19
Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By Greg Kennedy

Transcript of Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.:...

Page 1: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Kissimmee River Restoration Contract 13B

Florida Department of Environmental Protection Permit No.: EI 0272794-001

Aerial Photos Taken April 1, 2009By Greg Kennedy

Page 2: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

C-38

Spoil Mound B North

Northern Extent of C-38 Backfill for the 13-B Contract

Bypass Flow Way now drying due to flow

returning to the Historic and newly excavated Kissimmee Channel

Page 3: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Northern Extent of C-38 Backfill for the 13-B Contract

Culvert Crossing Washed Out During Initial Flows to the Restored Oxbows

Direction of Flow

Page 4: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Spoil Mound B North

C-38 To Be Filled

Restored Section of the Oxbow

Page 5: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Bypass Flow Way

Spoil Mound B North

Backfilled C-38

Restored Oxbow

Page 6: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Backfilled C-38

Drying Bypass Flow Way

C-38 To Be Backfilled

Restored Oxbow

Page 7: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Restored Oxbow

Spoil Mound B SouthC-38 To Be Backfilled

Page 8: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Spoil mound B South

C-38 To Be Backfilled

Bypass Flow Way

Restored Oxbow

Page 9: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Spoil Mound B South

Restored Oxbows

Bypass Flow Way

Page 10: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Spoil Mound B South

Partially Filled C-38

Restored Oxbows

Page 11: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Drying Bypass Flow Way

Partially Filled C-38

Restored Oxbow

Plugged C-38

Page 12: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Substantially Degraded Spoil Mound B South

Page 13: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Degraded Portion of Spoil Mound B South

Page 14: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Dredging of Historic Oxbow

Degraded Portion of Spoil Mound B South

Partially Filled C-38

Page 15: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Historic River Channel Being Dredged to Design Depth

Turbidity Generated from the Cutter Head on the Dredge

Note: The Plume Moving Up River Indicating an Absence of Flow

Page 16: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

All oxbows visible in this photograph were excavated from former Kissimmee River Marsh

Partially Filled C-38

Page 17: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Partially Filled C-38

Newly Excavated Oxbows

Page 18: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Substantially Filled C-38

Newly Created Oxbows

Page 19: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By.

Southern Limit of Contract 13B and Northern Limit of Contract 13A

Limit of Newly Excavated Oxbows as part of Contract 13B

Oxbow Excavated as Part of Contract 13A

Filled C-38