Sign up for project updatesnortheastlink.vic.gov.au
Printed on 100% recycled paper. When you’re finished, please recycle. Authorised and published by the Victorian Government, 1 Treasury Place, Melbourne
Works Notification22 July 2021
Upcoming day works for North East LinkRoad reinstatement works on Greensborough Road in Greensborough
Works are continuing to move utility services to provide space for North East Link. This is ahead of major construction starting in late 2021.
Following recent works to relocate electrical and telecommunication services on Greensborough Road, we will be reinstating affected sections of the roadway.
This will require temporarily closing Greensborough Road between Santon and Teresa streets along with the southbound bicycle lane.
What we'll be doingPermanent road reinstatement works
We will restore the road surface between 498 and 502 Greensborough Road, and the southbound bicycle lane between Santon and Doris streets.
This will involve:
• Occupying sections of Greensborough Road with designated work areas
• Removing temporary road reinstatement materials
• Laying permanent asphalt pavement
• Installing road surface markings.
Traffic management
We use traffic management when working near roadways to safely guide vehicles, cyclists and pedestrians through the area. These temporary measures are put in place to protect workers and the community.
This will involve:
• Greensborough Road closed between Santon and Teresa streets with a local detour route during works between 498 and 502 Greensborough Road
• Teresa and Doris streets closed at Greensborough Road during works in the southbound bicycle lane
• Southbound bicycle lane closed between Santon and Doris streets.
When and where we'll be workingWe will be working on Greensborough Road between Santon and Doris streets from Wednesday 28 July to Friday 30 July.
Working hours are 7am to 6pm, with traffic management set up from 6:30am.
Please note dates and times are subject to change.
What this means for youWe will contact properties near work areas in advance to provide further information about planned disruptions.
During works you may notice:
• Work crews and construction vehicles
• Noise from machinery and equipment
• Traffic management equipment, signage, and personnel
• Restricted driveway access and on-street vehicle parking near work areas.
We appreciate your patience and understanding throughout these works.
Health and safetyThe health and safety of our workforce and community remains our top priority. Physical distancing measures are in place as well as increased hygiene practices. For more information about coronavirus (COVID-19) visit coronavirus.vic.gov.au
Contact [email protected]
1800 105 105
NELP GPO Box 2392, Melbourne VIC 3001 Hub 17 Watsonia Rd, Watsonia VIC 3087
Please contact us if you would like this information in an accessible format.
If you need assistance because of a hearing or speech impairment, please visit relayservice.gov.au
Translation service For languages other than English, please call 03 9209 0147
Follow us on social media @nelpvic
Legend Local detour route during works between 498 and 502 Greensborough Road
Work areas
Road closed during works in southbound bicycle lane
Road reinstatement works on Greensborough Road
Schedule is subject to change. Visit northeastlink.vic.gov.au/works for schedule changes. If you have any questions, please contact us on 1800 105 105
Top Related