Indeck Overview May 2011 Capex (2)
Transcript of Indeck Overview May 2011 Capex (2)
![Page 1: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/1.jpg)
Energy for Generations©
Presentation
May 2011
![Page 2: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/2.jpg)
Insight. Inspiration. Independence. 22
Indeck Energy Services, Inc.
• Formed in 1985 from Indeck Power Equipment Company
• Part of the Indeck Group of Companies• Indeck Energy Services, Inc.• Indeck Operations, Inc.• Indeck Power Equipment Company• Indeck Boiler Company• Indeck Keystone Energy, LLC
![Page 3: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/3.jpg)
Insight. Inspiration. Independence. 33
Indeck Energy Services, Inc.
• Developer, owner and operator of power and biofuels projects• Power generation - 3,000 MW internationally• Ethanol and biodiesel - 755 million gal/yr
production• Biomass pellet production -90,000 tons/yr
• Prefer build, own, operate• Flexible - partners
![Page 4: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/4.jpg)
Insight. Inspiration. Independence. 44
Indeck Energy Services, Inc.
• Employee skill sets• Developers• Engineers• Financiers• Procurement• Construction Managers• Asset Management• Operators
• Flat organization
![Page 5: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/5.jpg)
Insight. Inspiration. Independence. 55
Conventional Power Projects
Facility Location Technology Capacity
Commercial Operation Status
FSC Paper Alsip, IL Gas Combined Cycle 9 MW 1987 Sold
Turners Falls Turners Falls, MA Coal Stoker 20 MW 1989 Sold
Yerkes Tonawanda, NY Gas Combined Cycle 53 MW 1990 Operating
Oswego Oswego, NY Gas Combined Cycle 50 MW 1990 Operating
Silver Springs Silver Springs, NY Gas Combined Cycle 55 MW 1991 Operating
Ilion Ilion, NY Gas Combined Cycle 58 MW 1993 Sold
Olean Olean, NY Gas Combined Cycle 79 MW 1994 Operating
Corinth Corinth, NY Gas Combined Cycle 128 MW 1995 Operating
Escuintla Escuintla, GUA Reciprocating Engine 40 MW 1996 Sold
Enfield London, UK Gas Combined Cycle 380 MW 1999 Sold
Rockford I Rockford, IL Gas Simple Cycle 300 MW 2000 Sold
Rockford II Rockford, IL Gas Simple Cycle 150 MW 2002 Sold
Bourbonnais Bourbonnais, IL Gas Combined Cycle 1,682 MW Development Sold
![Page 6: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/6.jpg)
Insight. Inspiration. Independence. 66
Enfield Energy Centre, UK
380 MWCombined
Cycle
Single Shaft
![Page 7: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/7.jpg)
Insight. Inspiration. Independence. 77
Rockford Energy Center
300 MWSimple Cycle
![Page 8: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/8.jpg)
Insight. Inspiration. Independence. 88
Alternative Power Projects
Facility Location Technology CapacityCommercialOperation Status
West Enfield West Enfield, ME Biomass C.F.B. 25 MW 1987 Sold
Jonesboro Jonesboro, ME Biomass C.F.B. 25 MW 1987 Sold
Alexandria Alexandria, NH Biomass Stoker 16 MW 1988 Operating
Senneterre Quebec, Canada Biomass Stoker 25 MW Development Sold
West Enfield Hydro
West Enfield, ME Run of River 13 MW 1988 Sold
![Page 9: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/9.jpg)
Insight. Inspiration. Independence. 99
Indeck-JonesboroEnergy Center
25 MW CFB
Wood-firedBiomass
![Page 10: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/10.jpg)
Insight. Inspiration. Independence. 1010
Indeck OperationsOperating Record
• Operator of 850 MW of generation in both merchant markets and under long-term PPAs
• Plant availability consistently exceeds industry averages
• Efficient plant staffing levels• Proven plant safety programs
![Page 11: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/11.jpg)
Insight. Inspiration. Independence. 1111
Ethanol and Biodiesel Development and Investment
• Equity positions representing 755 million gallons per year of production• Twelve ethanol facilities• One biodiesel facility
• Active investor • Boilers for steam and emissions control• Permitted and development of two facilities
![Page 12: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/12.jpg)
Insight. Inspiration. Independence. 1212
Indeck Ethanol andBiodiesel Projects
FacilityLocation
Capacity(Gallons/Year)
CommercialOperation Status
Little Sioux Corn Processors Marcus, IA 50 Million 2003 Operating
KAAPA Ethanol Kearney, NE 60 Million 2003 Operating
Lincolnland Agri-Energy, LLC Robinson, IL 45 Million 2004 Operating
Big River Ethanol West Burlington, IA 100 Million 2004 Operating
Platte Valley Ethanol Central City, NE 40 Million 2004 Sold
United Wisconsin Grain Producers
Friesland, WI 45 Million 2005 Operating
Granite Falls Ethanol Granite Falls, MN 40 Million 2006 Operating
Iroquois Bioenergy Rensselaer, IN 40 Million 2006 Sold
Western Wisconsin Energy Boyceville, WI 40 Million 2006 Operating
![Page 13: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/13.jpg)
Insight. Inspiration. Independence. 1313
Indeck Ethanol andBiodiesel Projects
Facility Location Capacity(Gallons/Year)
CommercialOperation Status
Cardinal Ethanol Winchester, IN 100 Million 2008 Operating
Blackhawk Biofuels, LLC Danville, IL 45 Million 2009 Operating
Big River Development Various, IA 100 Million Various Development
Highwater Ethanol Lamberton, MN 50 Million 2009 Operating
Total Annual Production 295 Million
![Page 14: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/14.jpg)
Insight. Inspiration. Independence. 1414
Lincolnland Agri-Energy, LLC
45 MMGPYEthanol
Co-Developer& Largest
Shareholder
![Page 15: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/15.jpg)
Insight. Inspiration. Independence. 1515
Biomass Pellet Production Development
• 90,000 tons/yr capacity• Bagged and bulk
product• Residential and
industrial grades• 100% of feedstock from
sustainable forestry practices
• CN rail access
![Page 16: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/16.jpg)
Insight. Inspiration. Independence. 1616
Indeck Biomass Pellet Production Projects
Facility Location
Capacity(Tons/Year)
CommercialOperation Status
Ladysmith BioFuel Center Ladysmith, WI 90 Thousand 2009 Operating
Magnolia BioFuel Center Magnolia, MS 90 Thousand Q4 2011 Development
Total Annual Production 180 Thousand
![Page 17: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/17.jpg)
Insight. Inspiration. Independence. 1717
Current Developments
• Electricity• Wind• Solar PV• Natural Gas
• Biofuels• Co-firing
![Page 18: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/18.jpg)
Insight. Inspiration. Independence. 1818
Wind• Mid to Late Stage
• Wildcat• Phase 1: 50 MW; 54.4% NCF• $100 MM Total Project Costs• Build-out to 200 MW total• South Central Kansas• Market: SPP participants, electric
cooperatives• Donica Creek
• 100 MW; 42.5% NCF• $190 MM Total Project Costs• East Central Illinois• Market: MISO participants, electric
cooperatives
• Early Stage• Minnesota Site
• Up to 300 MW; ~45% NCF• $570 MM Total Project Costs• Minnesota• Market: MISO participants, electric
cooperatives
![Page 19: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/19.jpg)
Insight. Inspiration. Independence. 1919
Solar PV• Mid to Late Stage
• Tonopah• 16 MW; 28.4% NCF• $65 MM Total Project Costs• Central Nevada• Market: NV Energy, California
• Yuba• 20 MW; 25.5% NCF• $85 MM Total Project Costs• Northern California• Market: PG&E territory, CAISO,
WAPA, NCPA, SMUD, CA Muni’s
• Early Stage• PJM Sites
• Up to 20 MW• $85 MM Total Project Costs• Within the PJM footprint; desktop review• Market: PJM participants
![Page 20: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/20.jpg)
Insight. Inspiration. Independence. 2020
Natural Gas• Early Stage• Multiple Sites
• Grid connected• Peaking to Base Load• Market: Confidential
![Page 21: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/21.jpg)
Insight. Inspiration. Independence. 2121
Co-firing• Coal Co-firing Market
Development• Wood Pellets• Hybrid Pellets• Market: Midwest Coal-
fired Boilers
![Page 22: Indeck Overview May 2011 Capex (2)](https://reader035.fdocuments.net/reader035/viewer/2022070322/5592c4b31a28abd10f8b46fe/html5/thumbnails/22.jpg)
Insight. Inspiration. Independence. 2222
Indeck Energy Services, Inc.
Energy for Generations©
For more information please visit us at:
www.indeckenergy.com