Thames Coromandel SMPs Coastal Panel Meeting 4 February 2021 Aim: to reflect on the coastal hazards and the risk consequences / risk tolerance

Transcript of Thames Coromandel SMPs

Page 1: Thames Coromandel SMPs

Thames Coromandel SMPsCoastal Panel Meeting 4

February 2021

Aim: to reflect on the coastal hazards and the risk consequences

/ risk tolerance

Page 2: Thames Coromandel SMPs

Agenda

1. Introduction

a. Meeting protocols

b. Chair

c. Actions

2. Feedback from last meeting

a. Values

b. SMP Objectives

3. Hazard Maps

a. Background

b. Show and tell

c. Feedback from Open Days

4. Defining risk acceptability

5. Reflections and close

Page 3: Thames Coromandel SMPs

Values

Coastal Panels and Summer Survey

Page 4: Thames Coromandel SMPs

Values

Thames Coast Coromandel to Kennedy Bay

Page 5: Thames Coromandel SMPs

Values

Mercury Bay Coast South East Coast

Page 6: Thames Coromandel SMPs

SMP Overarching Principles

• The recognition of the customary rights of iwi

• Our coastal environment is changing and our coastal

communities need to adapt

• What we cannot know is the exact characteristics, extent and timing of that

change

• However, we can predict the expected trajectory of change - this is what

the hazard mapping does

• The SMP Project relates to all public and private assets at

the coast, irrespective of ownership and responsibility

• The need to achieve different outcomes/have different

approaches for different locations is acknowledged

• These differences will come to the fore when management and policy

approaches are agreed for individual stretches of coast

Page 7: Thames Coromandel SMPs

SMP Objectives

Page 8: Thames Coromandel SMPs

Reflecting

values and

objectives

in the

process

First Pass Risk Assessment

Second Pass Risk Assessment

Third Pass Risk Assessment

Page 9: Thames Coromandel SMPs

Hazard Assessment

Coastal Erosion

Coastal

Inundation

Page 10: Thames Coromandel SMPs

Hazard Assessment

Page 11: Thames Coromandel SMPs

Risk management pathway