz-Dieter Detzner Dredged Material Treatment and Disposal Facilities SedNet Special Session: Managing the Elbe Estuary 9 th October 2009

Transcript of Dredged material treatment and disposal facilities

Page 1: Dredged material treatment and disposal facilities

Heinz-Dieter Detzner

Dredged Material Treatment and Disposal Facilities SedNet Special Session:Managing the Elbe Estuary

9th October 2009

Page 2: Dredged material treatment and disposal facilities

Dredged Material Management

2Heinz-Dieter Detzner

E L B E

Dewatering Fields

Sand andSealing-material

CeramicProducts

METHAFeldhofe

Francop

Effluent

RelocationRelocation

TreatmentTreatment

Beneficial UseBeneficial Use

DisposalDisposalDredging ServiceDredging Service

AvoidanceAvoidanceHarbour

JV

EELLBBEE

Page 3: Dredged material treatment and disposal facilities

Sites for Dredged Material Treatment

3Heinz-Dieter Detzner

METHA

Treatment Facility

Disposal Site

Page 4: Dredged material treatment and disposal facilities

Why Need We Dredged Material Separation?

4Heinz-Dieter Detzner

in %

in %

CadmiumCadmium

002525

45456363

9090125125

180180250250

d in d in µµmm

100100

9090

8080

7070

6060

5050

4040

3030

2020

1010

00

LeadLead

002525

45456363

9090125125

180180250250

d in d in µµmm

100100

9090

8080

7070

6060

5050

4040

3030

2020

1010

00

in %

in %

CopperCopper

002525

45456363

9090125125

180180250250

d in d in µµmm

100100

9090

8080

7070

6060

5050

4040

3030

2020

1010

00

in %

in %

Page 5: Dredged material treatment and disposal facilities

Treatment – Dewatering Fields Moorburg

5Heinz-Dieter Detzner

Page 6: Dredged material treatment and disposal facilities

Operation Principle of the Dewatering Fields

6Heinz-Dieter Detzner

Drainage PipesDrainage PipesSilt SuspensionSilt Suspension

Settled SiltSettled Silt

Silt SealingSilt Sealing

Transport to theTransport to theSilt Deposit Silt Deposit

•• Area size of dewatering fields:Area size of dewatering fields: about 100 ha about 100 ha

•• Field size: 2 Field size: 2 -- 4 ha4 ha

•• Annual throughput:Annual throughput: 200.000 200.000 –– 300.000 m300.000 m³³

Page 7: Dredged material treatment and disposal facilities

Operation of the Dewatering Fields

7Heinz-Dieter Detzner

Dewatered Material readyDewatered Material ready for beneficial use orfor beneficial use or disposaldisposal

Handling of the material in Handling of the material in the beginning of the processthe beginning of the process

Page 8: Dredged material treatment and disposal facilities

Treatment – METHA Plant

8Heinz-Dieter Detzner

Page 9: Dredged material treatment and disposal facilities

Principle Flowsheet of the METHA Plant - Sorting and Separation

9Heinz-Dieter Detzner

Dredged Dredged MaterialMaterial

Stock basinStock basin

Cutter withCutter withprepre--screeningscreening

Coarse fractionCoarse fraction

Rotary screenRotary screen (10 mm)(10 mm)

SandSand Fine sandFine sand

Hydro cyclonesHydro cyclones(63 (63 µµm stage)m stage)

UpstreamUpstreamcurrentcurrentclassifierclassifier

SandSandDewateringDewateringscreenscreen

HydroHydro--cyclonescyclones(20 (20 µµm stage)m stage)

SpiralsSpirals

VacuumVacuumdewateringdewateringbeltbelt

Page 10: Dredged material treatment and disposal facilities

Main Components of the METHA Plant - Sorting and Separation

10Heinz-Dieter Detzner

Rotary screen (10 mm)Rotary screen (10 mm)

HydroHydro--cyclones (63 cyclones (63 µµm)m)

HydroHydro-- cyclone cyclone (20 (20 µµm)m)

Upstream Upstream currentcurrentclassifierclassifier

SpiralsSpirals

Page 11: Dredged material treatment and disposal facilities

Principle Flowsheet of the METHA Plant - Dewatering

11Heinz-Dieter Detzner

SiltSilt

ThickenerThickener

Agitated stock tankAgitated stock tank

Waste waterWaste waterTreatmentTreatment

DewateringDewatering1st stage1st stage

Screen belt pressScreen belt press DewateringDewatering2nd stage2nd stage

High pressureHigh pressurebelt pressbelt press

DewateringDewateringMembrane chamberMembrane chamber

filter pressfilter press

Page 12: Dredged material treatment and disposal facilities

Main Components of the METHA Plant - Dewatering

12Heinz-Dieter Detzner

High pressure High pressure belt pressbelt press

Membrane chamberMembrane chamberfilter pressfilter press

Filter belt pressFilter belt press

Page 13: Dredged material treatment and disposal facilities

Facts and Figures of the METHA Plant

13Heinz-Dieter Detzner

•• Development of the technology: 1987 Development of the technology: 1987 -- 1992 1992

•• CommissioningCommissioning: March 1993March 1993

•• Annual throughput: about 900.000 mAnnual throughput: about 900.000 m³³ ≅

450.000 tDS

•• Investment costs: about 70.000.000 Investment costs: about 70.000.000 €€ (1993)(1993)

•• Operation costs: about 13.000.000 Operation costs: about 13.000.000 €€/a/a 3.800.000 3.800.000 €€/a (Process)/a (Process) 4.000.000 4.000.000 €€/a (Staff)/a (Staff) 5.000.000 5.000.000 €€/a (Depreciation /a (Depreciation & DebtDebt ServicesServices))

•• Staff: 96 Staff: 96 employeesemployees

Until today the METHA plant is the largest dredged material Until today the METHA plant is the largest dredged material treatment plant worldwide treatment plant worldwide

Page 14: Dredged material treatment and disposal facilities

Sites for Dredged Material Treatment

14Heinz-Dieter Detzner

METHA

Treatment Facility

Disposal Site

Page 15: Dredged material treatment and disposal facilities

Disposal – Francop Disposal Site

15Heinz-Dieter Detzner

•• Area size:Area size: about 100 ha about 100 ha

•• Total capacity:Total capacity: 9.000.000 m9.000.000 m³³

•• Annual capacity:Annual capacity: 200.000 200.000 –– 400.000 m400.000 m³³

•• Installation Operation:Installation Operation: until 2013until 2013

•• Continued use:Continued use: Public ParkPublic Park

20072007

Page 16: Dredged material treatment and disposal facilities

Disposal – Feldhofe Disposal Site

16Heinz-Dieter Detzner

•• Area size:Area size: about 80 ha about 80 ha

•• Total capacity:Total capacity: 9.000.000 m9.000.000 m³³

•• Annual capacity:Annual capacity: 400.000 m400.000 m³³

•• Installation Operation:Installation Operation: until 2025until 2025

•• Continued use:Continued use: Public ParkPublic Park

20072007

Page 17: Dredged material treatment and disposal facilities

Construction Principle - Francop Disposal Site

17Heinz-Dieter Detzner

ClayClay

Alternating Layers Alternating Layers of Silt and Sandof Silt and Sand

Surface SealingSurface Sealingand Cover Systemand Cover System

Old Flushing FieldOld Flushing FieldEdgeEdge

SupportSupport

Intermediate Intermediate SealingSealing

Base SealingBase Sealing

500 m500 m

38 m38 m

Page 18: Dredged material treatment and disposal facilities

Construction Principle - Francop Disposal Site

18Heinz-Dieter Detzner

Edge Support Structure with Drainage SystemEdge Support Structure with Drainage System

Edge SupportEdge Support

Control Shaft withControl Shaft withCircle PipelineCircle Pipeline

ShaftShaft

Drainage LayerDrainage Layer

Page 19: Dredged material treatment and disposal facilities

Construction Principle - Francop Disposal Site

19Heinz-Dieter Detzner

Surface Cover SystemSurface Cover System

Cultivable SoilCultivable Soil

Drainage LayerDrainage Layer

Upper SealingUpper Sealing(3 Layers of Silt)(3 Layers of Silt)

0

1

2

3

4m

HDPEHDPE--Liner 2,5 mmLiner 2,5 mm

Base SealingBase Sealing( 3 Layers of Silt)( 3 Layers of Silt)

Drainage LayersDrainage Layers

0,6

2,1m

BaseBase SealingSealing

Page 20: Dredged material treatment and disposal facilities

Disposal – Monitoring Program

20Heinz-Dieter Detzner

NoiseNoise

DustDustGasGas

VegetationVegetation

Ground WaterGround Water

Page 21: Dredged material treatment and disposal facilities

Dredged Material - Beneficial Use

21Heinz-Dieter Detzner

Refilling ofRefilling of harbour basinsharbour basins

BricksBricks

Leight weight pelletsLeight weight pellets

Dike constructionDike construction

Page 22: Dredged material treatment and disposal facilities

22Heinz-Dieter Detzner

Contacts

HPA Hamburg Port Authority AHPA Hamburg Port Authority AööRRNeuer Wandrahm 4Neuer Wandrahm 4

20457 Hamburg20457 Hamburg

www.hamburgwww.hamburg--portport--authority.deauthority.de

HeinzHeinz--Dieter DetznerDieter DetznerTel.: +49 40 42847Tel.: +49 40 42847--23872387EE--Mail: HeinzMail: [email protected]@hpa.hamburg.de

Thank you for your attention!