04 Trenching

102
UNDERGROUND CONSTRUCTION MANUAL TRENCHING Go to SECTION INDEX Back to MAIN INDEX

description

Trenching

Transcript of 04 Trenching

  • UNDERGROUND CONSTRUCTION MANUAL

    TRENCHING Go to SECTION INDEX Back to MAIN INDEX

  • DESCRIPTION DWG

    INDEX

    B

    15.03.05

    B

    11.08.10

    c

    J. Brooks

    D. McKeown

    T.Borg 54 5012 1 1

    5168/2

    5162/1

    5162/6

    5163/15163/25163/3

    5163/5

    5162/45162/3

    5168/3

    5168/1

    5162/7

    5163/6

    Joint electricity, gas and Telstra

    Conduit bend details at pillar 240mm 4 core cross road cable

    NQ REGION

    5162/2

    5163/4

    DESCRIPTION DWG

    5164/5

    MK REGION

    5164/45164/3

    5164/1

    5164/6

    5164/2

    TRENCHING

    Conduit ducting arrangementConduit ducting arrangementConduit ducting arrangement

    FN REGION

    Joint electricity, gas and multiple TelstraConduit bend at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bend at pillar - sections 240mm 4 core cross road cable 5162/5

    Allow bends for HV conduit road crossing5162/8Pillar base installation

    Conduit bend details at pillar 240mm 4 core cross road cablePillar base installation

    5163/75163/85163/9

    URD areasURD areas joint electricity and TelstraCity and urban areasJoint electricity - Telstra URD areas general layoutConduit bend at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bend at pillar - sections 240mm 4 core cross road cable

    Joint electricity and TelstraJoint electricity, Telstra and gasConduit bend at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bend at pillar - sections 240mm 4 core cross road cableConduit bend details at pillar 240mm 4 core cross road cable

    5164/7

    5164/8

    5164/9

    With Gas - Conduit bends at pillar - sections16mm 4 core cross road cable

    With Gas - Conduit bends at pillar - sections16mm 4 core cross road cable

    240mm 4 core cross road cable

    240mm 4 core cross road cable

    With Gas - Conduit bend details at pillar

    With Gas - Conduit bend details at pillar

    Pillar base installation

    5164/10

    5164/11

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • DESCRIPTION DWG

    INDEXB 15.3.05

    E

    11/8/10

    T.Borg 54 5012 2 2

    C 11.8.10

    5165/2

    5165/4

    5165/8

    5166/15166/25166/3

    5166/5

    CA REGION

    Conduit, trench and pillar alignment schedule

    5165/75165/6

    5165/3

    5165/1

    5165/9

    5166/6

    Trench detail electricity and TelstraTrench detail electricity and TelstraGladstone electricity and TelstraConduit bends at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bends at pillar - sections 240mm 4 core cross road cableConduit bend details at pillar 240mm 4 core cross road cablePillar base installation

    WB REGION

    Electricity and TelstraConduit bends at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bends at pillar - sections 240mm 4 core cross road cableConduit bend details at pillar 240mm 4 core cross road cablePillar base installation

    5165/5

    5166/4

    DESCRIPTION DWG

    5167/5

    5196/1

    SW REGION

    5167/45167/3

    5167/1

    5167/6

    Conduit bends at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bends at pillar - sections 240mm 4 core cross road cableConduit bend details at pillar 240mm 4 core cross road cablePillar base installation

    5167/2

    5196/2

    Electricity and Telstra

    ALL REGIONS

    Cable protection footpaths concrete slab detailCable protection roadways concrete encasement detailExclusion zone an LV pillarsPillar installation at easement or road reserve boundaryDetail at pillar for future extension

    bend location at pillarUnderground service from overhead system service conduit

    50165017

    51975187

    TRENCHING

    A. BletchlyD 2.6.11

    52285249

    C.Noel

    E 17.07.12

    TELECOMMUNICATION

    Joint electricity & Telecommunication

    - General layoutJoing electricity - Telecommunication URD areas

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • DESCRIPTION DWG

    INDEXB 15.3.05

    E54 5012 3 3

    C

    DESCRIPTION DWG

    TRENCHING

    A. Bletchly

    C. Noel

    L. Burton

    2/6/11

    2.6.11

    conduit location and cross section

    conduit location

    conduit location

    Front entry type conduit location & cross section

    Front entry type HV cable location ABB SDAF3 RMU Front entry type HV cable location Magnefix RMU + T Front entry type HV cable location Magnefix RMU & SFU Front entry type HV cable location no switchgear

    5115/15115/25115/35115/45115/5

    51285129513051315160

    11kV PADMOUNTED SUBSTATIONS

    Rectangular 22kV padmounted substation

    Rectangular 22kV padmounted substation

    Rectangular 22kV padmounted substation

    Rectangular 22kV padmounted substation

    Rectangular 22kV padmounted substation

    Rectangular 22kV padmounted substation

    Rectangular 22kV padmounted substation

    500kVA - LV conduit location

    1000kVA - LV conduit location

    3.7m padmount length - HV conduit location

    5142/1

    5142/2

    5142/3

    5142/4

    5142/5

    5142/6

    5142/7

    22kV PADMOUNTED SUBSTATIONS

    and cross section

    Insect protected cable

    Pole termination conduit and trench detail Pole termination conduit and trench detail Pole termination conduit bend detailPole termination conduit bend detail Distribution cabinet 6 module conduit location

    Distribution cabinet 6 module conduit bend details Distribution cabinet 6 module conduit location Distribution cabinet 6 module conduit location

    Distribution cabinet 6 module LV cable location

    5144/15144/25173/15173/25143/1

    5143/25143/35143/4

    5141

    HV / LV

    HV SWITCHGEAR

    ABB free standing RMU conduit location and cross section 5227/15227/25227/3

    ABB free standing RMU conduit locationABB free standing RMU conduit location Insect protected

    D 10.01.12

    Front entry type conduit location - ABB RMUFront entry type conduit location - ABB RMUFront entry type conduit location insect prot. cable - ABB RMU Front entry type conduit location insect prot. cable - ABB RMU Front entry type conduit location - FBX RMUFront entry type conduit location - FBX RMUFront entry type conduit location insect prot. cable - FBX RMU Front entry type conduit location insect prot. cable - FBX RMU

    5115/65115/75115/85115/9

    52685269

    Front entry type LV cable location - FBX RMUFront entry type HV cable location - FBX RMU

    Front entry type LV cable location - ABB RMU

    E 17.07.12

    Rectangular 22kV padmounted substation

    Rectangular 22kV padmounted substation

    5278/1

    5278/2500kVA - Schneider Electric LV conduit location

    1000kVA - Schneider Electric LV conduit location

    Rectangular 22kV padmounted substation 5142/8To suit RM6 switchgear - HV conduit location

    To suit F & G HV switchgear

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • C.Lindsay

    20/11/01

    D. M K.c

    TRENCHING

    5115

    NOTES:

    1. Conduit and cable nearest R.P. Street Alignment only, shown.

    3. Conduit depths shown are minimum and are dimensioned from finished ground line to top of conduit. Ramp down as required. Where conduits are normally laid at a depth greater than shown, that depth should be maintained.

    4. Terminate LV and HV cable conduit in line, each end of pit.

    5. Provide polymeric cable protection cover (and orange caution tape) over all cable not enclosed in conduit .6. Backfill cable pit with bedding sand.

    LV & HV cables

    F

    F

    Finished Ground Line

    o

    UniculvertFoundationF

    F

    Cable Pit

    R.P. StreetAlignment

    F

    45 Max. from front edge of uniculvert, or base slab where provided.

    F

    F

    Base Slab

    F

    F

    Conduit

    CROSS SECTION AT CABLE PITUNICULVERT FOUNDATION ONLY

    2. Locations and depths shown to conduit ends allow minimum bending radius of cables to be achieved for connection to switchgear. Refer MATERIAL DATA drawings No. 5108 to 5111 for minimum bending radius of cables.

    7. LV and HV cable locations shown at Padmounted Substation are illustrative only. Refer drawings No. 5128 to 5131 & 5160. Preferred sequence of construction is to install Padmounted Substation prior to cables.

    54 5115 1 1

    FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION AND CROSS SECTION

    B

    B

    13.12.11

    Dep

    th

    (ref

    er s

    heet

    s 2

    to 9

    )

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • C.Lindsay

    21/01/03

    D. M K.c

    F

    F

    F

    FOOTPATH

    SiteBoundary

    R.P. StreetAlignment

    3000

    5115

    HV LV

    Retaining Wall(where reqd)

    1000

    DEPTH DIM ASIZE

    400 4C 240mm2

    DEPTH DIM ASIZE

    NormalTo suit

    11kV cable

    F

    F

    Outline ofconcrete plinth

    F

    F

    F

    F

    Cable Pit

    F

    FA

    F

    End of conduitSeal around cable

    F

    F

    FF

    Side of trench /cable pit

    Cables asrequired

    FF

    11kV CABLE LV CABLE

    CONDUIT LOCATION

    H.V. ConduitL.V. Conduit not shownthis end of Cable Pit

    L.V. ConduitH.V. Conduit not shownthis end of Cable Pit

    PLAN VIEW

    H.V. CABLE ENTERING / EXITING FROM LEFTOR LEFT & RIGHT HAND SIDE OF PADMOUNT

    300

    54 5115 2 2

    FRONT ENTRY 11kV PADMOUNTED SUBSTATION

    Normal 0

    200 Min.

    B

    B 13.12.11 TRENCHING - ABB RMU

    TRIPLEX 185mm

    TRIPLEX 35mm

    TRIPLEX 400mm 1000 400

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • C.Lindsay

    21/01/03

    D. M K.cF

    F

    F

    FOOTPATH

    SiteBoundary

    R.P. StreetAlignment

    3000

    5115

    HV LV

    Retaining Wall(where reqd)

    1000

    DEPTHSIZE

    4C 240mm 2DEPTHSIZE

    NormalF

    F

    Outline ofconcrete plinth

    F

    F

    F

    F

    Cable Pit

    F

    F

    F

    End of conduitSeal around cable

    F

    F

    F

    Side of trench /cable pit

    Cables asrequired

    FF

    11kV CABLELV CABLE

    CONDUIT LOCATION

    H.V. ConduitL.V. Conduit not shownthis end of Cable Pit

    PLAN VIEW

    600

    L.V. Conduit

    300

    H.V. CABLE ENTERING / EXITINGRIGHT HAND SIDE OF PADMOUNT

    ONLY

    54 5115 3 3

    FRONT ENTRY 11kV PADMOUNTED SUBSTATION

    Normal

    B

    TRENCHING - ABB RMUB 13.12.11

    TRIPLEX 185mmTRIPLEX 35mm

    TRIPLEX 400mm 1000

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • C.Lindsay

    21/01/03

    D. M K.c

    FOOTPATH

    R.P. StreetAlignment

    5115

    HV LV

    200 Min.

    Retaining Wall(where reqd)

    11kV INSECT PROTECTED CABLE

    1250

    DEPTH DIM ASIZE

    500

    DEPTH DIM ASIZE

    LV INSECT PROTECTED CABLE

    To suit11kV cable

    F

    F

    F

    F

    F

    F

    Cable pit

    F

    FA

    F

    End of conduitSeal around cable

    F200 Min.

    Cables asrequired

    F

    Side of trench /cable pit

    F

    FF

    F

    F

    F

    SiteBoundary

    3000

    Outline ofconcrete plinth

    F

    L.V. ConduitH.V. Conduit not shownthis end of Cable Pit

    H.V. ConduitL.V. Conduit not shownthis end of Cable Pit

    F

    PLAN VIEW

    H.V. CABLE ENTERING / EXITING FROM LEFTOR LEFT & RIGHT HAND SIDE OF PADMOUNT

    400

    1100

    54 5115 4 4

    FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION INSECT PROTECTED CABLE

    01250

    B

    TRENCHING - ABB RMUB 13.12.11

    4C 240mmTRIPLEX 400mmTRIPLEX 185mmTRIPLEX 35mm

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • C.Lindsay

    21/01/03

    D. M K.c

    FOOTPATH

    R.P. StreetAlignment

    5115

    HV LV

    200 Min.

    Retaining Wall(where reqd)

    DEPTHSIZE

    LV INSECT PROTECTED CABLE

    F

    F

    F

    F

    F

    F

    Cable pit

    Cables asrequired

    FF

    F

    F

    F

    SiteBoundary

    3000

    Outline ofconcrete plinth

    F

    H.V. ConduitL.V. Conduit not shownthis end of Cable Pit

    PLAN VIEW

    F

    F

    F

    End of conduitSeal around cable

    F

    F

    F

    Side of trench /cable pit

    600

    L.V. Conduit

    H.V. CABLE ENTERING / EXITINGRIGHT HAND SIDE OF PADMOUNT

    ONLY

    400

    1100

    54 5115 5 5

    FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION INSECT PROTECTED CABLE

    11kV INSECT PROTECTED CABLE

    1250

    DEPTHSIZE

    1250

    B 13.12.11

    B

    TRENCHING - ABB RMU

    4C 240mmTRIPLEX 35mm

    TRIPLEX 400mmTRIPLEX 185mm

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • 13.12.11

    F

    F

    F

    FOOTPATH

    SiteBoundary

    R.P. StreetAlignment

    3000

    5115

    HV LV

    Retaining Wall(where reqd)

    1000

    DEPTH DIM ASIZE

    400 4C 240mm2

    DEPTH DIM ASIZE

    NormalTo suit

    11kV cable

    F

    F

    F

    F

    F

    Cable Pit

    F

    FA

    F

    End of conduitSeal around cable

    F

    F

    FF

    Side of trench /cable pit

    11kV CABLE LV CABLE

    CONDUIT LOCATION

    H.V. ConduitL.V. Conduit not shownthis end of Cable Pit

    L.V. ConduitH.V. Conduit not shownthis end of Cable Pit

    PLAN VIEW

    H.V. CABLE ENTERING / EXITING FROM LEFTOR LEFT & RIGHT HAND SIDE OF PADMOUNT

    300

    FRONT ENTRY 11kV PADMOUNTED SUBSTATION

    Normal 0

    200 Min.

    TRENCHING - FBX RMU

    TRIPLEX 185mm

    TRIPLEX 35mm

    TRIPLEX 400mm 1000 400

    654 5115 6T.Borg

    C.Noel

    A.Bletchly

    HV LV

    Outline ofconcrete plinth

    F

    Cables asrequired

    FF

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • 29.12.11

    F

    F

    F

    FOOTPATH

    SiteBoundary

    R.P. StreetAlignment

    3000

    5115

    LV

    Retaining Wall(where reqd)

    1000

    DEPTHSIZE

    4C 240mm 2DEPTHSIZE

    NormalF

    F

    F

    F

    F

    Cable Pit

    F

    F

    F

    End of conduitSeal around cable

    F

    F

    F

    Side of trench /cable pit

    11kV CABLELV CABLE

    CONDUIT LOCATION

    H.V. ConduitL.V. Conduit not shownthis end of Cable Pit

    PLAN VIEW

    600

    L.V. Conduit

    300

    H.V. CABLE ENTERING / EXITINGRIGHT HAND SIDE OF PADMOUNT

    ONLY

    FRONT ENTRY 11kV PADMOUNTED SUBSTATION

    Normal

    TRENCHING - FBX RMU

    TRIPLEX 185mmTRIPLEX 35mm

    TRIPLEX 400mm 1000

    754 5115 7T.Borg

    C.Noel

    A.Bletchly

    HV LV

    Outline ofconcrete plinth

    F

    Cables asrequired

    FF

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • 29.12.11

    FOOTPATH

    R.P. StreetAlignment

    5115

    200 Min.

    Retaining Wall(where reqd)

    11kV INSECT PROTECTED CABLE

    1250

    DEPTH DIM ASIZE

    500

    DEPTH DIM ASIZE

    LV INSECT PROTECTED CABLE

    To suit11kV cable

    F

    F

    F

    F

    F

    F

    Cable pit

    F

    FA

    F

    End of conduitSeal around cable

    F200 Min.

    Cables asrequired

    F

    Side of trench /cable pit

    F

    F

    F

    F

    F

    SiteBoundary

    3000

    Outline ofconcrete plinth

    F

    L.V. ConduitH.V. Conduit not shownthis end of Cable Pit

    H.V. ConduitL.V. Conduit not shownthis end of Cable Pit

    F

    PLAN VIEW

    H.V. CABLE ENTERING / EXITING FROM LEFTOR LEFT & RIGHT HAND SIDE OF PADMOUNT

    400

    1100

    FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION INSECT PROTECTED CABLE

    01250

    TRENCHING - FBX RMU

    4C 240mmTRIPLEX 400mmTRIPLEX 185mmTRIPLEX 35mm

    854 5115 8T.Borg

    C.Noel

    A.Bletchly

    HV LV

    FF

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • 29.12.11

    FOOTPATH

    R.P. StreetAlignment

    5115

    200 Min.

    Retaining Wall(where reqd)

    DEPTHSIZE

    LV INSECT PROTECTED CABLE

    F

    F

    F

    F

    F

    F

    Cable pit

    Cables asrequired

    F

    F

    F

    SiteBoundary

    3000

    H.V. ConduitL.V. Conduit not shownthis end of Cable Pit

    PLAN VIEW

    F

    F

    F

    End of conduitSeal around cable

    F

    F

    F

    Side of trench /cable pit

    600

    L.V. Conduit

    H.V. CABLE ENTERING / EXITINGRIGHT HAND SIDE OF PADMOUNT

    ONLY

    400

    1100

    FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION INSECT PROTECTED CABLE

    11kV INSECT PROTECTED CABLE

    1250

    DEPTHSIZE

    1250

    TRENCHING - FBX RMU

    4C 240mmTRIPLEX 35mm

    TRIPLEX 400mmTRIPLEX 185mm

    954 5115 9T.Borg

    C.Noel

    A.Bletchly

    HV LV

    FF

    FOutline ofconcrete plinth

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • C.Lindsay

    29/3/01

    D. M K.c

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    FO

    OT

    PA

    TH

    11

    00

    560

    SiteBoundary

    R.P. StreetAlignment

    30

    00

    2800

    10

    0

    10

    0

    80

    BACK ofLV cable

    FO

    OT

    PA

    TH

    12

    30

    SiteBoundary

    R.P. StreetAlignment

    30

    00

    2800

    580 (ref)

    Front ofcable support

    LV cable

    1st cable position

    2nd cable position

    3rd cable position

    4th cable position

    Cables as reqd(Refer design)

    LV cable

    Cable position

    560 BACK ofLV cable

    580 (ref)

    Front ofcable support

    LV CABLE LOCATION

    5128

    100kVA 200kVA, 315kVA, 500kVA, 750kVA & 1000kVA

    Position cables as close as possible to dimensions shown.

    54 5128 1

    FRONT ENTRY 11kV PADMOUNTED SUBSTATION

    B 29.12.11

    B

    TRENCHING - ABB SAFELINK RMUHARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • H.V.

    6000

    R.P.StreetAlignment

    FO

    OT

    PA

    TH

    40

    00

    TRENCHING17/01/03

    5142

    F

    F

    F

    FF

    F

    F

    500kVA, 3.7m & 4.1m PADMOUNT LENGTH

    54 5142 4 4

    RECTANGULAR 22kV PADMOUNTED SUBSTATION

    1st conduit position

    2nd conduit position

    3rd conduit position

    F

    F

    F

    4th conduit position

    5th conduit position

    6th conduit position

    320

    F

    F

    500kVA - LV CONDUIT LOCATION

    Cable Pit

    Site Boundary

    o

    Cable exit directionas required.

    B 7.11.03

    D

    C 24.9.08

    100100100100100

    550

    D 01.11.11A.Bletchly

    C.Noel

    T.Borg

    100 Dia 1830 Radius, 90 vertical bendsto 50mm Min. above concrete level.

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • H.V.

    6000

    R.P.StreetAlignment

    FO

    OT

    PA

    TH

    40

    00

    TRENCHING

    F

    F

    F

    FF

    F

    F

    54 5142 5 5

    RECTANGULAR 22kV PADMOUNTED SUBSTATION

    320

    F

    F

    Cable Pit

    Site Boundary

    1st conduit position

    2nd conduit position

    3rd conduit position

    1000kVA, 3.7m & 4.1m PADMOUNT LENGTH

    1000kVA - LV CONDUIT LOCATION

    5142

    F

    Customerconduitsas reqd

    Cable exit directionas required.

    o

    17/01/03B 19.11.03

    F

    F

    100100

    550

    F

    C 27.10.06

    DD 02.11.11

    A.Bletchly

    C.Noel

    T.Borg

    100 Dia 1830 Radius, 90 vertical bendsto 50mm Min. above concrete level.

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • H.V.

    L.V.

    6000

    AlignmentR.P.Street

    FO

    OTP

    AT

    H

    4000

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    if requiredService Platform Foundations

    F

    Cable Pit

    Site Boundary

    as required.Cable exit direction

    ASECTION

    F

    F1000

    F

    F1000

    ASECTION

    required.service platformscable trench where450 max. wide

    Where no service platforms reqd Where service platforms reqd

    F

    F

    150

    to 50mm above concrete level1000 Radius 90 vertical

    A

    500

    350F 300 360

    F

    F

    F

    1000 Radius 60 horizontal b

    TRENCHING

    5142 754 5142 7

    RECTANGULAR 22kV PADMOUNTED SUBSTATION17/01/03B 19.11.03

    D

    C 10.10.08

    4.1m PADMOUNT LENGTH

    NOTE:

    in all installations.3 conduits are required

    F & G HV SWITCHGEAR - HV CONDUIT LOCATIOND 11.07.12

    A.Bletchly

    C.Noel

    T.Borg

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • H.V.

    L.V.

    6000

    AlignmentR.P.Street

    FO

    OTP

    AT

    H

    4000

    F

    F

    F

    FF

    F

    F

    F

    F

    F

    if requiredService Platform Foundations

    F

    Cable Pit

    Site Boundary

    as required.Cable exit direction

    ASECTION

    F

    F1000

    F

    F1000

    ASECTION

    required.service platformscable trench where450 max. wide

    Where no service platforms reqd Where service platforms reqd

    F

    F

    150

    to 50mm above concrete level1000 Radius 90 vertical

    A

    400

    360F 700

    F

    F

    F

    1000 Radius 60 horizontal b

    5142

    25.06.12

    4.1m PADMOUNT LENGTH

    NOTE:

    in all installations.3 conduits are required

    365

    854 5142 8T.Borg

    C.Noel

    A.Bletchly

    concrete levelto 50mm above vertical bends1000 Radius 4

    F

    F

    RECTANGULAR 22kV PADMOUNTED SUBSTATIONSUIT RM6 SWITCHGEAR - HV CONDUIT LOCATION

    TRENCHINGA ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • NOTES:

    C.Lindsay

    14/01/03TRENCHING

    5144

    1. Locate cable on opposite side of pole to oncoming traffic where possible.

    2. Excessive excavation at the pole base may disturb pole foundation. Avoid excavating in areas shown.

    3. Location of conduit end and depth of excavation shown allow minimum bending radius of cable to be achieved.

    POLE TERMINATION

    CABLE DETAIL DIMENSION A DIMENSION B

    1.5m

    CABLE DETAIL DIMENSION A DIMENSION B

    Normal trench depth

    2.0m

    1.5m

    1.5m

    2.5m

    Normal trench depth

    LV CABLE

    CONDUIT AND TRENCH DETAIL

    54 5144 1 1

    11kV CABLE

    1.5m

    CABLE DETAIL DIMENSION A DIMENSION B

    Normal trench depth (FN)

    22kV CABLE

    1.5m Normal trench depth

    4. Provide polymeric cable protection cover and orange caution tape to all conduit/cable outside Electricity Footpath Allocation.

    5. Refer drawing No. 5173 for detail of allowable cables and bends at pole termination.

    1.2m

    2.0m

    1.2m (CA)

    1.05m

    1.05m1.5m

    Normal trench depth

    Normal trench depth

    1.2m

    Normal trench depth (FN)1.05m (CA)

    240mm 4C Insect Protected

    240mm 4C

    16mm 4C Insect Protected

    16mm 4C

    50mm 4C Insect Protected 1.5m 1.05m

    B 24.9.08

    C

    35mm TRIPLEX185mm TRIPLEX35mm TRIPLEX Insect Protected185mm TRIPLEX Insect Protected240mm Cu TRIPLEX Insect Protected

    185mm TRIPLEX

    630mm 3 x 1C

    35mm TRIPLEX Insect Protected

    C 23.3.11

    2.0m 1.2m

    400mm Cu TRIPLEX Insect Protected 2.0m 1.2m400mm Al TRIPLEX

    A.Bletchly

    C.Noel

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • Road crossing to diagonal propertynot straight across

    45 1830mm radius bend

    Real Property Boundary

    R.P. Street Alignment

    45 1830mm radius bend

    F

    F

    F

    F

    F

    F

    NOTE:Provide E Marker at all kerb crossings

    o

    o

    20/12/01

    54 5162 7 5162DJBD. M K.c

    TRENCHING - FN REGION

    ALLOWABLE BENDS FOR HV CONDUITROAD CROSSING

    7

    Kerb

    Electricity Footpath Allocation for FN Regionand Telstra is from 0.3 to 1.2m from propertyFN Region to be property side of Telstra.

    F

    Polymeric CableProtection Cover

    F

    R O A D W A Y

    B

    B

    1.06.09 HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • NOTES:

    C.Lindsay

    14/01/03

    D. M K.c

    TRENCHING

    5173

    1. Locate cable on opposite side of pole to oncoming traffic where possible.

    2. Excessive excavation at the pole base may disturb pole foundation. Avoid excavating in areas shown.

    POLE TERMINATION

    CABLE DETAIL

    LV CABLE

    54 5173 1 1CONDUIT BEND DETAIL

    3. Conduit bends shown allow minimum bending radius of cable to be achieved.

    BEND DETAIL

    CABLE DETAIL BEND DETAIL

    11kV CABLE

    CABLE DETAIL BEND DETAIL

    4. Provide polymeric cable protection cover and orange caution tape to all conduit/cable outside Electricity Footpath Allocation.

    5. Cables not listed must be direct buried at pole. Refer drawing No. 5144.

    22kV CABLE

    240mm 4C16mm 4C

    16mm 4CInsect Protected

    80 Dia. 90 750 Radius

    80 Dia. 90 750 Radius

    50mm 4CInsect Protected

    80 Dia. 90 1000 Radius

    35mm TRIPLEX 125 Dia. 90 1000 Radius

    125 Dia. 90 1000 Radius35mm TRIPLEXInsect Protected

    B 24.9.08

    B

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • F

    F

    Lc Pillar

    TRENCHING - ALL REGIONS

    Real PropertyBoundary

    F

    F

    Exclusion Zone

    F

    FRONT

    F

    FOOTPATH

    Property AllotmentProperty Allotment

    LLV Pillar Base

    Survey peg

    R.P. Street Alignment

    EXCLUSION ZONE AT LV PILLARS

    c

    Refer applicable regionalTRENCHING detail for trenchdetails and conduit positions.

    54 5196 1 5196

    20/9/05

    No other service authorities pits orabove ground plant to be locatedin this area.

    1

    B 09.08.10

    C 01.11.11

    CT.Borg

    C.Noel

    A.Bletchly

    400

    400 min

    400 min

    400 min

    400

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • F

    F

    Lc Pillar

    TRENCHING - ALL REGIONS

    Real PropertyBoundary

    F

    F

    Exclusion Zone

    F

    FRONT

    F

    FOOTPATH

    LV Pillar Base

    Survey peg

    Refer applicable regionalTRENCHING detail for trenchdetails and conduit positions.

    54 5196 2 5196

    23/9/08

    No other service authorities pits orabove ground plant to be locatedin this area.

    R.P. Street Alignment

    Property AllotmentEasement orRoad Reserve

    NOTES:

    1. Pillars shall be located in areas remote from vehicular access.

    2. Should the edge of the pillar base, at ground level, be located less than 1000mm from the kerb or the edge of trafficable areas, then the pillar shall be protected by two bollards. Refer to CONSTRUCTIONS PRACTICES for bollard details.

    Offset base to align with centre lineof survey peg clear of Road Reserveor Easement area.

    3. To gain access to a consumers property, remote from pillars, the lead in conduits shall be placed and run in the electricity footpath allocation. Locate to clear possible future fence corner post.

    PILLAR INSTALLATION AT EASEMENTOR ROAD RESERVE BOUNDARY

    F

    ServiceConduit

    F

    2

    B 01.11.11

    C.Noel

    A.Bletchly

    T.Borg B

    400

    400 min

    400 min

    400 min

    400

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    28/2/11TRENCHING

    NOTES:

    1. Conduit and cable nearest R.P. Street Alignment only, shown.

    3. Conduit depths shown are minimum and are dimensioned from finished ground line to top of conduit. Ramp down as required. Where conduits are normally laid at a depth greater than shown, that depth should be maintained.

    5. Provide polymeric cable protection cover (and orange caution tape) over all cable not enclosed in conduit .6. Backfill cable pit with bedding sand.

    LV & HV cables

    F

    F

    Finished Ground Line

    Cable Pit

    R.P. StreetAlignment

    F

    F

    F

    Base Slab

    F

    Conduit

    CROSS SECTION AT CABLE PITUNICULVERT FOUNDATION ONLY

    2. Locations and depths shown to conduit ends allow minimum bending radius of cables to be achieved for connection to switchgear. Refer MATERIAL DATA drawings No. 5108 to 5111 for minimum bending radius of cables.

    1CONDUIT LOCATION AND CROSS SECTION

    522754 5227 1

    ABB FREE STANDING RMU

    4. Terminate HV cable conduit in line, each end of pit.

    RMU Foundation

    F

    F

    F

    45 Max. from front edge of uniculvert, or base slab where provided.

    Dep

    th

    (ref

    er s

    heet

    s 2

    & 3

    )

    7. HV cable locations shown at RMU site illustrative only. Preferred sequence of construction is to install Padmounted RMU prior to cables.

    C. Noel

    A. Bletchly

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    24/2/11

    F

    F

    R.P. StreetAlignment

    3000

    TRENCHING

    F

    F

    Cable Pit

    End of conduitSeal around cable

    F

    CONDUIT LOCATION

    PLAN VIEW

    2522754 5227 2

    FOOTPATH

    TRIPLEX 400mmTRIPLEX 185mmTRIPLEX 35mm

    11kV CABLE

    SIZE

    H.V. Conduit H.V. Conduit

    DEPTH

    1000

    A. Bletchly

    C. Noel

    HV cable entering / exiting from left or left & right hand side of RMU.

    F

    Side of trench /cable pit

    F

    Outline of concrete plinth & foundation

    F

    Site boundryF

    Cables as required

    FF

    Side of trench /cable pit

    F

    ABB FREE STANDING RMUHARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    24/2/11TRENCHING

    522754 5227 3

    TRIPLEX 185mmTRIPLEX 35mm

    SIZE

    A. Bletchly

    C. Noel

    3CONDUIT LOCATION INSECT PROTECTED CABLE

    TRIPLEX 400mm

    F

    F

    R.P. StreetAlignment

    3000

    F

    F

    Cable Pit

    End of conduitSeal around cable

    F

    PLAN VIEW

    FOOTPATH

    H.V. Conduit H.V. Conduit

    HV cable entering / exiting from left or left & right hand side of RMU.

    F

    Side of trench /cable pit

    Outline of concrete plinth & foundation

    F

    Site boundryF

    Cables as required

    FF

    Side of trench /cable pit

    F

    TRIPLEX 240mm

    DEPTHDIM A

    210

    310

    360

    1250

    11kV INSECT PROTECTED CABLE

    0

    F200 Min.

    Retaining Wall(where reqd)

    F

    A

    F

    A

    F

    ABB FREE STANDING RMUHARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton 522854 5228 1

    7/3/11

    Finished surface line

    LV LV

    HV HV

    PL

    F

    F

    F

    Bedding Sand

    F

    F

    F

    F

    F

    F

    1050 min Road

    way - Min

    or

    900 min Footp

    ath

    Refer note 2 for

    Arterial R

    oad

    ways

    F

    F

    900 min Road

    way - Min

    or

    750 min Footp

    ath

    1200 min Road

    way - Arterial

    F

    F

    35

    0

    50

    Foo

    50

    0

    50

    Ro

    75 min

    150 m

    ax

    F

    F

    NOTES:

    1.

    2.

    3.

    4.

    drawing No. 5124 sheet 1 for locations.Refer CONSTRUCTION PRACTICES

    avoid trench depth in excess of 1.5m.cables may be laid at the same depth to For ARTERIAL (DMR) roads LV and HV

    side conduits first.Ergon cables are to occupy property

    Refer Note 1where required protection cover Polymeric cable

    ConduitPublic Lighting

    as RequiredHV and LV conduit

    VERTICAL

    LV

    HV

    100 Min

    300 Min

    LV

    HV

    100 Min

    100 Min

    DIMENSION

    DIMENSION RADIAL

    of conduits.to cover entire width Caution tape orange,

    F

    As per region

    Alignment

    F

    F

    As per region

    Trench width

    F

    F F

    F

    min25 min

    25

    min25

    C. Noel

    A. Bletchly

    TRENCHING - ALL REGIONS

    B

    JOINT ELECTRICITY & TELECOMMUNICATIONB 09.07.12

    T T

    (T) as requiredTelecommunication conduit

    Authority requirementsTelecommunication tape to Telecommunication marker

    Authority requirementsroadside of trench to Telecommunication Telecommunication conduit laid against

    Authority and Ergon conduits.Clearance between Telecommunication

    CONDUITS CROSSINGTELECOMMUNICATION

    SEPARATION FROM

    CONDUITS PARALLELTELECOMMUNICATION

    SEPARATION FROM

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • Kerb

    LO

    T 1

    LO

    T 2

    LO

    T 3

    LO

    T 4

    F

    F

    F

    F

    this Footp

    ath

    Share

    d Tre

    nch on

    F

    F

    F

    F

    F

    F

    F

    Boundary

    Real P

    roperty

    Alig

    nm

    ent

    R.P. Street

    services

    Electricity

    Alig

    nm

    ent

    R.P. Street

    HV/L

    V conduits

    Boundary

    Real P

    roperty

    services

    Electricity

    F

    F

    F

    F

    F

    F

    conduit

    Cross Road

    F

    F

    Kerb

    Cross-ro

    ad

    Pillar

    Supply

    Pillar

    F

    F

    F

    URD AREAS GENERAL LAYOUT

    Prote

    ctio

    n Cover

    Poly

    meric Cable

    F

    R O A D W A Y

    54 5249 1 5249

    1Note

    1Note

    details and conduit positions.trenching detail for trenchRefer applicable regionalNote 1.

    A. Bletchly

    L. Burton

    C. Noel

    23/3/11TRENCHING - ALL REGIONSB

    C

    01.11.11

    C 09.07.12

    Leadin conduit

    Teleco

    mm

    unicatio

    n

    T

    T T

    Leadin conduit

    Teleco

    mm

    unicatio

    n

    TTTeleco

    mm

    unicatio

    n Conduit

    2 x 100 M

    ax.

    T Teleco

    mm

    unicatio

    n pit

    Leadin conduit

    Teleco

    mm

    unicatio

    n

    T

    Leadin conduit

    Teleco

    mm

    unicatio

    n

    T

    Teleco

    mm

    unicatio

    n conduit

    Teleco

    mm

    unicatio

    n pit

    T

    F Zone

    Exclusio

    n

    Pillar

    Zone

    Exclusio

    n

    Pillar

    F

    JOINT ELECTRICITY - TELECOMMUNICATION

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • 29.12.11

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    FO

    OT

    PA

    TH

    SiteBoundary

    R.P. StreetAlignment

    30

    00

    2800

    BACK ofLV cable

    LV cable

    1st cable position

    2nd cable position

    3rd cable position

    4th cable position

    Cables as reqd(Refer design)

    LV CABLE LOCATION

    Position cables as close as possible to dimensions shown.

    FRONT ENTRY 11kV PADMOUNTED SUBSTATION

    54 5268 1 5268

    TRENCHING - FBX RMU

    T.Borg

    C.Noel

    A.Bletchly

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    FO

    OT

    PA

    TH

    11

    00

    SiteBoundary

    R.P. StreetAlignment

    30

    00

    2800

    BACK ofLV cable

    LV cable

    1st cable position

    2nd cable position

    3rd cable position

    4th cable position

    Cables as reqd(Refer design)

    315kVA & 500kVA

    640

    11

    011

    011

    0

    750kVA & 1000kVA

    640

    10

    00

    11

    0

    11

    0

    11

    0

    790 (ref)Recessrear wall

    790 (ref)

    Recessrear wall

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • 30.12.11

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    FO

    OT

    PA

    TH

    SiteBoundary

    R.P. StreetAlignment

    30

    00

    2800

    HV cable

    TRENCHING

    Position cables as close as possible to dimensions shown.

    FRONT ENTRY 11kV PADMOUNTED SUBSTATION

    A.Bletchly

    C.Noel

    T.Borg 54 5269 1 5269HV CABLE LOCATION FBX RMU

    FBX RMU

    32

    07

    50

    Centre oflug

    685

    790 (ref) Recessrear wall

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • H.V.

    6000

    AlignmentR.P.Street

    FO

    OTP

    AT

    H

    4000

    TRENCHING20.04.12

    F

    F

    F

    FF

    F

    F

    RECTANGULAR 22kV PADMOUNTED SUBSTATION

    1st conduit position

    2nd conduit position

    3rd conduit position

    F

    F

    F

    4th conduit position

    5th conduit position

    6th conduit position

    320

    F

    F

    Cable Pit

    Site Boundary

    o

    as required.Cable exit direction

    to 50mm Min. above concrete level.80 Dia 1000 Radius, 90 vertical bends

    100100

    200

    100

    450

    5278 154 5278 1

    A.Bletchly

    C.Noel

    T.Borg

    500kVA - SCHNEIDER ELECTRIC LV CONDUIT LOCATION

    315kVA & 500kVA, 3.7m & 4.1m PADMOUNT LENGTH

    100

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • H.V.

    6000

    FO

    OTP

    AT

    H

    4000

    TRENCHING

    F

    F

    F

    F

    F

    F

    F

    RECTANGULAR 22kV PADMOUNTED SUBSTATION

    320

    F

    F

    Cable Pit

    Site Boundary

    1st conduit position

    2nd conduit position

    3rd conduit position

    1000kVA, 3.7m & 4.1m PADMOUNT LENGTH

    F

    as reqdconduitsCustomer

    as required.Cable exit direction

    o

    20.04.12

    to 50mm Min. above concrete level.80 Dia 1000 Radius, 90 vertical bends

    F

    F

    100

    450

    F

    5278 254 5278 2

    1000kVA - SCHNEIDER ELECTRIC LV CONDUIT LOCATION

    AlignmentR.P.Street

    A.Bletchly

    C.Noel

    T.Borg

    100

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

    00 Trenching01 Trenching Index Sh101 Trenching Index Sh201 Trenching Index Sh3

    5016 Cable Protection Footpaths Concrete Slab Detail5017 Cable Protection Roadways Concrete Encasement Detail5115 Sh1 Front Entry 11kV Padmounted Sub Conduit Location and X-Section5115 Sh2 Front Entry 11kV Padmounted Sub Conduit Location5115 Sh3 Front Entry 11kV Padmounted Sub Conduit Location5115 Sh4 Front Entry 11kV Padmounted Sub Conduit Location Insect Protected Cable5115 Sh5 Front Entry 11kV Padmounted Sub Conduit Location Insect Protected Cable5115 Sh6 Front Entry 11kV Padmounted Sub Conduit Location - FBX RMU5115 Sh7 Front Entry 11kV Padmounted Sub Conduit Location - FBX RMU5115 Sh8 Front Entry 11kV Padmounted Sub Conduit Location Insect Prot Cable - FBX RMU5115 Sh9 Front Entry 11kV Padmounted Sub Conduit Location Insect Prot Cable - FBX RMU

    5128 Front Entry 11kV Padmounted Sub LV Cable Location5129 Front Entry 11kV Padmounted Sub HV Cable Location ABB SDAF3 RMU5130 Front Entry 11kV Padmounted Sub HV Cable Location Magnefix RMU5131 Front Entry 11kV Padmounted Sub HV Cable Location Magnefix RMU and SFU5141 Dist Cabinet 6 Module LV Cable Location5142 Sh1 Rect 22kV Padmounted Sub Conduit Location and XSection5142 Sh2 Rect 22kV Padmounted Sub Conduit Location5142 Sh3 Rect 22kV Padmounted Sub Conduit Location5142 Sh4 Rect 22kV Padmounted Sub 500kVA-LV Conduit Location5142 Sh5 Rect 22kV Padmounted Sub 1000kVA-LV Conduit Location5142 Sh6 Rect 22kV Padmounted Sub -HV Conduit Location5142 Sh7 Rect 22kV Padmounted Sub 4.7m Length-HV Conduit Location5142 Sh8 Rect 22kV Padmounted Sub RM6 SGear-HV Conduit Location

    5143 Sh1 Dist Cabinet 6 Module Conduit Location and XSection5143 Sh2 Dist Cabinet 6 Module Conduit Bend Details5143 Sh3 Dist Cabinet 6 Module Conduit Location5143 Sh4 Dist Cabinet 6 Module Conduit Location Insect Protected Cable

    5144 Sh1 Pole Termination Conduit and Trench Detail5144 Sh2 Pole Termination Conduit and Trench Detail

    5160 Front Entry 11kV Padmounted Sub HV Cable Location No Switchgear5162 Sh1 FN Region Joint Elect, Gas and Telstra5162 Sh2 FN Region Joint Elect, Gas and Multiple Telstra5162 Sh3 FN Region Conduit Bends at Pillar - Sections 16mm 4 Core XRoad Cable5162 Sh4 FN Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5162 Sh5 FN Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5162 Sh6 FN Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5162 Sh7 FN Region Allowable Bends for HV Conduit Road Crossing5162 Sh8 FN Region Pillar Base Installation

    5163 Sh1 NQ Region URD Areas5163 Sh2 NQ Region URD Areas Joint Elect and Telstra5163 Sh3 NQ Region City and Urban Areas5163 Sh4 NQ Region Joint Elect-Telstra URD Areas Gen Layout5163 Sh5 NQ Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5163 Sh6 NQ Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5163 Sh7 NQ Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5163 Sh8 NQ Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5163 Sh9 NQ Region Pillar Base Installation

    5164 Sh1 MK Region Joint Elect and Telstra5164 Sh2 MK Region Joint Elect, Telstra and Gas5164 Sh3 MK Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5164 Sh4 MK Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5164 Sh5 MK Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5164 Sh6 MK Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5164 Sh7 MK Region with Gas Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5164 Sh8 MK Region with Gas Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5164 Sh9 MK Region with Gas Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5164 Sh10 MK Region with Gas Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5164 Sh11 MK Region Pillar Base Installation

    5165 Sh1 CA Region Conduit, Trench and Pillar Alignment Schedule5165 Sh2 CA Region Trench Detail Elect and Telstra5165 Sh3 CA Region Trench Detail Elect and Telstra5165 Sh4 CA Region Gladstone Elect and Telstra5165 Sh5 CA Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5165 Sh6 CA Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5165 Sh7 CA Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5165 Sh8 CA Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5165 Sh9 CA Region Pillar Base Installation

    5166 Sh1 WB Region Electricity and Telstra5166 Sh2 WB Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5166 Sh3 WB Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5166 Sh4 WB Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5166 Sh5 WB Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5166 Sh6 WB Region Pillar Base Installation

    5167 Sh1 SW Region Electricity and Telstra5167 Sh2 SW Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5167 Sh3 SW Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5167 Sh4 SW Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5167 Sh5 SW Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5167 Sh6 SW Region Pillar Base Installation

    5168 Sh1 Conduit Ducting Arrangement5168 Sh2 Conduit Ducting Arrangement5168 Sh3 Conduit Ducting Arrangement

    5173 Sh1 Pole Termination Conduit Bend Detail5173 Sh2 Pole Termination Conduit and Trench Detail

    5187 UG Service from OH System Service Conduit Bend Location at Pillar5196 Sh1 Exclusion Zone at LV Pillars5196 Sh2 Pillar Installation at Easement or Road Reserve Boundary

    5197 Detail at Pillar for Future Extension5227 Sh1 ABB Free Standing RMU Conduit Location and X Section5227 Sh2 ABB Free Standing RMU Conduit Location5227 Sh3 ABB Free Standing RMU Conduit Location Insect Protected Cable

    5228 All Regions Joint Electricity and NBN5249 All Regions Joint Electricity NBN URD Areas Gen Layout5268 Front Entry 11kV Padmounted Sub LV Cable Location - FBX RMU5269 Front Entry 11kV Padmounted Sub HV Cable Location - FBX RMU5278 Sh1 Rect 22kV Padmounted Sub 500kVA Schneider Electric LV Conduit Location5278 Sh2 Rect 22kV Padmounted Sub 1000kVA Schneider Electric LV Conduit Location