  • East Side Lands Wastewater Servicing Class EA

    Public Consultation Centre November 8, 2016

    5:00pm ~ 7:30pm

    g Deer Ridge Golf Club 200 Deer Ridge Drive, Kitchener

  • CONESTOGA PKW Y

    K ITC

    H EN

    ER

    B IS

    H O

    P S

    T N

    FO U

    N TAIN

    ST N

    BLAIR R

    D

    KING ST E

    HOM ER W

    ATSON BLVD LACK

    NER BLVD

    K R

    A M

    P R

    D

    H W

    Y #7

    R ID

    ER R

    D

    VAN C

    E R D

    LER C

    H R

    D

    FIFE R D

    H O

    PEW ELL C

    R EEK R

    D

    K O

    S S

    U TH

    R D

    CHILLIG O RD HESPELER RD

    BR ID

    G E ST E

    EBYCREST RD

    M EN

    N O

    ST

    LO N

    SD ALE R

    D

    CO BER RD

    FOUNTAIN ST N

    CHERRY B

    LO S

    S O

    M R

    D

    HW Y #401

    FAIRW AY RD N

    O TTAW

    A ST N

    VIC TO

    R IA ST N

    RIVER RD

    W O

    O LW

    IC H

    RIVERBANK DR

    C A

    M B

    R ID

    G E

    HOM H

    R

    HOM ER

    East Side Lands The East Side Lands is an area of grow

    th in the R egion of W

    aterloo prim

    arily for em ploym

    ent developm ent w

    ith som e residential grow

    th. W

    astew ater servicing is required to support this planned developm

    ent

    EA ST SID

    E LA N

    D S

    B O

    U N

    D A

    R YREG

    IO N

    O F W

    A TE

    R LO

    O IN

    TE R

    N A

    TIO N

    A L

    A IR

    P O

    R T

    STA G

    E 1 (M ESP)

    EA STU

    D Y

    PR IM

    A R

    Y FO C

    U S

    A LLE

    N D

    A LE

    R D

    M ID

    D LE

    B LO

    C K

    R D

    M O

    H A

    W K

    R D

    H ESPELER

    W W

    TP

    BEAVERDALE RD

    D E

    E R

    R ID

    G E

    S U

    B D

    IV IS

    IO N

    K ITC

    H EN

    ER W

    W TP

    E A

    G LE

    S T

    PR ESTO

    N W

    W TP

    PR ESTO

    N W

    W TP

  • Project Overview What is this project about? Determining the long-term wastewater servicing solution to support growth in the East Side Lands.

    What is the short term strategy? To make the best use of existing infrastructure until the long term solution is needed. Initially, wastewater from the East Side Lands will be treated at the Preston Wastewater Treatment Plant (WWTP).

    What is the long term strategy? Ultimately, wastewater from the East Side Lands will be treated at the Kitchener WWTP.

    What is the focus of this study? How the wastewater flows will reach the Kitchener WWTP.

    We would like your input on the proposed wastewater servicing strategy

  • problem and inventory of

    EA Planning Process

    Identify the Identify the problem and problem and complete an complete an

    existing conditions

    Develop alternative alternative

    Select a complete an inventory of inventory of

    Develop alternative solutions

    Evaluate the Evaluate the alternatives

    Select a preferred preferredpreferred solution

    Stakeholderr Consultation

    This study is being completed as a Schedule ‘B’ Class EA. It builds on the previous work of the East Side Lands

    Master Environmental Servicing Plan (MESP).

  • Project Approach The project approach is to divide the servicing strategy into two parts:

    Part 1: Route Considers the alignment of the sanitary servicing infrastructure (pipeline) from the East Side Lands to the Kitchener Wastewater Treatment Plant (WWTP)

    Part 2: Wastewater Transfer Considers options for gravity or pumped wastewater flows

    - and ­

    Options for crossing the Grand River to reach the Kitchener WWTP.

  • Evaluation Evaluation Factors Scoring of Options

    Good

    Poor

    A preferred solution for the sewer pipe route was identified first (Part 1), then a preferred solution for transferring wastewater was identified (Part 2).

  • G R

    A N

    D R

    IV E

    R

    GRAND RIVER

    GRAND RIVER

    G RA

    ND R

    IV ER

    GRAND RIVER

    GRAND RIVER

    GRAND RIVER

    GRAND RIVER

    GR AN

    D R IVE

    R

    RAILW AY LINE

    RAILW AY LINE

    R AILW

    AY LIN E

    RAILWAY LINE

    RAILWAY LINE

    RAILWAY LINE

    RAILWAY LINE

    RAILWAY LINE

    RAILWAY LINE

    RAILWAY LINE

    RA ILW

    AY LI

    NE

    RAILWAY LINE

    CA M

    BR ID

    G E

    CA M

    BR ID

    G E

    KI TC

    HE NE

    R

    KI TC

    HE NE

    R

    CAM BRIDGE

    CAM BRIDGE

    KITCHENER

    KITCHENER

    CAMBRIDGE

    CAMBRIDGE

    KITCHENER

    KITCHENER

    CAMBRIDGE

    CAMBRIDGE

    KITCHENER

    KITCHENER

    CAMBRIDGE

    CAMBRIDGE

    KITCHENER

    KITCHENER

    G RA

    ND R

    IV ER

    G RA

    ND R

    IV ER

    FO U

    N TA

    IN S

    T N

    CHERRY

    BLOSSOM RD

    HW Y #8

    KING ST

    PIONEER TOWER RD

    HW Y #8

    SP OR

    TS WO

    RL D

    DR

    KITCHENER

    CAMBRIDGE

    Part 1 - Route Options Five options were evaluated for the route of the sewer pipe

    FREEPORT PS Future North-South Collector Road ALLENDALE RD (Exact alignment to be

    determined) KITCHENERKITCHENER

    CAMBRIDGECAMBRIDGE

    MAPLE GROVE RD

    DEER RIDGE DR

    PIONEER

    LO O

    K O

    U T

    LA N

    ETOWER PS

    KITCHENER WWTP

    ROUTE OPTIONS ROUTE 'A'

    ROUTE 'B'

    ROUTE 'C'

    ROUTE 'D'

    ROUTE 'E'

  • Part 1 Evaluation of Routes

    Pipeline Route B is currently the preferred option Key advantages include:

    Shortest overall length (and therefore cost) Avoids impacts to important natural features Mostly located within existing public utility corridors and roads to minimize impacts to the community

  • Part 2 Wastewater Transfer Options

    Option 1 Option 2 Option 3 Gravity sewer and pumping Gravity sewer and pumping Gravity sewer only

    station in the Deer Ridge station at Kitchener Wastewater with a dedicated service bridge Subdivision Treatment Plant across the Grand River

    Three wastewater transfer options were evaluated

  • t t t t

    Part 2 - Evaluation of Wastewater Transfer Options

    Option 3 is currently the preferred solution • Key advantages include:

    No pumping station required Lower capital and operating cost Lower risk of impacts to the Grand River

    OO tii 33 ii tll thh ff dd ll tii

  • G R

    A N

    D R

    IV E

    R

    G RA

    ND R

    IV ER

    GRAND RIVER

    GRAND RIVER

    GR AN

    D R IVE

    R

    RAILW AY LINE

    RAILW AY LINE

    RAILWAY LINE

    RAILWAY LINE

    RAILWAY LINE

    CAM BRIDGE

    CAM BRIDGE

    KITCHENER

    KITCHENER

    CAMBRIDGE

    CAMBRIDGE

    KITCHENER

    KITCHENER

    CAMBRIDGE

    CAMBRIDGE

    KITCHENER

    KITCHENER

    H

    KING ST

    PIONEER TOWER RD

    HW Y #8

    SP OR

    TS WO

    RL D

    DR

    Preferred Solution Future North-South Collector Road

    E EEDEER RIDGE DR

    PIONEER TOWER PS

    KITCHENER WWTP

    K O

    K LO

    O K

    O U

    T LA

    N E

  • Crossing the Grand River

    A new service bridge across the Grand River is proposed to carry the sewer pipe to the treatment plant.

    View from Kitchener Wastewater Treatment Plant Aerial view looking west

  • -

    - PublPu

    Proposed Timing

    Finalize the Finalize the Environmental EnvironmentalEnvironmental Study Report

    RequestRequest Council CouncilCouncil

    Approval

    30300 Day 3300 ayDaD Public Public PP icblPub

    Review ReviewReview Period

    Finalize Finalize thethethe

    Class EA

    Complete the Complete the Wastewater WastewaterWastewater Treatment TreatmentTreatment

    Master Plan

    Construct the Construct the East Side Lands East Side LandsEast Side Lands

    Long Term Long Term Long Term Servicing Solution

    Fall 2016 Winter 2017 Fall 2017 Future

    (to be confirmed)

    Public Input Public Input Public Input

  • Factors Affecting Timing

    The timing for construction will depend on: • rate of population growth; and • wastewater flows

    The Wastewater Treatment Master Plan is currently underway to estimate the timing for construction of the long term solution

  • Thank You for Participating Please deposit your comment sheet in the box provided or forward to the Region.