Hamid Shoaee LCLS FAC Controls [email protected] June 17, 2008 1 LCLS Control System...

26
Hamid Shoaee LCLS FAC Controls Review [email protected] du June 17, 2008 1 LCLS Control System •Personnel •Linac & BC2 Controls progress •LTU, Dump Controls •Undulator Control System •Summary
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    219
  • download

    0

Transcript of Hamid Shoaee LCLS FAC Controls [email protected] June 17, 2008 1 LCLS Control System...

Page 1: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 20081

LCLS Control System

•Personnel

•Linac & BC2 Controls progress

•LTU, Dump Controls

•Undulator Control System

•Summary

Page 2: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 20082

New responsibilities in Controls

Enzo Carrone, the new deputy in Controls Department, is now responsible for theLCLS control system

Page 3: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 20083

Questions from Tom Himel

H1: Any new problems which have come up or items where you would like our advice

The immediate question of delivering of long term high level applications VS resource allocation to the linac upgrade… See Patrick Krejcik’s presentation

H2: MPS progress and schedule[S. Norum’s talk]

H3: A general overview of the schedule for hardware installation and software with emphasis on any problems

[E. Carrone’s talk]

H4: How is the integration of the old controls group into LCLS going?How have the layoffs and shutdown of PEP effected things?

Page 4: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 20084

Questions from Tom Himel H5: What is your situation and policy as regards hardware spares?

We have started the process of converting the old CAMAC maintenance shops to support VME and other LCLS type hardware. We are also reviewing our spares needs and developing a plan for long term inventory and maintenance.

H6: How is the high level applications infrastructure coming? What were the results of the review we suggested?[see P. Krejcik’s presentation]H7: When do you need to move away from MATLAB based feedbacks, and how is the new feedback development coming?

The plan is to test 120 Hz operation in July of 2010. We are looking at list of issues to address, including time slot feedback, etc.

BC2 Commissioning

Page 5: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 20085

LCLS MPS… [S. Norum’s talk]Great progress has been made developing the

hardware and software

Completed hardwareMPS Link ProcessorMPS Link NodeGbE SwitchesBeam Loss MonitorQADC and transition boards prototypes complete

In progressQADC currently being tested

Completed softwareEPICS PVs for fault status, bypass status and valueMachine state bufferMachine protection logic (algorithm) handlingMachine rate bufferMitigation processing

Page 6: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 20086

Undulator Magnet PS - PH4 Installation Program

54 MCORs - UND 18 QUAD 36 X/YCOR

B913 B921

45 MCORs – UND 15 QUAD 30 X/YCOR03 Intermediate PS – DUMP06 MCORs – DUMP

Page 7: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Controls Installation for LTU, Undulator, DumpControls Installation for LTU, Undulator, Dump

LTU/Und/Dump LTU/Und/Dump ControlsControls

InstallInstall

LTU/LTU/UndUndComm. Comm.

Re-Re-commission commission

Inj/BC2 to SL2Inj/BC2 to SL2

First LightFirst Lightin FEEin FEE

FEE/N

EH

In

stall

PPS C

ert

. LT

U/D

um

p

CD

-4

(7/3

1/2

01

0)

JJ FF MM AA MM JJ JJ AA SS DD JJ FF MM AA MM JJ JJ AA SS OO NN DD JJ FF MM AA MM JJ JJONAA

2008 2009 2010 2008 2009 2010Down

PPS

AAMM

Linac/BC2 Linac/BC2 CommissioninCommissionin

g g FEEFEE

CommComm. April 18, 2008

Page 8: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 20088

Remaining Controls installation benefits greatly from the injector, linac & BC2 experience

LTU Controls is similar in scope to Linac & BC2We are past the engineering learning curve with very little development remainingAlmost all procurement is complete including 100% of cable plant All IOCs and VME crates are on handThe order for over 95% of all required control modules (PLC, ADC, motion control, etc.) has been placedSome I&C rack delivery is being delayed, no impact on installationRacks are currently being loaded & tested in high bay area

Page 9: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 20089

Rack Assembly Area (B024 )

B913 & B921 PS racks

B911 & B912 PS racks

Page 10: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200810

INSTALLATION SCHEDULE

Page 11: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

PPS cable plant installation is in progress

Page 12: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200812

49  GROUND BUS 209-958-00

48   

47  NEUTRAL BUS 209-959-00

46   

45

44

43

42

41

40

39

38

37

36

35

34

33

32

 CABLE FEEDTHRU C-FEEDTHRU 31  CABLE FEEDTHRU C-FEEDTHRU   30   

29

28

27

26

25

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

 ESS POWER SUPPLY 60V/165A

(MCOR BULK PS 3 ) ESS60V165A

 BLOWER

BLOWER-2

 MCOR-12 DRIVER CHASSIS 16CH

(DUMP ) 236-251-00 BLOWER

BLOWER-2

 BLOWER

BLOWER-2  

 MCOR-12 DRIVER CHASSIS 16CH

(UND1 ) 236-251-00 BLOWER

BLOWER-2

 ESS POWER SUPPLY 60V/165A

(MCOR BULK PS 1 ) ESS60V165A

 ESS POWER SUPPLY 60V/165A

(MCOR BULK PS 2 ) ESS60V165A

 MCOR-12 DRIVER CHASSIS 16CH

(UND1 ) 236-251-00 BLOWER

BLOWER-2 MCOR-12 DRIVER CHASSIS 16CH

(UND1 ) 236-251-00

 LCLS MCOR BULK PS PLC CHASSIS

(DUMP ) 384-801

 LCLS 4-30 CIRCUIT BREAKERS

  

 LCLS MCOR BULK PS PLC CHASSIS

 LCLS 4-30 CIRCUIT BREAKERS

CIR-BREAKR

  

(UND1 ) 384-801

 AC DISTRIBUTION BOX

ACBOX

 MCOR-12 DRIVER CHASSIS 16CH

(UND1 ) 236-251-00

CIR-BREAKR  

B921-10 B921-11

Equipment Status / Rack Readiness – B921

Page 13: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200813

Schedule – B913

Page 14: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200814

Safety Systems

BCSMature designProject is on schedule

MPSConcurrently developing new LCLS MPSResponse time of less than one pulse at 120 HzNew hardware extended 1.2 km past current MPS

Non-CAMACReady for photon section

PPSThe system design is based on the extension of the injector PLC-based architectureNeed to now address the BSY area

Page 15: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200815

Undulator Motion Control Software delivered by ANL and is being checked out

Page 16: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200816

Undulator Control System is on schedule for field installation

Magnets power supply and controls in very good shapeLoaded racks are being tested in B024/B15

There is a detailed schedule covering bench testing, through field installation

Software design is mature, requires little if any changes

RF BPMs – production proceeding wellReceivers will be shipped to SLAC June-July

Timing, Vacuum, Networks are all on schedule

Wire position monitor & hydrostatic leveling system will be interfaced to the control system

Page 17: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200817

Top Level CD Org Chart

CONTROLS DEPARTMENTHEAD: SHOAEE, Hamid

SOFTWARE ENGINEERINGWILLIAMS, Ernest

LAHEY, Terri (Deputy)

ITALICS Contract Employee% Casual Employee or < 50%$ Safety Committee# On Loan

Department total = 71

CONTROLS DEPARTMENTApril 28, 2008

DEPUTYCHESTNUT, Ron

DEPUTYCARRONE, Enzo

ELECTRONICS & INSTRUMENTATION

ENGINEERINGBROWNE, Mike

New Head – TBDJOHNSON, Ron (Deputy)

ANDERSON, DavidAVELAR, Alonzo BONG, JamesBRECHIN, Vernon BROWN, R. (Vergne) CORDOVA-GRIMALDI HARMS, Michael J. HOANG, Frank NGUYEN, SonyO’NEAL, JohnSMITH, VernonTRALLER, Robert%TRUEBENBACH, John

BROWN, David G DUSATKO, John GIOUMOUSIS, AndrewMEDVEDKO, Evgeny NORUM, Stephen OLSEN, Jeff ROSS, William SMITH, Stephen YEE, ChuckYOUNG, Andrew

ENGINEERING SUPPORTTILGHMAN, Anthony

JACOB, Ralph (Deputy)

BOYSEN, Tanya $#CORVIN, Clay de SALVO, Michael LILLY, Deborah KREJCIK, Patrick

Department Office

ALARCON, ArturoBOYES, MattBROBECK, KenBURGESS, RichardCHEVTSOV, SergeiCHU, PaulDECONTRERAS, GingerFAIRLEY, Diane#GRANIERI, CharlesGRUNHAUS, ElieHALL, RobertHOOBLER, Sonya$KNOPF, JimKOTTURI, DayleLUCHINI, KristiMILLER, EdPENG, ShengROCK, JudyROGIND, DebbieSANDBOTHE, BobSCHUH, StephenSPENCER, NancyWHITE, Greg#WOODLEY, MarkZELAZNY, MikeZHOU, Jingchen

SAFETY SYSTEMS

BENNETT, BrianBONG, Patrick$BROWN, JeffreyFICKLIN, DavidHARMS, Michael G.HILL, AlanMcDONALD, DevonMURPHY, JamesSALESKI, MichaelSIMMONS, BobSTARNER, SuanneTURNER, Kristina

Page 18: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200818

Software Engineering Section

ITALICS Contract Employee% Casual Employee or < 50%$ Safety Committee# On Loan

CONTROLS DEPARTMENTSoftware Section Task Assignments

April 28, 2008

LAHEY, TerriNetworking

KREJCIK, Patrick(acting)

High Level Apps

ZHOU, JingchenSystems

BROBECK, KenHALL, RobertROCK, Judy

CHEVTSOV, SergeiCHU, PaulFAIRLEY, DianeROGIND, DebbieWHITE, Greg#WOODLEY, MarkZELAZNY, Mike

ALARCON, ArturoBOYES, MattHOOBLER, SonyaKOTTURI, DayleLUCHINI, KristiPENG, ShengSCHUH, Stephen

BURGESS, RichardDeCONTRERAS, Ginger#GRANIERI, CharlyGRUNHAUS, Eli$KNOPF, Jim SANDBOTHE, BobMILLER, EdSPENCER, Nancy

WILLIAMS, ErnestEPICS

Page 19: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

CD - PCD Project Execution

Subsystem Design Prototype Unit Production Rack Production Installation Commissioning

Inst

alla

tion

PC

D

Com

mis

sion

ing

CD

Pro

duct

ion

Test

C

D-P

CD

Eng

inee

ring

Ser

vice

s P

CD

Eng

inee

ring

Des

ign

CD

● Receive Requirements● Detail Specifications● Conceptual Design● Prototype Design● Detail Circuit Design● Material List● Circuit Board Layout● Sketches to PCD● Functional Design Doc

● Receive Pckg Layout,Board Layout, Parts List● Procure materials● Prepare kit, PCB bids● Procure PCB (2)● Load Prototype● Machine, Label Panels● Final Assembly Proto I● Final Quality Check

● Develop Firmware● Develop Test & Calibration Software● Develop Test & Calibration Hdwe● Document Test & Calibration Procedure● Develop Rack, Cable System Sketches

● Receive Prototype● Debug & Test● Train Technician(s)● Rework, approve prototype for manufacture●

● Detail Standard Panel Layout● Detail E-M drawings● Begin System Drawings

● Develop Rack, layouts, Cable system sketchesReview, approve Rack, Cable, System drawings● Review, approve Bid Packages

● Receive Rack, Cable, Crate System Sketches● Document Racks, cables, crates, intra-rack cabling, long-haul cabling ● Develop Rack, Cable, Crate Bid Packages● Order Racks, Cables, Crates

● Receive Prototype for Manufacture● Order parts, prepare kits, prepare bid packages● Place vendor orders● QC Incoming Inspect● Deliver to Production Test

● Receive production units● Perform tests, stress tests, rework cycles● Maintain database● Deliver final QC product to Installation

● Develop overall Product test system● Develop QC plan● Setup Product Test areas● Procure, build test equipment● Train personnel

FIELD INSTALLATION● Install AC power, cooling water, Cable Trays● Install Loaded Racks, Earthquake bracing● Install Long haul signal cable plant, networks● Install Rack safety systems, monitoring

● Develop Field Installation Plans● Develop Field Installation Drawings, Instructions● Develop Resource plans, cost estimates, schedules ● Develop Bid Packages. Contracts

● Receive & Inspect Racks, Cables, Crates● Install Rack AC power,Crates, DC Power Supplies● Install tested units in Crates● Install internal Rack power, signal wiring● Test assembled Racks

● Bid, award installation contracts● Assemble internal resources● Train resources, UTR’sReceive all loaded Racks, Cables, Trays

COMMISSIONING● Safety Systems● AC Power systems● Top Level control system● Timing System● Networks, Sector Nodes● Instrumentation Subsystems● Test all Systems with Beam

● Complete all factory testing of loaded racks● Deliver Loaded Racks

DRAWN BY

RAY LARSEN 01-30-2008

CD-PCD Project Work Flow

Page 20: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200820

LCLS CONTROL SYSTEMHEAD: CARRONE, Enzo

CABLE PLANT SYSTEMS

System ManagerRODRIGUEZ,

Ponciano

SAFETY SYSTEMSSystem Manager

SALESKI, Michael(Acting)

BEAM INSTRUMENTS & DIAGNOSTICS

System ManagerJOHNSON, Ronald

DATA ACQUISITION & CONTROL

System ManagerWILLIAMS, Ernest

GLOBAL SYSTEMS

System ManagerKREJCIK, Patrick

MAGNET POWER & CONTROL

LUCHINI, Kristi -SE/BELLMO, Paul -EE

DeLIRA, Antonio -EEMacNAIR, David -EEROGIND, Debbie -SE

MOVER SYSTEMS

CABLE PLANT CONTRACTS

RODRIGUEZ, Ponciano-EE

ORTEGA, Mario-AEDiSALVO, Michael-AEBALTAZAR, Dak-AE

AGUAS, Bernardo-AEBUHAIN, Juanito-AE

PERSONNEL/LASER PROTECTION PPS/

LSSBONG, Patrick -EE

MURPHY, J – EEMcDONALD, D – ETFICKLIN, D - D

ENGINEER

BEAM CONTAINMENT BCS

TILGHMAN, Anthony – AE

BENNETT, Brian -AE

ALARCON, Arturo -EPSIMMONS, Robert -AE

MACHINE PROTECTION INTERMED. IMPS

TILGHMAN, Anthony -AE

NORUM, Stephen- EENGUYEN, Sony -AE

MACHINE PROTECTION NEW

NORUM, Stephen - EE

ENGINEER

TOROIDSBROWN, David-EE

MONTAGNE, M.-ME

BPMS JOHNSON, R.-EP

SMITH, S. -EPSTRAUMANN,T.-EPMEDVEDKO, E. -EEMONTAGNE, T.-ME

SMITH, V. - AE

PROFILE MONITORSPENG, Sheng-EE

BROWN, V. -AERAGO, C. -ME

TUNE-UP DUMP PENG, Sheng-EE

BROWN, V. -AERAGO, C. -ME

LCLS PROJECT DIRECTORJ. Galayda

FARADAY CUPS

BUNCH LENGTHBLM, OTR, YAG

SCREENSPENG, Sheng -EE

FRISCH, Josef -EPBROWN, V -AE

ZDARKO, Richard -CMONTAGNE, Tim-ME

TIMINGKREJCIK, Patrick

BROWNE, MichaelDUSATKO, John-EE

ALLISON, Stephanie-SEBROWN, David - EE

ZELAZNY, Michael -SEMONTAGNE, Timothy -ME

ROGIND, Debbie, SE

SERVERS/NETWORKSLAHEY, Terri -SE

BROBECK, Kenneth -SEZHOU, Jingchen -SE

MURRAY, Douglas -AEDiSALVO, Michael -AEMONTAGNE, Tim -ME

KNOPF, Jim - AE

VACUUM SYSTEMSSCHUH, Steve -EP

NGUYEN, Sony -CO’NEAL, John -AE

APPLICATIONS SOFTWARE

System ManagerFAIRLEY, Diane/

ZELAZNY, Michael

HIGH LEVEL APPLICATIONS

FAIRLEY, Diane-SEZELAZNY, Michael - SE

CHEVTSOV, Sergei -SECHU, Paul -SE

LARRIEU, Chris – SEROGIND, Debbie – SE

WHITE, Greg - SE

FEEDBACK SYSTEMSENGINEER

MCC APPLICATIONS

ENGINEERING SERVICES

System Managers

J. Olszewski-AET. Montagne-MER. Chestnut-EP

DESIGNERDRAFTER

COORDINATORTECHNICIAN

Contract SupportCaptar

ENGINEERPROGRAMMERContract Support

PROJECT MANAGEMENT

LIAISONBOYSEN, Tanya

PRECISION TIMING LBNL

BYRD, J. -EP

DOOLITTLE, L. -EEENGINEER

LASER CONTROLSWHITE, William

PENG, Sheng-EE

ROSTER, Bill-AEMONTAGNE, Tim -ME

LOW LEVEL RFAKRE, Ron -EE

KOTTURI, Dale-SEHILL, Alan -AE

TEMP MONITORSSCHUH, Stephen -EP

TILGHMAN, Anthony-AERAGO, Carl -ME

SAFETY ENGINEERSALESKI, Michael

RACKS, DC PWR & SIGNAL DIST.

ORTEGA, M. -AE

TRUNKS & PATCH PANELS

TILGHMAN, Anthony-AE

NGUYEN, Sony -CMONTAGNE, Tim -ME

DC 24V PWRDiSALVO, Michael -AE

RAGO, Carl -ME

LEGENDEE-ElecEngrME-MechEngrSE-Software EngrEP- EngPhysAE-AssocEngrC- CoordinatorD-DesignerET- Elect TechMT- Mech Tech

CONTROLS SYSTEM PHYSICISTKREJCIK, Patrick -EP

Electrical Electronic

Mechanical Electromechanical

Controls Engineering & Software

CAVITY BPMS ANL

LILL, Robert – EE

WALTER, Dean - ME NORUM, Eric - SE

LCLS CONTROLS PROJECTMay 7, 2008 R11

Wire Pos. Mon.Hydrostatic

Leveler

Page 21: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Controls Status since the last reviewThe Linac/BC2 Controls installation went very wellThe system was delivered in December 2007, within a week of the scheduled date (12/03/07)

Page 22: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200822

Summary of Controls Sub-Systems installed for Linac and BC2 Commissioning

Cable Plant Networking Magnet power supply Vacuum Controls LLRF Timing system Laser control upgrade OTR/YAG imaging BPM Wire Scanners

Faraday Cup Cerenkov monitor Moveable collimator BC2 beamline control Bunch length monitor MPS BCS Configuration software MATLAB feedback system Bunch length measurement

Page 23: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Linac & BC2 Controls in use by physicists & Operations

Page 24: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

New Feedback framework & bunch length measurement applications are in operation

Page 25: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200825

Injector laser Controls has been upgraded for BC2 operation

Page 26: Hamid Shoaee LCLS FAC Controls Reviewhamid@SLAC.Stanford.edu June 17, 2008 1 LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.

Hamid Shoaee

LCLS FAC Controls Review [email protected]

June 17, 200826

Conclusions

The linac & BC2 control system is online & operational

We are on schedule for the installation and completion of the electron control system

The major risk for the above items is schedule rather than technical complexity

detailed plans are in place for the undulator control in collaboration with ANL