Clara Gaspar, April 2012 The LHCb Experiment Control System: Automation concepts & tools.
1_kasapoglu_igarss11.ppt
Fujitsu Semiconductor Europe @ OFC 2010 - 56Gss ADC Enabling 100GbE
Status of work of Russian groups in the ATLAS collaboration CERN-Russia Joint Working Group October 2009 A.Zaitsev, IHEP, Protvino.
PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute.
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
First attempt of ECS training Work in progress… A lot of material was borrowed! Thanks!
Template for Weekly Online Report
NCAR Activity Update
UM lab activity
RPC D etector C ontrol S ystem: towards the final system
NCAR Activity Update John Hubbert, Cathy Kessinger, Mike Dixon, Scott Ellis, Greg Meymaris and Frank Pratte To the NEXRAD TAC 12-13 October 2005 San Diego,