1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
The 31 st Meeting of the CERN-Russia Committee Participation of Russian Institutions in the LHC Experiments 21 November 2009, Geneva Victor Savrin LHC.
The LHCb Experiment Control System:
Neutron Detector Shutdown Procedure
Operations
Belle-II iTOP HV Bias Prototypes (Power Reduction and Reliability)