THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope...

30
1 JAAP DEKKER PROJECT DIRECTOR LONDON 15 MARCH 2016 THE NEW SUEZ CANAL CHALLENGE

Transcript of THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope...

Page 1: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

1

JAAP DEKKER PROJECT DIRECTOR

LONDON

15 MARCH 2016

THE NEW SUEZ CANAL CHALLENGE

Page 2: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

2

NEW SUEZ CANAL

Two way traffic over 71 km

Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

Cutting transit time from 20hrs to 11hrs

Increase capacity from 49 ships/day tot 97 ships/day

Increase in Revenues

SUEZ CANAL

Page 3: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

3

2000 – 600 BC

Several dynasty’s have “dredged” canals connecting the Nile with the Red Sea

1798 NAPOLEON

Interest in finding the remains of an ancient waterway passage

1804 erroneous “survey measurements” indicated a height difference of 10m between Mediterranean & Red Sea

SUEZ CANAL HISTORY

Page 4: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

4

1854

Ferdinand de Lesseps enlisting the interest of the Egyptian viceroy Said Pasha in the project.

1858

La Compagnie Universelle du Canal Maritime de Suez. Private Egyptian concern, its stock owned chiefly by French and Egyptian interests.

1859

Start of the works

1869

17 November 1869 Opening of the Suez Canal

SUEZ CANAL HISTORY

Page 5: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

5

SUEZ CANAL HISTORY

Page 6: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

6

THE SUEZ CANAL – AUGUST 2014 17,000 VESSEL TRANSITS PER YEAR

5 BILLION USD TRANSIT FEES PER YEAR

5% OF EGYPT’S GDP

CANAL ONE WAY TRAFFIC

Page 7: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

7

THE SUEZ CANAL – THE FUTURE 30,000 VESSEL TRANSITS PER YEAR

12 BILLION USD TRANSIT FEES PER YEAR

25% OF EGYPT’S GDP (INC SCZONE)

THE GOAL IS TWO WAY TRAFFIC

TO BE ACCOMPLISHED IN 1 YEAR

Page 8: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

8

TENDER ANNOUNCEMENT - 5TH AUGUST 2014

Depth: 24 m

Width: 147 -177 m (toe line)

Length: 35 km

Volume: 170 million m3

President Abdel Fattah al-Sisi “The Project has to be finished within one year”

TENDER PROCESS

Page 9: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

9

TENDER PROCESS SCOPE OF WORKS CHALLENGE CONSORTIUM

35 km Channel (Lot 2,3,4 &5)

2 Service Channels

Page 10: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

10

THE CHALLENGE:

Project governed by time pressure but with a fixed end date of August 1st 2015

No preparation period

Record number of equipment required

Record daily productions

Technically not complicated – main challenges in logistics, organization and planning

CHALLENGE CONSORTIUM

Page 11: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

11

1 YEAR INCLUDING TENDER 13 AUGUST 2014 RECEIVED TENDER

17 SEPTEMBER TENDER SUBMISSION

20 SEPT – 15 OCT NEGOTIATIONS

15 OCTOBER 2014 CONTRACT AWARD

17 OCTOBER 7 DREDGERS DEPARTED

5 NOVEMBER 2014 1ST DREDGER COMMENCED

Page 12: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

12

STARTING THE PROJECT $1,500,000 PROJECT

220 MILLION M3 OF DREDGING

10 MONTHS TO GO

21 CUTTER SUCTION DREDGERS

5 TRAILING SUCTION HOPPER DREDGERS

2000 PEOPLE ON SITE

1.4MIO M3 PER DAY (PEAK PRODUCTIONS)

1,500M3 FUEL PER DAY

Page 13: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

13

EQUIPMENT WAS UNDERWAY

Brazil

Russia

Indonesia

Persian Gulf

LOCAL EQUIPMENT SUPPLIERS

Quick start and direct available

Competitive and paid in EGP

Limited reclamation experience

PREPARING ON THE GO

Page 14: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

14

PHASE 01

Page 15: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

15

CREATING ACCESS

Access via the north & south entrance

Access via 2 Service Canals

Access via 2 Cross Canals (not part of the design)

Floatation dredging only

MAKING SPACE

Page 16: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

16

PHASE 02: CREATING SPACE

More CSD equipment arriving

Creating width and depth

Plan ahead the shore connections

TSHD’s added to the fleet

AND MORE SPACE

Page 17: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

17

PHASE 03: CREATING A CANAL

Use equipment to the maximum

Prepare areas for final surveys

Clean up high spots and reducing the capacity

Handover and acceptance by the Client

DELIVERING THE NEW CANAL

Page 18: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

18

CHALLENGES, EXTRA M3

Page 19: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

19

THINK IN SOLUTIONS

Site is a military zone

Both canals dissect the area

Road connections between Sinai and Ismailia area

Irrigation channel crossing the New Canal route

Accommodation for all

Late IT (Wi-max) availability

Working in Consortium with 4 different Partners

45 Nationalities

Use dredgers to their maximum capability

AND THE ENVIRONMENT CONTINUES

Page 20: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

20

DREDGERS DO NOT COME ALONE

Page 21: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

21

HUMAN RESOURCES:

Almost 2000 people on site

Up to 200 drivers

4 Accommodation barges

1 Cruise vessel

40 Auxiliary vessels

DREDGERS DO NOT COME ALONE

0

500

1000

1500

2000

2500

0

100

200

300

400

500

600

700

800

Man

pow

er T

otal

Man

pow

er p

er c

ompa

ny

Month

NMDC Boskalis Van OordJan De Nul Hired TOTAL

Page 22: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

22

DREDGERS DO NOT COME ALONE

Page 23: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

23

Main office Mercure Hotel

Accommodation Barges

Morgan Hotel

Page 24: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

24

MOBILISATION COMPLETED IN JUNE

DEMOB COMMENCED IN MAY

CANAL DELIVERED 1 AUGUST 2015

DEMOB COMPLETED 31 OCTOBER 2015

MOB DREDGING AND DEMOB AT ONCE

Page 25: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

25

SUEZ CANAL PROJECT PROGRESS PICTURES:

Page 26: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

26

SUEZ CANAL PROJECT PROGRESS PICTURES:

Page 27: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

27

Page 28: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

28

Page 29: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

29

Page 30: THE NEW SUEZ CANAL CHALLENGE · 2016. 3. 16. · 2 NEW SUEZ CANAL Two way traffic over 71 km Scope Challenge Consortium = parallel to original canal over 35 km (KP58.2 – KP 92.6)

\

30

1 AUGUST 2015 – FINAL COMPLETION