Suez Canal Future

download Suez Canal Future

of 60

Transcript of Suez Canal Future

  • 8/10/2019 Suez Canal Future

    1/60

    The Future of the

    Suez Canal

    Shifting International Trade Routes

    Tampa, January 15-16, 2009

    Ezzat M. El Sadek, Ph.D.

    Board Member

    Suez Canal Authority

  • 8/10/2019 Suez Canal Future

    2/60

    The Suez Canal links the Mediterranean Sea to

    the Red Sea.

    Suez Canal

    It was opened for international navigation on

    17 th November 1869.

  • 8/10/2019 Suez Canal Future

    3/60

    Map

    ofThe Suez Canal

  • 8/10/2019 Suez Canal Future

    4/60

    The Characteristics of the Suez Canal

    ( 1869 2008 )

    Description 1869 2008

    Overall Length km 164 190.25

    Doubled Parts km 0 78

    Depth m 7.5 22.5 - 24

    Cross Sectional Area m2 304 5000 - 5200

    Max. Draft feet 22 62

    Max. tonnage 103 tons 5 220

  • 8/10/2019 Suez Canal Future

    5/60

    125.0m

    345.0m

    280.0m

    125.0m

    345m.345 m

    280m

  • 8/10/2019 Suez Canal Future

    6/60

    Double parts of the Canal

    Port Said by-bass Ballah by-bass

    Deversoir & Bitter Lakes by-passesTemsah by-pass

    The Length 27.5 KMIts Length 5 KM

    Its Length 36.5 KM Its Length 9 KM

    21

    Acc. In 1955Acc. In 1980

    3

    Acc. In 1980

    4

    Acc. In 1980

  • 8/10/2019 Suez Canal Future

    7/60

    The Present Canal 2009

    100 % of Container fleet 98 % of the bulk fleet

    100 % of other types60 % of the tanker fleet

  • 8/10/2019 Suez Canal Future

    8/60

    Emma Maersk

    ( First Transit 22/9/2006 S.B. )

    397.71Length (m)

    56.4Beam (m)

    16.02Draught (m)

    158 200DWT

    158 030SCNT

  • 8/10/2019 Suez Canal Future

    9/60

    DUHAIL - LNG Tanker

    First Transit: 1st April 2008

    305.57Length (m)

    50Beam (m)

    40Draught (ft)

    121667SCNT

  • 8/10/2019 Suez Canal Future

    10/60

    The Main Advantages of the Suez Canal

    Longest Canal in the world without locks.Longest Canal in the world without locks.

    Navigation goes day and night.Navigation goes day and night.

    Liable to be widened and deepened whenLiable to be widened and deepened when

    required to cope with the expansion in shiprequired to cope with the expansion in shipsizes of the world fleet .sizes of the world fleet .

    The VTMS system is securing the highestThe VTMS system is securing the higheststandards of safety to the vessels transitingstandards of safety to the vessels transiting

    the Canal.the Canal.

  • 8/10/2019 Suez Canal Future

    11/60

    Suez Canal Traffic

  • 8/10/2019 Suez Canal Future

    12/60

    Traffic System

    The navigation is run in a convoy system .

    Ships transit the Canal in three convoys daily :

    1- From Port Said at 0000 hrs going south.

    2- From Port Tawfiqe at 0600 hrs going north.

    3- From Port Said at 0630 hrs going south.

    Permissible speed for loaded tankers 13 Km/hr.

    Permissible speed for other ships 14 Km/hr.

    Average transit time from 12 to 16 hrs

    N2N2

    S1S1

    N1N1

  • 8/10/2019 Suez Canal Future

    13/60

    Development of the Suez Canal Traffic 1998Development of the Suez Canal Traffic 1998--20082008

    (Numbers)(Numbers)

    21415

    18664

    20384

    13472

    13490

    14142

    13956 13447

    15667

    16850

    18224

    0

    5000

    10000

    15000

    20000

    25000

    1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

    Year

    Numberofship

  • 8/10/2019 Suez Canal Future

    14/60

    Ship Type distribution in the Canal(2008)Ship Type distribution in the Canal(2008)

    ( Numbers)

    Bulk Carr.

    19%

    Others

    9%Car Carr.7%

    G. Cargo

    10%

    Tankers

    18%

    Cont. Ships37%

  • 8/10/2019 Suez Canal Future

    15/60

    Daily average number of transitsDaily average number of transits

    against Suez Canal capacityagainst Suez Canal capacity

    58.55754.2

    48.4

    41.2

    38.7

    49.851.1

    55.8

    0

    10

    2030

    40

    5060

    70

    80

    90

    100

    1980 1985 1990 1995 2000 2005 2006 2007 2008

    Year

    Numberofships

    Daily Average

    Capacity 88 shipsCapacity 98 ships

    Capacity 78 ships under the current transit system

    fully effective use of the By-Passesand through the change of the convoy

    system.

  • 8/10/2019 Suez Canal Future

    16/60

    Development of Suez Canal Traffic 1998Development of Suez Canal Traffic 1998--20082008

    (SCNT)(SCNT)

    444.8

    742.7

    910.1

    549.4

    848.2

    671.8621.2

    456.1439

    385

    386.1

    0

    200

    400

    600

    800

    1000

    1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

    Scnt(M.Ton)

  • 8/10/2019 Suez Canal Future

    17/60

    Ship Type distribution in the Canal(2008)Ship Type distribution in the Canal(2008)

    ( SCNT)

    Others4%Container

    53%

    Car Carr.9%

    Bulk Carr.

    14%

    LNG

    4%

    Tankers

    16%

    S C l T ffi D l t 2007&2008S C l T ffi D l t 2007&2008

  • 8/10/2019 Suez Canal Future

    18/60

    Suez Canal Traffic Development 2007&2008Suez Canal Traffic Development 2007&2008

    1000

    1300

    1600

    1900

    2200

    2007 2008

    2007 1629 1511 1667 1657 1679 1597 1761 1755 1761 1787 1765 1815

    2008 1690 1676 1699 1712 1840 1819 1854 1993 1872 1930 1770 1560

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Nov DEC

    Number of ships

    S C l T ffi D l t 2007&2008S C l T ffi D l t 2007&2008

  • 8/10/2019 Suez Canal Future

    19/60

    Suez Canal Traffic Development 2007&2008Suez Canal Traffic Development 2007&2008

    S N T

    50

    55

    60

    65

    70

    7580

    85

    90

    M

    .T

    o

    n

    2007 2008

    2007 67.4 63.4 66.8 66.8 71.0 67.4 74.4 72.7 73.0 75.2 72.6 77.4

    2008 73.8 72.8 72.6 73.1 76.7 76.3 79.4 84.1 79.6 81.2 73.6 66.9

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

  • 8/10/2019 Suez Canal Future

    20/60

    The Importance of the Suez Canal

    The geographical position of the Suez CanalThe geographical position of the Suez Canal

    makes it the shortest route between East & westmakes it the shortest route between East & west

    as compared with the Cape of Good Hope.as compared with the Cape of Good Hope.

    The Canal route achieves a saving in distanceThe Canal route achieves a saving in distance

    between the ports East & West the Canal, thebetween the ports East & West the Canal, the

    matter that is translated into saving in time, fuelmatter that is translated into saving in time, fuel

    consumption and ship operating costs .consumption and ship operating costs .

    About 10% of the world seaborne trade passesAbout 10% of the world seaborne trade passes

    through the Suez Canal.through the Suez Canal.

  • 8/10/2019 Suez Canal Future

    21/60

    Saving in Distance Via SuezSaving in Distance Via Suez

    Canal and Alternative RoutesCanal and Alternative Routes

    A - Ca p e o f Go d H o p e B - Pa n a m a Ca n a l

    A S i i di t hi d b th

  • 8/10/2019 Suez Canal Future

    22/60

    A- Saving in distance achieved by the

    Canal compared To Cape of God Hope

    Nautical miles Saving

    From ToSC Cape

    Savingby

    miles

    %saving

    Constanza 4144 12094 7950 66%

    Lavera 4684 10783 6099 57%

    Rotterdam 6436 11169 4733 42%

    Ras

    Tanura

    New orleans9645 12299 2654 22%

    Piraeus 1320 11207 9887 88%Jeddah

    Rotterdam 6337 10743 4406 41%

    Tokyo Rotterdam 11192 14507 3315 23%

    Singapore Rotterdam 8288 11755 3647 29%

  • 8/10/2019 Suez Canal Future

    23/60

    Via the Canal6436 n.m

    RotterdamRotterdam

    Ras TanuraRas Tanura

    Via the Cape

    11169 n.m

    Saving in distance via the Canal

    From Ras Tanura to Rotterdam (4733 n.m: 42%)

    From New YorkT (Mil )

    Suez Panama Difference

  • 8/10/2019 Suez Canal Future

    24/60

    Colombo

    Singapore

    Hong KongShenzhenShenzhen

    Pearl River DeltaPearl River Delta

    HalifaxNew York

    NorfolkSavannah

    To (Mile)Suez Panama e e ce

    Hong Kong 11632 11301 -331

    Laem Chabang 11002 12645 1643

    Singapore 10204 12537 2333

    Colombo 8600 14073 5473

    Diff.Diff.PanamaPanamaSuezSuez

    47647611616116161114011140From Halifax - Hong Kong (mile)

    Laem Chabang

    PRD is one of the two fastest

    growing manufacturing region

    in China

    B Suez/Panama

  • 8/10/2019 Suez Canal Future

    25/60

    Development of the Suez Canal

    1- Navigational Channel

    2- Equipment and Machinery

    3-Safety of the Traffic and NavigationalSupport

    4-Development of Pricing Policies

  • 8/10/2019 Suez Canal Future

    26/60

    1-Development of

    the Navigational

    Channel

    Development of the Navigational Channel

  • 8/10/2019 Suez Canal Future

    27/60

    Development of the Navigational Channel

    A . From the year 1869 till the present

    Description Unit 1869 1956 1962 1981 1994 1996 2001 2008

    Overall Length km 164 175 175 187.5 190.25 190.25 190.25 190.25

    Doubled Parts km - 29 29 78 78 78 78 78

    Depth m 7.5 14 15.5 19.5 20.5 21 22.5 22.5-24

    Cross

    Sectional Aream2 304 1200 1800 3600 3800 4200 4800

    5000-

    5200

    Max. Draft feet 22 35 38 53 56 58 62 62

    Max. tonnage 1000tons

    5 30 80 150 175 190 220 220

  • 8/10/2019 Suez Canal Future

    28/60

    B. On going Development

    The work is going on for the stage of 66 ft draft.

    It is planned to be completed by the end of

    this year .

    Upon completed, the canal depth will be 24 m

    and the cross sectional area will be 5200 m2

    allowing loaded tankers up to 240000 tonsD.W.T. to transit the canal and will be able to

    accommodate :

    - 99 % of the Bulk carriers.

    - 60 % of the Tanker fleet.

    - 100 % of all other types of vessels.

  • 8/10/2019 Suez Canal Future

    29/60

    C. Future Development

    Another stage for widening and deepening the canal is

    expected to be carried out depending upon the feasibility

    studies. This stage will be for increasing the draft up to72 ft.

    By the end of this stage, the canal depth will be 27m andthe cross sectional area will be 6750 m2 allowing loaded

    tankers up to 350000 tons D.W.T to transit the canal.

    Increase the lengths of double parts.

  • 8/10/2019 Suez Canal Future

    30/60

    2 - Development of

    Equipment

    and Machinery

  • 8/10/2019 Suez Canal Future

    31/60

    - Cutter suction dredger 31050 hp

    - Year of built 1996 - Max. dredging depth 35 m

    MASHOURMASHOUR

  • 8/10/2019 Suez Canal Future

    32/60

    Trailing Suction Hopper dredger- Hopper capacity 10000 m3 -Total installed power 25032 hp

    - Year of built 2004 - Max. dredging depth 35 m

    Mecca

  • 8/10/2019 Suez Canal Future

    33/60

    One of the biggest tugs of 160 bollard pull tons

  • 8/10/2019 Suez Canal Future

    34/60

    `

    Floating Crane Enkaz 500 tons

  • 8/10/2019 Suez Canal Future

    35/60

    Floating dock of 55000 tons

  • 8/10/2019 Suez Canal Future

    36/60

    3-Safety of traffic

    and navigationalsupport

  • 8/10/2019 Suez Canal Future

    37/60

    Targets achieved by the System :Targets achieved by the System :

  • 8/10/2019 Suez Canal Future

    38/60

    Targets achieved by the System :Targets achieved by the System :

    Increasing the standards of safety of vesselsIncreasing the standards of safety of vessels

    transiting the canal through a radar net worktransiting the canal through a radar net workcovering all the canal.covering all the canal.

    Radar surveillance covering an area of 30 Km atRadar surveillance covering an area of 30 Km at

    portport--Said and PortSaid and Port TawfikTawfik , and that gives an, and that gives anautomatic announcement of arrival time of allautomatic announcement of arrival time of allvessels getting into the waiting area.vessels getting into the waiting area.

    Monitoring all the vessels transiting the canal toMonitoring all the vessels transiting the canal to

    calculate average speed, separation distance,calculate average speed, separation distance,passing time at signal stations and to plot the realpassing time at signal stations and to plot the realtransit pattern.transit pattern.

    Participating in environment protection byParticipating in environment protection bydecreasing the number of accidents in the Canal anddecreasing the number of accidents in the Canal anddealing with them in the proper way in case theydealing with them in the proper way in case theyoccur.occur.

    B - The Maritime Training & Simulation Centre

  • 8/10/2019 Suez Canal Future

    39/60

    B The Maritime Training & Simulation Centre

    M i C t ' Obj tiM i C t ' Obj ti

  • 8/10/2019 Suez Canal Future

    40/60

    Main Center's ObjectivesMain Center's Objectives

    Training of S.C.A Pilots on the mainTraining of S.C.A Pilots on the mainmaneuvers for transiting the canal safely.maneuvers for transiting the canal safely.

    Training the pilots in order to be able toTraining the pilots in order to be able tocontrol the vessel on different weathercontrol the vessel on different weatherconditions.conditions.

    Analyzing any accident in the canal.Analyzing any accident in the canal. Studying the expected behavior of specialStudying the expected behavior of special

    types of ships before their first transit.types of ships before their first transit.

    Updating the technical information of theUpdating the technical information of thepilots to the latest technology in the field ofpilots to the latest technology in the field of

    pilotagepilotage..

    C S C l R h C t

  • 8/10/2019 Suez Canal Future

    41/60

    C. Suez Canal Research Center

    Suez Canal Authority Research Center isone of the Egyptian institutions specialized

    in conducting research and technicalstudies in the fields of design and

    development of navigation canals, port and

    harbor engineering, shore protections , and

    marine structures .

  • 8/10/2019 Suez Canal Future

    42/60

    The research center consists of five Sections :

    1. Canal and safety of navigation research section

    2. Harbor and coastal research section .

    3. Soil mechanics sections.

    4. Testing of materials and quality assurancesection .

    5. Maintenance of equipment and instrument

    section .

  • 8/10/2019 Suez Canal Future

    43/60

    Canal Research laboratory

    Canal current measurements Harbours Research Lab.

  • 8/10/2019 Suez Canal Future

    44/60

    4-Development of

    Pricing Policies

  • 8/10/2019 Suez Canal Future

    45/60

    The regular dues can attract most of ourThe regular dues can attract most of ourd f h ff ht d f th t ff th

  • 8/10/2019 Suez Canal Future

    46/60

    customers ,and for the rest we offer othercustomers ,and for the rest we offer other

    policies as :policies as :

    11--Establishing an elastic tollEstablishing an elastic toll s system to encourage alls system to encourage all

    the potential trade to pass through the Canal:the potential trade to pass through the Canal:

    -- LongLong-- haul vesselshaul vessels (Case by Case)(Case by Case)

    -- VLCCsVLCCs in ballast condition (20% reduction forin ballast condition (20% reduction forships fromships from CaribianCaribian and US Gulf to AG) .and US Gulf to AG) .

    -- Environmentally friendly vessels (2% reductionEnvironmentally friendly vessels (2% reductionfor Double Hull)for Double Hull)

    -- LNG carriers (35% , plus Other reductionsLNG carriers (35% , plus Other reductionsoffered to certain quantity of gas transportedoffered to certain quantity of gas transportedvia the Canal)via the Canal)

  • 8/10/2019 Suez Canal Future

    47/60

    22--Maintaining full complementary and coordinatingMaintaining full complementary and coordinatingpolicy with SUMED Pipeline.policy with SUMED Pipeline.

    33--Time saving service for vessels arriving after theTime saving service for vessels arriving after thetime limit against a surcharge of 3%,5% or 10%time limit against a surcharge of 3%,5% or 10%

    subject to vesselsubject to vessels time of arrival.s time of arrival.

    Suez Canal Container Traffic

  • 8/10/2019 Suez Canal Future

    48/60

    Suez Canal Container Traffic

    Importance of Suez CanalImportance of Suez Canal

  • 8/10/2019 Suez Canal Future

    49/60

    Importance of Suez CanalImportance of Suez Canal1000 TEU (LOADED)1000 TEU (LOADED)

    YearYearWorldWorld

    TradeTrade**%%

    TradeTrade

    viavia

    SuezSuez* ***%%

    % of% of

    SuezSuez

    toto

    worldworld

    20002000 66000 _ 11998 _ 18.2

    20012001 68000 3.0 12291 2.4 18.1

    20022002 76000 11.8 13700 11.5 18.0

    20032003 84000 10.5 15852 15.7 18.9

    20042004 96000 14.3 18535 16.9 19.3

    20052005 106000 9.4 20505 10.2 19.5

    20062006 117000 10.4 22875 11.6 19.6

    20072007 129000 10.3 26466 15.7 20.5 Source: *Container Intelligence Monthly. Clarkson. March 2008

    **Economic Unit. SCA

    Facilities and privileges granted toFacilities and privileges granted to

  • 8/10/2019 Suez Canal Future

    50/60

    Container ships heading the convoysContainer ships heading the convoys

    Container ships are to be exempted from the escorting tugContainer ships are to be exempted from the escorting tugboat ( the rental value of escorting tugs is 8000 SDR ).boat ( the rental value of escorting tugs is 8000 SDR ).

    The SCA has executed a widening and deepening project forThe SCA has executed a widening and deepening project for

    BallahBallah west branchwest branch aiming at allowing modern containeraiming at allowing modern containerships up to 100,000 SCGT within the permissible dimensionsships up to 100,000 SCGT within the permissible dimensionsto join the second southbound convoy (N2) .to join the second southbound convoy (N2) .

    Container ships carryingContainer ships carrying uncontaineriseduncontainerised general cargogeneral cargobesides the containers, shall not be subject to any surchargebesides the containers, shall not be subject to any surcharge..

    container ships transiting the Suez Canalcontainer ships transiting the Suez Canal

    In favorable navigational conditions, the limitIn favorable navigational conditions, the limit

  • 8/10/2019 Suez Canal Future

    51/60

    time for arrivals is to be extended, against atime for arrivals is to be extended, against a

    payment of a surcharge equal to a percentage ofpayment of a surcharge equal to a percentage of

    the normal transit dues with a maximum amountthe normal transit dues with a maximum amount..

    Container ships are to be exempted from extraContainer ships are to be exempted from extra

    dues on the top tier, if the top tier contains nodues on the top tier, if the top tier contains no

    more than ten TEUmore than ten TEU

    Suez Canal Container Traffic DevelopmentSuez Canal Container Traffic Development

    2007&20082007&2008

  • 8/10/2019 Suez Canal Future

    52/60

    2007&20082007&2008

    SCNT

    20

    25

    30

    35

    40

    45

    50

    M

    .Ton

    2007 2008

    2007 33.0 31.4 34.2 34.1 36.8 35.0 38.8 38.7 38.3 39.6 38.2 39.9

    2008 39.5 39.2 37.7 38.7 42.0 41.3 42.4 41.9 41.0 41.9 37.7 39.9

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Nov DEC

  • 8/10/2019 Suez Canal Future

    53/60

    Promoting the Suez Canal Route

    Suez Canal Authority signed Four

  • 8/10/2019 Suez Canal Future

    54/60

    y g

    Memoranda of Understanding (MOUs)with:

    The Port Authority of New York & NewJersey On June 14, 2006.

    Virginia Port Authority On June 21, 2006 and updated in December 12, 2007.

    Maryland Port Administration On October

    2,2006 .Georgia Port Authority on June 2, 2008.

    Signing MOU with

  • 8/10/2019 Suez Canal Future

    55/60

    Georgia Port AuthorityJune 2, 2008

  • 8/10/2019 Suez Canal Future

    56/60

    N ew MOU s i g n i n g

    Su e z a n a l H a l i f a x

    BY THE END OF TODAY

    Jan 15,2009A NEW MOU WILL BE SIGNED BY

    SUEZ CANAL AUTHORITYAND

    HALIFAX PORT AUTHORITY

    Targets of the MOUs :

  • 8/10/2019 Suez Canal Future

    57/60

    g

    Promoting trade between Asia and the

    ECNA through the Suez Canal.

    Generating business opportunities

    Enhancing customer service.

    Boosting economic growth

    Development of ECNA-Asia container traffic

    via Suez Canal

  • 8/10/2019 Suez Canal Future

    58/60

    via Suez Canal

    390 401

    686

    1302

    815 882

    968

    1003

    0

    500

    1000

    1500

    2000

    2500

    2004 2005 2006 2007

    1000

    TEU

    S.E.A- ECNA S. A - ECNA

    12051283

    1654

    2306

    Yearly avg. increase :

    Total Container trade via Suez Canal 11.5%

    ECNA S. Asia 5.3%

    ECNA-S.E. Asia 35.2%

    The SCA spares no

  • 8/10/2019 Suez Canal Future

    59/60

    The SCA spares no

    effort for the sake of

    ensuring a safe and

    secure service for alltransiting Vessels;

    thus contributing tothe prosperity of

    world trade and allnations as well.Suez Canal Headquarter

    Ismailia

  • 8/10/2019 Suez Canal Future

    60/60

    Thanks