Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

7
Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

description

Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01. The ASD suite of ILS standards. ASD/AIA/ATA?. ASD/AIA/ATA. ASD/AIA/ATA?. Development started Jan 2006. Planned issue date late 2006. S1000D. ASD and AIA work together since 2003 ATA joined Jan 2005 to evaluate future use of S1000D - PowerPoint PPT Presentation

Transcript of Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

Page 1: Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

Carl Wilén, Saab ABHuntsville, AL

2006-10-31/11-01

Page 2: Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

The ASD suite of ILS standardsS1000D

International specificationfor

technical publications

Utilizing aCommon Source DataBase

S2000MInternational Specification

formaterial management

Integrated data processingfor military equipment S3000L

Internationalprocedure handbook

forLogistics Support Analysis

LSA

S4000AInternational

procedure handbookfor

scheduledmaintenance analysis

Planned issue

date late 2006

Development

started

Jan 2006

ASD/AIA/ATA

ASD/AIA/ATA?

ASD/AIA/ATA?

Page 3: Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

S1000D

• ASD and AIA work together since 2003• ATA joined Jan 2005 to evaluate future use of

S1000D– May 2006: ATA to go S1000D– A400M to go Iss 2.2 (2.3)– 787 and A350 to go S1000D Iss 3.0

• Current issue is Iss 2.2

• Common MoU ASD-AIA-ATA in process

Iss 2.3 2007-02-28/Iss 3.0 200….

Page 4: Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

PLCS – S1000D

DEXes are needed to tie S1000D and engineering data together

• CAWG – CMBT (Config Management Business Team)– DEX1 A&D Basic parts data/Structure/Config data

• CAWG - MRPT (Maintenance Requirements PT)– DEX3 A&D Task information

• EPWG - EAUSWG (Eff, Appl, Update and Sensitivity WG)– DEX1 A&D and DEX3 A&D

• CAWG – EPWG– DEX2 A&D Fault isolation and reporting

The S1000D work IS BUSINESS DRIVEN (which involves some struggling with the anoraks in the technical team). Data needed by manufacturer and/or user is taken care of.

Page 5: Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

PLCS – S3000L

• S3000L needs an ”LSAR data set”– DEX3 A&D incl Refdata– Work will start mid 2007– Coordinated with S1000D-0007-PLCS work

Leif G – has introduced PLCS to EPWG– will brief S3000L project at next F2F meeting

Page 6: Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

S3000LS4000A

S2000M

S1000D

Acquisition logistics main business processes

Designof

Systems and

SupportEquipment

LogisticSupportAnalysis

Provi-sioning

Orderadmini-stration

Technicaldocu-

mentation

IN

SERVICE

USE

Acquisition logistics management

OPS Data

Functional

Breakdown

Equipment

Identification

Design Data

Logs

Mat Data

Logs Mat Requ.

LSA Data

LSA data

Design data

Provisioning

Data

IP Data

Subsets

Logs Mat

and Data

IETP

Other MediaDEX3 Task information

DEX1

Page 7: Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

Proposed new

Organizational structure

The Steering Committee

TPSMG

The Board

Electronic Publications

WG(EPWG)

Land Publ WG

(LPWG)

Sea Publ WG

(SPWG)

Air Publ WG

(APWG)

Civil Aviation

WG(CAWG)

Editorial WG(EDWG)

Defense WG

(DWG)

Standing WG

XX Task Team

(XXTT)

XX Task Team

(XXTT)

XX Task Team

(XXTT)

XX Task Team

(XXTT)

Task Team

ASD - CPSCCustomer & Product Support Committee

AIAProduct Support

Committee

ATAATA e-business

Parent org