    ABB Lummus Global B.V.

    SPECIFICATION

    page

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 1 of 39

    THISDOCUMENT/DRAWINGISTHEPROPERTYO

    FABBLUMMUSGLOBALB

    .V.

    INCLUDINGALLPATENTEDANDPATENTABLE

    FEATURESAND/ORCONFIDENTIALINFORMATIONANDITSUSEISCONDITIO

    NEDUPONTHEUSERSAGREEMENTNOTTOREPRODUCE

    THEDOCUMENT/DRAWING

    ,INWHOLEORINPA

    RT

    ,NORTHEMATERIALDESCRIBEDTHEREON

    ,NORTOUSETHEDOCUMENT/DRAWINGFORANYPURPOSEOTHERTHANASSPECIFICALLYPERMITTED

    INWRITINGBYABBLUMMUSGLOBALB

    .V.

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120.421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    Specification For:

    PIPING DESIGN INSTRUCTIONS

    IDOCS 13.3.2

    2.00 2006-12-06 Revised A.F.D. JJVA JBRO MPN

    1.00 2006-10-18 Revised A.F.D. JJVA JBRO MPN

    3.00 2007-01-15 Revised A.F.D. JJVA JBRO MPN

    REV. DATE DESCRIPTION PREPARED CHECKED APPROVED

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    2/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120.421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    INDEX

    SECTION PAGE

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 2 of 39

    1. GENERAL 51.1 INTRODUCTION 51.2 REFERENCE DOCUMENTS 51.3 QUALITY 51.4 COST 61.5 PLANNING, SCHEDULES AND PRIORITIES 61.6 DETAILING OF PIPING STUDIES 62. GENERAL DESIGN REQUIREMENTS 73. ISOMETRIC REQUIREMENTS 93.1 ISOMETRIC RELEASE 93.2 ISOMETRIC DISTRIBUTION 93.3 ISOMETRIC BREAKS 103.4 ISOMETRIC ANNOTATIONS (PDMS) 123.5 PIAS INSTRUCTIONS (LGB and LGS only) 123.6 STANDARD ISOMETRIC NOTES (VIA PIAS, LGS AND LGB ONLY) 134. INSULATION REQUIREMENTS 144.1 INSULATION NOTES (FOR PDMS) 145. PIPE SUPPORT REQUIREMENTS 155.1 SUPPORTING NOTES 156. VALVE AND CONTROL SETS 166.1 LOW-TEMPERATURE PIPING 16

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    3/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120.421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    INDEX (Contd)

    SECTION PAGE

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 3 of 39

    6.2 (CONTROL) VALVE ACTUATOR ORIENTATIONS: 166.3 CONTROL SET LOCATION ALONG PIPE RACKS (I) 176.4 CONTROL SET LOCATION ALONG PIPE RACKS (II) 186.5 CONTROL SET HOOK-UPS 196.6 CONTROL SET HOOK-UP IN STEAM SERVICE 206.7 VALVE SETS ON PLATFORMS 207. PUMP HOOK-UPS 217.1 END SUCTION PUMPS 217.2 VERTICAL INLINE PUMPS 227.3 SINGLE SUCTION TOP SUCTION TYPE PUMPS 23

    7.4 DOUBLE SUCTION PUMPS 248. TOWERS AND VESSELS 258.1 PIPE RUNS ALONG COLUMNS & VERTICAL VESSELS 258.2 PLATFORMS ON COLUMNS AND VERTICAL VESSELS 278.3 TOP NOZZLES ON HORIZONTAL & VERTICAL VESSELS 288.4 TOP NOZZLES ON VESSELS & TOWERS WITH A SPECTACLE BLIND OR SPACER 299. HEAT EXCHANGERS 309.1 AIR-COOLERS 309.2 SHELL & TUBE EXCHANGERS 3010. INSTRUMENTATION REQUIREMENTS & HOOK-UPS 3110.1 GENERAL 3110.2 LEVEL INSTRUMENTS 31

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    4/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120.421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    INDEX (Contd)

    SECTION PAGE

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 4 of 39

    11. TABLES 3211.1 GEAR OPERATED VALVES 3211.2 HYDRAULIC BOLT TENSIONING 3311.3 MINIMUM WELD DISTANCES 3312 JOB NOTES 39

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    5/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 5 of 39

    1. GENERAL

    1.1 INTRODUCTION

    This document shall be read in conjunction with the Specification for Piping Design andDrafting (H-652), which describes the mandatory requirements for Piping Designdevelopment, as agreed with the Client.The information contained in this document is further instructions to the design team andeach DEC is responsible for its implementation.This document will be supplemented with additional job-notes during the course of theproject.

    1.2 REFERENCE DOCUMENTS

    The following documents, together with these instructions, form an integral set of information andinstructions applicable for this project:

    A: Project Specific:

    Piping General Requirements DEP 31.38.01.11-GEN Plant Model Construction and Review DEP 30.10.05.11-GEN Human Factors Engineering E-00000-NA-7739-0080 Specification for Piping Design and Drafting, H-652 E-00000-PI-7737-0013

    Piping Standard drawings, H-653 E-00000-PI-7737-0014 Plant Layout Development in PDMS, H-654 E-00000-PI-7737-0021 Piping Materials Quantity Control, H-655 E-00000-PI-7737-0024 Standard Drawings Piping & Piping Components S38 DEP 22 Standard Dwg. List Specification for Instrumentation/ Piping E-00000-LF-7880-0008

    Interface, K-6021 (prepared by Instr. Dept.) Piping Execution Plan E-00000-PI-5880-0005 FEEEM Report Sessions 1, 2 & 3 E-00000-IN-6854-0003 Generic Ergonomic Templates E-00000-IN-6854-0002 Maintenance Bukom Requirements & Best Practice E-00000-PI-7880-0036 Model Review Follow-up Actions (1) E-00000-PI-8380-0003 Plotplan Rquirements E-00000-NA-7739-0026

    PDMS Project Setup E-00000-KA-7880-0002 2D AutoCAD Drafting E-00000-JA-7880-0012

    ANY DISCREPANCY IN ABOVE DOCUMENTS AND/OR PROPOSED DEVIATIONS BY THEDEC MUST BE REPORTED TO THE JV FOR EVALUATION AND RESOLUTION/ APPROVAL

    Notes:(1) Listed document covers the 30% model review comments. Actions for Piping (identified

    as action by JBRO) must be followed-up by the respective DEC after the hand-overmoment. The same applies to subsequent model review action lists.

    1.3 QUALITY

    Each team member is responsible for meeting the quality objectives of the project.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    6/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 6 of 39

    Avoid changes in your design. If it works and meets the project requirements, then do notchange. Revisions to AFC isometrics should be kept to an absolute minimum.Each team member is responsible to execute the required quality checks as per companyinstructions specified in the listed documents (see previous paragraph).

    1.4 COST

    All task force members shall execute their work with a constant alertness for all cost aspects,and strive for an optimum and efficient design using a minimum of welds, fittings (e.g. elbows),and pipe. The piping designer is also responsible for:

    Proper material management (update bulk MTO data as per design developments).

    Maximum use of purchased bulk commodities in the detail design.

    Maximum use of available steel for supporting piping to avoid additional support steelstructures.

    1.5 PLANNING, SCHEDULES AND PRIORITIES

    Each team member is responsible for meeting the schedules as defined for the project, or for thearea the team-member is working in. Schedules are prepared for piping study completion, noz-zle orientations (DICS), and isometric production. Ensure you are aware of these schedules!Unavoidable delays are to be addressed to the Lead Engineer in time.

    Priority Definitions:The following materials are defined as Priority-1 materials:

    Pipeclass 252091-H1 (P91) Pipeclass 252091-H2 (P91) Pipeclass 33055-H1 (347H SS) All sizes 30 and larger (all pipeclasses/ GRP)

    1.6 DETAILING OF PIPING STUDIES

    See specification H-654 plus the project scope-split matrix and related marked-up plotplanfor the required level of detailing for Pipe Study Preparation executed by LGN per unit or

    area.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    7/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 7 of 39

    2. GENERAL DESIGN REQUIREMENTS

    In general, eccentric reducers shall be used. Concentric reducers shall only be used ifrequired for process or instrumentation reasons.

    A drain is only allowed on eccentric reducers with a minimum size 10.Check limitations when drains are on heavy wall specs. (Ref. Para.3.1 of H-652)Locating drains on reducers takes preference if this saves a pipe-weld (avoiding a pipesection).

    Do not locate a spectacle blind between two valves. The valve bodies will obstruct theremoval of the (extended) bolts. Provide a spool-piece at one end of the spectacle blind.

    SPOOL PIECE

    Standard foundation heights will be (incl. grout):

    Horizontal pumps: 300mmVertical pumps: 400mm

    Vertical vessels: 150mmSkid-mount equipment 50 mm

    Elevations on piping documents shall be shown as EL. + 0000This means either Centerline Pipe or Face of Flange.Deviations shall be shown, e.g. B.O.P. EL. + 0000Platform elevations shall be shown as T.O.S. EL. + 0000This platform elevation is always underside grating.

    Pipe bending shall not be applied, only where specified by Process department .

    Ensure that all design developments affecting the bulk MTO are communicated to theMTO engineer. Ensure that correct line-number breaks and area-breaks are maintained

    to avoid MTO conflicts.(See also H-655: Piping Materials Quantity Control)

    Final hook-up of distribution systems (e.g. flare, cooling water, etc.) with respect ofheader and sub-headers, are to be determined in the piping study phase, and the relatedmaterials adapted in Marian (Piping Designer to inform MTO engineer).

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    8/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 8 of 39

    Minimum distance between welds at pipe-branches is 50 mm(for details, see para.11.3)Note that the 3D-CAD system checks from the centerlines of the branches! The de-signer/checker himself must check for the correct distance, taking into account the fol-lowing criteria: Pipe O.D., wall-thickness, branch-fitting dimension (especially for wel-dolets), reinforcing pad dimensions (if applicable). DONT DESIGN TOO TIGHT.

    When equipment is (to be) purchased with an odd or non-standard nozzleconnection(s), ensure that the vendor also provides the matching counter-flange (incl.bolting and gaskets), drilled to match the pipe spec.

    Fixed AG-UG piping connections must have an adequate field-fit provision toaccommodate differential settlements or misplacement of UG piping.Examples include UG cooling water connected to exchangers. An offset spool (min. 500mm) with field welds has to be included in the design between the equipment nozzle andUG piping, to allow adjustment for installation tolerances.The same applies to UG firewater connections to (prefabricated) Deluge houses. Ensurethe deluge house can accommodate such hook-up spool.

    The minimum pipe size for lines on the pipe racks is NPS 1. For pipespans see docE-00000-PI-7737-0012

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    9/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 9 of 39

    3. ISOMETRIC REQUIREMENTS

    3.1 ISOMETRIC RELEASE

    The release of isometrics for distribution shall be conform the agreed isometric scheduleand priority requirements as prepared for the respective areas or project.

    Distribution shall be focused on releasing all isometrics of the same line-number per areato enable material trending. Revisions to AFC isometrics (with material impact) require thehighest priority due to timely material deliveries.

    If a previously distributed/ issued isometric splits, the new distribution/ issue must includeboth sheets with the same revision. This will ensure correct material handling in Marian.

    Isometrics with priority-1 hold-materials may not be distributed as B1 (checked) isometric.To enable Pipe Stress & Support to work on these systems such an isometric is to bedistributed for information (e.g. rev. A1 in PIAS). Other material developments to thatLPA (Line Per Area) must be reported to the MTO engineer for manual update of MTOExplorer.

    3.2 ISOMETRIC DISTRIBUTION

    The following distribution is a reference of LGN, each DEC shall arrange its distribution to sute

    his responsibility and organization accordingly.

    First Second AFC

    Distribution (1): Distribution (2): Issue:

    (B1, B2, etc.) Status: (C1, C2, etc.) Status: (& rev.'s)

    Stress & Support All iso's I All iso's A (5) None

    Process Critical lines A (4) None None

    Instrum. Design None None None

    Instrum. Eng. With flow instr. I (3) A (4) None

    Electrical All electr. traced I (3) I All electr. traced

    Bm All iso's I(3)

    None

    Notes:

    (1) Isometric checked by Area Lead Designer(2) Isometric completed with supporting data(3) Additional distribution only required for significant changes(4) Approval by Isometric sign-off(5) Approval via PIAS

    Status:

    I For informationA For approval

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    10/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 10 of 39

    3.3 ISOMETRIC BREAKS

    No automatic isometric-split (by PDMS) is allowed. One Pipe in PDMS shall fit on oneisometric sheet. If a Pipe requires more isometric-sheets, a forced-split will be required(i.e. more pipes of the same LPA).

    Separate isometrics have to be made for each pipe class. Only next rating classes onthe same isometric are allowed! (e.g. 300# flg in 150# line to suit continuation isometric.)

    An isometric break shall be applied when there is a change in:

    Line number Material type

    Design condition

    Paint code

    Location (Unit, Rack, Sleeper)

    Ensure the isometric break is conform the line-number/area break as defined for materialallocation.

    A split between two isometrics shall be preferably at a valve or flange. When splitting ata valve, ensure that the gasket is on the isometric with the related valve (ensuring acorrect bolting extraction).

    Keep small bore systems (Called Field isometrics) separate from large bore systems

    (Called Shop isometrics), as logically feasible.

    Field-welds of two different materials must be avoided. Such a weld (if unavoidable)must always be on a shop isometric.

    Deleted

    Keep approx. 50mm clearance at the bottom of the material listing on your firstdistribution (B1) isometric, to accommodate future pipe-support materials.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    11/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 11 of 39

    Typical Break between pipe-rack and unit piping isometrics:

    Deleted

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    12/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 12 of 39

    3.4 ISOMETRIC ANNOTATIONS (PDMS)

    The following annotations are to be shown on the isometric:

    Item: Annotation: Remarks:

    Flow arrow - only one per isometricGear operated valve G.O. DIR DIR is orientation of hand wheelLO or LC valve LO or LC select locking device (in PDMS)CSO valve CSO

    TSO valve - no annotation requiredCryogenic valve H.P. at high pressure side of valveActuator position (automatic in PDMS) see SGUI 04-3940-04-003 for codesSpecial Piping Item H- named (selection in PDMS). Delivered by

    Piping Eng. or Spec. Equipm.

    Orifice Tappings Tapping orientation e.g. E45D / W45D

    Pipe support data shall be added on the isometric as per relevant instruction. See:

    E-00000-PI-2358-0001 0001 0014 Pipe Support Standards

    E-00000-PI-7880-0008 Hangers & Support Application using PDMS

    E-00000-PI-7880-0026 Pipe Stress & Support Engineering Instructions

    The BOM list of the isometric shall also show pipe support materials (for welded pipe parts only)and tagged instruments.

    3.5 PIAS INSTRUCTIONS (LGB and LGS only)

    Before building a line in 3D CAD, the designer indicates in PIAS that input has started. Theallocated drawing/sheet number will be used in 3D CAD to build the line:

    INPUT STARTED:

    Example

    Originator JEP Fill in initials of area lead engineer

    CWP code 21 Check this number carefully.This number must be the same as the CWP number in3D CAD. See Pias error report on the intranet, thisreport is updated on daily basis and mismatchesbetween CWP codes in PIAS and 3D CAD arehighlighted here A proper (and fast) follow up of thisreport is required

    Process codes / / Not Used!

    Input started Yes

    In the Additional Isometric Specifications screen in PIAS, data will be loaded from 3D CAD forreporting purposes. Do not modify this data as to avoid conflicts with the data as stored in CAD.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    13/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 13 of 39

    3.6 STANDARD ISOMETRIC NOTES (VIA PIAS, LGS AND LGB ONLY)

    The following notes can be printed on an isometric when selected in PDMS via Pipe attributesform.

    1 = Line to be pickled and passivated.2 = All welds to be inspected and tested prior to the installation of the jacket pipe.3 = No hydro test after installation.4 = Pipe supports by pipe support contractor.5 = Contractor to confirm routing in field.

    6 = Line must be fireproof insulated up to El +7,8 m above grade or tabletop.8 = Spools to be galvanized.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    14/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 14 of 39

    4. INSULATION REQUIREMENTS

    See the Project Insulation Specification for details regarding insulation requirements.For pipe-study purposes use the following information:

    The following items shall not be insulated for HOT insulation, unless otherwise specified:

    Valves and flanges in service below 300deg. (operation temp.), except in steam lines orwhen heat-traced (by steam, electric, etc.)

    Valves and flanges in hydrogen service. Steam traps.

    Condensate lines downstream the steam trap when discharging to open drainagesystem (add PP if applicable).

    Ball valves in insulated lines to be provided with an extended spindle.

    4.1 INSULATION NOTES (FOR PDMS)

    In case an isometric has non-insulated and insulated sections, separate branches are tobe made in PDMS for each type.

    In case an isometric has more than one type of insulation or tracing, separate branchesare to be made in PDMS for each type, and the isulation/ tracing split clearly indicated

    on the isometric.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    15/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 15 of 39

    5. PIPE SUPPORT REQUIREMENTS

    See the Pipe Support Standard Drawings for details regarding pipe-supports.For pipe-study purposes use the following information:

    Pipe Shoes for un- and insulated Pipe (Hot, PP, Noise):

    Insul. Thickness: Shoe Height:

    0 thru 50 10051 thru 100 150101 thru 150 200151 thru 200 250etc.

    Pipe Shoes for Cold Insulated Pipe:

    Shoe height is insulation thickness plus 100 mm.

    5.1 SUPPORTING NOTES

    During the pipe-rack studies, check for intermediate steel requirements in the pipe rackto support the small bore lines or branches.

    Deleted.

    For pipe rack isometrics include a temporary PS indication on the isometric at each pipe-rack column, prior to the distribution.

    If applicable, the note Pipe supports by pipe-support contractor shall be indicated in theRemarks box on the isometric using PIAS.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    16/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 16 of 39

    6. VALVE AND CONTROL SETS

    6.1 LOW-TEMPERATURE PIPING

    Valves in low-temperature liquid systems (cryogenic) are generally equipped with an extendedbonnet to allow vapor space between body cavity and gland seals to protect the stem seals. Theorientation of the stem is therefore limited to ensure proper functioning of this feature. See theSGUI 04-2801-01.027 (Low Temperature Piping Systems) and the appropriate pipe-specs fordetails.

    Valve orientations:Two services are to be distinguished:Liquid and/or liquid/vapor service100% gas service

    Valves in liquid and/or liquid/vapor service shall be installed with the stem orientatedupwards (preferred), or with a maximum inclination of 45 deg. From the vertical (1). Thisorientation prevents the (cold) liquid to flow into the bonnet extension and make contactwith the stem packing.

    Drain valves shall be installed likewise. The drain connections shall be provided withsupport/bracing, preferably to the header.

    Valve stems in no-flow connections (such as vents and pressure connections) may beinstalled at an angle up to 90 from vertical (i.e. they may be installed in vertical pipes).

    Valve stems in 100% gas service may be installed at an angle up to 90 from vertical(i.e. they may be installed in vertical pipes).

    When gate and ball valves have a pressure equalising hole (body cavity reliefprovisions), the high-pressure site of a valve in closed position shall be identified on theisometric with HP so ensure proper installation of the valve.H.P. shall be indicated on P&ID by process

    Preliminary dimensions for bonnet extensions:(for study purposes add L to the standard spindle length)

    Service -20C to -100C:Valve size NPS -1 1 -2 3-4 6-8 10-12 >=14

    L (mm): 100 125 150 175 200 250

    Service below -100C:Valve size NPS -1 1 -2 3-4 6-8 10-12 >=14

    L (mm): 200 250 300 350 400 500

    6.2 (CONTROL) VALVE ACTUATOR ORIENTATIONS:

    See Intools/ 3D Interface Guide SGUI 04-3940-04-003 for applicable actuator positions andrelated coding.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    17/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 17 of 39

    6.3 CONTROL SET LOCATION ALONG PIPE RACKS (I)

    GRADE

    (+100000)900 900CONTROL SETS UP TO DN 350

    1000CONTROL SETS DN 400 TO DN 4501000

    PREFERE

    DLOCATION

    PREFEREDLOCATION

    CONTROL SET WILL BE LOCATED INSIDE THE PIPE RACK

    WHEN THERE IS NO SPACE OUTSIDE

    700(NOTE 1)BACK-OF-SHOE

    NO

    TE2

    Note1) Aligned vertical pipes by back-of-shoe. All piping minimally with shoe height 100mm or

    higher depending insulation thickness, see support standards with exeption of pipe sizelarger than NPS 24.

    2) Prefered location control sets overrules back-of-shoe distance.3) Intermediate steels are only available on the lowest piperack level. Piping designer

    shall inform Civil design of intermediate steels if piping less than NPS 6 are arranged

    on the lowest level.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    18/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 18 of 39

    6.4 CONTROL SET LOCATION ALONG PIPE RACKS (II)

    RESERVED FOR PIPING

    RESERVED FOR INSTRUMENTS

    OR ELECTRICALSEE NOTES

    RESERVED FOR ELECTRICAL

    PIPE RACK COLUMNS

    1500

    800 SQ

    (TYP)

    The in and outside area of the pipe rack columns are reserved for piping Piping to ensure accessibility to the instrument or electrical components

    where applicable. Adequate access and escape routes to and from the unit areas are to be

    guaranteed.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    19/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 19 of 39

    6.5 CONTROL SET HOOK-UPS

    DR.

    DC

    B

    A

    F

    E

    DR.

    D

    B

    A

    F

    E

    DR.

    DC

    B

    A

    F

    E

    CHECK FORCLEARANCE

    (CA. 100)

    Note:The top hook-up is preferred.Components shown in these hook-up are indicative onlySee the project pipe spec. for appropriate detailsCheck for ergonomic and handling requirements, e.g. removal of control valves.

    TABLE 1

    DIMENSIONS

    Line size (NPS) Dim. A (mm)

    1 to 6 600

    8 to 10 650

    12 to 16 750

    DIMENSIONS (mm)

    A See TABLE 1

    B 1800 max.

    C 200 min.

    D 100 min.

    E pending drain size,pipe size &schedule

    F 150 min.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    20/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 20 of 39

    6.6 CONTROL SET HOOK-UP IN STEAM SERVICE

    DR.

    DC

    B

    TOBECALCULATED

    F

    E

    CHECK FORCLEARANCE

    (CA. 100)

    TO STEAM TRAP

    DR.

    ALTERNATIVE IFACTUATOR CLEARANCE

    IS LESS THAN 200mm

    6.7 VALVE SETS ON PLATFORMS

    For maintenance and operation, all elevated control sets should be located on a platform orconcrete table and not outside along the platform or concrete table.

    A B A

    Dimensions

    B 1800 (max.)

    C 200

    F 150 (min.)

    Dimensions

    A 200B 750 (min.)

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    21/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 21 of 39

    7. PUMP HOOK-UPS

    If a by-pass with SW or BW valve is to be provided around the discharge check valve, thanbreak flanges are to be added in the by-pass to allow removal of the discharge piping.

    BREAK FLANGES

    PUMP

    The following requirements for suction piping for centrifugal pumps shall applyto avoid cavitation:

    (Note: All material as per applicable Pipe class)

    7.1 END SUCTION PUMPS

    A straight length of piping of 4D with a minimum of 300 mm shall be provided immediatelyupstream the suction nozzle:

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    22/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 22 of 39

    7.2 VERTICAL INLINE PUMPS

    No requirements when suction elbow is in the same plane as the pump shaft.4D when suction elbow is at a right angle of the pump shaft.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    23/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 23 of 39

    7.3 SINGLE SUCTION TOP SUCTION TYPE PUMPS

    When the last elbow of the suction line is in the same plane as the pump shaft, no straightlength of piping immediately upstream the suction nozzle is required.

    SUCTION

    When the last elbow of the suction line is in plane at a right angle to the pump shaft, a straightlength of 4D minimum upstream the suction nozzle is required.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    24/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 24 of 39

    7.4 DOUBLE SUCTION PUMPS

    A straight length of piping of minimum 3D shall be provided immediately upstream the suctionnozzle and the first elbow shall always be at 90 angle on the pump shaft centerline.

    SUCTION

    D(LINESIZE)

    DISCHARGE

    3D MIN.

    When the first elbow cannot be installed with a 90 angle on the pump shaft centerline, thestraight length of piping shall be 5D minimum immediately upstream the suction nozzle.

    SUCTIONDISCHARGE

    5D MIN.

    NPS " DR.

    D(

    LINES

    IZE)

    TOP FLAT

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    25/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 25 of 39

    8. TOWERS AND VESSELS

    8.1 PIPE RUNS ALONG COLUMNS & VERTICAL VESSELS

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    26/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 26 of 39

    EQUALASPOSSIBLE

    =

    =

    Insulation ofTower or Vessel 300

    The height of all pipe shoes are designedas minimum 100 mm depends on insulationthickness, see support standard

    Piping which are sizes NPS 16 and under, are prefered to be arranged as indicated gropes.

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    27/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 27 of 39

    8.2 PLATFORMS ON COLUMNS AND VERTICAL VESSELS

    NOTE: For details, see STANDARD DRAWINGS FOR STRUCTUAL STEEL WORK J601,E-00000-BN-3580-0001, 0002

    DIMENSIONS

    A 500

    B 200

    C 460

    D 50

    E 50

    F 413

    R 300

    G 350

    *

    * For cold columns 135 mm

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    28/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 28 of 39

    8.3 TOP NOZZLES ON HORIZONTAL & VERTICAL VESSELS

    A: Nozzle extension through top platforms on towers and vessels:

    B: Nozzles along platforms on horizontal vessels:

    DIMENSIONS

    A 130

    B 200 max

    C 40

    D Vessel O.D.

    E 300

    F 200

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    29/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 29 of 39

    8.4 TOP NOZZLES ON VESSELS & TOWERS WITH A SPECTACLE BLIND OR SPACER

    WITH A WEIGHT OVER 25 KG

    DIMENSIONS

    A 200 min

    B 200 max

    C 40

    D Vessel O.D.

    For Vertical Vessels andColumns

    For Horizontal Vessels andDrums

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    30/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 30 of 39

    9. HEAT EXCHANGERS

    9.1 AIR-COOLERS

    The Air-cooler inlet and outlet piping manifold layout to be discussed with the ProcessDepartment. The manifold layout is to be checked with the MTO engineer to ensure that thecorrect materials are in the MTO.

    9.2 SHELL & TUBE EXCHANGERS

    Typical lay-out:

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    31/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 31 of 39

    10. INSTRUMENTATION REQUIREMENTS & HOOK-UPS

    10.1 GENERAL

    See Specification for Instrumentation/Piping Interface (K-6021) for installationrequirements and scope-split definition.

    10.2 LEVEL INSTRUMENTS

    Sometimes level instruments (e.g. certain magnetic type level gauges, or standpipes) requireexpansion loops at their nozzle connections. This is depending on the nozzle distances anddesign temperatures. The following table is indicative only (Pipe Stress & Support will determinethe final loop dimensions):

    Loop is necessary when operating temperature or nozzledistance exceed list below (indicative only)

    Design Temp CVessel/ Column

    Nozzle to NozzleDistance

    Loop LengthL

    100 2500 600150 1500 600200 1000 400250 800 400300 600 400350 450 400

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    32/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 32 of 39

    11. TABLES

    Spectacle Blind weights (Kg):

    Diam. Diam. Rating

    (mm) (inch) 150# 300# 600# 900#

    100 4 2.9 5.1 7.3 11

    150 6 5.5 11 20 30

    200 8 10.4 21 34 59

    250 10 18.1 36 64 104300 12 31 55 94 155

    Above black line: locate in horizontal (preferable) or vertical line (if unavoidable).Below black line: locate in horizontal lines only.

    Spectacle Blind vs. Spade & Spacer

    Rating: Spectacle Blind Spade/ Spacer

    150# 1/2" 16" 18" and up

    300# 1/2" 14" 16" and up

    600# 1/2" 12" 14" and up900#

    1500# 1/2" 10" 12" and up

    2500#

    Note: Hammer-blinds are to be installed in horizontal lines only.

    11.1 GEAR OPERATED VALVES

    Manually operated valves shall not require a force exceeding 350 N on the hand wheel orwrench to operate the valve.

    Manually operated valves shall, unless specified otherwise, be provided with a gear operator forsizes as shown and larger.

    VALVETYPE

    ASMECLASS

    BALLVALVESFB & RB

    (soft seated)

    GATEVALVES

    GLOBEVALVES

    PLUGVALVES

    BUTTERFLYVALVES

    BALLVALVES

    (metal seated)

    150 8" 20 16 6 8 3

    300 6 16 12 6 6 2

    600 4 12 10 4 4 2

    900 - 10 8 3 - -

    1500 - 8 6 2 - -

    2500 - 6 4 2 - -

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    33/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 33 of 39

    11.2 HYDRAULIC BOLT TENSIONING

    Hydraulic nolt tensioning shall be used tor tightening the bolts of flanged connections ofequipment and piping where the operating conditions require the stress distribution in the bolts tobe properly controlled to obtain a reliable joint. These conditions generally occur at high pressureand elevated temperature in conjunction with a medium which is difficult to seal.

    Hydrolic bolt tensioning shall be applied in the following cases:

    SERVICE ASME RATING CLASSES BOLT DIAMETER

    All All 2All 1500 1

    Hydrogen 600 1

    Critical applications(to be agreed between the

    Contractor and the Principal)

    All 1

    Piping free area for Bolt Tensioning:

    11.3 MINIMUM WELD DISTANCES

    The minimum distance between welds is 50 mm (or 2 x wall thickness, whichever is thegreatest). This distance is to be measured from weld-edge to weld-edge. The heavier the wallthickness, the larger the welds become. Do not design too tight!!

    The following tables can be used as a reference for pipe study preparation and isometricproduction. Note that these dimensions are the bare minimum.Add extra space (25 mm minimum) to accommodate tolerances and discrepancies.

    DIAM. 600# 900# 1500# 2500#

    Nom. A A A A

    1 240

    2

    3 240 265

    4 240 245 285

    6 250 280 335

    8 260 300 355

    10 270 335 440

    12 280 350 470

    14 295 380

    16 285 300 420

    18 290 450

    20 295 485

    24 330 550

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    34/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 34 of 39

    TABLE A: INLINE WELD INLINE WELD

    Header Schedule:

    Size: 5S 10 10S 20 30 40 40S STD 60 80 80S XS 100 120 140 160 XXS

    0.125 54 55 55 55 56 56 56

    54 55 55 55 57 57 57

    0.375 54 56 56 56 57 57 57

    54 55 56 56 56 58 58 58 60 64

    54 55 56 56 56 58 58 58 61 65

    1 54 56 57 57 57 59 59 59 62 67

    1 54 56 58 58 58 60 60 60 64 69

    2 54 56 58 58 58 61 61 61 66 70

    2 55 57 60 60 60 63 63 63 68 75

    3 55 57 61 61 61 64 64 64 70 774 55 57 62 62 62 66 66 66 70 74 80

    5 56 57 63 63 63 68 68 68 73 78 84

    6 56 57 64 64 64 70 70 70 76 82 85

    8 56 58 62 63 65 65 65 69 73 73 73 77 82 84 85 85

    10 57 59 62 65 67 67 67 73 77 73 73 82 84 87 94

    12 58 59 62 66 69 68 68 76 81 73 73 84 87 94 106

    14 58 62 60 65 68 70 68 68 77 84 73 73 85 93 102 111

    16 59 62 60 65 68 73 68 68 80 84 73 73 89 100 113 123

    18 59 62 60 65 70 76 68 68 84 85 73 73 96 110 121 134

    20 60 62 61 68 73 77 68 68 84 89 73 73 104 117 132 146

    24 61 62 62 68 76 81 68 68 86 100 73 73 119 136 151 168

    26 65 73 68 68 73 7328 65 73 78 68 68 73 73

    30 65 73 78 68 68 73 73

    32 65 73 78 81 68 68 73 73

    34 68 73

    36 68 73

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    35/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 35 of 39

    TABLE B: BRANCH OLET INLINE WELD

    Up to schedule STD/40:Header Olet Size:

    Size: 1 1 2 3 4 6 8 10

    78

    1 79 82

    1 79 82 88

    2 79 82 88 97

    2 80 83 89 98 106

    3 81 84 90 99 106

    4 81 84 90 99 106 129

    5 81 85 91 100 107 129 145

    6 82 85 91 100 107 130 145

    8 83 86 92 101 108 131 146 179

    10 84 87 93 102 109 132 147 180 21112 84 87 93 102 109 132 147 180 211 244

    14 84 87 93 102 109 132 147 180 211 244

    16 84 87 93 102 109 132 147 180 211 244

    18 84 87 93 102 109 132 147 180 211 244

    20 84 87 93 102 109 132 147 180 211 244

    24 84 87 93 102 109 132 147 180 211 244

    26 84 87 93 102 109 132 147 180 211 244

    28 84 87 93 102 109 132 147 180 211 244

    30 84 87 93 102 109 132 147 180 211 244

    32 84 87 93 102 109 132 147 180 211 244

    34 84 87 93 102 109 132 147 180 211 244

    36 84 87 93 102 109 132 147 180 211 244

    Above schedule STD/40, up to schedule XXS/160:Header Olet Size:

    Size 1 1 2 3 4 6 8 10

    88

    1 89 93

    1 90 93 100

    2 91 94 101 111

    2 93 97 103 114 122

    3 94 98 104 115 123

    4 96 99 106 116 125 150

    5 97 101 108 118 126 152 169

    6 98 101 108 118 127 152 1708 98 102 108 119 127 152 170 210

    10 106 110 117 127 135 161 178 218 267

    12 117 120 127 137 146 171 189 229 277 324

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    36/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 36 of 39

    14 122 125 132 142 151 176 194 234 283 329

    16 132 136 143 153 161 187 204 244 293 340

    18 143 146 153 163 172 197 215 255 304 350

    20 153 157 164 174 182 208 225 265 314 361

    24 174 178 185 195 203 229 246 286 335 382

    TABLE C: BRANCH WELD BRANCH WELD

    Up to header wall thickness 25 mmSize 2

    Size 1 1 1 2 3 4 5 6 8 10 12 14 16 18 20 24

    77 80 83

    1 84 87 91

    1 92 95 99 106

    2 98 101 105 113 119

    2 106 109 112 120 127

    3 114 117 121 129 135 151

    4 128 130 134 142 149 165 178

    5 142 145 149 156 163 179 192 207

    6 157 159 163 171 178 193 207 221 236

    8 183 186 190 198 204 220 234 248 263 289

    10 210 213 217 225 231 247 261 275 290 316 343

    12 236 239 242 250 257 273 286 300 315 342 369 394

    14 252 254 258 266 273 289 302 316 331 358 385 410 42616 277 280 284 292 298 314 327 342 356 383 410 435 451 477

    18 302 305 309 317 323 339 353 367 382 408 435 461 477 502 528

    20 328 331 335 342 349 365 378 392 407 434 461 486 502 528 553 578

    24 379 381 385 393 400 416 429 443 458 485 512 537 553 578 604 629 680

    (add width of reinforcing pad where applicable)

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    37/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 37 of 39

    TABLE D: BRANCH OLET BRANCH OLET

    Up to header wall thickness 25 mmSize 2

    Size1 1 1 2 3 4 6 8 10

    110

    114 118

    1 121 125 132

    1 131 135 142 152

    2 139 143 150 160 168

    3 165 169 176 186 194 220

    4 183 187 194 204 212 238 256

    6 222 226 233 243 251 277 295 334

    8 271 275 282 292 300 326 344 383 432

    10 318 322 329 339 347 373 391 430 479 526

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    38/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    LGN SSPE xx-xxxx-xx.xxx (2002-04-10) SPECIFICATION.DOTH-005 ECC PIPING DESIGN

    INSTRUCTIONS-rev3.DOCPage 38 of 39

    TABLE E: BRANCH OLET BRANCH WELD

    Up to header wall thickness 25 mmBranch Weldolet:Weld 1 1 2 3 4 6 8 10

    99

    102 105

    1 106 110 116

    1 114 118 125 135

    2 121 125 131 142 150

    2.5 130 133 140 150 159

    3 139 142 149 159 168 193

    4 153 156 163 173 182 207 225

    5 168 171 178 188 197 222 240

    6 184 187 194 204 213 238 256 296

    8 210 214 220 231 239 264 282 322 371

    10 241 245 252 262 270 296 313 353 402 449

    12 271 274 281 291 300 325 343 382 431 478

    14 288 292 299 309 317 343 360 400 449 496

    16 318 321 328 338 347 372 390 429 478 525

    18 347 350 357 367 376 401 419 459 508 554

    20 376 380 386 397 405 430 448 488 537 583

    24 434 438 445 455 463 489 506 546 595 642

    26 422 426 433 443 451 477 494 534 583 630

    28 450 454 461 471 479 505 522 562 611 658

    30 476 479 486 496 505 530 548 588 636 683

    32 502 506 513 523 531 557 574 614 663 710

    34 524 528 534 545 553 578 596 636 685 731

    36 549 553 560 570 578 604 621 661 710 757

    38 575 578 585 595 604 629 647 687 735 782

    40 600 604 610 621 629 654 672 712 761 808

    42 626 629 636 646 655 680 698 737 786 833

    44 651 655 661 672 680 705 723 763 812 858

    46 676 680 687 697 705 731 748 788 837 884

    48 702 705 712 722 731 756 774 814 862 909

    (add width of reinforcing pad where applicable)

  • 7/27/2019 H-005 Ecc Piping Design Instructions-rev3

    39/39

    ABB Lummus Global B.V.

    SPECIFICATION

    Client Shell Eastern Petroleum (Pte) Ltd. Always refer to this number

    Plant Shell ECC Project Singapore 120421 04217 H-005

    Location Pular Ular, Singapore Dept./Sect. Project Specification

    Doc. No. E-00000-PI-7737-0028 Rev. 3.00

    12 JOB NOTES

    INDEX:

    Jobnote: rev. Topic:

    See document E-00000-PI-7737-0025