![Page 1: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/1.jpg)
The Future of Boiler Room Control SystemsTotal Integration Assures Safety, Energy and Fuel Savings, Low Emissions, and More
![Page 2: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/2.jpg)
Topics
2
Today’s Challenges
Areas Of Focus For Overcoming Challenges
The Future:The Integrated Package
Linked Up: Communication and Logging Systems
1
2
3
4
![Page 3: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/3.jpg)
Today’s Challenges
3
Fuel savings
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
![Page 4: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/4.jpg)
Today’s ChallengesParallel Many Boiler Requests
4
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
Fuel savings
![Page 5: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/5.jpg)
Pulled together by the transmission
Today’s ChallengesThe Boiler And Car Analogy
5
Aerodynamic body
High powered fuel injected engine
Advanced suspension and steering
Pulled together by the integrated controls
![Page 6: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/6.jpg)
Integrated Control System
6
Fuel Air
Burner Management
Combustion Control
![Page 7: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/7.jpg)
• C.C. power and modulating motor energized• Limit line and low fire switch• Pre-ignition interlock• Blower motor & terminal “B” in mod. motor• High fire switch• (30 second purge timing)• Running interlock circuit (CAPS)• Terminal “W” in mod. motor• Trial for pilot• Flame proving• Main valve energized (proven)• Release to modulation• Alarms
7
Burner Management System Sequence“The Gate Way”
![Page 8: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/8.jpg)
• Parallel positioning• Fully metered/cross
limited• O2 trim • Draft control• FGR• Variable speed drive• Feedwater control• Lead lag control
8
Integrated Control System
Fuel Air
Burner Management
Combustion Control And Sub-Systems
![Page 9: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/9.jpg)
Meeting Today’s Challenges
9
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
Fuel savings
![Page 10: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/10.jpg)
Mod Motor
Firing Rate Signal From Boiler Controls
Fuel Valve
Mechanical Adjustable
Cam
Common Shaft and Linkage Connections
and Control
FGR valve(If Used)
Combustion Air
10
Single Jack Shaft Control
![Page 11: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/11.jpg)
Servo
FGR
Required for Low NOX –
around 30 ppm and below
PP Loop Controller
11
Parallel PositioningFuel Air Ratio Control
Servo
FUEL 2
Servo
FUEL 1
Servo
![Page 12: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/12.jpg)
Readers andSensors
Areas Of Focus For Overcoming Challenges:O2 Trim Control
ServoServo
FUEL
O2 Loop Controller O2 Probe Analyzer
12
![Page 13: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/13.jpg)
Areas Of Focus For Overcoming Challenges:O2 Trim Control
13
Benefits
Flue gas O2 consistencyFlue gas O2 consistency
Better combustionBetter combustion
Fuel-air corrections in conjunction with ambient air
temperature changes
Fuel-air corrections in conjunction with ambient air
temperature changes
Fuel-to-steam efficiencygains at an average of 1%Fuel-to-steam efficiency
gains at an average of 1%
![Page 14: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/14.jpg)
Areas Of Focus For Overcoming Challenges:Variable Speed Drive Control
14
Variable SpeedDrive Control
Burner Blower
Energy SavingsVSD Loop Controller
![Page 15: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/15.jpg)
Areas Of Focus For Overcoming Challenges:Variable Speed Drive Control
15
Benefits
Electrical savingsElectrical savings
Better combustionBetter combustion
Better control of excess airBetter control of excess air
Increased turndown capabilities
Increased turndown capabilities
Noise reduction atmid-to-low speedsNoise reduction atmid-to-low speeds
![Page 16: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/16.jpg)
Areas Of Focus For Overcoming Challenges:Draft Control
16
Stack DraftTransmitter
Stack Draft Damper
Draft Loop Controller
![Page 17: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/17.jpg)
Areas Of Focus For Overcoming Challenges:Draft Control
17
Benefits
Better flame stabilityBetter flame stability
Better combustionBetter combustion
Ability to maintain a positive furnace pressure
Ability to maintain a positive furnace pressure
Better control of excess airBetter control of excess air
![Page 18: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/18.jpg)
Areas Of Focus For Overcoming Challenges:Economizer Control
18
Economizer By-Pass(if used):
Diverts flue gas around economizer on low flue gas temps
Stack Temperature
Cooler Water In
Heated Water Out
Flue Gas FromBoiler Outlet
Economizer Loop Controller
Less waste out the stack
![Page 19: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/19.jpg)
Areas Of Focus For Overcoming Challenges:Economizer Control
19
Benefits
Increased efficiency between 2-4%Increased efficiency between 2-4%
Recovery of “normally lost” stack gasheat to pre-heat boiler feedwater
Recovery of “normally lost” stack gasheat to pre-heat boiler feedwater
By-pass helps alleviate condensingat low flue gas temperatures
By-pass helps alleviate condensingat low flue gas temperatures
![Page 20: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/20.jpg)
What It Takes To Accomplish This
20
FiringRate
Control
Fuel-AirRatio
Control
O2Trim
DraftControl
Economizer Control
VSD Control
Requires• Individual loop
controllers
• Separate control panel
• Interface wiring for BMS
• Relays and timers
• Extra wiring
• Expert tuning
![Page 21: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/21.jpg)
The Future: The Integrated Package
• Logic PLC Controller• Touch Screen• Integrated Programming for Parallel
Positioning• Integrated Programming for O2 Trim
and Monitoring• Integrated Programming for Draft
Control• PLC Based Firing Rate Control
• Lead/Lag Programming• Stack Temp with High Limit Cut-off• Burner Management• Thermal Shock Protection• Dual Set Points• Remote Set Point Modulation• VSD Control• Economizer Control
21
![Page 22: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/22.jpg)
Meeting Today’s Challenges
22
Fuel savings
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
![Page 23: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/23.jpg)
23
Servo
FGR
Required for Low NOX –
around 30 ppm and below
Servo
FUEL 2
Servo
FUEL 1
Servo
FGR For NOx Reduction
Burner Blower
![Page 24: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/24.jpg)
FGR With Integral Firetube Burner
Linkage is replaced with servo motor
![Page 25: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/25.jpg)
Meeting Today’s Challenges
25
Fuel savings
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
![Page 26: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/26.jpg)
Boiler Lead-Lag Control
26
![Page 27: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/27.jpg)
The Future: The Integrated PackagePLC Based Systems for IWTs
Full Metered Control – 1,2,3 Element Feedwater
27
![Page 28: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/28.jpg)
Meeting Today’s Challenges
28
Fuel savings
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
![Page 29: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/29.jpg)
The Old WayDeaerator/Surge Tanks
29
How do I communicate?
![Page 30: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/30.jpg)
New And ImprovedDeaerator/Surge Tanks
Tank Pressure
Tank Levels
Tank Temperature
![Page 31: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/31.jpg)
New And ImprovedDeaerator/Surge Tanks
Recirculation Automatic By-Pass
Tank LevelIndication
Variable Speed Drive Pump Control
31
![Page 32: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/32.jpg)
New And ImprovedDeaerator/Surge Tanks
32
232 F
![Page 33: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/33.jpg)
Meeting Today’s Challenges
33
Fuel savings
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
![Page 34: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/34.jpg)
The Future: The Integrated PackageEasy Set and Configuration
34
![Page 35: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/35.jpg)
The Future: The Integrated PackageTypical Status Overview Screen
35
![Page 36: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/36.jpg)
Meeting Today’s Challenges
36
Fuel savings
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
![Page 37: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/37.jpg)
The Future: The Integrated PackageTypical Status Overview Screen
37
![Page 38: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/38.jpg)
The Future: The Integrated PackageTypical Firing Rate Control Screen
38
![Page 39: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/39.jpg)
The Future: The Integrated PackageUser Friendly Set Point Screens
39
![Page 40: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/40.jpg)
Meeting Today’s Challenges
40
Fuel savings
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
![Page 41: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/41.jpg)
The Future: The Integrated PackageTypical Alarm History Screen
Maintains Last 100 Alarm Points
41
![Page 42: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/42.jpg)
Boiler Room
Boiler Controls
Other Auxiliary
Equipment
Communications
System Flow Instrumentation
Flow Control for Hot Water Boilers
Surge Tank Controls
DA Controls
The Future: The Integrated PackageControlling the Balance of the Boiler Plant
42
![Page 43: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/43.jpg)
Linked Up: Communication And Logging Systems
43
Universal
Premium
![Page 44: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/44.jpg)
Linked Up: Communication And Logging Systems
44
![Page 45: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/45.jpg)
Linked Up: Communication And Logging SystemsSCADA System: Elite Data Logging Option
45
For Hawk Family of Products
Alarm Printer
Data Printer
Uninterruptable Power Supply
Data transmitted from all connected CB Hawk boiler
control systems, CB ADAC DA and surge tanks systems and other balance of plant controls
![Page 46: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/46.jpg)
Building Management System Integration
46
![Page 47: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/47.jpg)
Meeting Today’s Challenges
47
Fuel savings
Energy savings
Increased efficiencies
EPA regulations
Low NOXburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
![Page 48: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/48.jpg)
48
• Integrated burner management system
• Integrated combustion control system –separated for maximum safety (NFPA 85)
• Integrated sub systems
• Integrated alarming
• All operating parameters and faults easily seen
• Advanced low water control
Ultimate Safety
![Page 49: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/49.jpg)
49
Magnetostrictive Level Control
Level Master
![Page 50: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/50.jpg)
Meeting Today’s Challenges
50
Fuel savings
Energy savings
Increased efficiencies
EPA regulations
Low NOxburner control
Reducedoperating costs
Ultimate safety
Precise load control
Expandability
Easy integration
Ease of operation
Data logging and communications
![Page 52: Future Of Boiler Room Controls-05-15-12b - Cleaver …cleaverbrooks.com › reference-center › resource-library...Areas Of Focus For Overcoming Challenges: O 2 Trim Control 13 Benefits](https://reader034.fdocuments.net/reader034/viewer/2022042405/5f1e1eae084ced4e1937f642/html5/thumbnails/52.jpg)
Total Integration Goes Far Beyond Controls