Yuksek Katli Bina Tasarimi

download Yuksek Katli Bina Tasarimi

of 95

Transcript of Yuksek Katli Bina Tasarimi

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    1/95

    Columbus Center

    East

    Kegan International

    10 December 2010

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    2/95

    Columbus Center Project10 December 2010

    Agenda

    I. Introduction to Kegan

    II. Overview - Columbus Center Project

    III. Conceptual DesignIV. Focus

    I. High Rise Building The Tripod

    II. Retail Center The Arch

    V. Concluding Remarks

    I. Costs and Benefits

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    3/95

    Columbus Center Project10 December 2010

    Kegan International

    Project Members:

    Jason COOK, Project Manager

    Aurelie BLE, Structural Engineer

    Sinan KETEN, Structural Engineer

    Miriam SON, Architectural Engineer

    Goldie KATZOFF, Construction Engineer

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    4/95

    Columbus Center

    Project

    Overview

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    5/95

    Columbus Center Project10 December 2010

    Columbus Center Project

    Overview

    Develop air rights spanning theMassachusetts Turnpike, I-90

    Utilize the fragmented, small plots nearthe turnpike for structural supports

    Create social and economical value forSouth End

    Maintain financial appeal to investors

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    6/95

    Columbus Center Project10 December 2010

    Columbus Center Project

    Site Location

    Downtown

    Boston, MA

    North Tipof the

    South End

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    7/95

    Columbus Center Project10 December 2010

    Columbus Center Project

    Site Layout

    16 17 18 19

    Parcel 16: 101 Clarendon StreetParking structure to service new

    development

    Parcel 17: 100 Berkeley StreetHigh rise building with office and

    residential space

    Parcel 18: 171 Arlington StreetArch structure for retail shopping

    Parcel 19: N/AUrban park environment

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    8/95

    Columbus Center Project10 December 2010

    Columbus Center Project

    Conceptual Design

    Parcel 16-Parking Garage

    Cantilever Structure

    Design A: Concrete Segmental bridge idea

    Pre-stressed & lightweight

    Design B: Steel

    Multi-story steel truss Prefabricate & install

    1

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    9/95

    Columbus Center Project10 December 2010

    High Rise Conceptual Design

    Conceptual Design

    Parcel 17-High Rise

    Design A: Tripod

    Longest span at base Inherent lateral stability

    Intriguing architecture

    Design B: Hanging

    Efficient use of material Column-free at grade

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    10/95

    Columbus Center Project10 December 2010

    Columbus Center Project

    Conceptual Design

    Parcel 18-Retail Center

    Design A: Arched Gravity Structure

    Quick and easy erection

    Design B: Arched Hanging Structure

    Lighter structure

    Less expensive

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    11/95

    Columbus Center Project10 December 2010

    Columbus Center Project

    Conceptual Design

    Parcel 19-Park

    Design: Hanging Platform

    Concrete slab supported by3 piles

    Overturning momentprevented by trussedbracing

    Additional stability providedby cables

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    12/95

    Columbus Center Project10 December 2010

    Columbus Center Project

    Selected Focus

    Parcel 17

    The High Rise

    Tripod Hanging

    Parcel 18

    The Arch

    Hanging

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    13/95

    Design OverviewThe High Rise

    Design OverviewStructural System

    Constructability

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    14/95

    Columbus Center Project10 December 2010

    High Rise Design OverviewFinal Design

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    15/95

    Columbus Center Project10 December 2010

    High Rise Design Overview

    Properties

    Combination of Schemes Tripod main structure

    Hanging floors

    Traditional gravity supportedtop section

    Structure Dimensions 57 stories, 720 ft tall

    300 ft clear span at grade 60 ft minimum at intersection

    135 ft span at top

    700,000 sq. ft of floor space

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    16/95

    Structural SystemThe High Rise

    Design OverviewStructural System

    Constructability

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    17/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Overview

    Main Structure

    Crown

    Core

    Load Transfer

    Foundation

    Structural Analysis

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    18/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Main Structure

    Main Structure

    Exterior Columns

    Tension Members

    Floor Framing

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    19/95

    Columbus Center Project10 December 2010

    Exterior Columns

    Function

    Carries loads to ground Provides inherent lateral

    stability and stiffness

    Description

    Triangular cross-section 76 degrees incline

    Bottom to top tapering

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    20/95

    Columbus Center Project10 December 2010

    Exterior Columns

    Materials

    Two concentric built up steeltriangles

    Concrete encased intriangular steel sections

    Center kept hollow

    Lowers weight

    Avoids mass concrete heatdissipation problems

    Increases moment of inertia

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    21/95

    Columbus Center Project10 December 2010

    Exterior Columns

    Dimensions

    Size determined byproportion of building

    Appears robust andcommunicates stability

    Bottom: 15 ft side

    Top: 5 ft side

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    22/95

    Columbus Center Project10 December 2010

    Tension Members

    Function

    Carries floor loadsup to exteriormega-columns

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    23/95

    Columbus Center Project10 December 2010

    Tension Members

    Description

    Exterior members Solid steel rods

    Placed at every five floors

    Connected at floor-column intersection rather

    than keeping angleconsistent

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    24/95

    Columbus Center Project10 December 2010

    Tension Members

    Description

    Interior members Solid steel rods

    Each member carriesloads of varying number offloors

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    25/95

    Columbus Center Project10 December 2010

    Tension Members

    Geometry

    Exteriormembers sizedaccording to load

    Interior membersplaced for

    constant radius

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    26/95

    Columbus Center Project10 December 2010

    Floor Framing

    Overview

    First floor mostcritical

    Large spans

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    27/95

    Columbus Center Project10 December 2010

    Floor Framing

    Layout

    Typical simple spanframes

    Reduced unbracedlength, 8 ft on centerspacing

    Corrugated metaldecking with one wayslabs

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    28/95

    Columbus Center Project10 December 2010

    Floor Framing

    SAP Analysis

    Floor framing Member sizing

    Check for strength

    Check for deflection

    High Rise Structural System

    Main Structure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    29/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Main Structure

    Floor Framing

    SAP analysis

    Deformed Shape

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    30/95

    Columbus Center Project10 December 2010

    Deformed Shape

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    31/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    The Crown

    The Crown

    Hat Truss

    Mega-Columns

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    32/95

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    33/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    The Crown

    Hat Truss

    Structure

    Exterior steel truss on3 faces

    W14 columns andchords, HSS diagonals

    Interior truss for spanloads, lateral stability

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    34/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    The Crown

    Mega-Columns

    Function

    Carries gravity loads tothe transition intersection

    Provides lateralresistance

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    35/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    The Crown

    Mega Columns

    Structure

    Same scheme as mainstructure

    Gravity loads distributedto transfer system

    Slabs and floor framinghelps lateral stability

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    36/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    The Core

    The Core

    Function

    Configuration

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    37/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    The Core

    Function

    Access to floors

    Resistance to inter-story drift

    Support for floorframing

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    38/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    The Core

    Configuration Braced steel truss

    Main structure Hung from transition

    intersection

    Larger triangle area

    Crown Supported by transition

    intersection

    Smaller rectangulararea

    Mainstructure

    Crownstructure

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    39/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Load Transfer

    Load Transfer

    Main Structure Crown

    Transition Tension Member -

    Column/Girder Connection

    Exterior members

    Interior members

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    40/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Load Transfer

    Main Structure Crown Transition

    Function Point of intersection

    of the main structureand crown

    Distributes loads tomain structurecolumns

    Provides bendingrigidity

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    41/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Load Transfer

    Main Structure Crown Transition

    Behavior Exterior mega-

    truss diagonals forload transfer

    Interior core forresisting bendingand drift

    Floor framing forlateral stability

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    42/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Load Transfer

    Tension Member - Column/GirderConnections

    Description Exterior connections

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    43/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Load Transfer

    Tension Member - Column/GirderConnections

    Description Interior connections

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    44/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Load Transfer

    Tension Member - Column/GirderConnections

    Design considerations Typical connections

    Double shear planes

    Stiffeners

    Hidden connections

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    45/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Load Transfer

    Tension Member - Column/GirderConnections

    On-site considerations Prefabricated welds

    Accessibility of connections

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    46/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Structural Analysis

    Structural Analysis

    Main Structural Skeleton

    Create geometry Dead, live and wind load combinations

    Rigid floor assumption diaphragm

    Find max forces on mega- columns

    Core member sizing

    Structural dynamics

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    47/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Structural Analysis

    Structural Analysis

    SAP Model of Main Structural Skeleton

    Deformed shape Torsion mode

    Sway mode

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    48/95

    Columbus Center Project10 December 2010

    Deformed Shape

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    49/95

    Columbus Center Project10 December 2010

    Fundamental Mode

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    50/95

    Columbus Center Project10 December 2010

    Second Mode

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    51/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Foundation

    Foundation Considerations

    Loads

    Local Soil Structure Foundation for Each Column

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    52/95

    Columbus Center Project10 December 2010

    Loads

    3 mega-columns

    30,000 kips each Local Soil Structure

    Organic deposits to -20 ft

    Marine deposits to -105 ft

    Bedrock at 105 ft

    High Rise Structural System

    Foundation

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    53/95

    Columbus Center Project10 December 2010

    High Rise Structural System

    Foundation

    Foundation forEach Column

    (6) 4-ft diametercaissons underpile cap

    Rock socket

    length: 57 ft Caisson capacity:

    5,270 kips

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    54/95

    ConstructabilityThe High Rise

    Design ConceptsStructural Details

    Constructability

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    55/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Overview

    Sequence

    Schedule Projected construction

    GANTT chart

    Special Considerations

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    56/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    STAGE 1: Foundation

    Clear site

    Foundation

    Drill

    Caissons

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    57/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    STAGE 2: Column Construction

    Stable under their own weightand wind loading up to height

    of 300 ft

    Transport prefabricated steelsections

    Progressively fill with concrete

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    58/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    STAGE 2: Column Construction

    Erect a temporary bracingsystem at 252 ft

    Provides lateral stability andstiffness

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    59/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    STAGE 2: Column Construction

    Continue construction

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    60/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    STAGE 2: Column Construction

    Erect a 2nd temporary bracingsystem at 450 ft

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    61/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    STAGE 2: Column Construction

    At 540 ft, reach transitionintersection

    Inherent stiffness of tripodstructure goes into effect ascolumns meet and connectionconstructed

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    62/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    STAGE 3: Core, Rods, Flooring, Frame

    Begin construction of core

    Trailing the downward construction

    of the core

    Affix tension rods

    Put in floors

    Remove temporary bracing

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    63/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    STAGE 3: Core, Rods, Flooring, Frame

    Begin construction on the crown,building upwards, at 252 ft

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    64/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    Sequence

    STAGE 3: Core, Rods, Flooring, Frame

    Continue with simultaneousconstruction

    Building downwards on main

    structure

    Building upwards on crown

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    65/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    Sequence

    STAGE 3: Core, Rods, Flooring, Frame

    Complete framing

    Construction of hat truss

    Construction of roof

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    66/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Sequence

    Sequence

    STAGE 4: Finishing

    Timing overlaps with stage 3 Begin after the start of core

    construction (Start-Start relationship)

    Mechanical system

    Faade

    Interior finishing

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    67/95

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    68/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Special Considerations Mass Pike Related

    Minimal highway closures

    Build high rise from columns up

    Utilization of climbing cranesthroughout

    Safety considerations

    Install safety net

    Weary motorist

    Provide screen to block their viewof construction

    http://www.nps.gov/jeff/arch-const.htm

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    69/95

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    70/95

    Columbus Center Project10 December 2010

    High Rise Constructability

    Special Considerations

    On-site Storage Issues

    Land surrounding columns can be used forimmediate storage

    Parcel 16 can be taken advantage of to storematerials for as long as construction ofparking structure has not yet begun

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    71/95

    Design OverviewThe Arch

    Design OverviewStructural System

    Constructability

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    72/95

    Columbus Center Project10 December 2010

    Total Area:

    222,500 ft2

    Land:21,900 ft2

    Parcel 18: Retail Structure

    Arch Site

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    73/95

    Structural SystemThe Arch

    Design OverviewStructural System

    Constructability

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    74/95

    Columbus Center Project10 December 2010

    Arch Design Hanging Structure

    Arch Structural System

    Overview

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    75/95

    Columbus Center Project10 December 2010

    Maximal high : 71.76 ftInitial incline : 45

    Arch Structural System

    Optimal Shape Determination

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    76/95

    Columbus Center Project10 December 2010

    Concrete slabs 8 in thick

    Double glazed glass roof 1 in thick

    Steel frame

    Arches and beams:

    W section members Columns: Plain steel

    tension member

    Foundation LBE: concrete

    Tied arch: plain steel

    tension member

    Arch Structural System

    Materials and Description

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    77/95

    Columbus Center Project10 December 2010

    Ensure stability betweentwo arches

    Carry roof loads of the

    double glazed glass

    52.80 ft wide and 4.92 ft high

    W sections : W8x24

    W8x10

    Arch Structural System

    Longitudinal Beam Description

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    78/95

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    79/95

    Columbus Center Project10 December 2010

    Tied arch:4in radius horizontal tensionmember

    Soil nature:Organic Deposits until -20ftMarine Deposit until -100ftBedrock beyond -100ft

    Foundations:LBE 4x9 ft at each end of the 14archesRock Socket length = 115 ft

    Arch Structural System

    Foundations

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    80/95

    Columbus Center Project10 December 2010

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    81/95

    ConstructabilityThe Arch

    Design ConceptsStructural Details

    Constructability

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    82/95

    Columbus Center Project10 December 2010

    Arch Constructability

    Sequence STAGE 1: Foundation

    Clear site

    Drill

    Caissons Arch Tie

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    83/95

    Columbus Center Project10 December 2010

    Arch Constructability

    Sequence STAGE 2: Arch Erection

    Off-site fabrication of segments

    Truck-in and raise into place during

    early morning hours Y-support, fixed at the center of the

    highway to provide temporary support

    Put up first two

    arches concurrently

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    84/95

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    85/95

    Columbus Center Project10 December 2010

    Arch Constructability

    Sequence STAGE 4: Tension Members

    Put tension members into place

    Pouring the first floor

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    86/95

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    87/95

    Columbus Center Project10 December 2010

    Arch Constructability

    Sequence STAGE 6: Finishing Touches

    Roof

    Faade

    Mechanical system Interior

    Etc.

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    88/95

    Columbus Center Project10 December 2010

    Arch Constructability

    Sequence Projected Time: 28 months

    Start: June 2, 2008 End: October 25, 2010

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    89/95

    Columbus Center Project10 December 2010

    Arch Constructability

    Special Considerations

    Considerations similar to high-rise

    Exceptions

    Highway closures in early morning hoursduring stage 1 of construction

    Lifting members into place

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    90/95

    Concluding RemarksCosts & Benefits

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    91/95

    Columbus Center Project10 December 2010

    Costs & Benefits-The High Rise

    Costs of the High Rise Structure

    Gross estimate: $225,968,000

    Material & construction costs: $82,000,000

    Concrete: 17,000 CY @ $988/CY

    Steel: 25,000 tons @ 2575/ton

    Mechanical & electrical: $30,984,000

    Difficulty factor scale: 2

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    92/95

    Columbus Center Project10 December 2010

    Costs and Benefits- The Arch

    Cost of the Arch Structure

    Gross estimate: $101,425,000

    Material & construction costs: $91,000,000

    Concrete: 19,000 cy @ $988/cy

    Steel: 28,150 tons @ 2575/ton

    Mechanical & electrical: $10,425,000

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    93/95

    Columbus Center Project10 December 2010

    Cost & Benefits

    Benefits

    The tripod high rise

    Redefines the Boston skyline

    Prime office space Penthouse rentals with magnificent views

    The arch structure

    Profitable retail space

    Idea location near the high rise Brings life to the South End

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    94/95

    Columbus Center Project10 December 2010

  • 8/8/2019 Yuksek Katli Bina Tasarimi

    95/95

    Thank You!

    Go raibh mle maith agait!Merci!

    Teekkrler!

    Grazie!Gracias!

    )YGEVMWXZ