Download - East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

Transcript
Page 1: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

East Side Lands Wastewater Servicing Class EA

Public Consultation Centre November 8, 2016

5:00pm ~ 7:30pm

g Deer Ridge Golf Club200 Deer Ridge Drive, Kitchener

Page 2: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

CONESTOGA PKWY

KITC

HEN

ER

BIS

HO

P S

T N

FOU

NTAIN

ST N

BLAIR R

D

KING ST E

HOMER W

ATSON BLVD LACK

NER BLVD

KR

AM

P R

D

HW

Y #7

RID

ER R

D

VANC

E RD

LERC

H R

D

FIFE RD

HO

PEWELL C

REEK R

D

KO

SS

UTH

RD

CHILLIGO RD HESPELER RD

BRID

GE ST E

EBYCREST RD

MEN

NO

ST

LON

SDALE R

D

COBER RD

FOUNTAIN ST N

CHERRY B

LOS

SO

M R

D

HWY #401

FAIRWAY RD N

OTTAW

A ST N

VICTO

RIA ST N

RIVER RD

WO

OLW

ICH

RIVERBANK DR

CA

MB

RID

GE

HOMH

R

HOMER

East Side LandsThe East Side Lands is an area of grow

th in the Region of W

aterlooprim

arily for employm

ent development w

ith some residential grow

th.W

astewater servicing is required to support this planned developm

ent

EAST SID

E LAN

DS

BO

UN

DA

RYRE

GIO

N O

F WA

TER

LOO

INTE

RN

ATIO

NA

LA

IRP

OR

T

STAG

E 1 (MESP)

EA STU

DY

PRIM

AR

Y FOC

US

ALLE

ND

ALE

RD

MID

DLE

BLO

CK

RD

MO

HA

WK

RD

HESPELER

WW

TP

BEAVERDALE RD

DE

ER

RID

GE

SU

BD

IVIS

ION

KITC

HEN

ERW

WTP

EA

GLE

ST

PRESTO

N W

WTP

PRESTO

N W

WTP

Page 3: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

Project Overview What is this project about? Determining the long-term wastewater servicing solution to support growth in the East Side Lands.

What is the short term strategy? To make the best use of existing infrastructure until the long term solution is needed. Initially, wastewater from the East Side Lands will be treated at the Preston Wastewater Treatment Plant (WWTP).

What is the long term strategy? Ultimately, wastewater from the East Side Lands will be treated at the Kitchener WWTP.

What is the focus of this study? How the wastewater flows will reach the Kitchener WWTP.

We would like your input on the proposed wastewater servicing strategy

Page 4: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

problem and inventory of

EA Planning Process

Identify the Identify the problem and problem and complete an complete an

existing conditions

Develop alternative alternative

Select a complete an inventory of inventory of

Develop alternative solutions

Evaluate the Evaluate the alternatives

Select a preferred preferredpreferred solution

Stakeholderr Consultation

This study is being completed as a Schedule ‘B’ Class EA. It builds on the previous work of the East Side Lands

Master Environmental Servicing Plan (MESP).

Page 5: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

Project Approach The project approach is to divide the servicing strategy into two parts:

Part 1: Route Considers the alignment of the sanitary servicing infrastructure (pipeline) from the East Side Lands to the Kitchener Wastewater Treatment Plant (WWTP)

Part 2: Wastewater Transfer Considers options for gravity or pumped wastewater flows

- and ­

Options for crossing the Grand River to reach the Kitchener WWTP.

Page 6: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

Evaluation Evaluation Factors Scoring of Options

Good

Poor

A preferred solution for the sewer pipe route was identified first (Part 1), then a preferred solution for transferring wastewater was identified (Part 2).

Page 7: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

GR

AN

D R

IVE

R

GRAND RIVER

GRAND RIVER

GRA

ND R

IVER

GRAND RIVER

GRAND RIVER

GRAND RIVER

GRAND RIVER

GRAND RIVER

RAILWAY LINE

RAILWAY LINE

RAILW

AY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LI

NE

RAILWAY LINE

CAM

BRID

GE

CAM

BRID

GE

KITC

HENE

R

KITC

HENE

R

CAMBRIDGE

CAMBRIDGE

KITCHENER

KITCHENER

CAMBRIDGE

CAMBRIDGE

KITCHENER

KITCHENER

CAMBRIDGE

CAMBRIDGE

KITCHENER

KITCHENER

CAMBRIDGE

CAMBRIDGE

KITCHENER

KITCHENER

GRA

ND R

IVER

GRA

ND R

IVER

FOU

NTA

IN S

T N

CHERRY

BLOSSOM RD

HWY #8

KING ST

PIONEER TOWER RD

HWY #8

SPORTSWORLD D

R

KITCHENER

CAMBRIDGE

Part 1 - Route OptionsFive options were evaluated for the route of the sewer pipe

FREEPORT PS Future North-South Collector Road ALLENDALE RD (Exact alignment to be

determined) KITCHENERKITCHENER

CAMBRIDGECAMBRIDGE

MAPLE GROVE RD

DEER RIDGE DR

PIONEER

LOO

KO

UT

LAN

ETOWER PS

KITCHENER WWTP

ROUTE OPTIONS ROUTE 'A'

ROUTE 'B'

ROUTE 'C'

ROUTE 'D'

ROUTE 'E'

Page 8: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

Part 1 Evaluation of Routes

Pipeline Route B is currently the preferred option Key advantages include:

Shortest overall length (and therefore cost) Avoids impacts to important natural features Mostly located within existing public utility corridors and roads to minimize impacts to the community

Page 9: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

Part 2 Wastewater Transfer Options

Option 1 Option 2 Option 3 Gravity sewer and pumping Gravity sewer and pumping Gravity sewer only

station in the Deer Ridge station at Kitchener Wastewater with a dedicated service bridge Subdivision Treatment Plant across the Grand River

Three wastewater transfer options were evaluated

Page 10: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

t t t t

Part 2 - Evaluation of Wastewater Transfer Options

Option 3 is currently the preferred solution • Key advantages include:

No pumping station required Lower capital and operating cost Lower risk of impacts to the Grand River

OO tii 33 ii tll thh ff dd ll tii

Page 11: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

GR

AN

D R

IVE

R

GRA

ND R

IVER

GRAND RIVER

GRAND RIVER

GRAND RIVER

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

CAMBRIDGE

CAMBRIDGE

KITCHENER

KITCHENER

CAMBRIDGE

CAMBRIDGE

KITCHENER

KITCHENER

CAMBRIDGE

CAMBRIDGE

KITCHENER

KITCHENER

H

KING ST

PIONEER TOWER RD

HWY #8

SPORTSWORLD D

R

Preferred Solution Future North-South Collector Road

E EEDEER RIDGE DR

PIONEER TOWER PS

KITCHENER WWTP

KO

KLO

OK

OU

T LA

NE

Page 12: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

Crossing the Grand River

A new service bridge across the Grand River is proposed to carry the sewer pipe to the treatment plant.

View from Kitchener Wastewater Treatment Plant Aerial view looking west

Page 13: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

-

-PublPu

Proposed Timing

Finalize the Finalize the Environmental EnvironmentalEnvironmental Study Report

RequestRequest Council CouncilCouncil

Approval

30300 Day 3300 ayDaDPublic Public PP icblPub

Review ReviewReview Period

Finalize Finalize thethethe

Class EA

Complete the Complete the Wastewater WastewaterWastewater Treatment TreatmentTreatment

Master Plan

Construct the Construct the East Side Lands East Side LandsEast Side Lands

Long Term Long Term Long Term Servicing Solution

Fall 2016 Winter 2017 Fall 2017 Future

(to be confirmed)

Public Input Public Input Public Input

Page 14: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

Factors Affecting Timing

The timing for construction will depend on: • rate of population growth; and • wastewater flows

The Wastewater Treatment Master Plan is currently underway to estimate the timing for construction of the long term solution

Page 15: East Side Lands Wastewater Servicing Class EA Public ... · East Side Lands Wastewater Servicing Class EA Public Consultation Centre November 8, 2016 5:00pm ~ 7:30pm Deer Ridge Golf

Thank You for Participating Please deposit your comment sheet in the box provided or forward to the Region.

For more information, please contact:

Jorge Cavalcante, M.Sc., P.Eng. Duane Lindner, P.Eng. Manager, Water Services Project Manager Region of Waterloo Associated Engineering [email protected] [email protected] 519–575-4412 226-214-3187 ext. 5301 150 Frederick Street 508 Riverbend Drive Kitchener ON N2G 4J3 Kitchener ON N2K 3S2