Underground Distribution Construction Manual
Section E2 – Padmount Transformers
Approved by: A. Bletchly
This drawing must not be
C COPYRIGHT 2019 ENERGEX
whole without writtenpermission from ENERGEX
reproduced in part or
UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL
ORIGIN
AL ISS
UE
DATE
APP’D
SECTION SUB-SECT.
CAD
RECD
CKD
DWN
SHT OF
FILE
ELECTRICAL
PADMOUNT TRANSFORMERS
SECTION INDEX
6229-A4 E
E2 01 1
UDC-E2-0-1E.DWG
R. ENGLISH
10/10/08
P.BARNEY
F.AMANPOORA
SECTION E2 - PADMOUNT TRANSFORMERS
ELECTRICAL
DA
TE
APP
D
CK
D
DR
NE03.0
4.19
A. BLET
CHL
Y
B. B
RU
NS
MA
NN
T. B
OR
G
2.13 & 4.6 A
DDE
D
SUB-SECT DESCRIPTION SHEETS
TECHNICAL DATA
1.1 Padmount, ground & dry type - stock code information 3
1.2 3Line diagram - rectangle & square
1.3 6
1.4 1
1.5 1
1.6 Old contract - repairs components 1
Old contract transformer stock code & line diagrams
Old contract rectangular - ancillary materials
Rectangular - build-up requirements - C & I
1.7 1
1.8 1
1.9 1
Rectangular - HV phase connections
Old contract - 11kV & LV separate earthing & GPO
Old contract - RMU & switchgear outlines - ABB / Andelect
1.10 1
1.11 1
RMU switchgear - ABB Safelink & Areva FBX
Square - fuse selection
SUB-SECT DESCRIPTION SHEETS
2.1 3
2.2 3
2.3 1
2.4 1
2.5 1
2.6 1
2.7 1
2.8 1
2.9 1
2.10 1
2.11 1
LV SWITCHBOARDS
2.12 1
2.13 1
Wilson PMT’s - contract C08008
Old contract 100kVA - ABB PMT
Old contract 200kVA - ABB PMT (C1/94)
Old contract 300kVA - ABB PMT (C1/94)
Old contract 500kVA - ABB PMT (C1/94)
Old contract 200kVA - ABB PMT (QESI 30/98)
Old contract 315kVA - ABB PMT (QESI 30/98)
Old contract 500kVA - ABB PMT (QESI 30/98)
Old contract 750kVA - ABB PMT (QESI 30/98)
Old contract 1000kVA - ABB PMT (QESI 30/98)
Paralleling cable up to 240mm† - ABB
Summary of switch sizes for loads
Miscellaneous items - LV monitoring & CFI
EARTHING
4.1 1
4.2 1
4.3 1
4.4 1
4.5 1
4.6 1
Square type - common earth arrangement
Square type - separate earth arrangement
Rectangular type - common earth arrangement
Rectangular type - separate earth arrangement
Dual square type - common earthing arrangement
Dual square type - separate earth arrangement
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
This drawing must not be
C COPYRIGHT 2011 ENERGEX
whole without writtenpermission from ENERGEX
reproduced in part or
UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL
ORIGIN
AL ISS
UE
DATE
APP’D
SECTION SUB-SECT.
CAD
RECD
CKD
DWN
SHT OF
FILE
ELECTRICAL
PADMOUNT TRANSFORMERS
TECHNICAL DATAOLD CONTRACT TRANSFORMER STOCK CODES & LINE DIAGRAMS
6229-A4 B
E2 1.31 6
UDC-E2-1.3-1B.DWG
R.ENGLISH
10/10/08
P.BARNEY
D.GOSDENA
The following table lists 11000/433-250V three phase Padmounted, Ground type and Dry type Distribution
Transformers previously were available from ABB and Wilson Transformers under Contract CK18. CK18 NOT CURRENT.
Dry Type *Separate Stock Codes for Top Entry and Bottom Entry Dry Types exist (i.e. for separate gland plate template arrangements)
Air Box HV, Bushing LV, Top or bottom cable entry, 7 tap, 6.25%Z150017025
Air Box HV, Bushing LV, Top or bottom cable entry, 7 tap, 5.0%Z100017024
Air Box HV, Bushing LV, Top or bottom cable entry, 7 tap, 5.0%Z75017023
Ground Type
Rectangular Type, LV isolator only, HV ABB Safelink CFC (SF6) RMU, 7 tap 5.0%Z100019470
Rectangular Type, Full LV switchboard, HV ABB Safelink CFC (SF6) RMU, 7 tap 5.0%Z75019469
Rectangular Type, Full LV switchboard, HV ABB Safelink CFC (SF6) RMU, 7 tap 4.0%Z50019468
Rectangular Type, Full LV switchboard, HV ABB Safelink CFC (SF6) RMU, 7 tap 4.0%Z31519467
Square Type, LV isolator only, HV ABB Safelink CFC (SF6) RMU, 7 tap 5.0%Z100018701
Square Type, Full switchboard, HV ABB Safelink CFC (SF6) RMU, 7 tap 5.0%Z75019312
Square Type, Full switchboard, HV ABB Safelink CFC (SF6) RMU, 7 tap 4.0%Z50018699
Square Type, Full switchboard, HV ABB Safelink CFC (SF6) RMU, 7 tap 4.0%Z31518698
Padmounted
Rating(kVA) DescriptionStock Code
Epoxy encapsulated with IP21 enclosure, Top cable entry, 7 tap, 6.0%Z150020685
Epoxy encapsulated with IP21 enclosure, Bottom cable entry, 7 tap, 6.0%Z100020689
Epoxy encapsulated with IP21 enclosure, Bottom cable entry, 7 tap, 6.0%Z75020688
Epoxy encapsulated with IP21 enclosure, Bottom cable entry, 7 tap, 4.0%Z50020687
Epoxy encapsulated with IP21 enclosure, Bottom cable entry, 7 tap, 4.0%Z31520686
Epoxy encapsulated with IP21 enclosure, Top cable entry, 7 tap, 6.0%Z150019898
Epoxy encapsulated with IP21 enclosure, Top cable entry, 7 tap, 6.0%Z100019899
Epoxy encapsulated with IP21 enclosure, Top cable entry, 7 tap, 6.0%Z75019900
Epoxy encapsulated with IP21 enclosure, Top cable entry, 7 tap, 4.0%Z50019901
Epoxy encapsulated with IP21 enclosure, Top cable entry, 7 tap, 4.0%Z31519902
DA
TE
APP
D
CK
D
DR
NB2/8/11
R. E
NGLIS
H
D. T
AY
LO
R
A. S
YM
ON
DS
NE
W C
ONT
RA
CT ITE
MS &
ST
OC
K C
ODES.
OL
D C
ONT
RA
CT D
ET
AIL
S
MO
VE
D T
O S
UB-SECT 1.3
OBSOL
ETE
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
This drawing must not be
C COPYRIGHT 2020 ENERGEX
whole without writtenpermission from ENERGEX
reproduced in part or
UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL
ORIGIN
AL IS
SUE
DATE
APP’D
SECTION SUB-SECT.
CAD
RECD
CKD
DWN
SHT OF
FILE
ELECTRICAL
PADMOUNT TRANSFORMERS
TECHNICAL DATARECTANGULAR - HV PHASE CONNECTIONS
6229-A4 B
E2 1.71 1
UDC-E2-1.7-1B.DWG
R. ENGLISH
10/10/08
P.BARNEY
D.GOSDENA
11kV underground cable is to be connected to the RING MAIN UNIT, it isFUTUREWhere
prefered that the first cable shall be connected to the RIGHT HAND SIDE CABLE BOX
and the cable box on the LEFT shall be kept free for future cable.
CABLE
AREA HV FEEDER
BRISBANE METRO
PHASE CONNECTION SEQUENCE BETWEEN HV EQUIPMENT AND CABLES
11kv FUSE UNIT
HV SWITCHGEAR-TERMINAL MARKINGS
11kV UNDERGROUND CABLING
TERMINAL MARKING
TRANSFORMER
HV RMU/FU AND
W (C)x
U (A)x
V (B)x
V
11kV RING MAIN UNIT
V
U
U
W
U
V
W
V
W
U
W U V W VU W
TERMINALS
FEEDER CABLE
REGIONAL AREAS HV
B
A
C
C
B
A
W
11kV TRANSFORMER
W
V
U
W
U V W
V
U
U V
CA B
New markings supplied with equipment
as per Australia Standard
DA
TE
APP
D
CK
D
DR
NBA.
BLET
CHL
Y
B.
BR
UNS
MA
NN
T.
BO
RG
Dra
win
g no
w obsolete
OBSOLE
TE
08.10.2020
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
This drawing must not be
C COPYRIGHT 2020 ENERGEX
whole without writtenpermission from ENERGEX
reproduced in part or
UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL
ORIGIN
AL ISS
UE
DATE
APP’D
SECTION SUB-SECT.
CAD
RECD
CKD
DWN
SHT OF
FILE
ELECTRICAL
PADMOUNT TRANSFORMERS
LV SWITCHBOARDSOLD CONTRACT 200kVA - ABB PMT (QESI 30/98)
6229-A4 C
E2 2.61 1
UDC-E2-2.6-1C.DWG
R. ENGLISH
10/10/08
P.BARNEY
D.GOSDENA
LV Isolating Switch-Disconnector
GENERAL INFORMATION
Maximum Demand Indicator
LV Circuit Fuses
Front View
Current Transformers
LV Circuit Fuse-Switch
LV Circuit Fuse-Switch
LV Isolating Link
MATERIAL ITEMS
QESI 30/98
ISOLATOR
TRANSFORMER
W
V
U
Various
4529
4527
4523
4529
STOCK CODE
5A ALSTOM3
As ReqdAs Reqd ENERGEX
QUANTITY
300/5
630A
400A
630A
630A
SIZE
2
3
1
3
1
SUPPLIER
ABB
ABB
ABB
ABB
ABB
End View
630
A
Line Diagram
**/400
A
**/400
A
**/630
A
BL
AN
K
DA
TE
APP
D
CK
D
DR
NB5/09/11
R. E
NGLIS
H
D. T
AY
LO
R
A. S
YM
ON
DS
AD
D O
LD C
ONT
RA
CT T
EX
T
TO TIT
LE.
DA
TE
APP
D
CK
D
DR
NCA. Bletchly
08/10/2020
B. Bruns
mann
T. Borg
File na
me c
orrected fro
m
6.2 t
o 2.6
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
This drawing must not be
C COPYRIGHT 2019 ENERGEX
whole without writtenpermission from ENERGEX
reproduced in part or
UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL
ORIGIN
AL ISS
UE
DATE
APP’D
SECTION SUB-SECT.
CAD
RECD
CKD
DWN
SHT OF
FILE
ELECTRICAL
PADMOUNT TRANSFORMERS
MISCELLANEOUS ITEMSLV MONITORING & CABLE FAULT INDICATORS
6229-A4 B
E2 2.131 1
UDC-E2-2.13-1B.DWG
J.LANSLEY
20/8/15
-
-
P.RELFA
SC223644G Antenna -
SC24901EDMI meter panel -
SC24888Current sensor panel - 5.
detailed in Technical Instruction TSD0181.
Mounting locations for meter, transducer box and current sensors are 4.
auxiliary board (If auxiliary board not fitted - install new board).
On a rectangular padmount, voltage supply to come from 100A fuses off 3.
spare circuit or piggy backed off existing circuit.
On square padmounts, voltage supply to meter to come from either a 2.
Instruction TSD0181.
padmount transformers. Refer to Engineering Standards Technical
monitoring can be retrofitted to both rectangular and square LV1.
LV MONITORING
SC22614Leelen DJ-3100
UGMAT42SC20109Horstmann OPTO-E 3.04.
cancel the effects of induced current in screen wires.
For the earth fault CT the screen wires shall be fed back through the CT to 3.
NoAuto-reset
4 hrsReset time
200msTime delay
40AEarth fault current rating:
800APhase fault current rating:
Unless otherwise advised, the following settings shall be applied to all CFIs:
TSD0140.
Standards Technical Instruction Triplex cable - refer to Engineering
2. For further information on cable fault indicators including installation to
padmount transformers.
Cable fault indicators to be fitted to RHS isolator on each RMU in new 1.
CABLE FAULT INDICATORS
PHASE & EARTH FAULT CT POSITION EARTH FAULT CT POSITION
sensorPhase fault CT
sensorEarth fault CT
B
indicator notes
to cable fault
Triple
x cable added
A.
BLET
CHL
Y
B.
BR
UNS
MA
NN
T.
BO
RG
APP’D
CK
D
AT
HR
DA
TE
23.01.19
Uncontrolled Document When Printed
UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL
ORIGIN
AL ISS
UE
DATE
APP’D
SECTION SUB-SECT.
CAD
RECD
CKD
DWN
SHT OF
FILE
ELECTRICAL
PADMOUNT TRANSFORMERS
EARTHINGSQUARE TYPE - SEPARATE EARTH ARRANGEMENT
6229-A4 E
E2 4.21 1
UDC-E2-4.2-1E.DWG
R. ENGLISH
10/10/08
P.BARNEY
D.GOSDENA
This drawing must not be
C COPYRIGHT 2020 ENERGEX
whole without writtenpermission from ENERGEX
reproduced in part or
NOTES:
PLAN
Footp
ath
rods if requiredAdditional earth
HV
LV
(4 of)
Earth Rods
HV Earth Grid
6
"C" CLAMP CONNECTION
rod
Bend cable tosuit the earth
11
1
2
Detail
1
Earth Rod
1
2
7
5
3
6
2
10 ohm
DISCONNECTED
MAX.
LV EARTH
LV NEUTRAL
LV Earth
N
Grid
Earth
10 ohmMAX.
DISCONNECTED
EARTH GRID
Neutral Bar
LV Earth
Earth Bar
Transformer
Bar
11. Modify LV EARTH BAR, Remove GPO & attach
5. Fence as required for residential areas and sloping
padmount footprint.
1. Attempt to locate separately earthed padmounts in
3. The clearance zone shall be road reserve or an
6. HV earth electrodes are to be contained within the
4. The clearance zone shall be turfed or landscaped
clearance zone from the edge of the plinth. Clearance2. For SEPARATE LV & HV earthing provide a 5m
20001300
9
8
ARBentonite/Gypsum (20kg)11
QTY
16
12
1
2
Cu Clad Earth Rod1440 x 13mm
Earth Rod Coupling Pin
DESCRIPTIONITEM
40m
4
32m
8
4
20m
1
1
DSPMSEGS
3
5
4
6
7
Cable to Rod
Cable to Cable
cover strip
Cu Crimp "C" Connector
Cu Crimp "C" Connector
Crimp Lug 70mm M12 Hole
19/2.14mm Bare Cu Cable
8
9
10
Installations
Separate LV Earth Bar
19/2.14mm PVC Cu Cable
Modification Kit (DSTFRSEN)
COMPATIBLE UNIT:-
Signs for Separate Earth
Polymeric cable protection
zone to be maintained free from metallic objects,
buildings and structures - including foundations.
with mulched beds and shrubs.
areas remote from residential dwellings.
easement to prevent encroachment.
sites.
"CAUTION LABEL"
of 100mm above all earthing not beneath the
9. Polymeric cover strip shall be installed a minimum
8. Earth grid to be 500mm below ground level.
Clearance Zone
LV Earth
ELEVATION
HV(MEN)
- Earth ConnectionELEVATION
minimum of 200mm clear separation.
10. When LV and HV earth systems cross maintain a
R.P. STREET ALIGNMENT
Grid
CODE
STOCK
-
15983
08351
12953
12952
15345
06260
07053
06144
22946
17322
17954
12 "STATION EARTH" TAG 2 06425
7. Two earthwires from the earth grid to be connected to the transformer earth bar.
to be connected toHV earth grid
2076
300 1000
5600
8900
962
962
12600
1
Min5m
HV Earth Grid
outside of clearance zone, are to be insulated.
12. Both HV and LV Earth cables, running to and
site.
8
8
8
DA
TE
APP
D
CK
D
DR
NE06.0
1.20
A. BLET
CHL
Y
B. B
RU
NS
MA
NN
T. B
OR
G
EA
RT
H C
ON
NECTIO
N
DIA
GR
AM A
LTERE
D
4
2
1
5mMin
5mMin
5mMin
Uncontrolled Document When Printed
Uncontrolled Document When Printed
Uncontrolled Document When Printed
UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL
ORIGIN
AL ISS
UE
DATE
APP’D
SECTION SUB-SECT.
CAD
RECD
CKD
DWN
SHT OF
FILE
ELECTRICAL
PADMOUNT TRANSFORMERS
EARTHINGDUAL SQUARE TYPE - SEPARATE EARTH ARRANGEMENT
6229-A4 B
E2 4.61 1
UDC-E2-4.6-1B.DWG
J.LANSLEY
10/5/17
L.LIM
P.RELFA
6
"C" CLAMP CONNECTION
rod
Bend cable tosuit the earth
This drawing must not be
C COPYRIGHT 2019 ENERGEX
whole without writtenpermission from ENERGEX
reproduced in part or
rods if required
Additional earth
1
Clearance Zone
to be connected to
HV earth grid
5m
Min
Min
5mFootpath
HV
LV Earth Bar
Neutral BarLV
8
5
16600
7
Alignment
R.P. Street
130020001300
8900
300
HV
Earth Grid
Earth Bar
Transformer
PLAN
HV
LV Earth Bar
Neutral BarLV
8
3 64
1
4300
4300
962
2076
962
962
2076
962
4300
NOTES:
11
1
2
Detail
1
Earth Rod
1
2
10 ohm
DISCONNECTED
MAX.
LV EARTH
LV NEUTRAL
LV Earth
N
Grid
Earth
10 ohmMAX.
DISCONNECTED
EARTH GRID
Neutral Bar
LV Earth
Earth Bar
Transformer
Bar
11. Modify LV EARTH BAR, Remove GPO & attach
5. Fence as required for residential areas and sloping
footprint.
1. Attempt to locate separately earthed padmounts in
3. The clearance zone shall be road reserve or an
6. HV earth electrodes are to be contained within the
4. The clearance zone shall be turfed or landscaped with
clearance zone from the edge of the plinth. Clearance
2. For SEPARATE LV & HV earthing provide a five metre
ARBentonite/Gypsum (20kg)11
QTY
16
12
1
2
Cu Clad Earth Rod1440 x 13mm
Earth Rod Coupling Pin
DESCRIPTIONITEM
40m
4
32m
8
4
20m
1
1
DSPMSEGS2
3
5
4
6
7
Cable to Rod
Cable to Cable
cover strip
Cu Crimp "C" Connector
Cu Crimp "C" Connector
Crimp Lug 70mm M12 Hole
19/2.14mm Bare Cu Cable
8
9
10
Installations
Separate LV Earth Bar
19/2.14mm PVC Cu Cable
Modification Kit (DSTFRSEN)
COMPATIBLE UNIT:-
Signs for Separate Earth
Polymeric cable protection
zone to be maintained free from metallic objects,
buildings and structures - including foundations.
mulched beds and shrubs.
areas remote from residential dwellings.
easement to prevent encroachment.
sites.
"CAUTION LABEL"
100mm above all earthing not beneath the padmount
9. Polymeric cover strip shall be installed a minimum of
8. Earth grid to be 500mm below ground level.
ELEVATION
HV(MEN)
- Earth ConnectionELEVATION
minimum of 200mm clear separation.
10. When LV and HV earth systems cross maintain a
STOCK CODE
-
15983
08351
12953
12952
15345
06260
07053
06144
22946
17322
17954
12 "STATION EARTH" TAG 2 06425
7. Two earthwires from the earth grid to be connected to
the transformer earth bar.
of clearance zone, are to be insulated.
12. Both HV and LV Earth cables, running to and outside
site.
2
1
B
& Earth grid added
RP Street
Align
ment
A.
BLET
CHL
Y
B.
BR
UNS
MA
NN
T.
BO
RG
APP’D
CK
D
AT
HR
DA
TE
23.01.19
8
LV
Earth Grid
Min
5m
Min
5m
Alignment
R.P. Street
8