04 Trenching
description
Transcript of 04 Trenching
-
UNDERGROUND CONSTRUCTION MANUAL
TRENCHING Go to SECTION INDEX Back to MAIN INDEX
-
DESCRIPTION DWG
INDEX
B
15.03.05
B
11.08.10
c
J. Brooks
D. McKeown
T.Borg 54 5012 1 1
5168/2
5162/1
5162/6
5163/15163/25163/3
5163/5
5162/45162/3
5168/3
5168/1
5162/7
5163/6
Joint electricity, gas and Telstra
Conduit bend details at pillar 240mm 4 core cross road cable
NQ REGION
5162/2
5163/4
DESCRIPTION DWG
5164/5
MK REGION
5164/45164/3
5164/1
5164/6
5164/2
TRENCHING
Conduit ducting arrangementConduit ducting arrangementConduit ducting arrangement
FN REGION
Joint electricity, gas and multiple TelstraConduit bend at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bend at pillar - sections 240mm 4 core cross road cable 5162/5
Allow bends for HV conduit road crossing5162/8Pillar base installation
Conduit bend details at pillar 240mm 4 core cross road cablePillar base installation
5163/75163/85163/9
URD areasURD areas joint electricity and TelstraCity and urban areasJoint electricity - Telstra URD areas general layoutConduit bend at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bend at pillar - sections 240mm 4 core cross road cable
Joint electricity and TelstraJoint electricity, Telstra and gasConduit bend at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bend at pillar - sections 240mm 4 core cross road cableConduit bend details at pillar 240mm 4 core cross road cable
5164/7
5164/8
5164/9
With Gas - Conduit bends at pillar - sections16mm 4 core cross road cable
With Gas - Conduit bends at pillar - sections16mm 4 core cross road cable
240mm 4 core cross road cable
240mm 4 core cross road cable
With Gas - Conduit bend details at pillar
With Gas - Conduit bend details at pillar
Pillar base installation
5164/10
5164/11
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
DESCRIPTION DWG
INDEXB 15.3.05
E
11/8/10
T.Borg 54 5012 2 2
C 11.8.10
5165/2
5165/4
5165/8
5166/15166/25166/3
5166/5
CA REGION
Conduit, trench and pillar alignment schedule
5165/75165/6
5165/3
5165/1
5165/9
5166/6
Trench detail electricity and TelstraTrench detail electricity and TelstraGladstone electricity and TelstraConduit bends at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bends at pillar - sections 240mm 4 core cross road cableConduit bend details at pillar 240mm 4 core cross road cablePillar base installation
WB REGION
Electricity and TelstraConduit bends at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bends at pillar - sections 240mm 4 core cross road cableConduit bend details at pillar 240mm 4 core cross road cablePillar base installation
5165/5
5166/4
DESCRIPTION DWG
5167/5
5196/1
SW REGION
5167/45167/3
5167/1
5167/6
Conduit bends at pillar - sections 16mm 4 core cross road cableConduit bend details at pillar 16mm 4 core cross road cableConduit bends at pillar - sections 240mm 4 core cross road cableConduit bend details at pillar 240mm 4 core cross road cablePillar base installation
5167/2
5196/2
Electricity and Telstra
ALL REGIONS
Cable protection footpaths concrete slab detailCable protection roadways concrete encasement detailExclusion zone an LV pillarsPillar installation at easement or road reserve boundaryDetail at pillar for future extension
bend location at pillarUnderground service from overhead system service conduit
50165017
51975187
TRENCHING
A. BletchlyD 2.6.11
52285249
C.Noel
E 17.07.12
TELECOMMUNICATION
Joint electricity & Telecommunication
- General layoutJoing electricity - Telecommunication URD areas
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
DESCRIPTION DWG
INDEXB 15.3.05
E54 5012 3 3
C
DESCRIPTION DWG
TRENCHING
A. Bletchly
C. Noel
L. Burton
2/6/11
2.6.11
conduit location and cross section
conduit location
conduit location
Front entry type conduit location & cross section
Front entry type HV cable location ABB SDAF3 RMU Front entry type HV cable location Magnefix RMU + T Front entry type HV cable location Magnefix RMU & SFU Front entry type HV cable location no switchgear
5115/15115/25115/35115/45115/5
51285129513051315160
11kV PADMOUNTED SUBSTATIONS
Rectangular 22kV padmounted substation
Rectangular 22kV padmounted substation
Rectangular 22kV padmounted substation
Rectangular 22kV padmounted substation
Rectangular 22kV padmounted substation
Rectangular 22kV padmounted substation
Rectangular 22kV padmounted substation
500kVA - LV conduit location
1000kVA - LV conduit location
3.7m padmount length - HV conduit location
5142/1
5142/2
5142/3
5142/4
5142/5
5142/6
5142/7
22kV PADMOUNTED SUBSTATIONS
and cross section
Insect protected cable
Pole termination conduit and trench detail Pole termination conduit and trench detail Pole termination conduit bend detailPole termination conduit bend detail Distribution cabinet 6 module conduit location
Distribution cabinet 6 module conduit bend details Distribution cabinet 6 module conduit location Distribution cabinet 6 module conduit location
Distribution cabinet 6 module LV cable location
5144/15144/25173/15173/25143/1
5143/25143/35143/4
5141
HV / LV
HV SWITCHGEAR
ABB free standing RMU conduit location and cross section 5227/15227/25227/3
ABB free standing RMU conduit locationABB free standing RMU conduit location Insect protected
D 10.01.12
Front entry type conduit location - ABB RMUFront entry type conduit location - ABB RMUFront entry type conduit location insect prot. cable - ABB RMU Front entry type conduit location insect prot. cable - ABB RMU Front entry type conduit location - FBX RMUFront entry type conduit location - FBX RMUFront entry type conduit location insect prot. cable - FBX RMU Front entry type conduit location insect prot. cable - FBX RMU
5115/65115/75115/85115/9
52685269
Front entry type LV cable location - FBX RMUFront entry type HV cable location - FBX RMU
Front entry type LV cable location - ABB RMU
E 17.07.12
Rectangular 22kV padmounted substation
Rectangular 22kV padmounted substation
5278/1
5278/2500kVA - Schneider Electric LV conduit location
1000kVA - Schneider Electric LV conduit location
Rectangular 22kV padmounted substation 5142/8To suit RM6 switchgear - HV conduit location
To suit F & G HV switchgear
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
C.Lindsay
20/11/01
D. M K.c
TRENCHING
5115
NOTES:
1. Conduit and cable nearest R.P. Street Alignment only, shown.
3. Conduit depths shown are minimum and are dimensioned from finished ground line to top of conduit. Ramp down as required. Where conduits are normally laid at a depth greater than shown, that depth should be maintained.
4. Terminate LV and HV cable conduit in line, each end of pit.
5. Provide polymeric cable protection cover (and orange caution tape) over all cable not enclosed in conduit .6. Backfill cable pit with bedding sand.
LV & HV cables
F
F
Finished Ground Line
o
UniculvertFoundationF
F
Cable Pit
R.P. StreetAlignment
F
45 Max. from front edge of uniculvert, or base slab where provided.
F
F
Base Slab
F
F
Conduit
CROSS SECTION AT CABLE PITUNICULVERT FOUNDATION ONLY
2. Locations and depths shown to conduit ends allow minimum bending radius of cables to be achieved for connection to switchgear. Refer MATERIAL DATA drawings No. 5108 to 5111 for minimum bending radius of cables.
7. LV and HV cable locations shown at Padmounted Substation are illustrative only. Refer drawings No. 5128 to 5131 & 5160. Preferred sequence of construction is to install Padmounted Substation prior to cables.
54 5115 1 1
FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION AND CROSS SECTION
B
B
13.12.11
Dep
th
(ref
er s
heet
s 2
to 9
)
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
C.Lindsay
21/01/03
D. M K.c
F
F
F
FOOTPATH
SiteBoundary
R.P. StreetAlignment
3000
5115
HV LV
Retaining Wall(where reqd)
1000
DEPTH DIM ASIZE
400 4C 240mm2
DEPTH DIM ASIZE
NormalTo suit
11kV cable
F
F
Outline ofconcrete plinth
F
F
F
F
Cable Pit
F
FA
F
End of conduitSeal around cable
F
F
FF
Side of trench /cable pit
Cables asrequired
FF
11kV CABLE LV CABLE
CONDUIT LOCATION
H.V. ConduitL.V. Conduit not shownthis end of Cable Pit
L.V. ConduitH.V. Conduit not shownthis end of Cable Pit
PLAN VIEW
H.V. CABLE ENTERING / EXITING FROM LEFTOR LEFT & RIGHT HAND SIDE OF PADMOUNT
300
54 5115 2 2
FRONT ENTRY 11kV PADMOUNTED SUBSTATION
Normal 0
200 Min.
B
B 13.12.11 TRENCHING - ABB RMU
TRIPLEX 185mm
TRIPLEX 35mm
TRIPLEX 400mm 1000 400
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
C.Lindsay
21/01/03
D. M K.cF
F
F
FOOTPATH
SiteBoundary
R.P. StreetAlignment
3000
5115
HV LV
Retaining Wall(where reqd)
1000
DEPTHSIZE
4C 240mm 2DEPTHSIZE
NormalF
F
Outline ofconcrete plinth
F
F
F
F
Cable Pit
F
F
F
End of conduitSeal around cable
F
F
F
Side of trench /cable pit
Cables asrequired
FF
11kV CABLELV CABLE
CONDUIT LOCATION
H.V. ConduitL.V. Conduit not shownthis end of Cable Pit
PLAN VIEW
600
L.V. Conduit
300
H.V. CABLE ENTERING / EXITINGRIGHT HAND SIDE OF PADMOUNT
ONLY
54 5115 3 3
FRONT ENTRY 11kV PADMOUNTED SUBSTATION
Normal
B
TRENCHING - ABB RMUB 13.12.11
TRIPLEX 185mmTRIPLEX 35mm
TRIPLEX 400mm 1000
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
C.Lindsay
21/01/03
D. M K.c
FOOTPATH
R.P. StreetAlignment
5115
HV LV
200 Min.
Retaining Wall(where reqd)
11kV INSECT PROTECTED CABLE
1250
DEPTH DIM ASIZE
500
DEPTH DIM ASIZE
LV INSECT PROTECTED CABLE
To suit11kV cable
F
F
F
F
F
F
Cable pit
F
FA
F
End of conduitSeal around cable
F200 Min.
Cables asrequired
F
Side of trench /cable pit
F
FF
F
F
F
SiteBoundary
3000
Outline ofconcrete plinth
F
L.V. ConduitH.V. Conduit not shownthis end of Cable Pit
H.V. ConduitL.V. Conduit not shownthis end of Cable Pit
F
PLAN VIEW
H.V. CABLE ENTERING / EXITING FROM LEFTOR LEFT & RIGHT HAND SIDE OF PADMOUNT
400
1100
54 5115 4 4
FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION INSECT PROTECTED CABLE
01250
B
TRENCHING - ABB RMUB 13.12.11
4C 240mmTRIPLEX 400mmTRIPLEX 185mmTRIPLEX 35mm
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
C.Lindsay
21/01/03
D. M K.c
FOOTPATH
R.P. StreetAlignment
5115
HV LV
200 Min.
Retaining Wall(where reqd)
DEPTHSIZE
LV INSECT PROTECTED CABLE
F
F
F
F
F
F
Cable pit
Cables asrequired
FF
F
F
F
SiteBoundary
3000
Outline ofconcrete plinth
F
H.V. ConduitL.V. Conduit not shownthis end of Cable Pit
PLAN VIEW
F
F
F
End of conduitSeal around cable
F
F
F
Side of trench /cable pit
600
L.V. Conduit
H.V. CABLE ENTERING / EXITINGRIGHT HAND SIDE OF PADMOUNT
ONLY
400
1100
54 5115 5 5
FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION INSECT PROTECTED CABLE
11kV INSECT PROTECTED CABLE
1250
DEPTHSIZE
1250
B 13.12.11
B
TRENCHING - ABB RMU
4C 240mmTRIPLEX 35mm
TRIPLEX 400mmTRIPLEX 185mm
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
13.12.11
F
F
F
FOOTPATH
SiteBoundary
R.P. StreetAlignment
3000
5115
HV LV
Retaining Wall(where reqd)
1000
DEPTH DIM ASIZE
400 4C 240mm2
DEPTH DIM ASIZE
NormalTo suit
11kV cable
F
F
F
F
F
Cable Pit
F
FA
F
End of conduitSeal around cable
F
F
FF
Side of trench /cable pit
11kV CABLE LV CABLE
CONDUIT LOCATION
H.V. ConduitL.V. Conduit not shownthis end of Cable Pit
L.V. ConduitH.V. Conduit not shownthis end of Cable Pit
PLAN VIEW
H.V. CABLE ENTERING / EXITING FROM LEFTOR LEFT & RIGHT HAND SIDE OF PADMOUNT
300
FRONT ENTRY 11kV PADMOUNTED SUBSTATION
Normal 0
200 Min.
TRENCHING - FBX RMU
TRIPLEX 185mm
TRIPLEX 35mm
TRIPLEX 400mm 1000 400
654 5115 6T.Borg
C.Noel
A.Bletchly
HV LV
Outline ofconcrete plinth
F
Cables asrequired
FF
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
29.12.11
F
F
F
FOOTPATH
SiteBoundary
R.P. StreetAlignment
3000
5115
LV
Retaining Wall(where reqd)
1000
DEPTHSIZE
4C 240mm 2DEPTHSIZE
NormalF
F
F
F
F
Cable Pit
F
F
F
End of conduitSeal around cable
F
F
F
Side of trench /cable pit
11kV CABLELV CABLE
CONDUIT LOCATION
H.V. ConduitL.V. Conduit not shownthis end of Cable Pit
PLAN VIEW
600
L.V. Conduit
300
H.V. CABLE ENTERING / EXITINGRIGHT HAND SIDE OF PADMOUNT
ONLY
FRONT ENTRY 11kV PADMOUNTED SUBSTATION
Normal
TRENCHING - FBX RMU
TRIPLEX 185mmTRIPLEX 35mm
TRIPLEX 400mm 1000
754 5115 7T.Borg
C.Noel
A.Bletchly
HV LV
Outline ofconcrete plinth
F
Cables asrequired
FF
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
29.12.11
FOOTPATH
R.P. StreetAlignment
5115
200 Min.
Retaining Wall(where reqd)
11kV INSECT PROTECTED CABLE
1250
DEPTH DIM ASIZE
500
DEPTH DIM ASIZE
LV INSECT PROTECTED CABLE
To suit11kV cable
F
F
F
F
F
F
Cable pit
F
FA
F
End of conduitSeal around cable
F200 Min.
Cables asrequired
F
Side of trench /cable pit
F
F
F
F
F
SiteBoundary
3000
Outline ofconcrete plinth
F
L.V. ConduitH.V. Conduit not shownthis end of Cable Pit
H.V. ConduitL.V. Conduit not shownthis end of Cable Pit
F
PLAN VIEW
H.V. CABLE ENTERING / EXITING FROM LEFTOR LEFT & RIGHT HAND SIDE OF PADMOUNT
400
1100
FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION INSECT PROTECTED CABLE
01250
TRENCHING - FBX RMU
4C 240mmTRIPLEX 400mmTRIPLEX 185mmTRIPLEX 35mm
854 5115 8T.Borg
C.Noel
A.Bletchly
HV LV
FF
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
29.12.11
FOOTPATH
R.P. StreetAlignment
5115
200 Min.
Retaining Wall(where reqd)
DEPTHSIZE
LV INSECT PROTECTED CABLE
F
F
F
F
F
F
Cable pit
Cables asrequired
F
F
F
SiteBoundary
3000
H.V. ConduitL.V. Conduit not shownthis end of Cable Pit
PLAN VIEW
F
F
F
End of conduitSeal around cable
F
F
F
Side of trench /cable pit
600
L.V. Conduit
H.V. CABLE ENTERING / EXITINGRIGHT HAND SIDE OF PADMOUNT
ONLY
400
1100
FRONT ENTRY 11kV PADMOUNTED SUBSTATIONCONDUIT LOCATION INSECT PROTECTED CABLE
11kV INSECT PROTECTED CABLE
1250
DEPTHSIZE
1250
TRENCHING - FBX RMU
4C 240mmTRIPLEX 35mm
TRIPLEX 400mmTRIPLEX 185mm
954 5115 9T.Borg
C.Noel
A.Bletchly
HV LV
FF
FOutline ofconcrete plinth
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
C.Lindsay
29/3/01
D. M K.c
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
FO
OT
PA
TH
11
00
560
SiteBoundary
R.P. StreetAlignment
30
00
2800
10
0
10
0
80
BACK ofLV cable
FO
OT
PA
TH
12
30
SiteBoundary
R.P. StreetAlignment
30
00
2800
580 (ref)
Front ofcable support
LV cable
1st cable position
2nd cable position
3rd cable position
4th cable position
Cables as reqd(Refer design)
LV cable
Cable position
560 BACK ofLV cable
580 (ref)
Front ofcable support
LV CABLE LOCATION
5128
100kVA 200kVA, 315kVA, 500kVA, 750kVA & 1000kVA
Position cables as close as possible to dimensions shown.
54 5128 1
FRONT ENTRY 11kV PADMOUNTED SUBSTATION
B 29.12.11
B
TRENCHING - ABB SAFELINK RMUHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
H.V.
6000
R.P.StreetAlignment
FO
OT
PA
TH
40
00
TRENCHING17/01/03
5142
F
F
F
FF
F
F
500kVA, 3.7m & 4.1m PADMOUNT LENGTH
54 5142 4 4
RECTANGULAR 22kV PADMOUNTED SUBSTATION
1st conduit position
2nd conduit position
3rd conduit position
F
F
F
4th conduit position
5th conduit position
6th conduit position
320
F
F
500kVA - LV CONDUIT LOCATION
Cable Pit
Site Boundary
o
Cable exit directionas required.
B 7.11.03
D
C 24.9.08
100100100100100
550
D 01.11.11A.Bletchly
C.Noel
T.Borg
100 Dia 1830 Radius, 90 vertical bendsto 50mm Min. above concrete level.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
H.V.
6000
R.P.StreetAlignment
FO
OT
PA
TH
40
00
TRENCHING
F
F
F
FF
F
F
54 5142 5 5
RECTANGULAR 22kV PADMOUNTED SUBSTATION
320
F
F
Cable Pit
Site Boundary
1st conduit position
2nd conduit position
3rd conduit position
1000kVA, 3.7m & 4.1m PADMOUNT LENGTH
1000kVA - LV CONDUIT LOCATION
5142
F
Customerconduitsas reqd
Cable exit directionas required.
o
17/01/03B 19.11.03
F
F
100100
550
F
C 27.10.06
DD 02.11.11
A.Bletchly
C.Noel
T.Borg
100 Dia 1830 Radius, 90 vertical bendsto 50mm Min. above concrete level.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
H.V.
L.V.
6000
AlignmentR.P.Street
FO
OTP
AT
H
4000
F
F
F
F
F
F
F
F
F
F
if requiredService Platform Foundations
F
Cable Pit
Site Boundary
as required.Cable exit direction
ASECTION
F
F1000
F
F1000
ASECTION
required.service platformscable trench where450 max. wide
Where no service platforms reqd Where service platforms reqd
F
F
150
to 50mm above concrete level1000 Radius 90 vertical
A
500
350F 300 360
F
F
F
1000 Radius 60 horizontal b
TRENCHING
5142 754 5142 7
RECTANGULAR 22kV PADMOUNTED SUBSTATION17/01/03B 19.11.03
D
C 10.10.08
4.1m PADMOUNT LENGTH
NOTE:
in all installations.3 conduits are required
F & G HV SWITCHGEAR - HV CONDUIT LOCATIOND 11.07.12
A.Bletchly
C.Noel
T.Borg
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
H.V.
L.V.
6000
AlignmentR.P.Street
FO
OTP
AT
H
4000
F
F
F
FF
F
F
F
F
F
if requiredService Platform Foundations
F
Cable Pit
Site Boundary
as required.Cable exit direction
ASECTION
F
F1000
F
F1000
ASECTION
required.service platformscable trench where450 max. wide
Where no service platforms reqd Where service platforms reqd
F
F
150
to 50mm above concrete level1000 Radius 90 vertical
A
400
360F 700
F
F
F
1000 Radius 60 horizontal b
5142
25.06.12
4.1m PADMOUNT LENGTH
NOTE:
in all installations.3 conduits are required
365
854 5142 8T.Borg
C.Noel
A.Bletchly
concrete levelto 50mm above vertical bends1000 Radius 4
F
F
RECTANGULAR 22kV PADMOUNTED SUBSTATIONSUIT RM6 SWITCHGEAR - HV CONDUIT LOCATION
TRENCHINGA ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
NOTES:
C.Lindsay
14/01/03TRENCHING
5144
1. Locate cable on opposite side of pole to oncoming traffic where possible.
2. Excessive excavation at the pole base may disturb pole foundation. Avoid excavating in areas shown.
3. Location of conduit end and depth of excavation shown allow minimum bending radius of cable to be achieved.
POLE TERMINATION
CABLE DETAIL DIMENSION A DIMENSION B
1.5m
CABLE DETAIL DIMENSION A DIMENSION B
Normal trench depth
2.0m
1.5m
1.5m
2.5m
Normal trench depth
LV CABLE
CONDUIT AND TRENCH DETAIL
54 5144 1 1
11kV CABLE
1.5m
CABLE DETAIL DIMENSION A DIMENSION B
Normal trench depth (FN)
22kV CABLE
1.5m Normal trench depth
4. Provide polymeric cable protection cover and orange caution tape to all conduit/cable outside Electricity Footpath Allocation.
5. Refer drawing No. 5173 for detail of allowable cables and bends at pole termination.
1.2m
2.0m
1.2m (CA)
1.05m
1.05m1.5m
Normal trench depth
Normal trench depth
1.2m
Normal trench depth (FN)1.05m (CA)
240mm 4C Insect Protected
240mm 4C
16mm 4C Insect Protected
16mm 4C
50mm 4C Insect Protected 1.5m 1.05m
B 24.9.08
C
35mm TRIPLEX185mm TRIPLEX35mm TRIPLEX Insect Protected185mm TRIPLEX Insect Protected240mm Cu TRIPLEX Insect Protected
185mm TRIPLEX
630mm 3 x 1C
35mm TRIPLEX Insect Protected
C 23.3.11
2.0m 1.2m
400mm Cu TRIPLEX Insect Protected 2.0m 1.2m400mm Al TRIPLEX
A.Bletchly
C.Noel
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
Road crossing to diagonal propertynot straight across
45 1830mm radius bend
Real Property Boundary
R.P. Street Alignment
45 1830mm radius bend
F
F
F
F
F
F
NOTE:Provide E Marker at all kerb crossings
o
o
20/12/01
54 5162 7 5162DJBD. M K.c
TRENCHING - FN REGION
ALLOWABLE BENDS FOR HV CONDUITROAD CROSSING
7
Kerb
Electricity Footpath Allocation for FN Regionand Telstra is from 0.3 to 1.2m from propertyFN Region to be property side of Telstra.
F
Polymeric CableProtection Cover
F
R O A D W A Y
B
B
1.06.09 HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
NOTES:
C.Lindsay
14/01/03
D. M K.c
TRENCHING
5173
1. Locate cable on opposite side of pole to oncoming traffic where possible.
2. Excessive excavation at the pole base may disturb pole foundation. Avoid excavating in areas shown.
POLE TERMINATION
CABLE DETAIL
LV CABLE
54 5173 1 1CONDUIT BEND DETAIL
3. Conduit bends shown allow minimum bending radius of cable to be achieved.
BEND DETAIL
CABLE DETAIL BEND DETAIL
11kV CABLE
CABLE DETAIL BEND DETAIL
4. Provide polymeric cable protection cover and orange caution tape to all conduit/cable outside Electricity Footpath Allocation.
5. Cables not listed must be direct buried at pole. Refer drawing No. 5144.
22kV CABLE
240mm 4C16mm 4C
16mm 4CInsect Protected
80 Dia. 90 750 Radius
80 Dia. 90 750 Radius
50mm 4CInsect Protected
80 Dia. 90 1000 Radius
35mm TRIPLEX 125 Dia. 90 1000 Radius
125 Dia. 90 1000 Radius35mm TRIPLEXInsect Protected
B 24.9.08
B
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
F
F
Lc Pillar
TRENCHING - ALL REGIONS
Real PropertyBoundary
F
F
Exclusion Zone
F
FRONT
F
FOOTPATH
Property AllotmentProperty Allotment
LLV Pillar Base
Survey peg
R.P. Street Alignment
EXCLUSION ZONE AT LV PILLARS
c
Refer applicable regionalTRENCHING detail for trenchdetails and conduit positions.
54 5196 1 5196
20/9/05
No other service authorities pits orabove ground plant to be locatedin this area.
1
B 09.08.10
C 01.11.11
CT.Borg
C.Noel
A.Bletchly
400
400 min
400 min
400 min
400
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
F
F
Lc Pillar
TRENCHING - ALL REGIONS
Real PropertyBoundary
F
F
Exclusion Zone
F
FRONT
F
FOOTPATH
LV Pillar Base
Survey peg
Refer applicable regionalTRENCHING detail for trenchdetails and conduit positions.
54 5196 2 5196
23/9/08
No other service authorities pits orabove ground plant to be locatedin this area.
R.P. Street Alignment
Property AllotmentEasement orRoad Reserve
NOTES:
1. Pillars shall be located in areas remote from vehicular access.
2. Should the edge of the pillar base, at ground level, be located less than 1000mm from the kerb or the edge of trafficable areas, then the pillar shall be protected by two bollards. Refer to CONSTRUCTIONS PRACTICES for bollard details.
Offset base to align with centre lineof survey peg clear of Road Reserveor Easement area.
3. To gain access to a consumers property, remote from pillars, the lead in conduits shall be placed and run in the electricity footpath allocation. Locate to clear possible future fence corner post.
PILLAR INSTALLATION AT EASEMENTOR ROAD RESERVE BOUNDARY
F
ServiceConduit
F
2
B 01.11.11
C.Noel
A.Bletchly
T.Borg B
400
400 min
400 min
400 min
400
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
L. Burton
28/2/11TRENCHING
NOTES:
1. Conduit and cable nearest R.P. Street Alignment only, shown.
3. Conduit depths shown are minimum and are dimensioned from finished ground line to top of conduit. Ramp down as required. Where conduits are normally laid at a depth greater than shown, that depth should be maintained.
5. Provide polymeric cable protection cover (and orange caution tape) over all cable not enclosed in conduit .6. Backfill cable pit with bedding sand.
LV & HV cables
F
F
Finished Ground Line
Cable Pit
R.P. StreetAlignment
F
F
F
Base Slab
F
Conduit
CROSS SECTION AT CABLE PITUNICULVERT FOUNDATION ONLY
2. Locations and depths shown to conduit ends allow minimum bending radius of cables to be achieved for connection to switchgear. Refer MATERIAL DATA drawings No. 5108 to 5111 for minimum bending radius of cables.
1CONDUIT LOCATION AND CROSS SECTION
522754 5227 1
ABB FREE STANDING RMU
4. Terminate HV cable conduit in line, each end of pit.
RMU Foundation
F
F
F
45 Max. from front edge of uniculvert, or base slab where provided.
Dep
th
(ref
er s
heet
s 2
& 3
)
7. HV cable locations shown at RMU site illustrative only. Preferred sequence of construction is to install Padmounted RMU prior to cables.
C. Noel
A. Bletchly
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
L. Burton
24/2/11
F
F
R.P. StreetAlignment
3000
TRENCHING
F
F
Cable Pit
End of conduitSeal around cable
F
CONDUIT LOCATION
PLAN VIEW
2522754 5227 2
FOOTPATH
TRIPLEX 400mmTRIPLEX 185mmTRIPLEX 35mm
11kV CABLE
SIZE
H.V. Conduit H.V. Conduit
DEPTH
1000
A. Bletchly
C. Noel
HV cable entering / exiting from left or left & right hand side of RMU.
F
Side of trench /cable pit
F
Outline of concrete plinth & foundation
F
Site boundryF
Cables as required
FF
Side of trench /cable pit
F
ABB FREE STANDING RMUHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
L. Burton
24/2/11TRENCHING
522754 5227 3
TRIPLEX 185mmTRIPLEX 35mm
SIZE
A. Bletchly
C. Noel
3CONDUIT LOCATION INSECT PROTECTED CABLE
TRIPLEX 400mm
F
F
R.P. StreetAlignment
3000
F
F
Cable Pit
End of conduitSeal around cable
F
PLAN VIEW
FOOTPATH
H.V. Conduit H.V. Conduit
HV cable entering / exiting from left or left & right hand side of RMU.
F
Side of trench /cable pit
Outline of concrete plinth & foundation
F
Site boundryF
Cables as required
FF
Side of trench /cable pit
F
TRIPLEX 240mm
DEPTHDIM A
210
310
360
1250
11kV INSECT PROTECTED CABLE
0
F200 Min.
Retaining Wall(where reqd)
F
A
F
A
F
ABB FREE STANDING RMUHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
L. Burton 522854 5228 1
7/3/11
Finished surface line
LV LV
HV HV
PL
F
F
F
Bedding Sand
F
F
F
F
F
F
1050 min Road
way - Min
or
900 min Footp
ath
Refer note 2 for
Arterial R
oad
ways
F
F
900 min Road
way - Min
or
750 min Footp
ath
1200 min Road
way - Arterial
F
F
35
0
50
Foo
50
0
50
Ro
75 min
150 m
ax
F
F
NOTES:
1.
2.
3.
4.
drawing No. 5124 sheet 1 for locations.Refer CONSTRUCTION PRACTICES
avoid trench depth in excess of 1.5m.cables may be laid at the same depth to For ARTERIAL (DMR) roads LV and HV
side conduits first.Ergon cables are to occupy property
Refer Note 1where required protection cover Polymeric cable
ConduitPublic Lighting
as RequiredHV and LV conduit
VERTICAL
LV
HV
100 Min
300 Min
LV
HV
100 Min
100 Min
DIMENSION
DIMENSION RADIAL
of conduits.to cover entire width Caution tape orange,
F
As per region
Alignment
F
F
As per region
Trench width
F
F F
F
min25 min
25
min25
C. Noel
A. Bletchly
TRENCHING - ALL REGIONS
B
JOINT ELECTRICITY & TELECOMMUNICATIONB 09.07.12
T T
(T) as requiredTelecommunication conduit
Authority requirementsTelecommunication tape to Telecommunication marker
Authority requirementsroadside of trench to Telecommunication Telecommunication conduit laid against
Authority and Ergon conduits.Clearance between Telecommunication
CONDUITS CROSSINGTELECOMMUNICATION
SEPARATION FROM
CONDUITS PARALLELTELECOMMUNICATION
SEPARATION FROM
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
Kerb
LO
T 1
LO
T 2
LO
T 3
LO
T 4
F
F
F
F
this Footp
ath
Share
d Tre
nch on
F
F
F
F
F
F
F
Boundary
Real P
roperty
Alig
nm
ent
R.P. Street
services
Electricity
Alig
nm
ent
R.P. Street
HV/L
V conduits
Boundary
Real P
roperty
services
Electricity
F
F
F
F
F
F
conduit
Cross Road
F
F
Kerb
Cross-ro
ad
Pillar
Supply
Pillar
F
F
F
URD AREAS GENERAL LAYOUT
Prote
ctio
n Cover
Poly
meric Cable
F
R O A D W A Y
54 5249 1 5249
1Note
1Note
details and conduit positions.trenching detail for trenchRefer applicable regionalNote 1.
A. Bletchly
L. Burton
C. Noel
23/3/11TRENCHING - ALL REGIONSB
C
01.11.11
C 09.07.12
Leadin conduit
Teleco
mm
unicatio
n
T
T T
Leadin conduit
Teleco
mm
unicatio
n
TTTeleco
mm
unicatio
n Conduit
2 x 100 M
ax.
T Teleco
mm
unicatio
n pit
Leadin conduit
Teleco
mm
unicatio
n
T
Leadin conduit
Teleco
mm
unicatio
n
T
Teleco
mm
unicatio
n conduit
Teleco
mm
unicatio
n pit
T
F Zone
Exclusio
n
Pillar
Zone
Exclusio
n
Pillar
F
JOINT ELECTRICITY - TELECOMMUNICATION
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
29.12.11
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
FO
OT
PA
TH
SiteBoundary
R.P. StreetAlignment
30
00
2800
BACK ofLV cable
LV cable
1st cable position
2nd cable position
3rd cable position
4th cable position
Cables as reqd(Refer design)
LV CABLE LOCATION
Position cables as close as possible to dimensions shown.
FRONT ENTRY 11kV PADMOUNTED SUBSTATION
54 5268 1 5268
TRENCHING - FBX RMU
T.Borg
C.Noel
A.Bletchly
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
FO
OT
PA
TH
11
00
SiteBoundary
R.P. StreetAlignment
30
00
2800
BACK ofLV cable
LV cable
1st cable position
2nd cable position
3rd cable position
4th cable position
Cables as reqd(Refer design)
315kVA & 500kVA
640
11
011
011
0
750kVA & 1000kVA
640
10
00
11
0
11
0
11
0
790 (ref)Recessrear wall
790 (ref)
Recessrear wall
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
30.12.11
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
FO
OT
PA
TH
SiteBoundary
R.P. StreetAlignment
30
00
2800
HV cable
TRENCHING
Position cables as close as possible to dimensions shown.
FRONT ENTRY 11kV PADMOUNTED SUBSTATION
A.Bletchly
C.Noel
T.Borg 54 5269 1 5269HV CABLE LOCATION FBX RMU
FBX RMU
32
07
50
Centre oflug
685
790 (ref) Recessrear wall
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
H.V.
6000
AlignmentR.P.Street
FO
OTP
AT
H
4000
TRENCHING20.04.12
F
F
F
FF
F
F
RECTANGULAR 22kV PADMOUNTED SUBSTATION
1st conduit position
2nd conduit position
3rd conduit position
F
F
F
4th conduit position
5th conduit position
6th conduit position
320
F
F
Cable Pit
Site Boundary
o
as required.Cable exit direction
to 50mm Min. above concrete level.80 Dia 1000 Radius, 90 vertical bends
100100
200
100
450
5278 154 5278 1
A.Bletchly
C.Noel
T.Borg
500kVA - SCHNEIDER ELECTRIC LV CONDUIT LOCATION
315kVA & 500kVA, 3.7m & 4.1m PADMOUNT LENGTH
100
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
-
H.V.
6000
FO
OTP
AT
H
4000
TRENCHING
F
F
F
F
F
F
F
RECTANGULAR 22kV PADMOUNTED SUBSTATION
320
F
F
Cable Pit
Site Boundary
1st conduit position
2nd conduit position
3rd conduit position
1000kVA, 3.7m & 4.1m PADMOUNT LENGTH
F
as reqdconduitsCustomer
as required.Cable exit direction
o
20.04.12
to 50mm Min. above concrete level.80 Dia 1000 Radius, 90 vertical bends
F
F
100
450
F
5278 254 5278 2
1000kVA - SCHNEIDER ELECTRIC LV CONDUIT LOCATION
AlignmentR.P.Street
A.Bletchly
C.Noel
T.Borg
100
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
00 Trenching01 Trenching Index Sh101 Trenching Index Sh201 Trenching Index Sh3
5016 Cable Protection Footpaths Concrete Slab Detail5017 Cable Protection Roadways Concrete Encasement Detail5115 Sh1 Front Entry 11kV Padmounted Sub Conduit Location and X-Section5115 Sh2 Front Entry 11kV Padmounted Sub Conduit Location5115 Sh3 Front Entry 11kV Padmounted Sub Conduit Location5115 Sh4 Front Entry 11kV Padmounted Sub Conduit Location Insect Protected Cable5115 Sh5 Front Entry 11kV Padmounted Sub Conduit Location Insect Protected Cable5115 Sh6 Front Entry 11kV Padmounted Sub Conduit Location - FBX RMU5115 Sh7 Front Entry 11kV Padmounted Sub Conduit Location - FBX RMU5115 Sh8 Front Entry 11kV Padmounted Sub Conduit Location Insect Prot Cable - FBX RMU5115 Sh9 Front Entry 11kV Padmounted Sub Conduit Location Insect Prot Cable - FBX RMU
5128 Front Entry 11kV Padmounted Sub LV Cable Location5129 Front Entry 11kV Padmounted Sub HV Cable Location ABB SDAF3 RMU5130 Front Entry 11kV Padmounted Sub HV Cable Location Magnefix RMU5131 Front Entry 11kV Padmounted Sub HV Cable Location Magnefix RMU and SFU5141 Dist Cabinet 6 Module LV Cable Location5142 Sh1 Rect 22kV Padmounted Sub Conduit Location and XSection5142 Sh2 Rect 22kV Padmounted Sub Conduit Location5142 Sh3 Rect 22kV Padmounted Sub Conduit Location5142 Sh4 Rect 22kV Padmounted Sub 500kVA-LV Conduit Location5142 Sh5 Rect 22kV Padmounted Sub 1000kVA-LV Conduit Location5142 Sh6 Rect 22kV Padmounted Sub -HV Conduit Location5142 Sh7 Rect 22kV Padmounted Sub 4.7m Length-HV Conduit Location5142 Sh8 Rect 22kV Padmounted Sub RM6 SGear-HV Conduit Location
5143 Sh1 Dist Cabinet 6 Module Conduit Location and XSection5143 Sh2 Dist Cabinet 6 Module Conduit Bend Details5143 Sh3 Dist Cabinet 6 Module Conduit Location5143 Sh4 Dist Cabinet 6 Module Conduit Location Insect Protected Cable
5144 Sh1 Pole Termination Conduit and Trench Detail5144 Sh2 Pole Termination Conduit and Trench Detail
5160 Front Entry 11kV Padmounted Sub HV Cable Location No Switchgear5162 Sh1 FN Region Joint Elect, Gas and Telstra5162 Sh2 FN Region Joint Elect, Gas and Multiple Telstra5162 Sh3 FN Region Conduit Bends at Pillar - Sections 16mm 4 Core XRoad Cable5162 Sh4 FN Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5162 Sh5 FN Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5162 Sh6 FN Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5162 Sh7 FN Region Allowable Bends for HV Conduit Road Crossing5162 Sh8 FN Region Pillar Base Installation
5163 Sh1 NQ Region URD Areas5163 Sh2 NQ Region URD Areas Joint Elect and Telstra5163 Sh3 NQ Region City and Urban Areas5163 Sh4 NQ Region Joint Elect-Telstra URD Areas Gen Layout5163 Sh5 NQ Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5163 Sh6 NQ Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5163 Sh7 NQ Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5163 Sh8 NQ Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5163 Sh9 NQ Region Pillar Base Installation
5164 Sh1 MK Region Joint Elect and Telstra5164 Sh2 MK Region Joint Elect, Telstra and Gas5164 Sh3 MK Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5164 Sh4 MK Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5164 Sh5 MK Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5164 Sh6 MK Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5164 Sh7 MK Region with Gas Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5164 Sh8 MK Region with Gas Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5164 Sh9 MK Region with Gas Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5164 Sh10 MK Region with Gas Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5164 Sh11 MK Region Pillar Base Installation
5165 Sh1 CA Region Conduit, Trench and Pillar Alignment Schedule5165 Sh2 CA Region Trench Detail Elect and Telstra5165 Sh3 CA Region Trench Detail Elect and Telstra5165 Sh4 CA Region Gladstone Elect and Telstra5165 Sh5 CA Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5165 Sh6 CA Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5165 Sh7 CA Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5165 Sh8 CA Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5165 Sh9 CA Region Pillar Base Installation
5166 Sh1 WB Region Electricity and Telstra5166 Sh2 WB Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5166 Sh3 WB Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5166 Sh4 WB Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5166 Sh5 WB Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5166 Sh6 WB Region Pillar Base Installation
5167 Sh1 SW Region Electricity and Telstra5167 Sh2 SW Region Conduit Bends at Pillar-Sections 16mm 4Core XRoad Cable5167 Sh3 SW Region Conduit Bend Details at Pillar 16mm 4Core XRoad Cable5167 Sh4 SW Region Conduit Bends at Pillar-Sections 240mm 4Core XRoad Cable5167 Sh5 SW Region Conduit Bend Details at Pillar 240mm 4Core XRoad Cable5167 Sh6 SW Region Pillar Base Installation
5168 Sh1 Conduit Ducting Arrangement5168 Sh2 Conduit Ducting Arrangement5168 Sh3 Conduit Ducting Arrangement
5173 Sh1 Pole Termination Conduit Bend Detail5173 Sh2 Pole Termination Conduit and Trench Detail
5187 UG Service from OH System Service Conduit Bend Location at Pillar5196 Sh1 Exclusion Zone at LV Pillars5196 Sh2 Pillar Installation at Easement or Road Reserve Boundary
5197 Detail at Pillar for Future Extension5227 Sh1 ABB Free Standing RMU Conduit Location and X Section5227 Sh2 ABB Free Standing RMU Conduit Location5227 Sh3 ABB Free Standing RMU Conduit Location Insect Protected Cable
5228 All Regions Joint Electricity and NBN5249 All Regions Joint Electricity NBN URD Areas Gen Layout5268 Front Entry 11kV Padmounted Sub LV Cable Location - FBX RMU5269 Front Entry 11kV Padmounted Sub HV Cable Location - FBX RMU5278 Sh1 Rect 22kV Padmounted Sub 500kVA Schneider Electric LV Conduit Location5278 Sh2 Rect 22kV Padmounted Sub 1000kVA Schneider Electric LV Conduit Location