The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down...

18

Transcript of The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down...

Page 1: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning
Page 2: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Sophie Salway

Geo Information Analyst

Shell Geomatics, Europe

Development Projects

Goldeneye Case Study

Page 3: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

GOLDENEYE

ST. FERGUS

• Gas Condensate Field

• Located in Outer Moray Firth, 100km NE of St Fergus Gas Terminals

• Low safety risks due to normally unmanned operations offshore

• Total lifetime production expected to be in excess of 500 Billion scf Gas and 17 Million barrels Condensate over a 10 Year period

• Greatest water depth (120 metres) in which a Jack-Up rig will be used for production well drilling

Goldeneye Case Study

Page 4: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Project Timeline

Activity / Year 1 2 3 4 5 6 7 8 9 10 11

Exploration Seismic Acquisition

Interpretation

Exploration Drilling

Appraisal

Final Investment Decision

Concept Select

Route Survey + Site Investigation

Front End +Detailed Design

Offshore Construction

Development Drilling

Production Start Up

Page 5: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

• Geology and reservoir characteristics

• Restrictions (Legal, Environmental, Physical)

• Proximity to infrastructure

• Location of markets

• Technology

• Prevailing Metocean Conditions

Concept Select

Page 6: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Construction Operations

• Pipe Lay – Shore Pull – Near shore / Offshore Operations

• Trenching

• Backfilling

• Platform Installation

• Tie-In and Pre-Commissioning Works

• Rock dumping – Crossings and Pipeline Protection

• Drilling Phase

Page 7: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Pre Installation Survey

• Ensures route / site is free of obstructions

• Side Scan Sonar and MBES

• ROV centre line / site visual survey

• Digital Terrain Model

• Route Topography Analysis

• Array visibility Analysis

Page 8: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Pipe Lay Operations Support

• Semi submersible pipe lay barge

• Deep and shallow water capability

• Dedicated pipe lay ramp

• Dual lay and piggyback lay

• Large diameter pipe lay capability

• Lay rate up to 7km/day

• Semi automatic welding system

• Self propelled vessel

• 12 point mooring system

Page 9: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Survey Support for Construction Operations

• Pre-Award Survey Input

• Pre-Construction Survey Activities

• Landfall Preparation and Plant Construction

• Pipe lay Barge Navigation

• Tug Management

• Shore Pull

• Pipeline crossing

• Pipe lay down

• Trenching and Backfill for service line

• Heavy lift vessel positioning

• Acoustic positioning USBL or LBL of structures

• EDM (Total Station) positioning of structures

Page 10: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Shore Pipeline Pull

Page 11: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Shore Pipeline Pull

Page 12: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Pipeline Routing

Page 13: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Trenching and Backfill

Page 14: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Platform Installation

Page 15: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Pipeline Tie Ins and Rock dump Operations

Page 16: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

As Built Records

Page 17: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Decommissioning • Infrastructure Assessments

• Debris Surveys

• Identify dropped objects

• Pipeline depth of cover

• Well positions for P&A

• Rig move planning for P&A

• Environmental surveys

Page 18: The Hydrographic Society In Scotland · •Shore Pull •Pipeline crossing •Pipe lay down •Trenching and Backfill for service line ... •Platform Installation •Tie-In and Pre-Commissioning

The Hydrographic Society In Scotland

Summary

• Pipe Lay – Shore Pull – Near shore / Offshore Operations

• Trenching

• Backfilling

• Platform Installation

• Tie-In and Pre-Commissioning Works

• Rock dumping - Crossings and Pipeline Protection

• Drilling Phase

• Decommissioning