Deerwood capex

download Deerwood capex

of 16

  • date post

    01-Mar-2016
  • Category

    Documents

  • view

    217
  • download

    0

Embed Size (px)

description

Deerwood capex

Transcript of Deerwood capex

  • - - ~,:

    V JLNC.

    Deerwood Meadows

    2012- CapEx

  • Deerwood Meadows Capital 2011

    Project description

    Refinish pool Furniture

    Asphalt repairs 20 areas-900 sq yd including potholes

    Sidewalk repairs and trip hazards

    Replace back pool fence

    lowest bid

    $7,024.36

    $37,800.00

    $4,780.00

    $8,400.00

  • Patio Options

    11909 Straight-A-Way LaneRaleigh NC 27613(919)676-7660Tax ID #56-1677278

    NAME/ADDRESS

    Deerwood Meadows Bus. OfficeAttn: Property Mng5855 Old Oak Ridge RdGreensboro NC 27410

    EstimateDATE

    8/25/2011

    ESTIMATE #

    7563

    ITEM

    jOunge Refurbish

    Chair Refurbish

    CC#OFRTL100

    CC#A-T 48 F/G

    Misc

    CC#200H

    Freight

    Budget

    DESCRIPTION

    TOTAL Refurbish/Repaint and Restrap of Lounge OFRVL100. Includes replacing adjusters and plastic feetinserts where needed ADD $1 8 for Cross weave

    OFR VC100 TOTAL Refurbish/Repaint and Restrap ofDining Chair OFR VC100. Includes plastic feet insertswhere needed ADD $10.00 for Cross weave

    Complete Refmish of Table 30" or Greater withFiberglass Top. Includes new Glides and Feet as needed.

    48" Fiberglass replacement table top IF NEWNEEDED

    Tax on materials only

    Dining Chair Horizontal Strapping Stackable

    Freight Pick up and Delivery

    Due to the potential of next year's price increase allow fora 8% increase in this year's pricesSales Tax

    QTY

    36

    8

    6

    6

    16

    PROJECT

    COST

    89.00

    59.00

    49.00

    12000

    200.98

    76.00

    230.00

    506.96

    6.75%

    TOTAL

    3,204.00

    472.00

    294.00

    720. GOT

    200.98

    1,216. DOT

    230.00T

    506. 96T

    180.42

    PLEASE REVIEW AND EMAIL TO Tf^-T A 1PATIO9@AOL.COM TOTAL $7,024.36

  • Benefits of RefinishingChange and update your colorschemes and styles without buyingnew furniture.

    Refinished furniture looks and lastslike new at a fraction of the cost.

    Create a uniform look across yourentire pool deck.

    Dramatically improve thesatisfaction and experience of yourmembers.

    Furniture is picked up and returnedto your facility at a nominal cost.

    Easy start up next season - furnitureis shrink wrapped for storage andready to go.

    our trucks:

    to. .. i ii. i ..insure its proper handling. Furniture

    will be picked up at your location andtransported to our facility where we haveall the tools to do the job right. Uponcompletion, your order will be shrinkwrapped and returned to you by ourtrucks ready to be stored or returned toyour pool deck.

    DM. MERC [A! R./ -

    STEP ONE:

    Remove old vinyl strapsand plastic wear parts.

    STEP TWO:

    Examine for structural integrity.Replace pivots, bolts and spacers.

    STEP THREE:

    Straighten and re-weld frames.

    STEP FOUR:

    Remove old finish by sandblasting.

    STEP FIVE:

    Powder coat finish electrostaticallyapplied and baked on.

    Re-strap with 100% virgin vinyl inany of 52 different

    STEP SEVEN:

    Refinished furniture is wrappedand ready for delivery.

    One of the largest refinishers of vinyl strapped aluminum furniture on the east coast.

  • it ' , Y~>.A"If K- f 'lw,/ f f ,MX } f^ I J, t

  • CAROLINA PAVEMENT PROPOSAL

    209 Devonhall LaneGary, NC 27518(919)303-7680Fax: (919)363-7680

    Date

    8/19/2011

    Estimate #

    6691

    Name / Address

    CORE Real Estate Management Group5855 Old Oak Ridge RoadGreensboro, NC 27410

    Project

    Deerwood Apartments

    DescriptionAsphalt Repairs (20 Areas - 900 SY including pot holes, alligator surfaces,pavement slippage, oil damage pavement and pumping pavement). Sawcutdamaged asphalt and remove to depth 4". Dispose of debris. Compactsub-base. Replace with 2" of Heavy Duty Binder and 2" of 12 Hot Mix Asphalt.Roll Smooth.

    One Year Warranty on All Services.

    Total37,800.00

    Total $37,800.00

    ACCEPTANCE OF PROPOSAL

    Please note, any alteration or deviation from the specification involving extra costs will be executed onlyby written orders, and will become an extra charge over and above the price contained in this proposal.

    Our proposal may be withdrawn if not accepted within 30 days.

    The terms, conditions, specifications and estimate as detailed are satisfactory and are accepted. You areauthorized to do the work as specified. Payment will be made in full within 30 days of receipt of invoice.

    Signature: Date:

  • Page 1 of 1

    deerwood manager

    From: Marc Jean [mjean@gconstruction.com] Sent: Thu 8/25/2011 9:16 AMTo: deerwood managerCc:

    Subject: SIDEWALK TRIP HAZARD BIDAttachments:

    GOOD MORNING JOY,

    REMOVE AND REPLACE SIDEWALK SECTIONS DUE TO TRIP HAZARDS OR CRACKED CONCRETE AT THE FOLLOWIILOCATIONS1206,2101,2301,2306,4203,4303,4305,2500,3001,3101,3103,3306,3307.REPAIR CONCRETE CURBS AT BUILDING 2100-2103-2105. $4,780.00

    THIS BID IS VALID FOR 30 DAYS ONLY.

    THANK YOU

    MARC JEANGENERATION CONSTRUCTION1615-A HOLBROOK ST.GREENSBORO, NC 27403336-525-5112 DIRECT909-900-3900 CELL336-547-0209 FAX

    Privileged and/or confidential information may be contained in this message. If you are not the addreindicated in this message (or are not responsible for delivery of this message to that person) , you maor deliver this message to anyone. In such case, you should destroy this message and notify the sende-mail.If you or your employer do not consent to Internet e-mail for messages of this kind, please advise theGeneration Construction, Inc. does not provide or endorse any opinions, conclusions or other informthis message that do not relate to the official business of the company or its subsidiaries.

    http://mail.corerealtyholdings.com/exchange/dmanager/Inbox/SIDEWALK%20TRIP%20... 8/26/2011

  • 1

  • ALLSOUTHRENFOVATIONTS

    BID PROPOSAL FORDeerwood Meadows Apartments

    Greensboro, NC

    Submitted to: Core RealtyAttention: Ms. Joy CollinsDate: 9/12/11

    We hereby propose to furnish all the material and labor necessary for the Fabrication & installation of poolfence per the scope of work/drawing attached. Allsouth Renovations, Inc. proposes to furnish the labor,insurance, materials and supervision to complete the attached scope of work.

    Quotation - $ 8.400.00

    > R & R pool fence & four foot gate w/ 5' powder coated fence per attached drawing> Furnish & install gate w/magna latch per local codes> All work to meet local & state codes

    SCOPE OF WORKProvide materials and labor to complete all renovations per scope of work. Any hidden damage orwork not listed will be considered additional work and will be negotiated before work commences.All work will be completed in a timely and professional manner as to conform to Industry standards.Allsouth will warranty all work for a period of one year.The scope of work for this project is attached and an Architectural Drawing/Permits will be provided uponrequest from Owner @ cost. All work will meet Industry standards and will be performed in accordancewith the drawings and specifications submitted for the above work. Proposal may be withdrawn after thirtydays due to rising cost in raw materials & freight charges.

    Proposal Submitted By:Mark Brown- VP Operations 9/12/11

    HAVE A GREAT DAY!"CUSTOMER SATISFACTION GUARANTEED"

    Office (336)847-7232 *Fax (336)731-3670