TECHNICAL PAPERS Environmental Aspects of Mine Closure and Abandoned Mine Sites Remediation in Germany Dipl.-Ing. Johannes Pastor Head of Division Soil Conservation Legislation Germany

Transcript of Johannes_P.pdf

Page 1: Johannes_P.pdf

TECHNICAL PAPERS

Environmental Aspects of Mine Closure and Abandoned Mine Sites Remediation in Germany

Dipl.-Ing. Johannes PastorHead of Division

Soil Conservation LegislationGermany

Page 3: Johannes_P.pdf

Lignite mining areas in Germany

Page 4: Johannes_P.pdf

Lignite mining areas in East Germany

Central Eastern German miningareaaround 40,000 ha

Lausitz miningareaaround 60,000 ha

Page 5: Johannes_P.pdf

Geotechnical work on worked-outopen casts Earth mass movements

Page 6: Johannes_P.pdf

Lignite opencast mine BerzdorfFinal stage

Page 7: Johannes_P.pdf

Major tasks duringrehabilitation

Mining engineering rehabilitationSlope design and securing, massmovements, securing the subsoil,

levelling off

Page 8: Johannes_P.pdf

Securing former waste heapsHeavy duty equipment / Soil

engineering

Mass movements withopencast mining equipment

Mass movements with mobile soil engineering equipment

Mass movements withmobile soil engineering

equipment

Page 9: Johannes_P.pdf

SlopeSlope designdesign and and massmassmovementsmovements

Esch10/70

Use of Esch 10/70 (walkingexcavator)Shaping remaining natural

slopes, levelling out in the areasto be filled with water up to > 2 m below future final water levelUse for lateral and vertical

worksTotal volume of earth

movements:around 6 million m³

Page 10: Johannes_P.pdf

Major tasks duringrehabilitation

Rehabilitation of existing pollutionsDismantling / scrapping, deconstruction / dismantling, reuse / disposal

Page 11: Johannes_P.pdf

Rehabilitation of pollutant depositsand contaminated soil

Page 12: Johannes_P.pdf

Blasting, deconstruction and demolition

Blasting of the central power station Demolition of power stations

Deconstruction of tar settling basin Demolition of dephenolising plant

Page 13: Johannes_P.pdf

Major tasks duringrehabilitation

RevegetationRehabilitate land foragricultural, forestry and restoration purposes

Page 14: Johannes_P.pdf

Major tasks duringrehabilitation

Flooding / WaterManagementFlooding of worked-out opencasts, design of receivingwaters, improvement of water quality

Page 15: Johannes_P.pdf

Visions become reality

Aqua Casa on the peninsulaWater runway Welzow Tourist boatHafen Großräschen (IBA)Port Großräschen (IBA)

Großräschen

EuroSpeedwayLausitz Lausitz-Industrial Park Marga Nature park TERRA NOVAFloating homes Hoyerswerda

Senftenberg

Schwarze Pumpe

Page 16: Johannes_P.pdf

Opencast mine WitznitzLake Witznitz

Opencast mine ZwenkauLake Zwenkau

Opencast mine EspenhainLake Markkleeberg

Opencast mine NachterstedtLake Concordia

Opencast mine Delitzsch SWLake Gremmin See

Opencast mine BreitenfeldLake Schladitz

Opencast mine MüchelnLake Geisel valley

Opencast mine GröbernLake Gröbern

Opencast mine BockwitzLake Bockwitz

Page 17: Johannes_P.pdf

Car Car racingracing on on formerformer wastewasteheapheap areaarea

Euro-Speedway Lausitzring

Page 18: Johannes_P.pdf

Construction of Europe‘s most modern whitewater canoe course in 2006/07

Page 19: Johannes_P.pdf

Official opening of solar power station Borna on LMBV area in 2006

Page 20: Johannes_P.pdf

Former opencast mine Mücheln –Geisel valley - vintage