Wendover Renovation Presentation 2011-2012

description

Wendover Renovation Presentation. 2011-2012. Renovation Stages Before Now After How you will be affected Questions/Concerns. Presentation Overview. This school was built in 1970 as a temporary school and was designed to last only twenty years. - PowerPoint PPT Presentation

Transcript of Wendover Renovation Presentation

Page 1: Wendover Renovation Presentation

Wendover Renovation Presentation

2011-2012

Page 2: Wendover Renovation Presentation

Presentation Overview

Renovation Stages◦Before◦Now◦After

How you will be affected

Questions/Concerns

Page 3: Wendover Renovation Presentation

Story Behind this School

This school was built in 1970 as a temporary school and was designed to last only twenty years.

So, in 1990 it should have been demolished and rebuilt.

But now, in 2012, it is being renovated.

Page 4: Wendover Renovation Presentation

Let’s get on to the stages…

Page 5: Wendover Renovation Presentation

Renovation Stages - Before

Front Side of Wendover

Water DamageBoarded Windows

Page 6: Wendover Renovation Presentation

Renovation Stages - Before

No Central Air Conditioning◦Over the years, there has been a couple air

conditioners added on to the building that mostly cool down rooms that don’t have windows.

Page 7: Wendover Renovation Presentation

Renovation Stages - Before

Other parts of the building that are damaged.

Page 8: Wendover Renovation Presentation

Renovation Stages - Before

Page 9: Wendover Renovation Presentation

Renovation Stages - Before

Page 10: Wendover Renovation Presentation

Renovation Stages – Before

Page 11: Wendover Renovation Presentation

Renovation Stages - Now

These pictures show a general idea of what is going on now.

The ceiling tiles were removed during Christmas break. Since they are gone, it will be slightly colder in the hallways.

Page 12: Wendover Renovation Presentation

Renovation Stages - Now

During the time period of the renovation, the equipment and trailers are going to be stored on the football field. It is still to be decided whether or not the football teams will be consolidated into one team next year.

Page 13: Wendover Renovation Presentation

Overview

Page 14: Wendover Renovation Presentation

Renovation Stages - Now

PHASE 1 – *Cafeteria* and Band Room (December 2011 – August 2012)

Page 15: Wendover Renovation Presentation

Renovation Stages - Now

PHASE 1 – *Cafeteria* and Band Room (December 2011 – August 2012)

Page 16: Wendover Renovation Presentation

Renovation Stages - After

Page 17: Wendover Renovation Presentation

Renovation Stages - Now

PHASE 1 – Cafeteria and *Band Room* (December 2011 – August 2012)

Page 18: Wendover Renovation Presentation

Renovation Stages - Now

PHASE 1 – Cafeteria and *Band Room* (December 2011 – August 2012)

Page 19: Wendover Renovation Presentation

Renovation Stages - After

Along with the cafeteria and the band room, there will be a server room where the old instrument storage room used to be. Also there will be an electrical room where the old weightroom used to be.

Page 20: Wendover Renovation Presentation

Renovation Stages - After

PHASE 2 – Kitchen and Storage(April 2012 – August 2012)

Page 21: Wendover Renovation Presentation

Renovation Stages - After

PHASE 2 – Kitchen and Storage(April 2012 – August 2012)

Page 22: Wendover Renovation Presentation

Renovation Stages - After

PHASE 3 – 8th Grade Hallway and Courtyard B (May 2012 – August 2012)

The new 8th grade hallway will be where rooms 127 and 128 are now. Also, Courtyard B will be between the 7th grade hallway and the 8th grade hallway. Also, there will be the new TV Studio where room 100 is now.

Page 23: Wendover Renovation Presentation

Renovation Stages - After

PHASE 4 – *6th Grade Hallway, Courtyard A,* Art Rooms, Chorus Room and Music Room

(September 2012-December 2012)

Page 24: Wendover Renovation Presentation

Renovation Stages - After

PHASE 4 – 6th Grade Hallway, Courtyard A, *Art Rooms, Chorus Room and Music Room*

(September 2012-December 2012)

Page 25: Wendover Renovation Presentation

Renovation Stages - After

PHASE 5 – *7th Grade Hallway*, Library, Health Room, Computer Lab

(January 2013 – May 2013)

Page 26: Wendover Renovation Presentation

Renovation Stages - After

PHASE 5 – 7th Grade Hallway, *Library, Health Room, Computer Lab*

(January 2013 – May 2013)

Page 27: Wendover Renovation Presentation

Renovation Stages- After

PHASE 6 – FCS, Computer Lab, Gym(March 2013 – August 2013)

Page 28: Wendover Renovation Presentation

Renovation Stages - After

PHASE 7 – Hallways and Entrance(June 2013 – August 2013)

Page 29: Wendover Renovation Presentation

Renovation Stages - After

PHASE 8 – Admin Offices and Auditorium(June 2013 – November 2013)

Page 30: Wendover Renovation Presentation

By the end of November 2013, this school will be complete.

Page 31: Wendover Renovation Presentation

How You Will Be Affected

On the first week of May, lunches will be moved into the front side of the gym.

Also in May, the classes in the back hallway will be moved into the auditorium.

Page 32: Wendover Renovation Presentation